W912DS22R0001_Amendment 0002.pdf
PDF 507 KB Posted
- Solicitation number
- W912DS22R0001
About this file
This document summarizes a federal solicitation for the construction of an Information Systems Node facility at Fort Hamilton, New York. The U.S. Army Corps of Engineers, New York District is seeking proposals for the construction of a single-story, 10,872 square foot building along with site improvements and infrastructure. The period of performance is 730 calendar days from notice to proceed. Eligible offerors must be registered in the System for Award Management. Proposals are due no later than March 29, 2022 at 2:00 PM Eastern Time and must be submitted electronically through the beta.SAM.gov website. The work includes construction of the building, installation of mechanical, electrical and security systems, as well as pavements, walks and landscaping. The facility is designed to LEED Silver standards and will incorporate sustainability, energy efficiency and cybersecurity measures.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Issue updated Wage Rates.
2. Post the Sign-In sheet from the 24 Feb 2022 Site Visit.
3. Revise and reissue draw ings and specif ications.
4. Provide responses to bidder inquires for informational purposes only.
5. Extend Offer Due Date to 29 March 2022 at 2:00 PM EDT and to extend the Bidder Inquiry Due Date to 7 March 2022 at 11:59 AM EST.
Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 23
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22R0001
X 9B. DATED (SEE ITEM 11)
28-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Mar-2022
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS22R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 15-Mar-2022 02:00 PM to 29-Mar-2022 02:00 PM.
The following have been modified:
OFFEROR INQUIRIES
BIDDER INQUIRIES: Submission of inquiries will open on 28 January 2022. Please submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at https://www.projnet.org. Submission of inquires will close 7 March 2022 at 11:59 AM EST. The Government reserves the right to decline addressing questions received after this date. If an Offeror believes that the requirements in this solicitation contains an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale.
The Government reserves the right to award this contract based on the initial proposal, as received, without discussions. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via e-mail, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet.
Approved answers to all timely questions will also be posted on www.sam.gov in the form of a report generated from ProjNet as soon as the comment/question entering period is over and answers are all finalized.
Bidder Inquiry Key: 5R9RU5-U44UDQ Specific Instructions for Initial ProjNet Bid Inquiry Access:
1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.
2. Identify the Agency as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. E-mail. Enter the e-mail address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, E-mail, Secret Question, Secret Answer, and Time Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
Steps 1 through 3: same as above.
4. E-mail. Enter the e-mail address you used to register previously in ProjNet.
5. Click Continue. A page will then open asking for the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been added by full text:
AMENDMENT 0002
TO OFFERORS:
The purpose of this amendment is to extend the Offer Due Date to 29 March 2022 at 2:00 PM EDT, to extend the Bidder Inquiry Due Date to 7 March 2022 at 11:59 AM EST, to respond to bidder inquiries, to publish the Sign-In Sheet from the Site Visit, provide updated Wage Rates, and to make the following changes to the solicitation.
DRAWINGS:
1. The following DRAWINGS have been REVISED and REISSUED:
G-003 A-604
2. The following DRAWINGS have been ADDED:
M-820
3. The following DRAWINGS have been DELETED: None
4. The following DRAWINGS have been REVISED but NOT REISSUED: None.
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein: None.
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
SECTION 00 00 01
SECTION 00 00 02
3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED:
None.
4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:
None.
QUESTIONS AND GOVERNMENT REPLY:
(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the offerors “For Information Only” and do not revise the solicitation, plans or specifications.)
BIDDER INQUIRY 1: Drawing M-820 is missing. In addition, Equipment Schedule drawings M-601 to M-604 do not contain any information of basis of design's manufacturer and model.
will you please provide the missing drawing and information?
GOVERNMENT RESPONSE 1: Without an approved justification, the Federal Acquisition Regulation prohibits the use of brand name or equal (bases of design) references in solicitations.
Please refer to drawings M-601 to M-604 and specifications Division 23 for salient characteristics of subject equipment. Sheet M-820 is provided in this amendment.
BIDDER INQUIRY 2: Door #’s 102A, 102B, 103, 104, 105A, 105B, 106, 107, 108, 110, 111A, 111B, 112A, 112B, 122, 123 are wood doors with aluminum frames according to the door schedule. Details for these doors indicated on the door schedule appear to show open back hollow metal door frames that wrap the wall the doors are being installed into. We believe that the previously mentioned door #’s should be wood doors with hollow metal frames. Please confirm.
GOVERNMENT RESPONSE 2: All door frames previously marked as aluminum have been changed to hollow metal to reflect details and manufacturer recommendations. Refer to updated sheet A-604.
BIDDER INQUIRY 3: Door #’s 113, 114, 117AA, 117C, 119, 120, 121B are hollow metal doors with aluminum door frames according to the door schedule. Aluminum door frame manufacturer does not recommend installing hollow metal doors into aluminum frames. We believe that the previously mentioned door #’s should have hollow metal frames. Please confirm.
GOVERNMENT RESPONSE 3: All door frames previously marked as aluminum have been changed to hollow metal to reflect details and manufacturer recommendations. Refer to updated sheet A-604.
BIDDER INQUIRY 4: Door #’s 113 & 117C are hollow metal doors with aluminum frames & 1 hour fire rating according to the door schedule. If these doors are to have aluminum frames & be fire rated, then the door must also be aluminum. Fire rated aluminum frame/door manufacturer will not allow/warrant/approve a fire rated entrance with an aluminum frame & hollow metal door. Details for these doors appears to show hollow metal frame. We believe that these openings should be hollow metal doors & frames with 1 hour fire rating. Please confirm.
GOVERNMENT RESPONSE 4: All door frames previously marked as aluminum have been changed to hollow metal to reflect details and manufacturer recommendations. Refer to updated sheet A-604.
BIDDER INQUIRY 5: Door types j & k appear on the door schedule, but no elevation of these door types was provided. Please provide.
GOVERNMENT RESPONSE 5: All doors previously listed as type J have been revised to type C and all doors previously marked as type K have been revised to type E. Refer to updated sheet A-604.
BIDDER INQUIRY 6: Does door #101B have a transom? According to the door schedule it does not but I ask because the door schedule also indicates that door #101A, which is the other door of this vestibule, does not have a transom but it does have a transom according to building elevations. Please clarify if a transom is required at interior door of vestibule 101, door #101B.
GOVERNMENT RESPONSE 6: Frame type Schedule in A-604 has been revised to include type 4 with a transom and type 4 has been listed to doors 101A and 101B.
BIDDER INQUIRY 7: Door #101A is 6’-8” wide according to the door schedule. Door elevation of type A door below door schedule, floor plan & building elevation of this door show 6’-0” width. Please clarify width of door #101A.
GOVERNMENT RESPONSE 7: Door type 101A has been revised to 6’-0” to reflect plans and elevations. Refer to updated sheet A-604.
BIDDER INQUIRY 8: Door #’s 125A & 125B are 3’-0” wide according to the door schedule, floor plan & building elevation. Door elevations of type B door below door schedule say that width of this door type is 3’-6”. Please clarify width of door #’s 125A & 125B.
GOVERNMENT RESPONSE 8: Door type 2 and frame type schedule have been revised to show that Doors 125A and 125B are 3’0”. Refer to updated sheet A-604.
BIDDER INQUIRY 9: Regarding the Mechanical Electrical and Plumbing schedule, please provide makes and models to be used for all plumbing fixtures and mechanical equipment.
GOVERNMENT RESPONSE 9: Without an approved justification, the Federal Acquisition Regulation prohibits the use of brand name or equal (bases of design) references in solicitations.
Please refer to equipment schedules within the drawings as well as specifications Divisions 22 and 23 for salient characteristics of subject equipment.
BIDDER INQUIRY 10: Drawing C-503 references a detail A4 on C-510 for the latch and wheel.
This drawing was not included in the set. Please provide
GOVERNMENT RESPONSE 10: The correct reference is A4/C-503. There is not a sheet C- 510.
BIDDER INQUIRY 11: Drawing C-502 shows a straight picket detail (D4) and a curved picket detail (D6). Please advise which detail is applicable as the site Plan does not specify. If both details are applicable, then please clarify the locations to which each apply.
GOVERNMENT RESPONSE 11: The straight picket detail applies.
BIDDER INQUIRY 12: Please allow for a one week RFI extension until March 7th and a two week bid extension until March 29th. Our subcontractors have asked for an extension due to certain questions that needs answers before they can begin to get pricing and put together quotes.
GOVERNMENT RESPONSE 12: This Amendment provides the requested extension.
WAGE RATES - 0002
"General Decision Number: NY20220003 02/25/2022
Superseded General Decision Number: NY20210003
State: New York MY 02/25/2022
Construction Types: Building, Heavy, Highway and Residential
Counties: Bronx, Kings, New York, Queens and Richmond Counties in New York.
BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS (includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 02/25/2022
ASBE0012-001 06/01/2021
Rates Fringes
Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 69.01 35.16
HAZARDOUS MATERIAL HANDLER.......$ 39.00 12.75
BOIL0005-001 01/01/2021
Rates Fringes
BOILERMAKER......................$ 63.38 33%+47.22+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve
BRNY0001-001 07/01/2020
Rates Fringes
BRICKLAYER.......................$ 62.54 29.40
MASON - STONE....................$ 67.88 36.91
BRNY0001-002 07/01/2020
Rates Fringes
Pointer, cleaner and caulker.....$ 55.97 29.64
BRNY0004-001 07/05/2021
Rates Fringes
MARBLE MASON.....................$ 61.73 37.91
BRNY0007-001 07/01/2021
Rates Fringes
TERRAZZO FINISHER................$ 55.21 36.97
TERRAZZO WORKER/SETTER...........$ 58.46 38.09
* BRNY0007-002 12/06/2021
Rates Fringes
TILE FINISHER....................$ 47.56 32.71
BRNY0020-001 01/04/2021
Rates Fringes
MARBLE FINISHER..................$ 48.27 35.40
BRNY0024-001 01/01/2021
Rates Fringes
BRICKLAYER
MARBLE POLISHERS............$ 45.37 28.80
* BRNY0052-001 12/06/2021
Rates Fringes
Tile Layer.......................$ 61.84 36.04
CARP0001-003 07/01/2021
Rates Fringes
CARPENTER (HEAVY & HIGHWAY)......$ 56.93 52.79
CARP0001-009 07/01/2021
Rates Fringes
CARPENTER (BUILDING &
RESIDENTIAL)
Carpenters..................$ 54.75 46.43 Soft Floor Layers...........$ 54.75 46.43
CARP0740-001 07/01/2021
Rates Fringes
MILLWRIGHT.......................$ 57.00 54.06
CARP1556-006 07/01/2021
Rates Fringes
Dock Builder & Piledrivermen.....$ 56.93 52.79
CARP1556-007 07/01/2021
Rates Fringes
Diver Tender.....................$ 51.34 52.79 Diver............................$ 71.80 52.79
CARP1556-011 07/01/2021
Rates Fringes
Carpenters:
TIMBERMEN...................$ 52.05 52.24
ELEC0003-001 04/11/2019
ELECTRICIAN
Electricians................$ 56.00 76.725%+16.25 Jobbing, and maintenance and repair work.............$ 28.50 51.243%+7.50+a
PAID HOLIDAYS:
a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day
ELEC1049-001 04/04/2021
QUEENS COUNTY
Rates Fringes
Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;
Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment) Groundman...................$ 36.73 25.66 Heavy Equipment Operator....$ 48.97 29.55 Lineman and Cable Splicer...$ 61.21 33.43 Tree Trimmer................$ 30.09 14.12
ELEV0001-002 03/17/2021
Rates Fringes
ELEVATOR MECHANIC
Elevator Constructor........$ 72.29 42.912+a+b Modernization and Repair....$ 50.49 40.399+a+b
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;
an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.
ENGI0014-001 07/01/2021
Rates Fringes
POWER EQUIPMENT OPERATOR
(HEAVY & HIGHWAY)
GROUP 1....................$ 107.75 34.60
GROUP 2....................$ 89.05 34.60
GROUP 3....................$ 91.89 34.60
GROUP 4....................$ 89.70 34.60
GROUP 5....................$ 87.94 34.60
GROUP 6....................$ 84.48 34.60
GROUP 7....................$ 86.05 34.60
GROUP 8....................$ 83.59 34.60
GROUP 9....................$ 81.85 34.60
GROUP 10....................$ 78.28 34.60
GROUP 11....................$ 73.21 34.60
GROUP 12....................$ 74.81 34.60
GROUP 13....................$ 75.36 34.60
GROUP 14....................$ 57.06 34.60
GROUP 15....................$ 53.11 34.60
POWER EQUIPMENT OPERATOR
(PAVEMENT-HEAVY & HIGHWAY)
Asphalt Plants..............$ 69.04 34.60 Asphalt roller..............$ 81.47 34.60 Asphalt spreader............$ 83.59 34.60
POWER EQUIPMENT OPERATOR
(STEEL ERECTION)
Compressors, Welding Machines....................$ 53.07 34.60 Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 88.77 34.60 Three drum derricks.........$ 92.36 34.60
POWER EQUIPMENT OPERATOR
(UTILITY)
Horizontal Boring Rig.......$ 79.56 34.60 Off shift compressors.......$ 66.26 34.60 Utility Compressors.........$ 52.77 34.60
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Tower crane
GROUP 2: Rubber Tire Backhoes over 37,000 lbs, Track
Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type
GROUP 3: Mine hoists and crane, etc. used as mine hoists
GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature
GROUP 5: Piledrivers, derrick boats, tunnel shovels
GROUP 6: All drills, and machines of a similar nature
GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers
GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps
GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)
GROUP 10: Concrete mixers
GROUP 11: Elevators
GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons
GROUP 13: Vibratory console
GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill
GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.
PREMIUMS ON CRANES (Crawler or Truck):
100' to 149' boom - add .50 150' to 249' boom - add .75 250' to 349' boom - add 1.00 350' to 450' boom - add 1.50
Premiums for Cranes on Steel Erection:
100' to 149' boom - add 1.75 150' to 249' boom - add 2.00 250' to 349' boom - add 2.25 350' to 450' boom - add 2.75 Tower crane - add 2.00
FOOTNOTE:
a. Paid Holidays: New Year's Day; Lincoln's Birthday;
Washington's Birthday; Memorial Day; Independence Day;
Labor Day; Veterans Day; Columbus Day; Election Day;
Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.
ENGI0014-002 07/01/2021
Rates Fringes
Power Equipment Operator
BUILDING & RESIDENTIAL
GROUP 1....................$ 84.16 34.60
GROUP 2....................$ 89.10 34.60
GROUP 3....................$ 77.98 34.60
GROUP 4....................$ 70.94 34.60
GROUP 5....................$ 53.12 34.60
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Double drum
GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks
GROUP 3: 4 pole Hoist, Single Drum Hoists
GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material
GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers
Premiums for Cranes:
100'-149' boom - add 1.75 150'-249' boom - add 2.00 250'-349' boom - add 2.25 350'-450' boom - add 2.75 Tower cranes add 2.00
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs
ENGI0015-001 07/01/2021
POWER EQUIPMENT OPERATOR
HEAVY AND HIGHWAY
GROUP 1....................$ 74.65 38.00
GROUP 2....................$ 72.40 38.00
GROUP 3....................$ 68.62 38.00
GROUP 4....................$ 64.82 38.00
GROUP 5....................$ 44.45 38.00
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cherrypickers 20 tons and over and loaders (rubber-tired and/or tractor type with a manfufacturer's rated capacity of six cubic yards and over
GROUP 2: Rubber Tire Backhoes up to and including 37,000 lbs, Basin Machines, Groover, Mechanical Sweepers, Bobcat, Boom Truck, Barrier Transport (Barrier Mover) and machines of a similar nature, Boat Captains, Boat Operators, operation of Churn Drills and machines of a similar nature, Stetco Silent Hoist and machines of a similar nature, Vac-alls, Meyers Machines, John Beam and machines of a similar nature, Ross Carriers and Travel Lifts and machines of a similar nature, Bulldozers, Scrapers, and Turn-a Pulls, Tugger Hoist (used exclusively for handling excavated material), Tractors with attachments, Hyster and Roustabout Cranes, Cherrypickers, Austin Western, Grove and machines of a similar nature, Scoopmobiles, Monorails, Conveyors, Trenchers, Loaders- Rubber-tired and Tractor, Barber Greene, Eimco Loaders and Eimco Backhoes, Mighty Midget and similar breakers and tampers, Curb and Gutter Pavers and Motor Patrol, Motor Graders and all machines of a similar nature, Locomotives ten (10) tons or under, Mini-Max, Break-Tech and machines of a similar nature, Milling Machines, robotic and demolition machines and machines of a similar nature including Bobcat, Pile Rig Rubber-tired Excavator (37,000 lbs. and under), 2 man auger GROUP 3: Minor Equipment such as Tractors, Post Hole Diggers and Drivers, Ditch Witch (Walk Behind), Road Finishing Machines, Rollers (five (5) tons and under), Tugger Hoists, Dual Purpose Trucks, Fork Lifts and Dempsey Dumpsters
GROUP 4: Oilers for the following equipment: (all gasoline, electric, diesel, or air operated) gradalls and concrete pumps or similarly equipment manned by two-men
GROUP 5: Oilers for the following equipment: (all gasoline, electric, diesel, or air operated) shovels, cranes (draglines), backhoes, pavers, trenching machines, gunite machines, compressors (3 or more in battery)
Premiums for Cranes:
100'-149' boom - add 1.75
150'-249' boom - add 2.00 250'-349' boom - add 2.25 350'-450' boom - add 2.75 Tower cranes add 2.00
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs
ENGI0015-002 07/01/2016
Rates Fringes
POWER EQUIPMENT OPERATOR
BUILDING
GROUP 1....................$ 65.94 32.95
GROUP 2....................$ 63.98 32.95
GROUP 3....................$ 57.42 32.95
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Oiler GROUP 2: Oilers on Crawler Cranes, Backhoes, Trenching machines, Gunite machines, Compressors (3 or more in Battery) GROUP 3: Gradalls: Concrete Pumps, Power Houses - All equipment in same is manned by two (2) men only, Driving Truck Cranes
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs
IRON0040-002 07/01/2021
BRONX, NEW YORK, RICHMOND
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 54.20 82.24
IRON0046-003 07/01/2021
Rates Fringes
IRONWORKER
METALLIC LATHERS AND
REINFORCING IRONWORKERS.....$ 56.90 26.30
IRON0197-001 07/01/2021
IRONWORKER
STONE DERRICKMAN............$ 55.63 55.10
IRON0361-002 07/01/2021
KINGS, QUEENS
Rates Fringes
Ironworkers:
(STRUCTURAL)................$ 54.20 82.24
IRON0580-001 07/01/2021
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 46.15 59.79
LABO0006-001 07/01/2016
Rates Fringes
LABORER (Cement and Concrete Workers).........................$ 42.48 17.35
LABO0029-001 07/01/2017
Rates Fringes
Laborers:
Heavy Blasters (hydraulic trac drill).....................$ 47.15 35.49 Blasters...................$ 46.27 35.49 Hydraulic Trac Drill.......$ 41.29 35.49 Jackhammers, Chippers, Spaders, Concrete Breakers, All Other Pneumatic Tools, Walk Behind Self-Propelled Hydraulic Asphalt and Concrete Breaker...........$ 39.34 35.49 Powder Carriers............$ 35.17 35.49
LABO0078-001 09/01/2021
Rates Fringes
LABORERS
BUILDING CONSTRUCTION
ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &
HAZARDOUS WASTE LABORERS
(Hazardous Waste, Hazardous Materials, Biochemical and Mold Remediation, HVAC, Duct Cleaning, Re-spray Fireproofing, etc).........$ 38.05 19.35
LABO0079-001 07/01/2018
Rates Fringes
LABORER (Building Construction) Demolition Laborers (Interior) Tier A.....................$ 37.44 23.60 Tier B.....................$ 26.63 17.57 Mason Tender/General Laborer.....................$ 40.65 28.85
CLASSIFICATIONS
TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.
TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.
LABO0147-001 07/01/2016
Rates Fringes
LABORERS (FREE AIR & TUNNEL).....$ 72.67 47.72
Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout Men, Gravel Men, Form Workers, Concrete Workers, Tunnel Laborers, Mole Nipper (one (1) Mole Sipper per Working Shaft per Shift for up to and including Two (2) Moles
LABO0731-001 07/01/2021
LABORER
Building, Heavy and Residential Construction LABORER: (Asbestos, Lead, Hazardous Waste Removal (including soil)/CEMENT/CONCRETE......$ 43.50 48.48
UTILITY LABORER............$ 43.35 48.48
Paid Holidays: Labor Day and Thanksgiving Day
LABO1010-001 07/01/2019
Rates Fringes
Laborers:
HIGHWAY CONSTRUCTION
Fence Installer & Repairer.$ 42.98 43.91
FORMSETTERS................$ 46.85 43.91
LABORERS...................$ 42.98 43.91
Landscape Planting & Maintenance................$ 42.98 43.91 Maintenance Safety Surface.$ 42.98 43.91 Slurry/Sealcoater/Play Equipment Installer........$ 42.98 43.91 Small Equipment Operator (Not Operating Engineer)...$ 42.98 43.91 Small Power Tools Operator.$ 42.98 43.91
FOOTNOTES:
a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.
LABO1010-002 07/01/2019
Rates Fringes
Laborers-Asphalt Construction:
Micro Paver.................$ 47.45 43.91 Raker.......................$ 46.85 43.91 Screedperson................$ 47.45 43.91 Shoveler (Production Paving Only)................$ 42.98 43.91 Small Equipment Operator (Asphalt)...................$ 42.98 43.91
PAIN0009-001 05/01/2020
GLAZIER..........................$ 46.55 44.77
PAINTER
Painters, Drywall Finishers, Lead Abatement Worker......................$ 45.70 27.67 Spray, Scaffold and Sandblasting................$ 48.70 27.67
PAIN0806-001 10/01/2021
Rates Fringes
Painters:
Structural Steel and Bridge.$ 53.00 51.23
PAIN1974-001 06/28/2021
Rates Fringes
Painters:
Drywall Tapers/Pointers.....$ 48.47 29.06
PLAS0262-001 08/01/2019
Rates Fringes
PLASTERER........................$ 45.73 30.37
PLAS0262-002 08/01/2019
KINGS AND QUEENS COUNTIES
Rates Fringes
PLASTERER........................$ 45.73 30.37
PLAS0780-001 07/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 51.97 33.56
* PLUM0001-001 01/01/2022
Rates Fringes
PLUMBER
MECHANICAL EQUIPMENT AND
SERVICE
Any repair and/or replacement of the present plumbing system that does not change the existing roughing..........$ 46.60 19.96
PLUMBERS:...................$ 71.25 39.95
PLUM0638-001 07/01/2020
Rates Fringes
PLUMBER
SERVICE FITTERS.............$ 41.75 14.00
SPRINKLER FITTERS,
STEAMFITTERS................$ 59.05 58.34
Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.
ROOF0008-003 07/01/2021
Rates Fringes
ROOFER...........................$ 45.25 35.62
SHEE0028-002 07/29/2021
Rates Fringes
SHEET METAL WORKER
BUILDING CONSTRUCTION.......$ 51.35 53.51
RESIDENTIAL CONSTRUCTION....$ 23.84 8.40
TEAM0282-001 07/01/2020
Rates Fringes
TRUCK DRIVER
Asphalt.....................$ 42.68 46.9025+a Euclids & Turnapulls........$ 45.62 50.5625+a High Rise...................$ 53.79 49.2025+a
FOOTNOTES:
PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day, Day after Thanksgiving and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)