E3TRYLCK202201-SPEC_SOL-2024-04-05.pdf

PDF 3 MB Posted

Attached to
Troy Lock – Stoplog Dam Concrete Recesses and Steel Lock Filter
Solicitation number
W912DS24B0006
Issued by

About this file

This document is a solicitation for construction services to replace the stoplog dam concrete recesses and steel lock filter at the Troy Lock and Dam in Troy, New York. The key details are:

The solicitation is for a competitive 8(a) set-aside contract to be awarded by the U.S. Army Corps of Engineers, New York District. The work includes demolition, concrete work, underwater concrete, fabrication, painting, surveying, stoplog installation, trash rack replacement, and site restoration. The contract will be split into two construction seasons, with the first season focused on stoplog recess replacement and the second season focused on upstream trash rack replacement. The contractor will be required to demobilize between the two seasons. Pricing is a mix of lump sum and unit-price items, including mobilization/demobilization, temporary construction facilities, concrete removal and placement, and various other work elements. The solicitation contains detailed specifications and requirements related to antiterrorism, security, sustainability, insurance, schedule, payment, and other construction-related aspects.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO.: W912DS24B0006

E3TRYLCK202201

US Army Corps of Engineers Rock Island District

HUDSON RIVER BASIN

TROY LOCK

TROY, NY

STOPLOG RECESS AND TRASH RACK

REPLACEMENT

Construction Solicitation and Specifications

APRIL 2024

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Mobilization and Demobilization 1 JOB XXXXXXXX $

0002 Temporary Construction Facilities

0002AA First 6 Months 6 MO $_________ $

0002AB Over 6 Months 2 MO $_________ $

0003 Surveying 1 JOB XXXXXXXX $

0004 Diving 1 JOB XXXXXXXX $

0005 Cofferdam Work 1 JOB XXXXXXXX $

0006 Electrical Work 1 JOB XXXXXXXX $

0007 Stoplog Recess Concrete Removal

0007AA First 50 Cubic Yards 50 CY $_________ $

0007AB Over 50 Cubic Yards 15 CY $_________ $

0008 Stoplog Recess Concrete Placement

0008AA First 70 Cubic Yards 70 CY $_________ $

0008AB Over 70 Cubic Yards 15 CY $_________ $

0009 Recess Work 1 JOB XXXXXXXX $

0010 Protection Plate Fabrication 1 JOB XXXXXXXX $

0011 Lifting Beam Guide Block Installation 1 JOB XXXXXXXX $

0012 Stoplog Work 1 JOB XXXXXXXX $

0013 Trash Rack Work 1 JOB XXXXXXXX $

0014 Handrailing Replacement 1 JOB XXXXXXXX $

0015 Site Restoration 1 JOB XXXXXXXX $

JOB = LUMP SUM MO = MONTH CY = CUBIC YARDS

TOTAL OF ESTIMATED AMOUNTS

(ITEM NOS. 0001 THROUGH 0015)

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 73 05 SPECIAL CONTRACT REQUIREMENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00 PRICE AND PAYMENT PROCEDURES

01 32 16 CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00 RESIDENT MANAGEMENT SYSTEM (RMS)

01 45 04 CONTRACTOR QUALITY CONTROL

01 50 00 BULLETIN BOARD, PROJECT SIGN, AND PROJECT SAFETY SIGN

01 50 02 TEMPORARY CONSTRUCTION FACILITIES

01 53 11 PROTECTION, DEWATERING, AND DEBRIS REMOVAL

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 78 00 CLOSEOUT SUBMITTALS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 21 00 SURVEYS

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 01 10 CONCRETE REMOVAL

03 01 20 CONCRETE WIRE SAWING

03 11 19 FORMWORK FOR CONCRETE

03 15 14 JOINTS IN CONCRETE

03 20 01 CONCRETE REINFORCEMENT

03 31 00 CAST-IN-PLACE STRUCTURAL CONCRETE

DI VI SI ON 05 - METALS

05 05 20 GROUT AND ANCHOR BOLTS

05 05 23 STRUCTURAL WELDING

05 50 14 STRUCTURAL METAL FABRICATIONS

DI VI SI ON 09 - FI NI SHES

09 97 02 PAINTING: HYDRAULIC STRUCTURES

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 92 10 REPAIR DAMAGED TURFED AREAS

DI VI SI ON 33 - UTI LI TI ES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 73 05

SPECIAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 ADDITIONAL COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

1.4 UNANTICIPATED HAZARDOUS MATERIAL

1.5 COORDINATION WITH OTHERS

1.6 ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)

1.6.1 Access and General Protection Policy and Procedures

1.6.2 E-Verify Program

1.7 ACTIVITY REGULATIONS FOR CONTRACTOR ACCESS AND USE OF PREMISES

1.8 SUSTAINABILITY

1.9 MINIMUM AMOUNT OF INSURANCE REQUIRED

1.10 EVALUATION OF SUBDIVIDED ITEMS

1.11 VARIATIONS IN ESTIMATED QUANTITIES OF SUBDIVIDED ITEMS

1.12 CONDITION OF EXISTING STRUCTURES, ROADWAYS, AND OTHER FACILITIES

1.13 U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH MANUAL (EM 385-1-1)

1.14 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

1.15 PROGRESS MEETINGS

1.16 INSPECTION

1.17 DAMAGE TO WORK

1.18 SPECIAL SAFETY REQUIREMENTS

1.19 LOCATION OF PARKING, STAGING, AND STORAGE AREAS

1.20 ELECTRICAL POWER LINES

1.21 BARRICADES AND WARNING SIGNS

1.22 ONE CALL SYSTEM FOR EXCAVATORS

1.23 ADDITIONAL PHYSICAL DATA CLAUSE INFORMATION

1.24 DELAYS DUE TO HIGH WATER

1.25 HIGH WATER ACTION PLAN

1.26 NEW YORK RETAILERS' OCCUPATIONAL TAX AND USE TAX EXEMPTION

1.27 PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS

1.28 AVAILABILITY AND USE OF UTILITY SERVICES

1.29 VIDEO INSPECTION PLAN

1.30 REQUIREMENTS FOR NAVIGATION

1.31 SIGNAL LIGHTS

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

DOCUMENT 00 73 05 Page 1

SECTION 00 73 05

SPECIAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1926.106 Working Over or Near Water

33 CFR 207.50 Hudson River at Troy, N.Y.; Navigation

DOCUMENT 00 73 05 Page 2

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Background Checks; G SL

Company Enrollment in E-Verify; G SL

Form I-9; G SL

**NOTE: To protect the privacy of the Contractor, all Contractor employees, and all subcontractor employee's security information, submit with a cover page stating the Contract Number (e.g., W912EK23CXXXX), Contract Title, and the Contractor's point of contact information in a sealed envelope/container and mail to:

Security Office U.S. Army Corps of Engineers Jacob K. Javits Federal Building 26 Federal Plaza, Room 1843D New York, NY 10278-0090

Insurance; G CT

Permits; G

Pre-Construction Condition Survey; G

High Water Action Plan; G

Video Inspection Plan; G ECDL

SD-11 Closeout Submittals

Post-Construction Condition Survey; G

DOCUMENT 00 73 05 Page 3

1.3 ADDITIONAL COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

In addition to the requirements of FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, comply with the following requirements:

a. Secure and keep unauthorized persons out of all work sites with signing, fencing, or by other approved means.

b. The Lock will be occupied by the employees of the Lock. Accessibility is required for customer vehicles and deliveries during the construction period. Conduct construction operations in a manner that will not disrupt locking operations or normal operations of the Lock and Dam, except as otherwise specified or as indicated, such as during Lock outages.

c. Work Area Requirements

(1) Radios and similar devices that can be heard outside the Contractor's work area are prohibited within that area(s).

(2) Remove dust and debris from the work areas daily.

(3) Complete work that generates noise above the exposure limits, as specified in EM 385-1-1, outside the building or during non-business hours. Schedule this work with the Contracting Officer in advance.

d. Work involving open flames, sparks, or other operations deemed dangerous by the Lockmaster is prohibited during lockages of tows containing flammable products. Additionally, during all lockages, not just those tows containing flammable products, conduct operations such that no loud noises occur during the lockage that would interfere with barge personnel hearing radio communications.

e. Provide all necessary protection, appurtenant equipment and supplies, including, but not limited to, enclosures, heating, lighting, and sufficient labor to accomplish the work required during the aforementioned periods, taking into account high water, low and high temperatures, wind forces, ice, sleet, snow, wind chill, high humidity, and heat index factors that may be encountered at the site and working adjacent to water. This may require additional labor or shifts and special equipment or special equipment maintenance to compensate for lost productivity caused by low or high temperatures and other associated environmental factors. Contractor is responsible for removing snow and ice from work area, staging area, and other frequently used areas within the project site.

f. In accordance with the "Bald and Golden Eagle Protection Act" and "Migratory Bird Treaty Act," limit construction activity near bald eagle roosting sites during the winter months unless otherwise approved by the Contracting Officer. Conduct operations in a manner that minimizes the disturbance to bald eagles. The Bald Eagle Management Guidelines and Conservation Measures found at https://www.fws.gov/midwest/MidwestBird/EaglePermits/baeatakepermit.html may be used to determine what constitutes a disturbance and to find information on minimizing impact to bald eagles. Also contact the USFWS or appropriate state Department of Natural Resources for assistance.

DOCUMENT 00 73 05 Page 4

g. This project consists of two construction seasons. The first season involves stoplog recess replacement and the second season involves upstream trash rack replacement. Contractor to demobilize in-between construction seasons.

1.4 UNANTICIPATED HAZARDOUS MATERIAL

If a hazardous material(s) is encountered where it was not indicated, cease work and immediately notify the Contracting Officer of the located potential hazardous material(s) found. Upon direction from the Contracting Officer, it may be required to conduct sampling and testing of these suspect material(s) in accordance with an Industrial Hygienist's recommended procedures and the Contract Specification Section(s) as applicable that will be provided to the Contractor as a Modification to the Contract, unless already provided. Payment for this additional work will be handled under FAR 52.243-4 CHANGES.

1.5 COORDINATION WITH OTHERS

Schedule and coordinate operations affecting other Contractors, Government Personnel, utilities, and property occurring within the work limits.

Accomplish with lead time sufficient for coordination of all involved parties as necessary for timely completion of each Contract feature. At a minimum, establish coordination with each of the following point(s) of contact, as required:

Derek Sanderson Albany Field Office U.S. Army Corps of Engineers 1 Bond Street, Troy, NY 12180 OPS Division, New York District Office No.: 518-273-0870 (Collect calls not accepted.)

1.6 ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)

1.6.1 Access and General Protection Policy and Procedures

Per ENG FORM 6055, the Contractor must comply with the following Operational Security Requirements.

All Contractor and subcontractor employees shall comply with installation and facility access guidelines and rules as stated herein. Contractor workforce must comply with all personal identity verification requirements as directed by Department of Defense (DoD), Department of the Army Headquarters, New York District, and local policy. In addition to the changes otherwise authorized by the CHANGES clause of this Contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

In support of New York District evaluation of personnel authorized for access to federal facilities, pay all fees for and submit background checks that have been conducted by a bonded third party within the last 6 months of the Notice to Proceed date and authorize reports to be mailed to the New York District Security and Law Enforcement Office by the third party, see paragraph SUBMITTALS for address and other requirements. The background check will cover, at a minimum, the last seven years covering the states the employee had/has lived in, national crime records which

DOCUMENT 00 73 05 Page 5 includes felony and misdemeanor offenses, Department of Motor Vehicles (DMV) records, and a national sex offender registry check, submitted 14 days prior to accessing the project site.

Identification Badges: The Contractor shall be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge shall have the following items shown, the employee's picture, employee's name, and company name working for. The badge will be prominently displayed unless restricted for safety concerns, in which case it will be available for immediate display upon request (carried on person).

As employees are added or deleted from the submitted and approved Access Control List (ACL), this information will be reported immediately to the Contracting Officer. Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.

Disqualifying factors include, but are not limited to:

a. Criminal conduct, in particular, violent crime and sex offenders;

b. Habitual use of intoxicating beverages to excess as evidenced by Driving Under the Influence (DUI) or public intoxication records; or

c. Any illegal activity or other disqualification which makes the individual unfit for service (e.g., drug trafficking or procurement fraud).

In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the New York District security personnel. The Contractor agrees to cooperate and ensure that Contractor employees provide any documentation required to complete these checks. Any employee lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the contract. The New York District retains the right to deny any Contractor and sub-contractor employee(s) from working on this contract based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee or unforeseen change in work site condition, the Contractor shall immediately contact the Contracting Officer to coordinate obtaining written approval from the Security Office for new/additional personnel to be brought on-site prior to background check acceptance. The Contractor shall submit ATTACHMENT A - Personnel Change Request Form and will receive written authorization from the Security Officer prior to bringing new personnel on-site, and will ensure a background check is sent to the New York District Security Office no later than 10 days from written notice of approval. The New York District reserves the right to terminate access of the employee upon completion of the Government's review of the background check and the Contractor shall be notified immediately of any such Government decision.

In the event that an unforeseen change in site conditions, which may require a contract modification, and the Contractor has to immediately add employees, the Contractor shall submit ATTACHMENT A - Personnel Change Request Form and will receive written approval from the Security Officer

DOCUMENT 00 73 05 Page 6 prior to bringing new personnel on-site, and will ensure a background check is sent to the New York District Security Office no later than ten

(10) days from written notice of approval. The New York District reserves the right to terminate access of the employee upon completion of the Government's review of the background check and the Contractor shall be notified immediately of any such Government decision.

Subcontractor personnel who are not expected to be on the worksite for more than 15 days may be allowed on-site with the following conditions:

a. Employee will be on site a total of 15 days or less, for the duration of the project.

b. Employee is added to the ACL as a short term employee.

c. Employee is escorted while on-site. This is defined as being in the line of sight of an identified Contractor employee who has a background check on file with the New York District (as noted on the

ACL).

d. Each Contractor employee can sponsor only one short term employee at a time.

Foreign National Employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the New York District Security Office no later than 30 days prior to arrival on-site. Short term foreign national employees (e.g. specialists with a two week period of performance) may work on site with the following conditions:

a. Foreign national employee will be on-site a total of 15 days or less, for the duration of the project.

b. Foreign national employee will comply with E-Verify requirements (see paragraph "E-Verify Program").

c. Approved and identified Contractor employee shall escort the foreign national employee AT ALL TIMES while on-site.

d. Each Contractor employee can sponsor only one short term foreign national at a time.

DOCUMENT 00 73 05 Page 7

1.6.2 E-Verify Program

The Contractor must pre-screen candidates using the E-Verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the candidate has two valid forms of Government-issued identification prior to enrollment to ensure the correct information is entered into the E-Verify system. Documentation of company enrollment in E-Verify, via a print screen of the company profile within the E-Verify system, must be submitted to the Security Office no later than 3 business days after receiving the Notice to Proceed.

When contracts are with individuals, the individuals will be required to coordinate with the Contracting Officer, complete the Form I-9, and submit the Form I-9. This form will be submitted to the Security Office after Notice to Proceed is given.

1.7 ACTIVITY REGULATIONS FOR CONTRACTOR ACCESS AND USE OF PREMISES

Follow all current Army Security Regulations concerning strict visitor control and preservation of all Government assets. Immediately report all security concerns to the Contracting Officer.

Work may be affected by the following Force Protection Conditions levels:

FPCON NORMAL

When there is no discernible terrorist activity. Routine security posture.

FPCON ALPHA

When there is a general threat of possible threat activity against personnel and the installation, or both. There will be a limited impact on normal operations.

FPCON BRAVO

When there is an increased or more predictable threat. There will be an impact on normal operations but it will not cause undue hardship to personnel, substantially affect operational capabilities, or cause aggravated relations with local authorities and civilians.

FPCON CHARLIE

When an incident occurs or intelligence is received indicating imminent terrorist action. If this lasts for more than a short period it will probably create hardships for personnel and affect the peacetime activities of units and personnel.

FPCON DELTA

When a terrorist attack has occurred or intelligence indicates likely terrorist action against a specific location. This is normally declared as a localized warning and requires implementation of mandatory security measures. This cannot be sustained for an extended period without causing significant hardships for personnel and affecting the peacetime activities of

DOCUMENT 00 73 05 Page 8 units and personal.

FPCON NORMAL through FPCON BRAVO will not affect the work. FPCON CHARLIE and FPCON DELTA will affect work. FPCON CHARLIE will subject the Contractor to a higher degree of inspection and may not be able to work on-site for short periods of time as decreed by the District Security Officer. FPCON DELTA, as determined by the District Security Officer, will close the site down and the Contractor will not be able to work on the site.

1.8 SUSTAINABILITY

a. Meet USEPA recycled content requirements. Ensure all Contractor-furnished supplies contain recycled content (e.g., insulation, restroom dividers, roofing materials). The list of USEPA-Designated Recovered Material Products is available online at:

http://bit.ly/2ak11jp

b. Meet USDA BioPreferred Program requirements. Ensure all Contractor-furnished supplies contain biobased content (e.g., interior wall panels, plastic insulating foam, plastic lumber). The list of USDA-Designated BioPreferred Program Product Categories is available online at:

http://bit.ly/2ajZE3V )

c. Use energy- and water-efficient building-related products and equipment. Ensure all Contractor-furnished equipment meets energy efficiency requirements (e.g., light fixtures, gas water heaters, central air conditioners, windows, doors), and water efficient requirements (e.g., faucets, showerheads, toilets) (when applicable to the work to be performed). The list of USDOE Product Categories Covered by Efficiency Programs is available online at:

http://bit.ly/2ajZJ7S

d. Print all deliverables double-sided on paper that contains post-consumer fiber.

DOCUMENT 00 73 05 Page 9

1.9 MINIMUM AMOUNT OF INSURANCE REQUIRED

a. Provide in accordance with FAR 52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION and procure not less than the following types of insurance in the amount indicated:

Minimum Type Amount

Workman's Compensation Insurance As required by State Law Employer's Liability Insurance $100,000 Comprehensive General Liability Insurance $500,000 B.I.

Comprehensive Automobile Liability Insurance $200,000/$500,000 B.I.

$ 20,000 P.D.

b. Provide insurance certificate with the following endorsement:

Cancellation or any material change in the policies adversely affecting the interests of the Government in such insurance will not be effective for such period as may be prescribed by the laws of the state in which the Contract is performed and in no event less than 30 days after written notice to the Contracting Officer.

c. Annotate insurance certificates with the Contract number and name.

1.10 EVALUATION OF SUBDIVIDED ITEMS

Bid Item Nos. 0002, 0007, and 0008 are subdivided into two or more estimated quantities and separately priced. The Government will evaluate each of these items on the basis of total price of the subitems.

1.11 VARIATIONS IN ESTIMATED QUANTITIES OF SUBDIVIDED ITEMS

FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY is applicable only to Bid Item Nos. 0002, 0007, and 0008.

a. Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in Contract unit price.

b. Where the actual quantity of work performed for Bid Item Nos. 0002, 0007, and 0008 are less than 85 percent of the quantity of the first sub-item listed under such item, it will be paid at the Contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment will be made.

c. If the actual quantity of work performed under Bid Item Nos. 0002, 0007, and 0008 exceeds 115 percent or is less than 85 percent of the total estimated quantity of the sub-item under that item and if the quantity of the work performed under the second sub-item or any subsequent sub-item under Bid Item Nos. 0002, 0007, and 0008 exceeds 115 percent or is less than 85 percent of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this Contract, the Contract completion time will be adjusted.

DOCUMENT 00 73 05 Page 10

1.12 CONDITION OF EXISTING STRUCTURES, ROADWAYS, AND OTHER FACILITIES

a. Pre-Construction Condition Survey - After receiving Notice to Proceed, coordinate with the Contracting Officer to make a detailed survey of all existing structures, Contractor staging and parking areas, roadways, boat ramp, staging, storage, and parking areas, roadways, vegetation, and other facilities that may be affected by the Contractor's operations. Conduct surveys with the Contractor and the Contracting Officer, and obtain signatures from both parties. Survey sufficiently in scope to provide advance agreement among all concerned as to the condition of the existing structures, Contractor staging and parking areas, roadways, boat ramp, staging, storage, and parking areas, roadways, vegetation, and other facilities. Presume responsibility for full and active participation in such pre-construction condition survey of existing structures, Contractor staging and parking areas, roadways, boat ramp, staging, storage, and parking areas, roadways, vegetation, and other facilities as deemed necessary to permit determination and accurate assessment of any subsequent damage to existing structures, Contractor staging and parking areas, roadways, boat ramp, staging, storage, and parking areas, roadways, vegetation, and other facilities which may be incurred during the Contract.

b. Post-Construction Condition Survey - After completion of the work, and prior to final acceptance of the work, make a detailed post-construction condition survey of the same structures, Contractor staging and parking areas, roadways, boat ramp, staging, storage, and parking areas, roadways, vegetation, and other facilities previously surveyed with the Contractor and the Contracting Officer, and obtain signatures from both. Conduct survey sufficiently in scope for agreement among all concerned as to the post-project condition of the existing structures, Contractor staging and parking areas, roadways, boat ramp, staging, storage, and parking areas, roadways, vegetation, other facilities other facilities. Presume responsibility for full and active participation in such post-construction condition survey as deemed necessary to permit determination and accurate assessment of any damage to existing structures, Contractor staging and parking areas, roadways, boat ramp, staging, storage, and parking areas, roadways, vegetation, banklines, and any other facilities other facilities which have been incurred during the Contract.

c. Include, but do not limit the surveys to, photographs, videos, sketches, and written descriptions. Submit all documentation to each party involved.

d. If it is determined by the post-construction condition survey that damage has occurred to structures, Contractor staging and parking areas, roadways, boat ramp, staging, storage, and parking areas, roadways, vegetation, and any other facilities other facilities, repair such damage to a condition equal to the pre-Contract conditions, as approved, at no cost to the Government.

DOCUMENT 00 73 05 Page 11

1.13 U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH MANUAL (EM 385-1-1)

The Government Safety Manual, EM 385-1-1 (including all interim changes) will be followed and in effect on the date of award for all construction aspects of the Contract. EM 385-1-1 is at the following website:

https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/

1.14 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

a. This special Contract requirement does not apply to terminations. See EP 1110-1-8 and FAR Part 49 TERMINATION OF CONTRACTS.

b. The base allowable cost for construction and equipment in sound workable condition, furnished by a Contractor or subcontractor at any tier on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the Contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the Contractor's accounting records, base costs for that equipment upon the applicable provisions of EP 1110-1-8 , Region I. Consider working conditions as average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations applies. For retroactive pricing, the schedule in effect at the time the work was performed applies.

c. Equipment rental costs are allowable, subject to the provisions of FAR 31.105 CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS, paragraph (d)(ii) and FAR 31.205-36 RENTAL COSTS. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

d. When actual equipment costs are proposed and the total amount of the pricing action exceeds the Simplified Acquisition Threshold (SAT), the Contracting Officer will request a submission of either certified cost or pricing data, or partial/limited data, as appropriate. Submit data on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

DOCUMENT 00 73 05 Page 12

1.15 PROGRESS MEETINGS

a. Attend progress meetings as scheduled by the Government with an agenda prepared by the Contractor. The list of attendees includes, but is not limited to, the Contractor's key site personnel, supervisor(s)/superintendent(s), safety person(s), quality control manager(s), and subcontractors' representative(s).

b. Address and discuss such items as progress of the work, potential factors for delays, proposed daily work schedule for the next period, deficiencies, utility service interruptions, protection of adjacent areas, coordination with other Contractors and Government hired labor, materials delivery schedules, submittals, quality control, and safety issues, and any other issues requiring addressing or discussions.

c. Prepare minutes of the progress meetings and obtain a list of invitees and attendees from all parties. Submit minutes to all parties involved.

1.16 INSPECTION

The presence of a Government inspector does not relieve the Contractor of the responsibility for the proper execution of the work in accordance with the Contract Specifications and Drawings.

Perform a videotaped post construction dive inspection as quality control verification to ensure all Contractor responsible debris and material have been removed. Dive inspection to encompass entire project area from the downstream end of the concrete replacement to the upstream end of the concrete replacement on both sides of the lock chamber and the sill area in between. Perform this inspection during the closure period. Provide 24 hours notice, to the Contracting Officer, to perform the post construction dive inspection. Submit a copy of the post construction videotaped inspection to the Contracting Officer. See paragraph "VIDEO INSPECTION PLAN" for details.

Post construction survey to include:

a. Setting of Government provided stoplogs in newly constructed stoplog recesses to verify seal and bearing on embedded sill plates.

b. Measure gaps between the stoplogs and vertical face of stoplog recess.

c. Videotape dive inspection and submit copy to Contracting Officer within 3 days.

DOCUMENT 00 73 05 Page 13

1.17 DAMAGE TO WORK

The responsibility for damage to any part of permanent work is specified in FAR 52.236-7 PERMITS AND RESPONSIBILITIES. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed or completed by the Contractor is damaged by flood, earthquake, or another natural disaster in which the damage is not due to the failure of the Contractor and will take reasonable precautions or exercise sound engineering and construction practices to make the repairs as directed by the Contracting Officer, and full compensation for such repairs will be made at the applicable Contract unit or job price as fixed and established in the Contract. If, in the opinion of the Contracting Officer, the Contract unit or job price are not applicable to any part of scheduled work, an equitable adjustment pursuant to FAR 52.243-4 CHANGES, will be made as full compensation for the repairs of that part of the permanent work. Except as provided, repair the damage to all work (including temporary construction), utilities, materials, equipment, and plant to the satisfaction of the Contracting Officer at no additional cost to the Government, regardless of the cause of such damage.

1.18 SPECIAL SAFETY REQUIREMENTS

Remove any employee of the Contractor's who disregards safety regulations or displays unsafe attitudes and actions from the job site, as directed by the Contracting Officer, and in accordance with EM 385-1-1.

When working over or near water, be in accordance with 29 CFR 1926.106 , Section 19.A.07(i).

a. Provide employees working over or near water, where the danger of drowning exists, with U.S. Coast Guard approved life jackets or buoyant work vests.

b. Prior to and after each use, inspect buoyant work vests or life preservers for defects which would alter their strength or buoyancy.

Do not use defective units.

c. Furnish ring buoys in accordance with EM 385-1-1 and refer to Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, paragraph "LIFESAVING AND

SAFETY SKIFFS."

d. Provide at least one lifesaving skiff immediately available at a location where employees are working over or near water. Refer to Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, paragraph

"LIFESAVING AND SAFETY SKIFFS."

When operating mechanized equipment on a floating plant, provide positive and acceptable means of preventing this equipment from moving or falling into the water. The type of equipment addressed by this clause includes front end-loaders, bulldozers, trucks (both on- and off-road), backhoes, track hoes, and similar equipment. If the Contractor intends to use such equipment on floating plant, then develop an Activity Hazard Analysis (AHA) for this feature of work. Include a detailed explanation of the type or types of physical barriers, curbs, structures, facilities, to be incorporated to protect the operator and prevent the equipment from entering the water. Nonstructural warning devices may be considered for situations where the use of structural barriers are impracticable.

Thoroughly address the procedure and submit the AHA to the Government prior to commencing work.

DOCUMENT 00 73 05 Page 14

1.19 LOCATION OF PARKING, STAGING, AND STORAGE AREAS

The Contractor's parking, staging, and storage areas are as indicated or as coordinated and approved by the Contracting Officer.

1.20 ELECTRICAL POWER LINES

Prior to mobilization, if adjacent to power lines, provide appropriate danger signs where any equipment scheduled for use is incapable of contacting such lines. To confirm the location of underground lines, coordinate with the Contracting Officer. Either have aerial power lines temporarily shut off and prevent the lines from being energized, or maintain clearances required by EM 385-1-1. Do not proceed working into dangerous areas without assigning additional employees to watch the movements of other personnel and equipment. Ensure that designated clearances are maintained.

1.21 BARRICADES AND WARNING SIGNS

Provide and maintain barricades, danger and warning signs, and, if applicable, suitable and efficient lighting at all points of entry to the area(s) that will be closed to public travel or access. Separate payment will not be made for any costs incurred for furnishing barricade and warning signs. Costs will be considered as a subsidiary obligation and included in the mobilization costs.

1.22 ONE CALL SYSTEM FOR EXCAVATORS

One call systems, established by law, are operated by owners of underground utilities for excavators. Upon notification by an excavator through a one call system, all participating operators of underground utilities in a covered area will identify and locate utilities. Use of a ground penetrating radar or services of a utility locating company is acceptable to the Government. Identify One Call system by contacting:

"Call Before You Dig" Telephone No.: 811 Internet: http://www.call811.com

New York 811 60 Knickerbocker Avenue Bohemia, New York 11716 Telephone No.: Toll Free: 800-524-7603

DOCUMENT 00 73 05 Page 15

1.23 ADDITIONAL PHYSICAL DATA CLAUSE INFORMATION

Additional Contractor information associated with the FAR 52.236-4

PHYSICAL DATA.

(b) Weather Conditions

National Weather Service climatological data consisting of precipitation and temperature records observed at Albany International Airport, Albany, New York are shown in the table below. These data are based on monthly averages for the 10-year period 2012-2021, inclusive.

PRECIPITATION TEMPERATURE (Degrees Fahrenheit)

Days Over Days Over Total Average Average Monthly Days Below Month 0.1" 0.5" For Month Maximum Minimum Average 32 Degrees

January 6 1 2.31 33 17 25 28 February 6 2 2.55 36 19 27 26 March 5 2 2.24 45 27 36 22 April 7 2 3.02 58 37 47 10 May 8 2 3.41 71 49 60 0 June 8 3 4.26 79 58 68 0 July 9 4 5.18 84 64 74 0 August 6 2 3.67 81 61 71 0 September 6 3 3.94 75 53 64 0 October 6 3 4.04 62 44 53 3 November 6 2 2.53 48 30 39 18 December 8 2 3.41 39 25 32 24

(d) Reference Drawings

Provided as a separate file, reference drawings are to be used for reference only. Drawings are the property of the Government and are not to be used for any purpose other than that intended by the Contract.

(e) Hydraulic Data

The Corps of Engineers does not manage any Hudson River gauges. Refer to website for hydraulic data:

http://waterdata.usgs.gov/ia/nwis/current/?type=flow&group_key=basin_cd

(f) Additional Survey Data

Additional informational data is for the Contractor's information and the Government to not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

DOCUMENT 00 73 05 Page 16

1.24 DELAYS DUE TO HIGH WATER

Upon mobilization and continuing throughout the Contract, record on the daily CQC report, the high water level elevation at the site and any resultant impact to normally scheduled Contract work or specify specifics. The Contract period will be extended by the number of calendar days that water levels prevent such work. The Government will not reimburse the Contractor for standby costs associated with delays caused by high water levels. Delays caused by high water levels will not be the basis for an adjustment in Contract price. Refer to paragraph ADDITIONAL PHYSICAL DATA CLAUSE INFORMATION, Historic River Level Data for the Duration Curves. Accurately interpret gages and duration curves.

The construction site(s) is located in Troy, New York and is susceptible to water level fluctuations. The site does not have a stream gage to clearly define stage or flow. Throughout the duration of the Contract, record the number of days that high water levels impacted normally scheduled work on the daily CQC report. Delays caused by high water levels will not be the basis for an adjustment in Contract price. In the event of high water, the Contractor is responsible for removal of their equipment and tools, and construction materials.

1.25 HIGH WATER ACTION PLAN

Provide a plan detailing the activities to minimize the adverse effects of high water. Include protection of accomplished work and Contractor's equipment and personnel. Include emergency measures to restore any damaged sections of the project. Emergency measures to provide sound engineering methods that provides protection at or greater than the height of the existing feature, should high water occur.

1.26 NEW YORK RETAILERS' OCCUPATIONAL TAX AND USE TAX EXEMPTION

Pursuant to the rulings of the New York Department of Revenue, materials which are to be physically incorporated into real estate owned by the Government are exempt from New York Retailers' Occupational Tax and Use Tax. However, sales of tools, fuel, lumber for forms and other end use or consumption items which are not physically incorporated into real estate are taxable sales. After Contract award, the Contractor may request the Government Sales Tax Exemption Number, which must be used when purchasing tax-exempt materials.

1.27 PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS

This is an option, to the Contractor, to use a commercially available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing, and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8 PAYROLLS AND BASIC RECORDS and FAR 52.222-13

COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED

REGULATIONS.

If the Contractor elects to use an electronic Davis-Bacon payroll processing system, the Contractor will be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the Contractor to comply with Davis-Bacon and related Act regulations. When the Contractor uses an electronic Davis-Bacon payroll system, ensure that

DOCUMENT 00 73 05 Page 17 the electronic payroll service prepares, processes, and maintains the relevant payrolls and basic records during all work and is capable of preserving these payrolls and related basic records for the required 3 years after Contract completion. If the Contractor chooses to use an electronic Davis-Bacon payroll system, then obtain and provide electronic system access to the Government, as required in accordance with the Davis-Bacon and related Act regulations over the Contract duration.

Include electronic review access by the Government Contract administration office to the electronic payroll processing system used by the Contractor.

Ensure that the Contractor's provision and use of an electronic payroll processing system meets the following basic functional criteria:

commercially available; compliant with appropriate Davis-Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://rmssupport.helpserve.com/ ) for export in an Excel spreadsheet to be imported into RESIDENT MANAGEMENT SYSTEM (RMS-CM), that in turn exports payroll data to the RESIDENT MANAGEMENT SYSTEM (RMS-GM); demonstrated security of data and data entry rights; ability to produce Contractor-certified electronic versions of weekly payroll data;

ability to identify erroneous entries and track the data/time of all versions of the certified Davis-Bacon payrolls submitted to the Government over the life of the Contract; placed on a CD or DVD and provide a PDF file record of data from the system database at end of the Contract closeout. Submit data from the electronic Davis-Bacon payroll processing system as a Closeout Submittal.

Include all Contractor-incurred costs related to the Contractor's provision and use of an electronic payroll processing service in the Contractor's price for the overall work under this Contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services are not a separately bid, proposed, or reimbursed item under this Contract.

1.28 AVAILABILITY AND USE OF UTILITY SERVICES

The Government will not make any utility or facility services available to the Contractor. Provide utility services and maintain within the construction area a minimum field-type sanitary facility as approved. See 01 14 00 WORK RESTRICTIONS for additional electrical requirements.

1.29 VIDEO INSPECTION PLAN

Perform the video inspection in accordance with the approved Video Inspection Plan. Conduct the inspection in accordance with the following:

Perform a video inspection of all concrete reinforcement prior to placing concrete.

a. Concrete reinforcement video inspection(s) to include reinforcement placed for cofferdam and bulkhead sills. Video to also verify removal of all silt and debris in sill area.

b. Do not exceed 30 feet of inspection per minute.

Perform a video inspection of the stoplogs placed within the newly constructed recesses and surrounding area.

a. Inspect each stoplog within the recess in a single, continuous

DOCUMENT 00 73 05 Page 18 run.

b. Progress through the entire recess to be inspected in a uniform direction. Repeat for other recess. Repeat on other side of stoplogs.

c. Do not exceed 30 feet of inspection per minute.

The camera to be used in the inspection to:

a. Have high-resolution color with adjustable iris focus.

b. Have integral lighting suitable to provide proper illumination and a clear video image of the entire periphery of inspection area(s).

c. Be capable of operating underwater.

d. Produce a high quality video image.

Submit a plan to include, but not be limited to, proposed equipment, procedures to be used, descriptions on what will be reported, product limitations, technical details, and other documentation as needed to perform the work. Notify the Government 15 days prior to preparing the stoplogs and recesses for inspection. Coordinate with the Contracting Officer to ensure presence during the inspection. Submit the inspection report for the inspection along with videos in color of the inspection in a common digital video format (.mp4, .wmv., e.g.). A general description of the inspection is to be recorded as part of the report.

1.30 REQUIREMENTS FOR NAVIGATION

Movement of floating plant in accordance with 33 CFR 207.50 and EM 385-1-1. The areas 600 feet above and 150 feet below the dam are posted and designated as restricted areas. As such, movement of any vessel, boat, or other floating item(s) in these areas is prohibited except by, or under the direction of, the Lockmaster. Any moving vessel/boat or floating plant within the restricted are to furnish two working crews and the boat motor(s) a minimum of 800 horsepower.

1.31 SIGNAL LIGHTS

Display signal lights and conduct operations in accordance with US Coast Guard regulations (Commandant Instruction M16672.2 Series) and EM 385-1-1 on watercraft and floating plant(s).

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 73 05 Page 19

ATTACHMENT A TO SECTION 00 73 05

PERSONNEL CHANGE REQUEST FORM

Contract No. ____________________ Date _______________

We, ____________________, respectfully request to add / replace (circle one) personnel to the jobsite due to the following situation:

Personnel to be conditionally added to the ACL (escorted by):

Background checks (if required for a long term employee) submitted by the close of business on (insert proposed date): _________________________

(Insert signature block)

-- End of Section --

DOCUMENT 00 73 05 Page 20

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY OF WORK

1.2 PROJECT LOCATION

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 11 00 Page 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY OF WORK

The work includes, but is not limited to, placing and dewatering cofferdams, demolition, concrete work and underwater concrete, fabrications, painting, surveying, stoplogs, dive inspection and video inspection, and site restoration.

1.2 PROJECT LOCATION

The work is located at Hudson River, Troy, Rensselaer County, New York, and as indicated.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 11 00 Page 2

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 COORDINATION AND WORK HOURS

1.3.1 Coordination with Lock and Dam Operations

1.3.2 Miter Gate and Culvert Valve Operation

1.3.3 Work Hours

1.4 SPECIAL SCHEDULING REQUIREMENTS

1.4.1 Work Allowed Prior to Lock Closure Period

1.4.2 Lock Closure Period

1.4.2.1 Cofferdam Installation and Stoplog Slot Replacement

1.4.2.2 Dewatering Structures Installation and Lock Test Dewatering

1.4.2.3 Second Lock Dewatering

1.5 TEMPORARY CONSTRUCTION CONSIDERATIONS

1.5.1 Construction Power

1.6 CONTRACTOR ACCESS AND WORK AREAS

1.6.1 General Work Area Restrictions

1.6.2 Grounds and Roadways

1.7 RESTRICTIONS ON PLACEMENT OF CONTRACTOR EQUIPMENT

1.7.1 Equipment on Lock Wall Surfaces

1.7.2 Lock Wall Stability Analysis

1.8 CONTRACTOR FLOATING PLANT

1.8.1 Floating Plant

1.8.2 Mechanized Equipment on Floating Plant

1.8.3 Locking of Floating Plant

1.8.4 Mooring of Floating Plant

1.8.5 Maintenance of Floating Plant

1.8.6 Equipment and Personnel

1.8.7 Sewage and Bilge Water Disposal

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 14 00 Page 1

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C2 (2023) National Electrical Safety Code

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2023) National Electrical Code

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

33 CFR 207.50 Hudson River at Troy, N.Y.; Navigation

46 CFR PART 1 Organization, General Course and Methods Governing Marine Safety Functions

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Floating Plant Plan; G

Pre-Closure Work Plan; G

SD-05 Design Data

Equipment Placement Plan; G ECDS

Lock Wall Stability Analysis; G ECDS

SECTION 01 14 00 Page 2

1.3 COORDINATION AND WORK HOURS

1.3.1 Coordination with Lock and Dam Operations

The Lock operates 24 hours per day, seven days per week, including all federal and state holidays. The lock closure period is 01 December through 30 April. Any work allowed outside of the closure period will need to accommodate lock operations, including temporary covers over open trenches, clearing of work areas, continuous access along the land wall, e.g. During all lockages, conduct operations to minimize noise so normal radio communications at the site can occur.

This is the start of the file's text. The full file is on GovTribe.