This is an amendment to a solicitation for the construction of a Munitions Storage Area at Joint Base McGuire-Dix-Lakehurst in New Jersey. The amendment revises pricing for CLIN 0008 to increase the quantity from 1 to 1,000 cubic yards and change the unit of issue from a job to cubic yards for disposal of contaminated soil. It also provides responses to bidder questions to clarify soil improvement requirements and responses. Bids are due no later than January 25, 2022 and will be opened the same day. The solicitation is being conducted by the Department of the Army Corps of Engineers Engineering District New York.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise and reissue CLIN 0008 2.Answ er RFI's
3. Clarify submission requirements
4. Revise draw ings and specifications Bidder must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND
WITHDRAWAL OF BIDS (FAR 15.208).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22B0002
X 9B. DATED (SEE ITEM 11)
05-Nov-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Jan-2022
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS22B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CLIN
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Construction of MSA at JBMDL NJ
FFP
Construction of MSA at JBMDL NJ: All work (includes all plant, labor, and material) for the construction of the 27 munition igloos and associated site work as described in the plans and specifications except for work included in items below FOB: Destination
PSC CD: Y1JZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
Construction of MSA at JBMDL NJ
FFP
Construction of MSA at JBMDL NJ: All work (includes all plant, labor, and material) for construction for MX Admin Facility and Admin Bldgs as described in plans and specifications.
FOB: Destination
PSC CD: Y1JZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job
Construction of MSA at JBMDL NJ
FFP
Construction of MSA at JBMDL NJ: All work (includes all plant, labor, and material) for demolition of Bldg 1913, 1918 and 1939 as described in plans and specifications.
FOB: Destination
PSC CD: Y1JZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 1 Job
Construction of MSA at JBMDL NJ
FFP
Construction of MSA at JBMDL NJ: All work (includes all plant, labor, and material) for construction of remaining site work as well as fencing as described in the plans and specifications.
FOB: Destination
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 1 Job
Construction of MSA at JBMDL NJ
FFP
Construction of MSA at JBMDL NJ All work for the Final Record Drawing Submission. This line item is pre-priced and cannot be changed.
FOB: Destination
PSC CD: Y1JZ
$30,000
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 1 Job OPTION Option 1
FFP
Construction of MSA at JBMDL NJ All work associated with procurement delivery and installation of Furniture, Fixtures, & Equipment (FF&E) as listed on the drawings FOB: Destination
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0007 1 Job OPTION Option 2
FFP
Construction of MSA at JBMDL NJ All work associated with installation of extended lightening protection system.
FOB: Destination
PSC CD: Y1JZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0008 1,000 Cubic
Yard OPTION Option 3
FFP
Construction of MSA at JBMDL NJ All work associated with disposal of contaminated soil.
FOB: Destination
PSC CD: Y1JZ
NET AMT
TOTALS/NOTES
TOTAL BASE BID (SUM of CLINs 0001 through 0005)
TOTAL OPTIONAL ITEMS (SUM of CLINs 0006 through 0008)
TOTAL BASE BID PLUS OPTIONAL ITEMS (SUM OF CLINs 0001 through 0008)
NOTES:
1. Bidders are required to bid on all the Base Bid and all the Optional Bid Items or their bids will be rejected.
2. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself, thereto, may render the bid non-responsive and be cause for its rejection.
3. Line item 0005 is pre-priced at $30,000.00 and this price shown may not be changed. This price is set by the government as assurance to receive final drawings, it may not reflect the actual effort of developing final set. The Offerors are to include balance of actual effort in CLIN 0001, whether credit or additional cost.
4. The Basis of Evaluation will be the lowest responsive, responsible Offeror based on the Total Amount for the Base Bid Items plus any Optional Bid Items (Line Items 0001 thru 0008).
5. Option 1, 2 and/or 3: The Government may execute any option at any time before 300 calendar days from issuance of Notice to Proceed. Execution of any of these optional items will not extend construction duration.
6. The Bid Acceptance Period is as stated on Standard Form 1442.
AMENDMENT 0004
Munition Storage Area
Joint Base McGuire-Dix-Lakehurst, NJ
W912DS22B0002
Amendment 0004
AMENDMENT 0004 to DRAWINGS and SPECIFICATIONS for Munitions Storage Area, Joint Base McGuire-Dix-Lakehurst, New Jersey.
TO OFFORERS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
2. The following DRAWINGS have been REVISED and REISSUED:
- None
3. The following DRAWINGS have been ADDED:
- None
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- None
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- None
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
1. Who will be the engineer of record for the ground improvement vibro compaction and dynamic deep compaction scopes of work? RESPONSE: The Contractor will utilize a Professional Engineer to perform the soil matrix improvement design and oversee the successful completion of the work. Please refer to the Contract Documents. Specification Section 31 32 19.17 VIBRO- COMPACTION, Paragraph 1.2. and Note 6 on Sheet S-001 states
2. What is the depth of vibro compaction that we should be assuming for bidding purposes? RESPONSE: The Contractor will utilize a Professional Engineer to perform the soil matrix improvement design and oversee the successful completion of the work. Refer to plans and specifications for details.
3. What is the grid pattern for vibro compaction we should assume for bidding purposes? RESPONSE:
The Contractor will utilize a Professional Engineer to perform the soil matrix improvement design and oversee the successful completion of the work. Refer to specification 31 32 19.19 for requirements.
4. What should we assume the vibro compaction pulling criteria to be for bidding purposes? The Contractor will utilize a Professional Engineer to perform the soil matrix improvement design and oversee the successful completion of the work. Refer to specification 31 32 19.17 for requirements.
5. Will we have to set up vibration/settlement monitoring? If so, please provide the quantity and type of monitors we should assume for bidding purposes. RESPONSE: The Contractor will utilize a Professional Engineer to perform the soil matrix improvement design and oversee the successful completion of the work. Please also refer to Paragraphs 1.4.1, 1.4.2 and 1.4.3 of Specification Section 31 32 19.17 for trial installation and monitoring during the soil matrix improvement work. Long-term monitoring of vibrations and settlement is not required.
6. Are both the vibro compaction and Dynamic Deep Compaction soil improvement methods necessary for 15’ on either side of the extents of the utilities per the note on S-001? RESPONSE: The Contractor will utilize a Professional Engineer to perform the soil matrix improvement design and oversee the successful completion of the work. Please refer to Note 6 on Sheet S-001 which shall be interpreted as “earth-bermed igloos and earth-bermed utilities.” The Contractor will utilize a Professional Engineer to interpret, design and implement a soil matrix improvement program.
7. Are both the vibro compaction and Dynamic Deep Compaction soil improvement methods necessary for 15’ on either side of the extents of the utilities per the note on S-001? For drawing CU101- The entire length of waterline from the start of the additional 275LF down South Ammo Road to the end of the utility line around coordinates N:437887.43, E:473036.99. This would be a 30’ wide area plus the outer diameter of the pipe. Also, the same parameter applies for the 4” sanitary sewer line coming off of the new administration building but not under the building itself. RESPONSE: The Contractor will utilize a Professional Engineer to perform the soil matrix improvement design and oversee the successful completion of the work. Please refer to Note 6 on Sheet S-001 which shall be interpreted as “earth-bermed igloos and earth-bermed utilities.” The Contractor will utilize a Professional Engineer to interpret, design and implement a soil matrix improvement program.
8. Are both the vibro compaction and Dynamic Deep Compaction soil improvement methods necessary for 15’ on either side of the extents of the utilities per the note on S-001? For drawing ES102-Will we have to perform the ground improvement methods for the entire length of the new electrical conduits and duct banks with a width of 30’ plus the outer diameter of duct bank or conduits? RESPONSE:
The Contractor will utilize a Professional Engineer to perform the soil matrix improvement design and oversee the successful completion of the work. Please refer to Note 6 on Sheet S- 001 which shall be interpreted as “earth-bermed igloos and earth-bermed utilities.” The Contractor will utilize a Professional Engineer to interpret, design and implement a soil matrix improvement program.
9. Are both the vibro compaction and Dynamic Deep Compaction soil improvement methods necessary for 15’ on either side of the extents of the utilities per the note on S-001? For drawing ES104-Will we have to perform the ground improvement methods for the entire length of the new communication conduits and duct banks with a width of 30’ plus the outer diameter of duct bank or conduits? RESPONSE: The Contractor will utilize a Professional Engineer to perform the soil matrix improvement design and oversee the successful completion of the work. Please refer to Note 6 on Sheet S-001 which shall be interpreted as “earth-bermed igloos and earth-bermed utilities.” The Contractor will utilize a Professional Engineer to interpret, design and implement a soil matrix improvement program.
10. Will any of the HDPE and DIP pipe from the stormwater management scope of work, drawings CG103, CG103A, CG201, CG202, require soil improvement methods applied? Or will this work solely be for the electrical, communications, water, and sewer utility lines? RESPONSE: The Contractor will utilize a Professional Engineer to perform the soil matrix improvement design and oversee the successful completion of the work. Please refer to Note 6 on Sheet S-001 which shall be interpreted as “earth-bermed igloos and earth-bermed utilities.” The Contractor will utilize a Professional Engineer to interpret, design and implement a soil matrix improvement program.
11. Is the select fill called out on drawing S-001 note 6 we’re supposed to import borrow material? RESPONSE: The contractor is responsible to provide all select fill from their own sources.
12. Will alternate methodology for the ground improvements be considered? RESPONSE: Please submit bids per construction documents as posted. Any substitutions/deviations for requirements will be evaluated at the time of the submittal review process.
BID SUBMISSION INSTRUCTIONS
BID SUBMISSION INSTRUCTIONS Contractors are required to deliver Bids to 26 Federal Plaza room 16-300 the designated recipient of bids is Nicholas Emanuel (917)790-8069. Bids are due no later than 25 January 2022 at 2:00 P.M. Bid opening will happen on 25 January 2022 at 2:00 P.M. EST Contractors are required to wear a mask on the main floor and are required to wear a mask on floor 16. The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that Bids are submitted so as to reach the designated recipient and designated location. Offerors are responsible for allowing sufficient time for the bids to be received in accordance with the instructions provided.
Contractors will not be allowed to physically be in the conference room during the bid opening however Bidders are encouraged to call into the following teleconference line:
Call number +1-844-800-2712 US Toll Free +1-669-234-1177 US Toll Access code: 199 476 8533 Bidder must keep their phone on mute as to not disrupt the reader. Please limit the amount of company employees calling into the line so that the line does not disconnect. The abstract of bids will be posted to the Beta.Sam website. ADDITIONAL INSTRUCTIONS Potential Bidders are reminded that only the minimum documents are required for bid submission:
1. Signed 1442.
2. Acknowledged amendments.
3. Filled out bid schedule and totals.
4. Bid Guarantee.
5. Bidders must check off box (d) in 52.204-8 Annual Representations and Certifications (DEC 2019) for being on SAM.gov
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
CLIN 0008
The pricing detail quantity has increased by 999.00 from 1.00 to 1,000.00.
The unit of issue has changed from Job to Cubic Yard.
The following Delivery Schedule item for CLIN 0008 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
720 dys. ANP 1 PPMD-MILITARY
STELLA MARCO
26 FEDERAL PLAZA ROOM 21-100
NEW YORK NY 10278
(917) 790-8224 FOB: Destination
W912DS
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
720 dys. ANP 1,000 PPMD-MILITARY
STELLA MARCO
26 FEDERAL PLAZA ROOM 21-100
NEW YORK NY 10278
(917) 790-8224 FOB: Destination
W912DS
(End of Summary of Changes)
File details come from the government source that posted it. Updated .