W912DS-20-B-0004 Amendment 0005.pdf
PDF 520 KB Posted
- Solicitation number
- W912DS-20-B-0004
About this file
This solicitation seeks bids for the construction of fourteen new stone groins and five groin rehabilitations along the Atlantic coast of New York City between East Rockaway Inlet and Rockaway Inlet and Jamaica Bay. The work includes placement of approximately 265,000 tons of 10-ton rock armor, 75,000 tons of 5-ton armor, and 22,000 tons of core and bedding stone. It also requires around 30,000 cubic yards of rock excavation, 350,000 cubic yards of sand excavation, and removal of two timber groins approximately 300 feet in length each. Bids are due by the U.S. Army Corps of Engineers, New York District, with an estimated cost of $100,000,000 to $250,000,000. The selected contractor must commence work within five calendar days of notice to proceed and complete all work within 1460 calendar days thereafter.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Answer questions to prospective bidders for informational purposes only.
NOTE: Bidders must acknowledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the following methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE
SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF BIDS (FAR 14.304).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS20B0004
X 9B. DATED (SEE ITEM 11)
21-Feb-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE
DATE
30-Mar-2020
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS20B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
Questions and Answers:
The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.
This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents.
Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the FBO.
RFI SET #11:
Question #1: Reviewing the cross sections provided, it shows the large armor rock sticking out beyond the 6" tolerance in the transition zone between the toe and side slopes. It appears the Corp understands this is going to be the case considering the size of the stone. The specification says that tolerances don't apply in the toe anchor stone limit. Please confirm this also means at the bottom of the side slope where transition into the toe stone occurs.
Answer #1: Yes, that is correct.
Question #2: Are there going to be any changes to the bid delivery method and opening plans considering the current events related to COVID19?
Answer #2: Refer to amendment 4.
RFI SET #12:
Question #1: Do to the current COVID-19 Pandemic, specifically as being experiencing in New York City and the expected continuation into the near future, and in concert to be compliant with government directives to help slow / contain the spread of said virus, will the USACE consider an electronic submission of Form 1442, the Bid Form (CLINS) & Bid Bond in lieu of in-person delivery to the New York District Office, Contracting Division, Room 16-300 NY,NY? If so, please provide said procedures.
Answer #1: Refer to amendment 4.
Question #2: Section 35 31 29.40, subsection 2.4.1 Factor Conversion table lists the Bulk Specific Gravity (SSD) for all stone at 2.58. Is this Bulk Specific Gravity SSD of 2.58 an absolute minimum?
Answer #2: No. This is based on the average qualified rock density of 165 lbs/cubic ft recommended in the Shore Protection Manual. USACE will investigate the proposed rock quality and density for approval based on the specifications.
Question #3: Section 35 31 29.40, 2.2.1 Table 1 states the wetting-drying maximum loss of 1% at 30 cycles. If the stone’s loss is slightly higher than 1%, based on the ASTM D5313 standard for 80 cycles, would that stone’s results be acceptable?
Answer #3: Yes.
Question #4: A Canadian quarry has shown interest in providing stone material for this project. Does the Army Corp need to visually inspect the quarry’s stone material at the quarry location to assure it meets the requirements of this project?
Answer #4: No, the USACE will review the proposed rock specifications and lab test results for pre-qualification. The delivered rock may still be rejected at site by COR if different from the proposed quality and size. Please reference clause 52.225-11 in the solicitation and note that it is the bidders responsibility to determine compliance with the clause.
Question #5: 01 50 00 subsection 2.2.2 Barricades states: Erect and maintain temporary barricades to limit public access to hazardous areas. Drawing G-001 note 14 states that localized smaller work areas not greater than 500’ wide, near a groin being worked on is permitted.
Question #5A: Does that fenced off area surrounding the groin extend from the water’s edge (MLW) to the wooden fenced off areas that protect the beach plantings? Are we allowed to completely close off the beach from pedestrian access at that location?
Answer #5A: Yes.
Question #5B: How much beach can be completely closed to the public at one time? Example would be, if construction is being done at Groin W3 (B135th ST) and contractors are using staging area B 126 for storage of material, would the contractors be allowed to close and barricade/fence off all public access points at B135th St, B134th St, B133rd St, B132nd St, B131st St, B130th St, B129th St, B128th St, B127th St up to B126th St to prevent any public access to the construction area anywhere between B135th St to B126th St?
Answer #5B: No. If Groin W3 is being worked on, access to B. 135th and B. 134th will be closed off and redirected to the next closest access.
Question #5C: Does the contractor have to fence off a (2 mile) corridor of the beach front for heavy haul truck use, from access point at B9th St to groin E1 (B52nd St) during the construction time frame? How will each pedestrian access point within that 2 mile stretch be barricade/fenced to prevent beach goers from crossing the haul truck route?
Answer #5C: Yes, contractor must fence to delineate the haul roads and have breaks at all major points where pedestrian crossing; at each break point, "Stop" signs are used to control trucks movement. Additional signs can be used to direct pedestrian traffic to these break points. For active truck access points to staging areas, flaggers should be employed at all time.
Question #6: Section 01 32 01.00 10 Project Schedule § 3.13.e states the Oracle Primavera P6 calendar work hours/day “must remain” at 8.0 hr./day. Section 01 14 00 Work Restrictions § 1.2.2 specifies the working hours as an 8.5-hour period. Which specification will prevail upon contract award?
Answer #6: The schedule's base calendar should be kept as 8 hour per day (as per section 01 32
01.00 10), 5 days a week. The working period specified in section 01 14 00 is an 8.5 hour period that covers the 0.5 hour lunch break.
Question #7: If contractors obtain permission to use an area outside the construction boundaries for additional storage and construction facilities, will the USACE allow the construction boundaries to be extended further to allow more beach access for haul trucks?
Answer #7: If the contractor obtains permission to use an area outside the construction boundaries for additional storage and construction facilities, it will be at their own risk. Their offsite arrangements will not become part of the project boundaries. A haul route that it outside of the construction limit of work must be agreed upon by all parties prior to any construction.
(End of Summary of Changes)