Sheet - ES-502 - ELECTRICAL SITE DETAILS - 2.pdf

PDF 132 KB Posted

Attached to
Construction of Information Systems Node (ISN) Facility, Fort Hamilton, NY
Solicitation number
W912DS22R0001
Issued by

About this file

This document contains details for a federal construction solicitation and the related federal construction opportunity. The U.S. Army Corps of Engineers, New York District, is soliciting proposals for the construction of an Information Systems Node facility at Fort Hamilton, NY through a Request for Proposal with a Best Value Trade Off source selection procedure. The project involves construction of a single-story, 10,872 square foot building along with site improvements, utilities, security systems, and sustainability measures. The estimated value is between $10-25 million and the period of performance is 730 calendar days. The NAICS code is 236220 and preferences include HUBZone. Interested parties can access the full solicitation on SAM.gov when it is posted. Offerors must be registered in SAM and CPARS will be used to evaluate past performance. The point of contact is provided.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

' 3" MIN '

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

ES-502

EL

EC

TR

IC

AL

S

IT

E

DE

TA

IL

S

-2

FO

RT

H

AM

IL

TO

N

NY

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LZ

, N

EW

Y O

R K

, N Y, N

EW

Y

O R

K , N

Y

R K

R K

R K

SE

P

, 2

RTA

IN

FO

R M

AT

IO

N S

ER

VI

CI

NG

N O

D E

PR

O

JE

C

T #6

D uc tb an k

C l a rif ic at io n R ev is io n

M ar

NTSES-502

1 12-WAY TELECOMM DUCTBANK

CONCRETE ENCASED FOR ENTIRE

ROUTE, INCLUDING BELOW SLAB

TO THE CABLE VAULT

THREE (3) 3X3" FIBER FABRIC

MESH MULTICELL INNERDUCT

IN FOUR (4) OF THE 12-WAY DUCTS

TRACER WIRE (SEE NOTE 4, TYP)

TRACER WIRE (SEE NOTE 4, TYP)

NTSES-502

2 9-WAY TELECOM DUCTBANK

THREE (3) 3X3" FIBER FABRIC

MESH MULTICELL INNERDUCT

IN THREE (3) OF THE 9-WAY DUCTS

GENERAL DUCTBANK NOTES:

1. DUCTBANKS SHALL BE CONCRETE ENCASED UNDER ALL ROADWAYS AND PARKING AREAS.

COMMUNICATIONS DUCTBANKS SHALL BE CONCRETE ENCASED FOR THE ENTIRE LENGTH,

INCLUDING UNDER THE ISN BUILDING.

2. THE TELECOMMUNICATIONS SERVICE ENTRANCE DUCTBANKS (I.E., DUCTBANK ROUTED TO

UNDERGROUND CABLE VAULT) SHALL BE CONCRETE ENCASED FOR ENTIRE RUN INCLUDING

BELOW THE ISN BUILDING TO THE CABLE VAULT.

3. ALL PRIMARY CABLE (8KV) DUCTBANKS SHALL BE CONCRETE ENCASED FOR THE ENTIRE LENGTH.

PROVIDE (EMBED) A #4/0 GROUND CONDUCTOR IN THE CONCRETE DUCTBANK (UFER GROUND), AT

THE APPROXIMATE LOCATION SHOWN. BOND THIS GROUND CONDUCTOR AT EACH MANHOLE

GROUND ROD AND TO THE PAD MOUNTED TRANSFORMER GROUNDING COUNTERPOISE LOOP.

4. PROVIDE WARNING TAPE FOR ALL UNDERGROUND DUCTBANKS/CONDUIT. PROVIDE WARNING

TAPE AND TRACER WIRE FOR ALL UNDERGROUND COMMUNICATIONS DUCTBANK. TRACER

WIRE SHALL BE INSTALLED IN 1" PVC CONDUIT. SEE TRACER WIRE WELL DETAIL ON SHT

ES-503 FOR SPECIFICS. WARNING TAPE SHALL BE LOCATED 12" - 18" ABOVE ALL

COMMUNICATIONS DUCTBANK, IN ACCORDANCE WITH I3A, CHAPTER 3.

5. SEE TELECOMM SITE PLANS (SHTS. TS-101 THROUGH TS-102), NEW DUCTBANK PROFILE DETAILS (SHTS. ES-505 & ES-506) AND SHT. ET-601 FOR OSP CABLES TO BE INSTALLED IN EACH DUCTBANK.

6. ALL SPARE DUCTS SHALL BE PROVIDED WITH PULL STRINGS AND PROVIDED WITH EXPANDABLE

PLUGS TO SEAL ALL DUCTS.

7. PROVIDE DUCTBANK PROFILES FOR ALL TELECOM DUCTBANKS IN ACCORDANCE WITH I3A,

CHAPTER 3 REQUIREMENTS. TELECOM DUCTBANKS BETWEEN MANHOLES SHALL BE PROVIDED

WITH A APEX AT MIDSPAN WITH DUCTS SLOPING A MINIMUM OF 1/8" PER FOOT. TELECOM

DUCTBANKS SHALL BE PROVIDED WITH A MINIMUM SLOPE OF 1/8" PER FOOT.

TRACER WIRE (SEE NOTE 4, TYP)

THREE (3) 3X3" FIBER FABRIC

MESH MULTICELL INNERDUCT

IN TWO (2) OF THE 6-WAY DUCTS

#4 REBAR (TYP)

24" ON CENTER

4" SCH 40 PVC

(TYPICAL)

3000 PSI CONCRETE

36" MINIMUM

NTSES-502

4 2-WAY 8 KV POWER DUCTBANK

FINISHED GRADE

6" DETECTABLE WARNING TAPE

"WARNING - TELECOMMUNICATIONS CABLE BELOW"

LOCATE 12"-18" ABOVE THE DUCTBANK

36" MINIMUM

3000 PSI CONCRETE

4" SCH 40 PVC

(TYP)

BASE AND INTERMEDIATE

SPACERS 48" ON

CENTER

3" MINIMUM

SEPARATION (TYP) 1 1/2" MINIMUM

SEPARATION

(TYP)

3" MINIMUM

(TYP)

3" MINIMUM

SEPARATION (TYP)

#4 REBAR (TYPICAL)

24" ON CENTER

#4 REBAR (TYP)

6" DETECTABLE WARNING TAPE

"WARNING - TELECOMMUNICATIONS CABLE BELOW"

LOCATE 12"-18" ABOVE THE DUCTBANK

36" MINIMUM

3000 PSI CONCRETE

4" SCH 40 PVC

(TYP)

BASE AND INTERMEDIATE

SPACERS 48" ON

CENTER

3" MINIMUM

SEPARATION (TYP) 1 1/2" MINIMUM

SEPARATION

(TYP)

3" MINIMUM

(TYP)

3" MINIMUM

SEPARATION (TYP)

#4 REBAR (TYPICAL)

24" ON CENTER

#4 REBAR (TYP)

FINISHED GRADE

3" MINIMUM

SEPARATION (TYP)

1 1/2" MINIMUM (TYP)

3" MINIMUM

(TYP)

3" MINIMUM (TYP)

#4 REBAR (TYP)

6" DETECTABLE WARNING TAPE

"WARNING - TELECOMMUNICATIONS CABLE BELOW"

LOCATE 12"-18" ABOVE THE DUCTBANK

FINISHED GRADE

6" DETECTABLE WARNING TAPE

"WARNING - POWER CABLE BELOW"

18" MINIMUM BELOW FINISHED GRADEFINISHED GRADE

36" MINIMUM

3000 PSI CONCRETE

4" SCH 40 PVC

(TYPICAL)

BASE

SPACERS

48" ON

CENTER

#4 REBAR (TYP)

3" MINIMUM (TYP)

#4 REBAR (TYP)

24" ON CENTER

3" MINIMUM

(TYP)

1 1/2" MINIMUM (TYP)

3" MINIMUM

SEPARATION (TYP)

8 KV POWER

CONDUCTORS

SPARE 4"C

NTSES-502

3 6-WAY TELECOM DUCTBANK

BASE AND INTERMEDIATE

SPACERS 48" ON

CENTER

NTSES-502

5 4-WAY 8 KV POWER DUCTBANK

FINISHED GRADE

6" DETECTABLE WARNING TAPE

"WARNING - POWER CABLE BELOW"

18" MINIMUM BELOW FINISHED

GRADE

BASE AND INTERMEDIATE

SPACERS 48" ON

CENTER

#4 REBAR (TYP)

24" ON CENTER

#4 REBAR (TYP)

36" MINIMUM

3000 PSI CONCRETE

4" SCH 40 PVC

(TYPICAL)

3" MINIMUM

SEPARATION (TYP)

1 1/2" MINIMUM (TYP)

3" MINIMUM (TYP)

3" MINIMUM

(TYP)

8 KV POWER

CONDUCTORS

SEE GENERAL DUCTBANK NOTE 3

SEE GENERAL DUCTBANK NOTE 3

NTSES-502

6 1-WAY 8 KV POWER DUCTBANK

APPROX. 36"

(DEPTH SHALL FOLLOW

THE DEPTH OF THE EXISTING

8 KV POWER DUCTBANK

(SEE SHT. ES-102

FOR ADDITIONAL

REQUIREMENTS)

DUCTBANK SHALL BE INSTALLED

ABUTTING/ADJACENT TO THE EXISTING

8 KV DUCTBANK. SEE SHT. ES-102 FOR

APPROXIMATE ROUTING OF THIS 8 KV

DUCTBANK.

#4 REBAR (TYP)

24" ON CENTER

3" MINIMUM (TYP)

3" MINIMUM

(TYP)

BASE

SPACERS

48" ON

CENTER

4" SCH 40 PVC

(TYPICAL)

8 KV POWER

CONDUCTORS

#4 REBAR (TYP)

3000 PSI CONCRETE

SEE GENERAL DUCTBANK NOTE 3

UNDISTURBED SOIL BELOW DUCTBANK (UON)

UNDISTURBED SOIL BELOW DUCTBANK (UON)

UNDISTURBED SOIL BELOW DUCTBANK (UON)

UNDISTURBED SOIL BELOW DUCTBANK (UON)

UNDISTURBED SOIL BELOW DUCTBANK (UON)

UNDISTURBED SOIL BELOW DUCTBANK (UON)

6" DETECTABLE WARNING TAPE

"WARNING - POWER CABLE BELOW"

18" MINIMUM BELOW FINISHED

GRADE

Sheets
ES-502 - ELECTRICAL SITE DETAILS - 2

File details come from the government source that posted it. Updated .