This document is an amendment to a solicitation for construction services. The amendment extends the bid opening date to February 8, 2022, revises the CLINs and bid schedule, and responds to bidder questions. The solicitation is for construction of a Munitions Storage Area at Joint Base McGuire-Dix-Lakehurst in New Jersey, including construction of 27 igloos, administrative facilities, demolition of three buildings, remaining site work and fencing. The award will be made to the lowest responsive, responsible bidder based on the total of the base bid plus any selected optional items. Optional items include procurement and installation of furniture and equipment, installation of a lightning protection system, and disposal of contaminated soil. The document provides responses to bidder questions seeking clarification on soil improvement requirements and criteria.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Extend bid opening date to 8 February 2022.

2. Revise and reissue CLINs and Bid Schedule

3. Revise and reissue Draw ings and Specs

4. Respond to RFI's Bidder must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND

WITHDRAWAL OF BIDS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22B0002

X 9B. DATED (SEE ITEM 11)

05-Nov-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jan-2022

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS22B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

Construction of MSA at JBMDL NJ

FFP

Construction of MSA at JBMDL NJ: All work (includes all plant, labor, and material) for the construction of the 27 munition igloos and associated site work as described in the plans and specifications except for work included in items below FOB: Destination

PSC CD: Y1JZ

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

Construction of MSA at JBMDL NJ

FFP

Construction of MSA at JBMDL NJ: All work (includes all plant, labor, and material) for construction for MX Admin Facility and Admin Bldgs as described in plans and specifications.

FOB: Destination

PSC CD: Y1JZ

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Job

Construction of MSA at JBMDL NJ

FFP

Construction of MSA at JBMDL NJ: All work (includes all plant, labor, and material) for demolition of Bldg 1913, 1918 and 1939 as described in plans and specifications.

FOB: Destination

PSC CD: Y1JZ

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 1 Job

Construction of MSA at JBMDL NJ

FFP

Construction of MSA at JBMDL NJ: All work (includes all plant, labor, and material) for construction of remaining site work as well as fencing as described in the plans and specifications.

FOB: Destination

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 1 Job

Construction of MSA at JBMDL NJ

FFP

Construction of MSA at JBMDL NJ All work for the Final Record Drawing Submission. This line item is pre-priced and cannot be changed.

FOB: Destination

PSC CD: Y1JZ

$30,000

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006 1 Job OPTION Option 1

FFP

Construction of MSA at JBMDL NJ All work associated with procurement delivery and installation of Furniture, Fixtures, & Equipment (FF&E) as listed on the drawings FOB: Destination

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0007 1 Job OPTION Option 2

FFP

Construction of MSA at JBMDL NJ: All work associated with installation of extended lightening protection system around existing maintenance building 1914 as shown on Drawings: EG201 Detail A4, EG203 and EG204 FOB: Destination

PSC CD: Y1JZ

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0008 1,000 Cubic

Yard OPTION Option 3

FFP

Construction of MSA at JBMDL NJ All work associated with disposal of contaminated soil.

FOB: Destination

PSC CD: Y1JZ

NET AMT

TOTALS/NOTES

TOTAL BASE BID (SUM of CLINs 0001 through 0005)

TOTAL OPTIONAL ITEMS (SUM of CLINs 0006 through 0008)

TOTAL BASE BID PLUS OPTIONAL ITEMS (SUM OF CLINs 0001 through 0008)

NOTES:

1. Bidders are required to bid on all the Base Bid and all the Optional Bid Items or their bids will be rejected.

2. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself, thereto, may render the bid non-responsive and be cause for its rejection.

3. Line item 0005 is pre-priced at $30,000.00 and this price shown may not be changed. This price is set by the government as assurance to receive final drawings, it may not reflect the actual effort of developing final set. The Offerors are to include balance of actual effort in CLIN 0001, whether credit or additional cost.

4. The Basis of Evaluation will be the lowest responsive, responsible Offeror based on the Total Amount for the Base Bid Items plus any Optional Bid Items (Line Items 0001 thru 0008).

5. Option 1, 2 and/or 3: The Government may execute any option at any time before 300 calendar days from issuance of Notice to Proceed. Execution of any of these optional items will not extend construction duration.

6. The Bid Acceptance Period is as stated on Standard Form 1442.

Munition Storage Area Joint Base McGuire-Dix-Lakehurst, NJ

W912DS22B0002

Amendment 0007

AMENDMENT 0007 to DRAWINGS and SPECIFICATIONS for Munitions Storage Area, Joint Base McGuire-Dix-Lakehurst, New Jersey.

TO OFFORERS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- None

3. The following DRAWINGS have been ADDED:

- None

4. The following DRAWINGS have been DELETED:

- None

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

- Section 31 32 19.17 – Vibro-Compaction – revised and reissued in its entirety

- Section 31 32 19.19 – Dynamic Deep Compaction – revised and reissued in its entirety

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

- None

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

1. What is the expected depth of soil-improvement? RESPONSE: The depth of soil improvement is to be determined by the Engineer that develops the Soil Matrix Improvement Program. The Vibro- Compaction process primarily consolidates the deeper soil matrix and is to be performed first. The Dynamic Deep Compaction process primarily consolidates the upper soils and shall meet the performance criteria of Section 1.8 of Specification Section 31 32 19.19 and Soil/Foundation Note 6 on Sheet S-001.

2. It appears as though Specification 31 32 19.19 (DDC) section 1.8 Performance Criteria applies to both the DDC work and Specification 31 32 19.17 for Vibro-Compaction. We have concerns about meeting the Performance Criteria, specifically regarding minimum N-values at in depths which cannot be influenced by DDC. Will alternate seismic evaluation methods be accepted? RESPONSE:

Please refer to the revised Specifications for Vibro-Compaction and Dynamic Deep Compaction for modified Performance Criteria.

3. Will alternate soil improvement methods be accepted? RESPONSE: Please propose as shown in the Contract Documents. The successful bidder may propose an alternative for Government consideration via a substitution request during construction.

4. Our understanding is that vibro-compaction is required to mitigate liquefaction. In our experience, sands with fines content, similar to what is identified in the boring logs for this site, are less susceptible to liquefaction. When compared to SPT testing, CPT test data/processing can more completely vet the risks and estimates of lateral/horizontal subsidence resulting from a seismic event.

Will the owner consider additional geotechnical testing in the form of CPT’s? RESPONSE: The Geotechnical Report indicates that the underlaying soils are marginally susceptible to liquefaction during a design earthquake event. One of the stated Performance Criteria is to mitigate the potential for liquefaction. Refer to revised Specifications for Vibro-Compaction and Dynamic Deep Compaction for modified Performance Criteria. Recommendations for verification testing shall be submitted as part of the Soil Matrix Improvement Procedure. In Section 1.8.A of revised Specification 31 32 19.19 (dated 27 January 2022), the average Standard Penetration Test (SPT) and individual SPT N-values of 40 and 30, respectively, have been deleted. The proposed performance verification testing procedures and target values shall be clearly stated in the Soil Matrix Improvement Program that is to be submitted by the Contractor to the Government for approval. The Government does not anticipate any additional test to be performed. The bidders, however, may perform additional testing as needed, in collaboration with their Geotechnical Engineer to achieve project requirements.

5. We reached out to numerous piles / vibro- compaction contractors for this project and all have refused to bid this because the specification for this work is vague. We would request you to amend with the revised specs in order to correctly price the project. RESPONSE: Please refer to the revised specification section as revised and reissued under this amendment.

6. On drawing S-718 it refers to the Internal Locking Device. I called the number on the drawing and left a message. The number on the drawing 805-982-1212 refers to another number 805-607-5456.

The second number answer DOD Lock, I left another message. We need to know the cost of the Internal Locking Device RESPONSE: This device is integral to the performance of this tested assembly. The question does not state when these numbers were called, it may take some time to gain this information from the vendor.

7. We cannot meet the densification criteria of 40 bpf which appears to be applicable to both Vibro-compaction and Deep Dynamic Compaction technologies. RESPONSE: The performance specifications for the Soil Matrix Improvement Program have been revised as follows: A Soil Matrix Improvement Program shall be developed by the Contractor and submitted for approval as indicated in Soil/Foundation Note 6 on Sheet S-001. The Soil Improvement Area is defined as the existing subgrade beneath and within 15 feet of all new earth-bermed munitions igloos and earth-bermed utilities. The Program shall incorporate Vibro-Compaction (Specification 31 32 19.17, revised 27 January 2022) for improvement of the deeper soils and Dynamic Deep Compaction (Specification 31 32 19.19, revised 27 January 2022) for improvement of the upper soils. The intended result of this performance program is to provide an allowable soil bearing pressure of 2,000 PSF beneath new footings, to reduce the anticipated overall settlement at new igloos and utilities to a maximum of 0.75 inches, to reduce the anticipated differential settlement at new igloos and utilities to a maximum of 0.50 inches and to mitigate the potential liquefaction of the subgrade soils in the event of a design earthquake event.

8. Vibro-compaction is best-suited for sites with “clean” sands where the vibrational energy can more easily penetrate the surrounding soils. In our case, the amount of fines present would limit densification. In order for us to price this project with design responsibility, we would need a performance specification and loads as described below. Additionally, we would request to use other ground improvement technologies to achieve the performance criteria. RESPONSE: While we are in agreement with the above reasoning, the intent of the revised specifications is to provide a solution which is readily available. If an alternate solution, including a proprietary solution, should be considered the successful bidder may submit a substitution request for the government’s consideration after award of the contract.

9. What are Footing and slab loads (dead/live). RESOPONSE: For settlement considerations, the sustained dead load shall be assumed to be 1,900 PSF at the bottom of the footings. The transitory average live loads on the slab shall be assumed to be 100 PSF over the entire slab area.

10. What is the Bearing capacity Criteria? RESPONSE: In accordance with SOILS/FOUNDATION NOTE 1., 2,000 PSF bearing is the basis of the design at the bottom of the munitions igloo footings which bear 3’-0” minimum below grade.

11. What is the Criteria for Post-Construction Settlement and Differential Settlement? RESPONSE: In accordance with the performance specifications, beneath and within 15 feet of earth-bermed munitions igloos and earth-bermed utilities, the maximum settlement shall be limited to 0.75 inches and the maximum differential settlement shall be limited to 0.50 inches.

12. Dynamic settlement criteria verified through pre and post CPT test program? RESPONSE: In accordance with the performance specifications, the proposed Vibro-Compaction Procedure shall be verified by a Trial Installation and shall be adjusted as needed to achieve the indicated performance criteria.

13. The fines content of the soil exceeds the limits that vibro-compaction can treat. The depth of improvement exceeds the limit that dynamic compaction can treat. RESPONSE: The Soil Matrix Improvement Program shall incorporate Vibro-Compaction for improvement of the deeper soils and Dynamic Deep Compaction for improvement of the upper soils.