W912DS24B0006 0003.pdf
PDF 1021 KB Posted
- Solicitation number
- W912DS24B0006
About this file
This document is an amendment to Solicitation W912DS24B0006 for the Troy Lock - Stoplog Dam Concrete Recesses and Steel Lock Filter project. The purpose of the amendment is to provide a revised bid schedule and updated specifications. Key details include:
The revised bid schedule adds Option CLIN 0016 for furnishing cofferdams. The contract duration is 685 days after notice to proceed. Bids must be valid for 180 calendar days after the bid due date. The government reserves the right to exercise Option CLIN 0016 by July 1, 2024. The contract includes work items such as mobilization, temporary construction facilities, surveying, diving, cofferdam work, electrical work, concrete removal and placement, recess work, protection plate fabrication, lifting beam guide block installation, stoplog work, trash rack work, handrail replacement, and site restoration. Pricing is required for all CLINs, and the award will be made to the lowest responsive, responsible bidder based on the total amount for all CLINs 0001 through 0016.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to 1) provide a revised Bid Schedule to include Option CLIN 0016 and 2) revised and updated specifications.
NOTE: Bidders must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24B0006
X 9B. DATED (SEE ITEM 11)
22-Apr-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
P00003
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10 - May-2024
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS24B0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
REVISED BID SCHEDULE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Mobilization and Demobilization
FFP
Mobiilization and demobilization will consist of all work as per the SOW and Section 01 20 00 of the specifications document.
FOB: Destination
PSC CD: Z2KA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Temporary Construction Facilities
FFP
Information Only Clause. Do not list price. List prices on following SubClins
0002AA-0002AB.
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AA 6 Months Temporary Construction Facilities
FFP
First 6 Months of a specified location on the secured Albany Field Office property for a construction trailer, to store equipment, and a specific number of employee parking spaces.
FOB: Destination
PSC CD: Z2KA
0002AB 2 Months Temporary Construction Facilities
FFP
Over 6 Months of a specified location on the secured Albany Field Office property for a construction trailer, to store equipment, and a specific number of employee parking spaces.(ESTIMATE)
0003 1 Job Surveying
FFP
A minimum of two surveys are required to be completed under the direction of a certified Land Surveyor who is licensed/registered as per Section 02 21 00 of the specifications document.
0004 1 Job Diving
FFP
All diving performed will be in strict accordance with rules and regulations in accordance with 29 CFR 1910 Subpart T and EM 385-1-1, Section 30, Diving Operations. A diving plan outlined in specification section 01 35 26 will need to be submitted.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 1 Job
Cofferdam Work
FFP
The Contractor will be responsible for lock chamber debris removal, installing and removing cofferdams, sealing, dewatering, and maintaining in dewatered state as per 01 14 00 of the specifications document.
FOB: Destination
PSC CD: Z2KA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 1 Job
Electrical Work
FFP
The contractor is responsible for providing their own power, as well as temporary power to the Programmable Logic Controller (PLC) located in the lock house while electric services are disconnected for safety during the stoplog dam concrete recesses portion of the work. Qualifications of Technician certification and temporary power plan will be required as outlined in specification section 33 71 02.
FOB: Destination
Stoplog Recess Concrete Removal
FFP
Information Only Clause. Do not list price. List prices on following SubClins
0007AA-0007AB.
0007AA 50 Cubic
Yard
Stoplog Recess Concrete Removal
FFP
Removal of all concrete is to be submitted in a removal plan outlined in specification section 03 01 10 - First 50 Cubic Yards (Estimated Quantities)
0007AB 15 Cubic
Stoplog Recess Concrete Removal
Removal of all concrete is to be submitted in a removal plan outlined in specification section 03 01 10 - Over 50 Cubic Yards (Estimated Quantities)
Stoplog Recess Concrete Placement
FFP
Information Only Clause. Do not list price. List prices on following SubClins
0008AA-0008AB.
0008AA 70 Cubic
Stoplog Recess Concrete Placement
First 70 Cubic Yards (Estimated Quantities)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0008AB 15 Cubic
Yard Stoplog Recess Concrete Placement
FFP
Over 70 Cubic Yards (Estimated Quantities) FOB: Destination
PSC CD: Z2KA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0009 1 Job
Recess Work
FFP
All the work associated with the lining of each of the concrete recesses with the recess frames. This includes, but is not limited to metal work fabrication, fastening, welding, and painting.
FOB: Destination
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0010 1 Job
Protection Plate Fabrication
FFP
Included is all work associated with the lining of each of the concrete recesses with the recess frames. This includes, but is not limited to metal work fabrication, fastening, welding, and painting.
FOB: Destination
PSC CD: Z2KA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0011 1 Job
Lifting Beam Guide Block Installation
FFP
Included is all work associated with the lifter beam. This includes, but is not limited to metal work fabrication, fastening, welding, painting and use of crane for installation.
FOB: Destination
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0012 1 Job
Stoplog Work
FFP
Install the furnished stoplogs with appropriately sized crane and the lock will be dewatered to test the performance of the work as per the SOW and spceifications.
FOB: Destination
PSC CD: Z2KA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0013 1 Job
Trash Rack Work
FFP
Work for upstream trash racks and support beams includes, but not limited to, concrete removal including embedded metals, concrete placement, fabricating trash rack grating, painting, installing support beams, and installing trash rack as per the SOW and specifications.
FOB: Destination
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0014 1 Job
Handrailing Replacement
FFP
Existing handrail sections that must be removed from the lock wall to do the stoplog concrete recesses work must be replace in kind. This includes handrailing, fabricating, packaging, delivering, and incidentals, including painting as per the SOW and specifications.
FOB: Destination
PSC CD: Z2KA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0015 1 Job
Site Restoration
FFP
Work to include restoring the site and staging areas to original or better condition.
This includes, but is not limited to, seeding and debris removal as per the SOW and specifications.
FOB: Destination
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0016 1 Job OPTION Furnish Cofferdams
FFP
The work includes, but is not limited to, furnishing two cofferdams including all necessary design, submittals, fabrication, and transportation as per Section 01 11 00.
FOB: Destination
PSC CD: Z2KA
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 685 dys. ANP 1 OPS-ALBANY FIELD OFFICE
KRISTIN IRWIN
1 BOND STREET
TROY NY 12180-1208
(518)273-0870 FOB: Destination
W912DS
0002 N/A N/A N/A N/A
0002AA 685 dys. ANP 6 OPS-ALBANY FIELD OFFICE
KRISTIN IRWIN
1 BOND STREET
TROY NY 12180-1208
(518)273-0870 FOB: Destination
W912DS
0002AB 685 dys. ANP 2 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0003 685 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0004 685 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
W912DS
0005 685 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0006 685 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0007 N/A N/A N/A N/A
0007AA 685 dys. ANP 50 OPS-ALBANY FIELD OFFICE
KRISTIN IRWIN
1 BOND STREET
TROY NY 12180-1208
(518)273-0870
0007AB 685 dys. ANP 15 (SAME AS PREVIOUS LOCATION)
0008 N/A N/A N/A N/A
0008AA 685 dys. ANP 70 OPS-ALBANY FIELD OFFICE
KRISTIN IRWIN
1 BOND STREET
TROY NY 12180-1208
(518)273-0870
0008AB 685 dys. ANP 15 (SAME AS PREVIOUS LOCATION)
0009 685 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0010 685 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0011 685 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0012 685 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0013 685 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0014 685 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0015 685 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0016 01-JUL-2024 1 (SAME AS PREVIOUS LOCATION)
TOTALS/NOTES
TOTAL BASE CLINs (0001 - 00015) $_____________________
TOTAL OPTION CLIN (0016) $_____________________
TOTAL BASE PLUS OPTION CLINS (0001 - 0016) $_____________________
NOTES:
1) Total bid shall include all costs associated with each item number including all bonding, overhead and profits.
2) Bidders must submit a price for every CLIN. Failure to do so may result in the offer being considered non-responsive.
3) The Basis of Evaluation will be the lowest responsive, responsible Bidder based on the Total Amount for the
CLINS 0001 – 0016.
4) Contract Duration is 685 days after NTP.
5) Bid Acceptance Period: Bids are to be valid for 180 calendar days after the date bids are due.
6) The Government reserves the right to exercise Option CLIN 0016, if at all, by 01 July 2024.
7) If Option CLIN 0016 is exercised, the contract duration will not be extended.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .