W912DS22R0001_Amendment 0001.pdf

PDF 976 KB Posted

Attached to
Construction of Information Systems Node (ISN) Facility, Fort Hamilton, NY
Solicitation number
W912DS22R0001
Issued by

About this file

This document summarizes a federal solicitation for construction services. The U.S. Army Corps of Engineers, New York District is seeking proposals for the construction of an Information Systems Node facility at Fort Hamilton, NY. The project scope includes construction of a 10,872 square foot building, site work, utilities, security systems, and sustainability features to achieve LEED Silver certification. The period of performance is 730 calendar days from notice to proceed. The procurement will use best value tradeoff source selection with a HUBZone price evaluation preference. The estimated value is between $10-25 million. Interested vendors must register with the System for Award Management to access the full solicitation, which will be posted electronically at https://sam.gov/. Proposals must be submitted electronically as well. The point of contact for any questions is Monica Chahary of the U.S. Army Corps of Engineers, New York District.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Post site visit instructions for 24 February 2022 at 10:00AM EST.

Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Feb-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22R0001

X 9B. DATED (SEE ITEM 11)

28-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Feb-2022

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS22R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS

The following have been added by full text:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- DATE AND TIME: Thursday, 24 Feb 2022 at 10:00AM EST.

(c) Participants will meet at-- LOCATION: Contractors should meet the USACE representatives at the Fort Hamilton PX (Post Exchange) parking lot and everyone will walk to the site as a group from there. For GPS directions to the PX parking lot, enter the following address: 123 General Lee Ave, Brooklyn, NY 11252.

PRE-SITE VISIT INSTRUCTIONS: Contractors must submit a background check form to USACE by the end of day on Friday, 18 Feb 2022, for their personnel that need Installation access. The background check request form is included below (NCIC III – Background Consent/Waiver). Please fill out and submit below form to the following points of contact:

monica.c.chahary@usace.army.mil and andrew.a.andreeko@usace.army.mil.

SITE VISIT POC:

Andrew Andreeko USACE, Project Manager Cell: 917-599-3156

(End of provision)

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been modified:

WAGE RATES

"General Decision Number: NY20220003 01/07/2022 Superseded General Decision Number: NY20210003 State: New York MY 01/28/2022

Construction Types: Building, Heavy, Highway and Residential Counties: Bronx, Kings, New York, Queens and Richmond Counties in New York.

BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS

(includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.

If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/07/2022

* ASBE0012-001 06/01/2021

Rates Fringes

Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 69.01 35.16

HAZARDOUS MATERIAL HANDLER.......$ 39.00 12.75

BOIL0005-001 01/01/2021

Rates Fringes

BOILERMAKER......................$ 63.38 33%+47.22+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0001-001 07/01/2020

Rates Fringes

BRICKLAYER.......................$ 62.54 29.40

MASON - STONE....................$ 67.88 36.91

BRNY0001-002 07/01/2020

Rates Fringes

Pointer, cleaner and caulker.....$ 55.97 29.64

BRNY0004-001 07/05/2021

Rates Fringes

MARBLE MASON.....................$ 61.73 37.91

BRNY0007-001 07/01/2021

Rates Fringes

TERRAZZO FINISHER................$ 55.21 36.97

TERRAZZO WORKER/SETTER...........$ 58.46 38.09

BRNY0007-002 06/01/2021

Rates Fringes

TILE FINISHER....................$ 47.26 32.61

* BRNY0020-001 01/04/2021

Rates Fringes

MARBLE FINISHER..................$ 48.27 35.40

* BRNY0024-001 01/01/2021

Rates Fringes

BRICKLAYER

MARBLE POLISHERS............$ 45.37 28.80

BRNY0052-001 12/02/2019

Rates Fringes

Tile Layer.......................$ 59.73 35.37

CARP0001-003 07/01/2021

Rates Fringes

CARPENTER (HEAVY & HIGHWAY)......$ 56.93 52.79

CARP0001-009 07/01/2021

Rates Fringes

CARPENTER (BUILDING &

RESIDENTIAL)

Carpenters..................$ 54.75 46.43 Soft Floor Layers...........$ 54.75 46.43

CARP0740-001 07/01/2021

Rates Fringes

MILLWRIGHT.......................$ 57.00 54.06

CARP1556-006 07/01/2021

Rates Fringes

Dock Builder & Piledrivermen.....$ 56.93 52.79

CARP1556-007 07/01/2021

Rates Fringes

Diver Tender.....................$ 51.34 52.79 Diver............................$ 71.80 52.79

CARP1556-011 07/01/2021

Rates Fringes

Carpenters:

TIMBERMEN...................$ 52.05 52.24

ELEC0003-001 04/11/2019

ELECTRICIAN

Electricians................$ 56.00 76.725%+16.25 Jobbing, and maintenance and repair work.............$ 28.50 51.243%+7.50+a

PAID HOLIDAYS:

a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day

* ELEC1049-001 04/04/2021

QUEENS COUNTY

Rates Fringes

Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;

Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment) Groundman...................$ 36.73 25.66 Heavy Equipment Operator....$ 48.97 29.55 Lineman and Cable Splicer...$ 61.21 33.43 Tree Trimmer................$ 30.09 14.12

* ELEV0001-002 03/17/2021

Rates Fringes

ELEVATOR MECHANIC

Elevator Constructor........$ 72.29 42.912+a+b Modernization and Repair....$ 50.49 40.399+a+b

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;

an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.

* ENGI0014-001 07/01/2021

Rates Fringes

POWER EQUIPMENT OPERATOR

(HEAVY & HIGHWAY)

GROUP 1....................$ 107.75 34.60

GROUP 2....................$ 89.05 34.60

GROUP 3....................$ 91.89 34.60

GROUP 4....................$ 89.70 34.60

GROUP 5....................$ 87.94 34.60

GROUP 6....................$ 84.48 34.60

GROUP 7....................$ 86.05 34.60

GROUP 8....................$ 83.59 34.60

GROUP 9....................$ 81.85 34.60

GROUP 10....................$ 78.28 34.60

GROUP 11....................$ 73.21 34.60

GROUP 12....................$ 74.81 34.60

GROUP 13....................$ 75.36 34.60

GROUP 14....................$ 57.06 34.60

GROUP 15....................$ 53.11 34.60

POWER EQUIPMENT OPERATOR

(PAVEMENT-HEAVY & HIGHWAY)

Asphalt Plants..............$ 69.04 34.60 Asphalt roller..............$ 81.47 34.60 Asphalt spreader............$ 83.59 34.60

POWER EQUIPMENT OPERATOR

(STEEL ERECTION)

Compressors, Welding Machines....................$ 53.07 34.60 Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 88.77 34.60 Three drum derricks.........$ 92.36 34.60

POWER EQUIPMENT OPERATOR

(UTILITY)

Horizontal Boring Rig.......$ 79.56 34.60 Off shift compressors.......$ 66.26 34.60 Utility Compressors.........$ 52.77 34.60

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Tower crane

GROUP 2: Rubber Tire Backhoes over 37,000 lbs, Track

Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type

GROUP 3: Mine hoists and crane, etc. used as mine hoists

GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature

GROUP 5: Piledrivers, derrick boats, tunnel shovels

GROUP 6: All drills, and machines of a similar nature

GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers

GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps

GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)

GROUP 10: Concrete mixers

GROUP 11: Elevators

GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons

GROUP 13: Vibratory console

GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill

GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.

PREMIUMS ON CRANES (Crawler or Truck):

100' to 149' boom - add .50 150' to 249' boom - add .75 250' to 349' boom - add 1.00 350' to 450' boom - add 1.50

Premiums for Cranes on Steel Erection:

100' to 149' boom - add 1.75 150' to 249' boom - add 2.00 250' to 349' boom - add 2.25 350' to 450' boom - add 2.75 Tower crane - add 2.00

FOOTNOTE:

a. Paid Holidays: New Year's Day; Lincoln's Birthday;

Washington's Birthday; Memorial Day; Independence Day;

Labor Day; Veterans Day; Columbus Day; Election Day;

Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.

* ENGI0014-002 07/01/2021

Rates Fringes

Power Equipment Operator

BUILDING & RESIDENTIAL

GROUP 1....................$ 84.16 34.60

GROUP 2....................$ 89.10 34.60

GROUP 3....................$ 77.98 34.60

GROUP 4....................$ 70.94 34.60

GROUP 5....................$ 53.12 34.60

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Double drum

GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks

GROUP 3: 4 pole Hoist, Single Drum Hoists

GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material

GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers

Premiums for Cranes:

100'-149' boom - add 1.75 150'-249' boom - add 2.00 250'-349' boom - add 2.25 350'-450' boom - add 2.75 Tower cranes add 2.00

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs

ENGI0015-001 07/01/2021

POWER EQUIPMENT OPERATOR

HEAVY AND HIGHWAY

GROUP 1....................$ 74.65 38.00

GROUP 2....................$ 72.40 38.00

GROUP 3....................$ 68.62 38.00

GROUP 4....................$ 64.82 38.00

GROUP 5....................$ 44.45 38.00

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cherrypickers 20 tons and over and loaders (rubber-tired and/or tractor type with a manfufacturer's rated capacity of six cubic yards and over

GROUP 2: Rubber Tire Backhoes up to and including 37,000 lbs, Basin Machines, Groover, Mechanical Sweepers, Bobcat, Boom Truck, Barrier Transport (Barrier Mover) and machines of a similar nature, Boat Captains, Boat Operators, operation of Churn Drills and machines of a similar nature, Stetco Silent Hoist and machines of a similar nature, Vac-alls, Meyers Machines, John Beam and machines of a similar nature, Ross Carriers and Travel Lifts and machines of a similar nature, Bulldozers, Scrapers, and Turn-a Pulls, Tugger Hoist (used exclusively for handling excavated material), Tractors with attachments, Hyster and Roustabout Cranes, Cherrypickers, Austin Western, Grove and machines of a similar nature, Scoopmobiles, Monorails, Conveyors, Trenchers, Loaders- Rubber-tired and Tractor, Barber Greene, Eimco Loaders and Eimco Backhoes, Mighty Midget and similar breakers and tampers, Curb and Gutter Pavers and Motor Patrol, Motor Graders and all machines of a similar nature, Locomotives ten (10) tons or under, Mini-Max, Break-Tech and machines of a similar nature, Milling Machines, robotic and demolition machines and machines of a similar nature including Bobcat, Pile Rig Rubber-tired Excavator (37,000 lbs. and under), 2 man auger GROUP 3: Minor Equipment such as Tractors, Post Hole Diggers and Drivers, Ditch Witch (Walk Behind), Road Finishing Machines, Rollers (five (5) tons and under), Tugger Hoists, Dual Purpose Trucks, Fork Lifts and Dempsey Dumpsters

GROUP 4: Oilers for the following equipment: (all gasoline, electric, diesel, or air operated) gradalls and concrete pumps or similarly equipment manned by two-men

GROUP 5: Oilers for the following equipment: (all gasoline, electric, diesel, or air operated) shovels, cranes (draglines), backhoes, pavers, trenching machines, gunite machines, compressors (3 or more in battery)

Premiums for Cranes:

100'-149' boom - add 1.75

150'-249' boom - add 2.00 250'-349' boom - add 2.25 350'-450' boom - add 2.75 Tower cranes add 2.00

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs

ENGI0015-002 07/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR

BUILDING

GROUP 1....................$ 65.94 32.95

GROUP 2....................$ 63.98 32.95

GROUP 3....................$ 57.42 32.95

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Oiler GROUP 2: Oilers on Crawler Cranes, Backhoes, Trenching machines, Gunite machines, Compressors (3 or more in Battery) GROUP 3: Gradalls: Concrete Pumps, Power Houses - All equipment in same is manned by two (2) men only, Driving Truck Cranes

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs

* IRON0040-002 07/01/2021

BRONX, NEW YORK, RICHMOND

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 54.20 82.24

IRON0046-003 07/01/2021

Rates Fringes

IRONWORKER

METALLIC LATHERS AND

REINFORCING IRONWORKERS.....$ 56.90 26.30

IRON0197-001 07/01/2021

IRONWORKER

STONE DERRICKMAN............$ 55.63 55.10

* IRON0361-002 07/01/2021

KINGS, QUEENS

Rates Fringes

Ironworkers:

(STRUCTURAL)................$ 54.20 82.24

IRON0580-001 07/01/2021

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 46.15 59.79

LABO0006-001 07/01/2016

Rates Fringes

LABORER (Cement and Concrete Workers).........................$ 42.48 17.35

LABO0029-001 07/01/2017

Rates Fringes

Laborers:

Heavy Blasters (hydraulic trac drill).....................$ 47.15 35.49 Blasters...................$ 46.27 35.49 Hydraulic Trac Drill.......$ 41.29 35.49 Jackhammers, Chippers, Spaders, Concrete Breakers, All Other Pneumatic Tools, Walk Behind Self-Propelled Hydraulic Asphalt and Concrete Breaker...........$ 39.34 35.49 Powder Carriers............$ 35.17 35.49

LABO0078-001 09/01/2021

Rates Fringes

LABORERS

BUILDING CONSTRUCTION

ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &

HAZARDOUS WASTE LABORERS

(Hazardous Waste, Hazardous Materials, Biochemical and Mold Remediation, HVAC, Duct Cleaning, Re-spray Fireproofing, etc).........$ 38.05 19.35

LABO0079-001 07/01/2018

Rates Fringes

LABORER (Building Construction) Demolition Laborers (Interior) Tier A.....................$ 37.44 23.60 Tier B.....................$ 26.63 17.57 Mason Tender/General Laborer.....................$ 40.65 28.85

CLASSIFICATIONS

TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.

TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.

LABO0147-001 07/01/2016

Rates Fringes

LABORERS (FREE AIR & TUNNEL).....$ 72.67 47.72

Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout Men, Gravel Men, Form Workers, Concrete Workers, Tunnel Laborers, Mole Nipper (one (1) Mole Sipper per Working Shaft per Shift for up to and including Two (2) Moles

LABO0731-001 07/01/2021

LABORER

Building, Heavy and Residential Construction LABORER: (Asbestos, Lead, Hazardous Waste Removal (including soil)/CEMENT/CONCRETE......$ 43.50 48.48

UTILITY LABORER............$ 43.35 48.48

Paid Holidays: Labor Day and Thanksgiving Day

LABO1010-001 07/01/2019

Rates Fringes

Laborers:

HIGHWAY CONSTRUCTION

Fence Installer & Repairer.$ 42.98 43.91

FORMSETTERS................$ 46.85 43.91

LABORERS...................$ 42.98 43.91

Landscape Planting & Maintenance................$ 42.98 43.91 Maintenance Safety Surface.$ 42.98 43.91 Slurry/Sealcoater/Play Equipment Installer........$ 42.98 43.91 Small Equipment Operator (Not Operating Engineer)...$ 42.98 43.91 Small Power Tools Operator.$ 42.98 43.91

FOOTNOTES:

a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.

LABO1010-002 07/01/2019

Rates Fringes

Laborers-Asphalt Construction:

Micro Paver.................$ 47.45 43.91 Raker.......................$ 46.85 43.91 Screedperson................$ 47.45 43.91 Shoveler (Production Paving Only)................$ 42.98 43.91 Small Equipment Operator (Asphalt)...................$ 42.98 43.91

PAIN0009-001 05/01/2020

GLAZIER..........................$ 46.55 44.77

PAINTER

Painters, Drywall Finishers, Lead Abatement Worker......................$ 45.70 27.67 Spray, Scaffold and Sandblasting................$ 48.70 27.67

PAIN0806-001 10/01/2021

Rates Fringes

Painters:

Structural Steel and Bridge.$ 53.00 51.23

* PAIN1974-001 06/28/2021

Rates Fringes

Painters:

Drywall Tapers/Pointers.....$ 48.47 29.06

PLAS0262-001 08/01/2019

Rates Fringes

PLASTERER........................$ 45.73 30.37

PLAS0262-002 08/01/2019

KINGS AND QUEENS COUNTIES

Rates Fringes

PLASTERER........................$ 45.73 30.37

PLAS0780-001 07/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 51.97 33.56

PLUM0001-001 07/01/2021

Rates Fringes

PLUMBER

MECHANICAL EQUIPMENT AND

SERVICE

Any repair and/or replacement of the present plumbing system that does not change the existing roughing..........$ 45.25 19.06

PLUMBERS:...................$ 71.25 39.95

PLUM0638-001 07/01/2020

Rates Fringes

PLUMBER

SERVICE FITTERS.............$ 41.75 14.00

SPRINKLER FITTERS,

STEAMFITTERS................$ 59.05 58.34

Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.

* ROOF0008-003 07/01/2021

Rates Fringes

ROOFER...........................$ 45.25 35.62

* SHEE0028-002 07/29/2021

Rates Fringes

SHEET METAL WORKER

BUILDING CONSTRUCTION.......$ 51.35 53.51

RESIDENTIAL CONSTRUCTION....$ 23.84 8.40

TEAM0282-001 07/01/2020

Rates Fringes

TRUCK DRIVER

Asphalt.....................$ 42.68 46.9025+a Euclids & Turnapulls........$ 45.62 50.5625+a High Rise...................$ 53.79 49.2025+a

FOOTNOTES:

PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day, Day after Thanksgiving and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union, which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Division National Office Branch of Wage Surveys. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)

Imani-Joi.Chambers Typewritten Text

File details come from the government source that posted it. Updated .