This document contains an amendment to a federal solicitation for maintenance dredging services. The U.S. Army Corps of Engineers, New York District, is seeking to dredge approximately 370,000 cubic yards of material from the Port Jersey Channel in New Jersey to a depth of -50 feet MLLW plus 2 feet of overdepth allowance. Dredged material consists primarily of silt, sand and clay and must meet all applicable environmental standards for ocean placement. A mechanical dredge with environmental bucket is required due to water quality permit restrictions. Multiple ocean-going barges and tugboats will also be needed to transport dredged materials approximately 5 miles east of Sandy Hook, New Jersey to the Historic Area Remediation Site placement area. The contractor must commence work within 5 days of notice and maintain minimum production rates of 1,000 cubic yards per day when dredging over utility infrastructure, and 6,000 cubic yards per day elsewhere. Liquidated damages of $2,144 per day will be assessed for delays. The estimated value is between $5-10 million and work is to be completed between June 2020 and January 2021.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DS20B0007

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0004 is,

1) Bid due date remains 22-May-2020 at 2:00 P.M. EST

2) Respond to bidder request for information. For information only.

3) Revise Specif ication Section 35 20 23.05 18 Paragraph 1.3

NOTE: Bidders must acknow ledge receipt of this amendment by date specif ied in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below .FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THELATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID

(FAR

14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS20B0007

X 9B. DATED (SEE ITEM 11)

15-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-May-2020

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

TO BIDDERS:

The following changes shall be made to the drawings and specifications.

DRAWINGS:

1. The following DRAWINGS have been REVISED and REISSUED:

a. None

2. The following DRAWINGS have been REVISED but NOT REISSUED:

3. The following DRAWINGS have been ADDED:

4. The following DRAWINGS have been DELETED:

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

a. SECTION 35 20 23.05 18 Paragraph 1.3 (SECTION 35 20 23.05 18 Page 3)

SPECIFICATIONS:

1) SECTION 35 20 23.05 18 Paragraph 1.3 (SECTION 35 20 23.05 18 Page 3):

the following has been added to Paragraph 1.3 as follows:

An example of a PVSC Steel Plate Damage Preventions Work Plan (Example Work Plan), containing requirements from a previous Port Jersey dredging contract, has been provided as an attachment to this solicitation on beta.SAM.GOV. Ensure the NEW PVSC Corridor Steel Plate Damage Preventions Work Plan (New Work Plan) for this contract incorporates all methods, surveys and procedures found in the Example Work Plan including but not limited to:

a. Before Dredging & After Dredging Surveying and Remote Sensing (Section B Example Work Plan) Perform Before Dredging & After Dredging Surveying following the BD and AD methods and survey technique (sub-bottom reflection seismology, multibeam and side-scan Orthosonographs) found in the example Work Plan.

b. Use of a “LEVEL CUT” Environmental Cable Arm Bucket for dredging over the PVSC plates

c. Overall Horizontal Control of Dredge Position (Section E Example Work Plan) Verify the horizontal position of the dredge using a licensed land surveyor according to the example Work Plan

d. Guidelines & Methodology for Digging over Steel Plates (Section F Example Work Plan) The NEW WORK PLAN shall incorporate all methods in the EXAMPLE WORK PLAN (Section F) to ensure the dig plane does not cause damage to or displace steel plates. The Contractor shall include into the NEW WORK PLAN a typical drawing showing how the dredging Bucket is positioned as to not allow the closing line to fall in line with an edge / lip of the steel plate.

e. Defining “Disturbance” & Plan to Reposition Disturbed Plates(Section H).

NEW WORK PLAN shall incorporate all definition and methods in the EXAMPLE WORK PLAN (Section H) for defining “Disturbance” and method for repositioning disturbed plates.

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

(Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the bidders “For Information Only” and do not revise the solicitation, plans or specifications.)

Question 1: What are we looking for the sewer plate survey? Are we looking for something similar to what great lakes provided in the past? Or something more detailed or less detailed. The survey maps each plate to make sure they haven’t moved.”

Answer 1: Please see the Example PVSC Steel Plate Damage Preventions Work Plan Section B, attached with Amendment 0004, for the requirement of the level of detail on BD and AD survey over the PVSC Utility Corridor.

Question2: “Can you confirm if licensed/certified nj/ny survey(or) is required.”

Answer 2: Please see the Example PVSC Steel Plate Damage Preventions Work Plan Section E, attached with Amendment 0004, for the requirement of a licensed land surveyor during pre-check of the horizontal location of the dredge, spuds and bucket.

Question3: “Please clarify that this is required for a BD and an AD, two surveys and two reports.”

Answer 3: Please see the Example PVSC Steel Plate Damage Preventions Work Plan Section B, attached with Amendment 0004, for the requirement BD and AD survey over the PVSC Utility corridor.

(End of Summary of Changes)