W912DS22R0001 - Amendment 0003.pdf

PDF 385 KB Posted

Attached to
Construction of Information Systems Node (ISN) Facility, Fort Hamilton, NY
Solicitation number
W912DS22R0001
Issued by

About this file

This document contains an amendment to a solicitation and related federal contract opportunity. The amendment revises and reissues drawings, provides responses to bidder inquiries for informational purposes only, and requires bidders to acknowledge receipt of the amendment by a specified date.

The related federal contract opportunity is for construction of an Information Systems Node facility at Fort Hamilton, NY. The U.S. Army Corps of Engineers, New York District is preparing plans and specifications for a 10,872 square foot building structure to serve as a command center with administrative offices, network operations, and technical support functions. Requirements include utilities, security systems, sustainable design measures, and compliance with accessibility standards. The procurement method is a request for proposal using best value tradeoff evaluation. The estimated value is between $10-25 million and period of performance is 730 calendar days.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Revise and reissue draw ings.

2. Provide responses to bidder inquires for informational purposes only.

Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Mar-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22R0001

X 9B. DATED (SEE ITEM 11)

28-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Mar-2022

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS22R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been added by full text:

AMENDMENT 0003

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED:

S-305 S-503 G-002 A-607

2. The following DRAWINGS have been ADDED: None.

3. The following DRAWINGS have been DELETED: None

4. The following DRAWINGS have been REVISED but NOT REISSUED: None.

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein: None.

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

None.

3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED:

None.

4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:

None.

QUESTIONS AND GOVERNMENT REPLY:

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the offerors “For Information Only” and do not revise the solicitation, plans or specifications.)

BIDDER INQUIRY 1: Please confirm all equipment and services specified for this project complies with FAR 52.204-25 regarding banned equipment and services from certain Chinese firms.

GOVERNMENT RESPONSE 1: The project drawings and specifications specify only two brand name manufacturers for electronic systems (DAQ and Simplex). Neither of those manufacturers are prohibited by FAR clause 52.204-25.

Pursuant to Section 01 33 00, The Contractor's Quality Control (CQC) System Manager are to check and approve all items before submittal and stamp, sign, and date indicating action taken.

Proposed deviations from the contract requirements are to be clearly identified.

Product submittal(s) from a prohibited source shall be considered a deviation from the contract requirements.

BIDDER INQUIRY 2: The canopies shown on S-305 are "By Others". Please confirm the owner is furnishing and installing these items, and shown for coordination purposes only? Please confirm these canopies are painted by owner as well.

GOVERNMENT RESPONSE 2: The canopies shall be designed, furnished, and installed by the Contractor. Drawing sheets S-305 and S-503 have been updated and reissued with this amendment.

BIDDER INQUIRY 3: Is fireproofing required on this project? If yes, what is the scope of work?

GOVERNMENT RESPONSE 3: This building is a construction type IIB, and fireproofing is not required per the IBC Tables 601 and 602. Drawing sheet G-002 has been revised and reissued to remove language about fire proofing.

BIDDER INQUIRY 4: As per drawing (S-501- Section C4). The maximum depth of excavation will be at least 9' feet below grade (Top of footing- 7' below grade + 1'-4" footing depth + 12" stone below), no support of excavation or shoring drawings have been provided in the initial contract drawings. Please clarify on how to proceed with this.

GOVERNMENT RESPONSE 4: Excavation and trenching shall comply with the requirements of EM 385-1-1. There is sufficient space within the project boundaries for sloping or benching.

Maximum allowable slopes and allowable configurations for sloping and benching systems shall be determined by the contractor in accordance with the conditions and requirements set forth in 29 CFR 1926, Subpart P, Appendices A and B. See also EM 385-1-1 Figure 25-1.

Dewatering work plan and calculations, if needed, are to be prepared by the contractor. Refer to Section 31 00 00.

BIDDER INQUIRY 5: Is there a basis of design product in mind for the exterior aluminum windows? Details for these windows are generic but do show a window system with 11” depth.

Is 11” window depth a requirement for this project? I do not know of a window system that has

11” depth. The system with the profile closest to what is shown on the drawings would be a curtain wall system with 2 ½” face cap sightline & 10 ½” depth. Please advise if a curtain wall system with 10 ½” mullion depth is an acceptable product for the exterior W2 windows or provide a basis of design manufacturer & window model.

GOVERNMENT RESPONSE 5: For the window design, the 11” depth is not meant to be a definite number. Refer to revised sheet A-607 with added notes indicating the 11” depth should be verified in field, however the requirements for the dimensions of the aluminum window frame are:

1. That the glazing must be aligned to the insulation.

2. The depth of the window must be large enough for anchoring into the CMU.

Please note that the exterior windows need to meet the salient characteristics and performance requirements listed in the specification.

(End of Summary of Changes)