Troy Lock – Stoplog Dam Concrete Recesses and Steel Lock Filter
Solicitation number
W912DS24B0006
Issued by

About this file

This document is an amendment to a solicitation for the Troy Lock – Stoplog Dam Concrete Recesses and Steel Lock Filter project, issued by the U.S. Army Corps of Engineers, New York District. The amendment revises the bid schedule and provides amended specifications. Key details include:

The revised bid schedule includes the following major line items: Mobilization/Demobilization, Temporary Construction Facilities, Surveying, Diving, Cofferdam Work, Electrical Work, Stoplog Recess Concrete Removal and Placement, Recess Work, Protection Plate Fabrication, Lifting Beam Guide Block Installation, Stoplog Work, Trash Rack Work, Handrailing Replacement, and Site Restoration. The bid opening date is not extended. Bidders must acknowledge receipt of this amendment prior to the bid due date. The contract duration is 685 days after notice to proceed. The basis of award will be the lowest responsive, responsible bidder based on the total amount for the 15 line items.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to 1) revise the bid schedule and 2) provide amended specifications. The bid opening date is not extended.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-May-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24B0006

X 9B. DATED (SEE ITEM 11)

22-Apr-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-May-2024

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS24B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

REVISED BID SCHEDULE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Mobilization and Demobilization

FFP

Mobilization and demobilization will consist of all work as per the SOW and Section 01 20 00 of the specifications document.

FOB: Destination

PSC CD: Z2KA

NET AMT

Temporary Construction Facilities

FFP

Information Only Clause. Do not list price. List prices on following SubClins

0002AA-0002AB.

0002AA 6 Months Temporary Construction Facilities

FFP

First 6 Months of a specified location on the secured Albany Field Office property for a construction trailer, to store equipment, and a specific number of employee parking spaces.

0002AB 2 Months Temporary Construction Facilities

FFP

Over 6 Months of a specified location on the secured Albany Field Office property for a construction trailer, to store equipment, and a specific number of employee parking spaces.(ESTIMATE)

0003 1 Job Surveying

FFP

A minimum of two surveys are required to be completed under the direction of a certified Land Surveyor who is licensed/registered as per Section 02 21 00 of the specifications document.

0004 1 Job Diving

FFP

All diving performed will be in strict accordance with rules and regulations in accordance with 29 CFR 1910 Subpart T and EM 385-1-1, Section 30, Diving Operations. A diving plan outlined in specification section 01 35 26 will need to be submitted.

0005 1 Job Cofferdam Work

FFP

The Contractor will be responsible for lock chamber debris removal, installing and removing cofferdams, sealing, dewatering, and maintaining in dewatered state as per 01 14 00 of the specifications document. The work also includes, but is not limited to, furnishing two cofferdams including all necessary design, submittals, fabrication, and transportation as per Section 01 53 11.

0006 1 Job Electrical Work

FFP

The contractor is responsible for providing their own power, as well as temporary power to the Programmable Logic Controller (PLC) located in the lock house while electric services are disconnected for safety during the stoplog dam concrete recesses portion of the work. Qualifications of Technician certification and temporary power plan will be required as outlined in specification section 33 71 02.

Stoplog Recess Concrete Removal

FFP

0007AA-0007AB.

0007AA 50 Cubic

Yard

Stoplog Recess Concrete Removal

FFP

Removal of all concrete is to be submitted in a removal plan outlined in specification section 03 01 10 - First 50 Cubic Yards (Estimated Quantities)

0007AB 15 Cubic

Stoplog Recess Concrete Removal

Removal of all concrete is to be submitted in a removal plan outlined in specification section 03 01 10 - Over 50 Cubic Yards (Estimated Quantities)

Stoplog Recess Concrete Placement

FFP

0008AA-0008AB.

0008AA 70 Cubic

Stoplog Recess Concrete Placement

First 70 Cubic Yards (Estimated Quantities)

0008AB 15 Cubic

Stoplog Recess Concrete Placement

Over 70 Cubic Yards (Estimated Quantities)

0009 1 Job Recess Work

FFP

All the work associated with the lining of each of the concrete recesses with the recess frames. This includes, but is not limited to metal work fabrication, fastening, welding, and painting.

0010 1 Job Protection Plate Fabrication

FFP

Included is all work associated with the lining of each of the concrete recesses with the recess frames. This includes, but is not limited to metal work fabrication, fastening, welding, and painting.

0011 1 Job Lifting Beam Guide Block Installation

FFP

Included is all work associated with the lifter beam. This includes, but is not limited to metal work fabrication, fastening, welding, painting and use of crane for installation.

0012 1 Job Stoplog Work

FFP

Install the furnished stoplogs with appropriately sized crane and the lock will be dewatered to test the performance of the work as per the SOW and spceifications.

0013 1 Job Trash Rack Work

FFP

Work for upstream trash racks and support beams includes, but not limited to, concrete removal including embedded metals, concrete placement, fabricating trash rack grating, painting, installing support beams, and installing trash rack as per the SOW and specifications.

0014 1 Job Handrailing Replacement

FFP

Existing handrail sections that must be removed from the lock wall to do the stoplog concrete recesses work must be replace in kind. This includes handrailing, fabricating, packaging, delivering, and incidentals, including painting as per the SOW and specifications.

0015 1 Job Site Restoration

FFP

Work to include restoring the site and staging areas to original or better condition.

This includes, but is not limited to, seeding and debris removal as per the SOW and specifications.

The following have been deleted:

ADDITIONAL RFIS

REVISED BID SCHEDULE

SECTION 00 10 00 - SOLICITATION

CLIN 0005

The CLIN extended description has changed from:

The Contractor will be responsible for lock chamber debris removal, installing and removing cofferdams, sealing, dewatering, and maintaining in dewatered state as per 01 14 00 of the specifications document.

To:

The Contractor will be responsible for lock chamber debris removal, installing and removing cofferdams, sealing, dewatering, and maintaining in dewatered state as per 01 14 00 of the specifications document. The work also includes, but is not limited to, furnishing two cofferdams including all necessary design, submittals, fabrication, and transportation as per Section 01 53 11.

CLIN 0016

The CLIN description has changed from Furnish Cofferdams to Unused.

The CLIN extended description has changed from:

The work includes, but is not limited to, furnishing two cofferdams including all necessary design, submittals, fabrication, and transportation as per Section 01 11 00.

N/A The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.

The unit of issue Job has been deleted.

The option status has changed from Option to No Status.

The PSC code Z2KA has been deleted.

The PROG code C20 has been deleted.

The NAICS code 237990 has been deleted.

The MDAP/MAIS Code 000 has been deleted.

The following Delivery Schedule for CLIN 0016 has been deleted:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

01-JUL-2024 1 OPS-ALBANY FIELD OFFICE

KRISTIN IRWIN

1 BOND STREET

TROY NY 12180-1208

(518)273-0870

W912DS

The following have been modified:

TOTALS/NOTES

TOTAL CLINs (0001 - 0015) $_____________________

NOTES:

1) Total bid shall include all costs associated with each item number including all bonding, overhead and profits.

2) Bidders must submit a price for every CLIN. Failure to do so may result in the offer being considered non-responsive.

3) The Basis of Evaluation will be the lowest responsive, responsible Bidder based on the Total Amount for the

CLINS 0001 – 0015.

4) Contract Duration is 685 days after NTP.

5) Bid Acceptance Period: Bids are to be valid for 180 calendar days after the date bids are due.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The Acceptance/Inspection Schedule for CLIN 0016 has been changed from:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government OPS-ALBANY FIELD OFFICE

1 BOND STREET

TROY NY 12180-1208

Government

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination N/A

(End of Summary of Changes)