This document is an amendment to a solicitation for construction of a Munitions Storage Area at Joint Base McGuire-Dix-Lakehurst in New Jersey. The amendment revises drawings and specifications, adds revised wage rates, removes two clauses, and extends the bid due date from January 6, 2022 to January 25, 2022. The scope of work includes construction of 27 munitions storage igloos, an administration building, and site work. Bids are to be submitted to the U.S. Army Corps of Engineers District Office in New York. The estimated value of construction is between $25 million and $100 million. The solicitation is designated as 100% small business set-aside with a Hubzone price evaluation preference.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise and reissue draw ings and revise specif ications. 2. Add revised w age rates. 3. Remove clauses 52.217-9 and 252.223-7999 4.
Respond to RFI's. 5. Extend bid due date to 25 Jan 2022.
Bidder must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods:in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND
WITHDRAWAL OF BIDS (FAR 15.208).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 28
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Dec-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22B0002
X 9B. DATED (SEE ITEM 11)
05-Nov-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Dec-2021
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS22B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 06-Jan-2022 02:00 PM to 25-Jan-2022 02:00 PM.
The required performance has changed from Project Title: MUNITIONS STORAGE AREA, JOINT- BASE-MDL (McGuire AFB), New Jersey1. 100% Unrestricted Full and Open Competition with Hubzone Price Evaluation preference.2. NAICS Code: 236220, Commercial and Institutional Building Construction; Size Standard:
$39,500,000.3. Magnitude of Construction: Between $25,000,000 and $100,000,000.4. Submit Bids no later than 2:00 PM EST on 7 December 2021 to:U.S. Army Corps of Engineers New York District, Contracting Division, Room 16-300 26 Federal Plaza New York, NY 10278-00905. Funds are not presently available for this acquisition.
No contract award will be made until appropriated funds are made available.Contract Specialist: Sandra Schenning, Email: sandra.l.schenning@usace.army.mil to Project Title: MUNITIONS STORAGE AREA, JOINT-BASE-MDL (McGuire AFB), New Jersey1. 100% Unrestricted Full and Open Competition with Hubzone Price Evaluation preference.2. NAICS Code: 236220, Commercial and Institutional Building Construction; Size Standard:
$39,500,000.3. Magnitude of Construction: Between $25,000,000 and $100,000,000.4. Submit Bids no later than 2:00 PM EST on 25 December 2022 to:U.S. Army Corps of Engineers New York District, Contracting Division, Room 16-300 26 Federal Plaza New York, NY 10278-00905. Funds are not presently available for this acquisition.
No contract award will be made until appropriated funds are made available.Contract Specialist: Sandra Schenning, Email: sandra.l.schenning@usace.army.mil.
The following have been modified:
TOTALS/NOTES
TOTAL BASE BID (SUM of CLINs 0001 through 0005)
TOTAL OPTIONAL ITEMS (SUM of CLINs 0006 through 0007)
TOTAL BASE BID PLUS OPTIONAL ITEMS (SUM OF CLINs 0001 through 0007)
NOTES:
1. Bidders are required to bid on all the Base Bid and all the Optional Bid Items or their bids will be rejected.
2. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself, thereto, may render the bid non-responsive and be cause for its rejection.
3. Line item 0005 is pre-priced at $30,000.00 and this price shown may not be changed. This price is set by the government as assurance to receive final drawings, it may not reflect the actual effort of developing final set. The Offerors are to include balance of actual effort in CLIN 0001, whether credit or additional cost.
4. The Basis of Evaluation will be the lowest responsive, responsible Offeror based on the Total Amount for the Base Bid Items plus any Optional Bid Items (Line Items 0001 thru 0007).
5. Option 1 and/or 2: The Government may execute any option at any time before 300 calendar days from issuance of Notice to Proceed. Execution of any of these optional items will not extend construction duration.
6. The Bid Acceptance Period is as stated on Standard Form 1442.
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
INSTRUCTIONS TO BIDDERS
CPARS
The Federal Acquisition Regulation (FAR) requires that Past Performance Information (PPI) be collected on DoD contracts. The Contractor Performance Assessment Reporting System (CPARS) is a web enabled application the supports the completion, distribution and retrieval of all contract performance evaluations. Contractor Representative are responsible for reviewing and commenting on evaluations submitted on the Contractor Performance Assessment Reporting System (CPARS) website at https://www.cpars.gov/index.htm.
NOTICE REGARDING BID BONDS, PEFORMANCE BONDS, AND PAYMENT BONDS
The Standard Forms (SF24, SF25, and SF25A) for these bonds have been revised as of August 2016.
When including your bid/offer, contractors/sureties shall use the revised versions. No other version will be valid and thus may render your bid/offer nonresponsive.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been deleted:
252.223-7999 ENSURING ADEQUATE
52.217-9 Option To Extend The Term Of The Contract MAR 2000
SECTION 00 72 00 - GENERAL CONDITIONS
WAGE RATES
"General Decision Number: NJ20210027 12/03/2021
Superseded General Decision Number: NJ20200027
State: New Jersey MY 12/03/2021
Construction Type: Building
County: Burlington County in New Jersey.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 02/19/2021 2 05/21/2021 3 05/28/2021 4 07/23/2021 5 09/10/2021 6 10/08/2021 7 10/15/2021
8 10/22/2021 9 12/03/2021
ASBE0014-003 05/01/2021
BURLINGTON COUNTY (City of Beverly; Townships of Cinnaminson, Delanco, Delron, Edgewater Park, Evesham, Hainesport and Lumberton; Borough of Maple Shade; Township of Medford; Borough of Medford Lakes; Townships of Moorestown and Mt. Laurel;
Borough of Palmyra; Township of Riverside; Borough of Riverton;
Townships of Shamong, Southampton, Tabernacle, Westhampton and Willingboro)
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement).......................$ 54.35 39.62
* ASBE0089-003 07/01/2021
BURLINGTON COUNTY (Townships of Bordentown, Burlington, Chesterfield, Easthampton, Florence, Mansfield, Mt. Holly, New Hanover, North Hanover, Pemberton, Springfield and Woodland)
ASBESTOS WORKER/HEAT & FROST
INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 50.50 36.10
PAID HOLIDAYS:
The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.
BRNJ0002-013 05/01/2021
Rates Fringes
Bricklayer.....................$ 45.20 33.26
Work on high stacks: 22% per hour additional.
BRNJ0007-012 07/05/2021
Rates Fringes
Marble setter...................$ 61.73 37.91
BRNJ0007-014 07/01/2021
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 58.46 38.09
BRNJ0007-017 06/07/2021
Rates Fringes
Tile finisher..................$ 42.05 28.21 Tile setter....................$ 48.94 33.79
Tile finisher:
Work grouting all epoxy: $10.00 additional per day.
CARP0006-009 05/01/2021
Rates Fringes
CARPENTER (Scaffold Builder).....$ 51.89 57%
The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
CARP0006-010 05/01/2021
Rates Fringes
CARPENTER
Including Acoustical Ceiling Installation, Drywall Hanging, Formwork, Batt and Blown Insulation...$ 51.89 57%
CARP0029-006 05/01/2021
Rates Fringes
Soft floor layer...............$ 51.89 57%
* CARP0454-009 05/01/2021
Rates Fringes
PILEDRIVERMAN....................$ 43.73 35.29
PAID HOLIDAYS:
New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday.
CARP0715-007 05/01/2020
Rates Fringes
Millwright.....................$ 51.58 58%+0.25
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
ELEC0269-017 07/01/2020
BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road;
then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line)
Electrician and cable splicer (Includes Low Voltage Wiring)....$ 51.71 64.70%
ELEC0351-001 10/04/2021
ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington
- Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt.
Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line);
CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM
COUNTIES:
Electricians:
Cable splicer on lead cable.$ 46.51 72.54% + .65 Electrician and cable splicer.....................$ 50.19 77.04%+.55
ELEV0005-004 01/01/2018
Rates Fringes
Elevator mechanic..............$ 55.76 32.65
PAID HOLIDAYS:
New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.
PAID VACATION:
Employer contributes 2% of basic hourly rate as vacation pay credit for 6 months to 5 years of service, and 4% for 5 years or more of service.
ENGI0825-020 07/01/2018
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 51.77 30.45
GROUP 2.....................$ 50.18 30.45
GROUP 3.....................$ 48.27 30.45
GROUP 4.....................$ 46.64 30.45
GROUP 5.....................$ 44.93 30.45
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.
PAID HOLIDAYS:
New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided
1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.
DEFINITION OF GROUPS:
GROUP 1:
Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);
Elevating Grader; Excavator; Front End Loader (5 cu. yd.
and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher
GROUP 2:
Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);
Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom
GROUP 3:
Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd.
and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;
GROUP 4:
Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;
Pump, Hydraulic
GROUP 5:
Oiler
IRON0068-011 07/01/2016
(Lumberton)
Rates Fringes
IRONWORKER
Reinforcing.................$ 44.55 20.88 Structural and Ornamental...$ 46.54 20.88
IRON0350-009 07/01/2016
BURLINGTON COUNTY (south and east of a line starting from the point on the Atlantic-Burlington county line where the Atlantic-Burlington county line crosses Route 206; then, following a line northeast through Wharton State Park to the town of Chatsworth; then, continuing along the same line, to the Burlington-Ocean county line)
Ironworkers:
Reinforcing.................$ 47.02 37.75 Structural and Ornamental...$ 48.02 37.75
IRON0399-005 07/01/2018
BURLINGTON COUNTY (north and west of a line starting from the point on the Atlantic-Burlington county line where the Atlantic-Burlington county line crosses Route 206; then, following a line northeast through Wharton State Park to the town of Chatsworth; then, continuing along the same line, to the Burlington-Ocean county line)
IRONWORKER (Structural, Reinforcing and Ornamental)......$ 49.43 29.70
LABO0008-001 05/01/2011
Rates Fringes
Asbestos Removal Laborer.........$ 28.37 21.62
The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)
LABO0077-002 05/01/2021
Rates Fringes
LABORER
MASON TENDER:
Brick/Cement/Concrete.......$ 35.25 30.22
LABO0077-004 05/01/2021
Laborers:
Asphalt Shoveler, Asphalt Spreader, Landscape Laborer, Pipelayer, Power Toole Operator and Screedman...................$ 34.50 30.22
* PAIN0021-032 05/01/2021
BURLINGTON COUNTY (south of a line drawn between these cities:
Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Heights)
Glazier........................$ 45.67 31.20
Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional.
* PAIN0711-011 05/01/2021
BURLINGTON COUNTY (north of a line drawn between these cities:
Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Heights)
Glazier........................$ 48.50 12%+21.30
Work welding or using a cutting torch: $1.00 per hour additional.
Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:
$1.00 per hour additional.
* PAIN0711-018 05/01/2021
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 40.39 26.51
PAIN0711-019 05/01/2017
Rates Fringes
PAINTER (Brush & Roller).........$ 39.25 22.66 PAINTER (Spray)..................$ 40.28 19.98
PLAS0592-036 05/01/2021
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 44.71 33.92
* PLUM0009-015 07/01/2021
BURLINGTON COUNTY (north of a line drawn from the town of Burlington City, includes Burlington City; then, along County Road Route 541 East, also known as High St., until it reaches the city of Mt. Holly, includes the city of Mt. Holly; then, along Madison Ave. in Mt. Holly to State Road Route 38 East;
then, along State Road Route 38 East until it crosses over State Road Route 206 and becomes County Road Route 530; then, along County Road Route 530 to Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)
PIPEFITTER (Including HVAC Pipe Installation)...............$ 52.34 42.28 Service and Repair..........$ 37.48 21.08 PLUMBER (Excluding HVAC Pipe Installation)....................$ 52.34 42.28 Service and Repair..........$ 37.48 21.08
PLUM0322-008 05/01/2021
BURLINGTON COUNTY (south of a line drawn from the town of Burlington City, does not include Burlington City; then, along County Road Route 541 East, also known as High St., until it reaches the city of Mt. Holly, does not include the city of Mt.
Holly; then, along Madison Ave. in Mt. Holly to State Road Route 38 East; then, along State Road Route 38 East until it crosses over State Road Route 206 and becomes County Road Route 530, does not include Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Rd. to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)
PIPEFITTER (Including HVAC Pipe Installation)...............$ 46.72 45.69 PLUMBER (Excluding HVAC Pipe Installation)....................$ 46.72 45.69
* ROOF0030-027 05/01/2021
Rates Fringes
Roofer
SHINGLES....................$ 30.50 21.20
SLATE AND TILE..............$ 33.50 21.20
ALL OTHER WORK..............$ 40.33 32.62
Mopper, and operator of felt-laying machine: $.50 per hour additional.
Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour additional.
PAID HOLIDAY:
The last working day before Christmas, to be paid at the rate of four hours pay.
SFNJ0669-006 04/01/2021
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 52.19 29.08
SFNJ0692-002 05/01/2021
Within 15 miles beyond the city limits of Philadelphia.
Rates Fringes
Sprinkler fitter (Fire Sprinklers)......................$ 60.83 30.34
SHEE0027-009 06/01/2021
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 53.12 43.62
TEAM0469-003 05/01/2020
BURLINGTON COUNTY (east of a line drawn from the New Jersey Turnpike to the Delaware River)
Truck drivers:
Dump Truck..................$ 42.85 34.135 Off the Road Truck..........$ 43.00 34.135
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.
PAID HOLIDAYS:
New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.
VACATION PAY CREDIT:
Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).
* TEAM0676-002 05/01/2021
BURLINGTON COUNTY (west of a line drawn from the New Jersey Turnpike to the Delaware River)
Truck drivers:
Dump Truck Drivers..........$ 38.75 29.4211 Off the Road Truck..........$ 39.10 29.4211
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required:
$1.00 per hour additional.
SHIFT WORK:
An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of pay.
PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday occurs.
BEREAVEMENT PAY:
In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays.
SUNJ2004-003 01/02/2009
Rates Fringes
LABORER: Common or General......$ 19.27 12.42
PLASTERER........................$ 42.33 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
The following items are applicable to this modification:
AMENDMENT 0002
Munition Storage Area Joint Base McGuire-Dix-Lakehurst, NJ
Amendment 0002
AMENDMENT 0002 to DRAWINGS and SPECIFICATIONS for Munitions Storage Area, Joint Base McGuire-Dix-Lakehurst, New Jersey.
TO OFFORERS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
2. The following DRAWINGS have been REVISED and REISSUED:
- G-002 – Updated Sheet Index
- CD-102 – Revised Label to Identify Existing Building 1939
- CS-101 – Removed Base Bid/Option Text
- CS-102 – Removed Base Bid/Option Text
- CS-103 – Removed Base Bid/Option Text
- CU-101 – Removed Errant Note
- S-001 – Revised Soils/Foundation Notes #5 and #6
- S-701 – Deleted General Plan Note #11
- S-702 – Deleted General Plan Note #11
- S-709 – Revised Trench Requirements at Each Side of Each Igloo
- S-713 – Clarified Steel Ventilator Flame Plate Material
- A-604 – Revised FF&E Note
- ES-102 – Removed Base Bid/Option Text, Clarified Scope
- ES-103 – Removed Base Bid/Option Text, Clarified Scope
- ES-104 – Removed Base Bid/Option Text, Clarified Scope
- ES-501 – Detail Calrification
- EG-201 – Removed Base Bid/Option Text, Deleted Detail
- EG-202 – Removed Base Bid/Option Text and Detail
- EG-203 – Removed Base Bid/Option Text
- EG-204 – Removed Base Bid/Option Text
- EG206 – Changed Reference in Note #10
- E-101 – Added general note
- E-102 – Added general note
- E-103 – Clarify power and Com
- E-104 – added general note
- EP-601 – Revised Transformer Names
3. The following DRAWINGS have been ADDED:
- None
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- None
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- Section 01 11 00 – revise paragraph 1.3 as follows: “This project is estimated between $25,000,000 and $100,000,000”
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
1. Upon review of the solicitation document there was not much clarity on the list of documents to be included with a bid package to be submitted for this project. Could the government assist with providing the list of documents to be included along with our bid package please. We sincerely appreciate the help. RESPONSE: This solicitation is advertised as Invitation for Bid, there are no special requirements to submit additional information.
2. Would the government consider making this bid submission an electronic DoD SAFE submission to allow for more efficient price proposals to be received from subcontractors. RESPONSE: Please submit bids to 26 Federal Plaza on 25 January 2022.
3. General Note #I on drawing CS-102 calls for Munition Igloos #22 through #27 as being part of Optional Bid Item, but Bid Form does not show this as an Optional Item. RESPONSE: Please follow the Bid Schedule, CLIN 0001 clearly indicates all 27 igloos are to be priced under that CLIN. Drawings are revised to remove Base Bid and Option Terminology.
4. Bid Schedule Item #0006 for Option 1 calls for delivery/installation of FF&E as listed on drawings.
Note "A" on drawing A-604 states furniture is provided under a separate contract. Please advise if this is in our scope. If so, please provide specs for bidding purposes. RESPONSE: The intent of this note is to signify that the purchase of the FF&E items will be funded with separate funding source, it is to be included as part of the overall price proposal, see Bid Schedule; the Note on Sheet A-604 is revised.
5. SF 1442 point 3 says that the magnitude of construction is between $25,000,000 and $100,000,000.
However as per the specification section 01 11 00 summary of work (page 14 of 2134 of specification) para 1.3 says that the magnitude of construction is between $10,000,000 and $25,000,000. Kindly clarify the correct magnitude of construction for this project. RESPONSE:
SF1442 has the correct magnitude range, Specification Section 01 11 00 is hereby revised to comply with SF 1442.
6. M501 C4, What is the diameter of the geothermal well? RESPONSE: Please refer to Specification Section 23 81 47 Paragraph 3.4.1 (Vertical Well Fields) for the requirements of the vertical portion of the geothermal wells.
7. CG111: Excavation for Admin Building and Maintenance - Which item# on bid form should contain the cost of this feature. Does this go in Item#002 Construction of Admin building and Admin Facility or in Item #004 - Construction for remaining site work or some other? Please clarify. RESPONSE: ALL relevant work related to construction of new Admin Building and addition to MX Facility should be included in CLIN 0002.
8. The bid form item#2 says "All work for construction for MX Admin Facility and Admin Bldgs as described in plans and specifications". But in the drawings, we have a Admin Building and a Maintenance Building. Please advise if they both refer to the same structure. If not, which building is MX Admin facility and which building is Admin Building. RESPONSE: CLIN 0002 includes all costs related to construction of two structures, new Admin Facility as well as addition to MX Facility.
9. Is FF&E part of Item#6 or is it a separate contract? RESPONSE: FF&E costs should be included as part of the proposal, it is an option within this solicitation. The Note on Sheet A-604 is revised.
10. CD101 & 102: As per bid form - Item#3 shows demo of bldg 1913, 1918 and 1939. In the drawings we are unable to locate building 1939. Please provide this information. RESPONSE: Sheet CD102 is revised to include reference to Existing Building 1939.
11. CD101: Can the government provide as-built drawings for the existing buildings and site structures that are to be demolished per contract drawings? RESPONSE: The Gov is reviewing the archives, if any as-build drawings will be located those will be issues in future amendment.
12. S701: General plan note no 11, please clarify if we have to put 1000 cy on each igloo. RESPONSE:
Please refer to the revised notes on drawings S701, S702 and S001 as issued in this amendment.
13. Both Instructions to Proposers (Section 00 21 16 - Item 8.4) and Checklist for Bidders reference a technical proposal requirement. Please confirm and advise the content that is to be provided.
RESPONSE: This solicitation is advertised as Invitation for Bid, there are no special requirements to submit additional information.
14. CU101 A. Drawing CU–101 Please provide the size and material of the existing water main that we are to tie into for new water service. B. Drawing CU–101 show a fire line coming out of the building but does not show where it's supposed to tie into the new water main or if it needs a PIV. Please advise. RESPONSE A: The size of the existing water main is noted on the Drawing CU-101.
Based on available information the pipe is a concrete water pipe. RESPONSE PART B: The “6” FIRE WATER LINE REFER TO SHEET FX101 FOR CONTINUATION” construction note with leader is an error. A fire water line is not required for the new administration building, note is hereby deleted as noted in reissued drawings CU101.
15. The RFP states: Submission of inquiries will close 30 November 2021 11:59 AM EDT. Projnet shows dates of November 1 to November 25 for this project. Please confirm that the final date to submit RFIs for this project is November 30. RESPONSE: The projnet submission date for RFI’s will be adjusted per final bid due date. The Gov would like to have all RFIs at least 10 calendar days before the bid due date.
16. S-713 D1 Drawing S-713 Detail D1 calls for a ventilator flame plate. Please provide the manufacturer of the ventilator flame plate. RESPONSE: The ¼” thick stainless steel ventilator flame plate in Detail D1/S-713 is to be fabricated as indicated in the detail; this is a custom made fabrication, there is no manufacturer.
17. ES102 There is a mention of Bid options for igloos. But there is no item for bid option in the bid form/SF1442. Please clarify. RESPONSE: Drawings are revised to remove Base Bid and Option Terminology.
18. Sheet EG-206, Note #10 states to refer to Sheet EG-502 Detail D2. There is no detail D2 on Sheet EG-502. Please provide. RESPONSE: Drawing EG206 is hereby revised to include proper reference on EG502.
19. For igloo - floor finish, wall finish and ceiling are not given. Please provide this information.
RESPONSE: The floor, wall and ceilings in the Igloos are constructed of concrete. Concrete will be the final finish as there is not a finish schedule noting otherwise.
20. E103: Note number 2 says the minipower zone IG21 which serves 3-bay igloo is typical for 5 instances. Note number 3 says the minipower zone IG22 which serves 4-bay igloo is typical for 5 instances. However, there are only 4 instances of 3-bay igloo and only 3 instances of 4-bay igloo in civil / site drawings. Please clarify how many mini power zones are there. RESPONSE: The correct number of Mini-Power zones and the required rating of each are reflected on Sheets ES102 and EP601. On Sheet EP601, the Mini-Power Zone Panelboard names and equipment ratings are correct, but the transformer names have been revised to reflect the appropriate panelboard.
21. Sheet S-709, Section A1 shows a 3½ inch pre-sloped, continuous trench drain in the concrete slab for the munition's igloos. The specifications do not call out for trench drains; please clarify and provide manufacturer. RESPONSE: Please refer to revised Sheet S-709, the note describing the trench at each side of the igloo is hereby modified as follows: 4” WIDE BY 18’-0” LONG (+/- 6”) PRE-
SLOPED CONTINUOUS TRENCH DRAIN WITH BOTTOM OUTLET FOR 2” DIAMETER PIPE.
RUN DRAIN PIPES THRU FOUNDATION STEM WALL AND TERMINATE WITHIN 6” OF
FOOTING DRAIN PIPE (NOT SHOWN). BASIS OF DESIGN IS STANDARTPARK DRAIN 4”
CHANNEL DUCTILE CAST IRON SLOTTED PACKAGE (LOAD CLASS C) OR EQUAL.
22. Reference – Solicitation Clause 252.223-7999 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors. This clause implements Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors, dated September 9, 2021. Solicitation Clause 252.223-7999 requires that all contractors comply with Executive Order 14042 and require the contractor includes the substance of this clause in all subcontractors at any tier. There are currently twenty-seven (27) states that have filed litigation in seven (7) different Federal District Courts challenging the validity of Executive Order 14042. The first preliminary injunction of the federal contractor mandate is scheduled to be heard by the Eastern District of Kentucky starting on November 18, 2021. Motions for preliminary injunction have also been filed in three (3) other cases. The pending litigation charges that the Executive Order violates the Procurement Act and that the FAR Counsel acted ultra vires by not providing for adequate public notice and comment. Further, the States argue that EO 14042 constitutes an unconstitutional delegation of authority and that the mandate violates the Spending Clause. The challenges of Executive Order 14042 are in current litigation and open. The implementation of Solicitation Clause 252.223-7999 is causing a hardship due to a limited amount of bid respondents. We request a Bid Extension until the Executive Order 14042 litigation is resolved and finalized. If a Bid Extension is not an option, we request that the required compliance stated in Clause 252.223-7999 be removed from this Solicitation. RESPONSE: Removed.
23. we are kindly requesting a (3) week bid date extension. We feel it would be in the owners best interest to extend the bid date to allow for optimal time to receive the most competitive bid pricing.
RESPONSE: Bid due date has been extended as noted in the previous amendment.
24. Please clarify item 52.217-9 listed in the solicitation page 37, is not the contract duration 720 days?
So if the government exercised that option listed, would not that extend the completion date? Or this is meant for only holding price prior award? RESPONSE: Removed clause. Please review # 5 on bid schedule.
25. Please provide required staff members, the specifications section 014500 requires certain supporting staff to the CQC manager, considering the repeated and specialized scope, can that list be reduced or allowed to be utilized from the subcontractors staff? Also please provide the required credentials for the safety manager. RESPONSE: The intent of additional qualified personnel refers to CQC and SHM and should multiple work zones be ongoing where one person cannot be present the contractor needs to provide adequate inspections/monitoring at each of the sites. Each of the individual persons should mee the minimum requirements for the function performing.
26. 01 30 01 Please confirm the commissioning agency to be hired by the contractor. RESPONSE:
Please refer to Specification Section 01 91 00.15 10 for commissioning related requirements.
27. 01 30 01 Please confirm the third-party inspector agency to be hired by the contractor. RESPONSE:
Please provide more specifically formulated question, based on this we are unable to provide any clarification. Per various specification sections, depending on type of work third-party inspectors may be required.
28. 08 11 13 Please confirm list of acceptable manufacturers that have successful track record with the government constructing the igloos's entrance blast doors. RESPONSE: The Government does not have a list of manufacturers for blast doors. Any manufacturer will be evaluated during submittal process to meet the minimum requirements of the specifications and UFCs.
29. 1.ES102 only shows Comm conduit connections to the furthest groups of Igloos. Should there be Comm conduit connections to each group of Igloos? RESPONSE: Comm raceways are required to each group of igloos. Comm handhole locations are shown on Comm Site Plan, Sheet ES104.
Raceway information from the handholes to each typical igloo group is provided on Sheet E- 103.
2.ES104 does not show MaxCell to be installed in the existing conduit between the (2) existing manholes (keynote 4's). Does this section need MaxCell or do we just install cable in the existing conduit? RESPONSE: Install cable in existing conduit.
3.E-103 shows the OSP Cat5E being installed to the Igloos and terminated on a Circa protector.
Does the comm work end at the Circa protector or is there any Comm work to extend the cable to a jack location? RESPONSE: Empty Comm raceway installation from the Circa protector to the igloos is intended to support Intrusion Detection System (IDS) installation at igloos. Refer to Sheet E-104, Keynote 5. IDS hardware and installation is typically included as part of the ESS system provided by a Government-approved manufacturer sub-contractor.
4.E-102 shows backboard and comm/data drops inside the Maintenance Bay building. There is no copper or fiber feed to this building. Are there any requirements for copper and/or fiber to feed this building? Where would these originate from? Please provide detail on how the feed and station cable need to be terminated on the plywood. RESPONSE: Refer to Sheets EY102, EY602, and EY604.
5.E-103 calls for (3) innerducts to be installed from the Igloo to the HH. Is there any innerduct or MaxCell required in the conduit from the ES104 new HH's (Keynote 1) to the HH/Igloo (Keynote 8)?
RESPONSE: Provide (2)-4” 3-cell flexible textile innerducts in each 4” raceway between the Keynote 1 and Keynote 3 handholes shown on Sheet ES104.
6.E-103 (Keynote 8) calls for a 3" conduit from the HH to the Igloo with (3) 1" innerducts. (3) 1" innerducts will not fit in a 3" conduit. What should be installed for Keynote 8 for conduit and innerduct? RESPONSE: The requirement for innerduct in this raceway should be (1)-3”-3-cell flexible textile innerduct.
7.ES102 and ES104 call for jack and bore steel casings. Can the steel casings be installed by horizontal drilling? RESPONSE: Casing material shall be steel and of the physical dimensions shown on Sheet ES501, Detail A4. Installation Means and Methods utilized shall not require a reduction of these requirements.
8.ES102 and ES104 show the electrical conduits and comm conduits following the same route. There are fewer areas for jack and bore on the comm conduits. Should we quote only the bores shown on ES102 and ES104? RESPONSE: Quote the bores as reflected on the documents.
30. On Structural drawing S-001 it lists a geotechnical report being performed by Matrix New World dated February 2021. There is a statement that the recommendations in the geographical report were not incorporated into the project plans and specifications because the recommendations were too expensive and some foundation issues will occur. Please provide this report. RESPONSE: Change Soils/Foundation Note #5 of Sheet S-001 to read as follows: “The subsurface soils beneath the munitions igloos shall be improved in accordance with the requirements of these contract documents and as described in the Geotechnical Report No.21-138 prepared by Matrix New World Engineering, Land Surveying and Landscape Architecture, P.C. Dated February 2021.
31. CS102 If the option for the six (6) optional storage igloos is not exercised, is there a grading plan for this area? RESPONSE: Please refer to the Bid Schedule. The drawings are hereby revised to match the Bid Schedule; all 27 igloos are part of CLIN 0001.
32. 28 10 05 1) Part 2 Products, 2.1 System Description: Please provide the DoD standardized system or…