2a_Bldg_110_FP_Spec_21_13_13_00_10.pdf

PDF 276 KB Posted

Attached to
Building 110 Renovation at Watervliet, NY
Solicitation number
W912DS19B0017
Issued by

About this file

2a specs

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WATERVLIET BUILDING 110

SECTION 21 13 13.00 10

WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

05/09

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)

ASSE 1015 (2011) Performance Requirements for Double Check Backflow Prevention Assemblies and Double Check Fire Protection Backflow Prevention Assemblies - (ANSI approved 2010)

ASME INTERNATIONAL (ASME)

ASME B16.1 (2015) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250

ASME B16.11 (2016) Forged Fittings, Socket-Welding and Threaded

ASME B16.21 (2016) Nonmetallic Flat Gaskets for Pipe Flanges

ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300

ASME B16.4 (2011) Standard for Gray Iron Threaded Fittings; Classes 125 and 250

ASME B16.9 (2018) Factory-Made Wrought Buttwelding Fittings

ASME B18.2.2 (2015) Nuts for General Applications:

Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)

ASTM INTERNATIONAL (ASTM)

ASTM A135/A135M (2009; R2014) Standard Specification for Electric-Resistance-Welded Steel Pipe

ASTM A183 (2014) Standard Specification for Carbon Steel Track Bolts and Nuts

ASTM A449 (2014) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use

SECTION 21 13 13.00 10 Page 1

Amendment 1.

06 SEPT 2019

ASTM A47/A47M (1999; R 2018; E 2018) Standard Specification for Ferritic Malleable Iron Castings

ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A536 (1984; R 2014) Standard Specification for Ductile Iron Castings

ASTM A795/A795M (2013) Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use

ASTM F436 (2011) Hardened Steel Washers

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS)

MSS SP-71 (2011; Errata 2013) Gray Iron Swing Check Valves, Flanged and Threaded Ends

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 13 (2016; TIA 16-1; TIA 16-2; TIA 16-3 2016;

Errata 17-1; Errata 17-2) Standard for the Installation of Sprinkler Systems

NFPA 24 (2016; ERTA 2016) Standard for the Installation of Private Fire Service Mains and Their Appurtenances

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES

(NICET)

NICET 1014-7 (2012) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-310-04 (2013; with Change 1, 2016) Seismic Design of Buildings

UNDERWRITERS LABORATORIES (UL)

UL Bld Mat Dir (updated continuously online) Building Materials Directory

SECTION 21 13 13.00 10 Page 2

UL Fire Prot Dir (2012) Fire Protection Equipment Directory

1.2 SYSTEM DESCRIPTION

Furnish piping offsets, fittings, and any other accessories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively effect or disrupt the sprinkler discharge pattern and coverage. Provide wet pipe sprinkler system in areas indicated on the drawings. Except as modified herein, the system shall be designed and installed in accordance with NFPA 13 . Pipe sizes which are not indicated on drawings shall be determined by hydraulic calculation. Design any portions of the sprinkler system that are not indicated on the drawings including locating sprinklers, piping and equipment, and size piping and equipment when this information is not indicated on the drawings or is not specified herein. The design of the sprinkler system shall be based on hydraulic calculations, and the other provisions specified herein.

1.2.1 Hydraulic Design

Hydraulically design the system to discharge a minimum density of 0.20 gpm/square foot over the hydraulically most demanding 1,950 square feet of floor area for industrial areas and a minimum density of 0.10 gpm/square foot over the hydraulically most demanding 1,500 square feet of floor area for light hazard areas. Hydraulic calculations shall be in accordance with the Area/Density Method of NFPA 13 . Water velocity in the piping shall not exceed 20 ft/s.

1.2.1.1 Hose Demand

Add an allowance for exterior hose streams of 500 gpm for industrial areas to the sprinkler system demand at the fire hydrant closest to the point where the water service enters the building and 250 gpm for light hazard areas.

1.2.1.2 Basis for Calculations

The design of the system shall be based upon a water supply with a static pressure of 58 psi, and a flow of 1,062 gpm at a residual pressure of 35 psi.

Water supply shall be presumed available at the point of connection to existing. Hydraulic calculations shall be based upon the Hazen-Williams formula with a "C" value of 120 for steel piping, 140 for new cement-lined ductile-iron piping, and 100 for existing underground piping. Hydraulic calculations shall be based on operation of the fire pump(s) provided in Section 21 30 00 FIRE PUMPS

1.2.1.3 Hydraulic Calculations

Submit hydraulic calculations, including a drawing showing hydraulic reference points and pipe segments and as outlined in NFPA 13 , except that calculations shall be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings. Software that uses k-factors for typical branch lines is not acceptable. Calculations shall be based on the water supply data shown on the drawings to substantiate that the design area used in the calculations is the most demanding hydraulically. Water supply curves and system requirements shall be plotted on semi-logarithmic graph paper so as to present a summary of the complete hydraulic calculation. Provide a

SECTION 21 13 13.00 10 Page 3

WATERVLI ET BUI LDI NG 110

summar y sheet l i s t i ng spr i nkl er s i n t he desi gn ar ea and t hei r r espect i ve hydr aul i c r ef er ence poi nt s, el evat i ons, act ual di schar ge pr essur es and act ual f l ows. El evat i ons of hydr aul i c r ef er ence poi nt s ( nodes) shal l be i ndi cat ed. Document at i on shal l i dent i f y each pi pe i ndi v i dual l y and t he nodes connect ed t her et o. I ndi cat e t he di amet er , l engt h, f l ow, vel oci t y, f r i c t i on l oss, number and t ype f i t t i ngs, t ot al f r i c t i on l oss i n t he pi pe, equi val ent pi pe l engt h and Hazen- Wi l l i ams coef f i c i ent f or each pi pe. For gr i dded syst ems, cal cul at i ons shal l show peaki ng of demand ar ea f r i c t i on l oss t o ver i f y t hat t he hydr aul i cal l y most demandi ng ar ea i s bei ng used.

Al so f or gr i dded syst ems, a f l ow di agr am i ndi cat i ng t he quant i t y and di r ect i on of f l ows shal l be i ncl uded. A dr awi ng showi ng hydr aul i c r ef er ence poi nt s ( nodes) and pi pe desi gnat i ons used i n t he cal cul at i ons shal l be i ncl uded and shal l be i ndependent of shop dr awi ngs.

1. 2. 2 Spr i nkl er Cover age

Spr i nkl er s shal l be uni f or ml y spaced on br anch l i nes. I n bui l di ngs pr ot ect ed by aut omat i c spr i nkl er s, spr i nkl er s shal l pr ovi de cover age t hr oughout 100 per cent of t he bui l di ng. Thi s i ncl udes, but i s not l i mi t ed t o, t el ephone r ooms, el ect r i cal equi pment r ooms, boi l er r ooms, swi t chgear r ooms, t r ansf or mer r ooms, and ot her el ect r i cal and mechani cal spaces.

Cover age per spr i nkl er shal l be i n accor dance wi t h NFPA 13, but shal l not exceed 130 squar e f eet f or or di nar y hazar d occupanci es, and 225 squar e f eet f or l i ght hazar d occupanci es.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 02 Shop Dr awi ngs

Shop Dr awi ngs; G

As- Bui l t Dr awi ngs

SD- 03 Pr oduct Dat a

Fi r e Pr ot ect i on Rel at ed Submi t t al s

Mat er i al s and Equi pment ; G

Spar e Par t s

Pr el i mi nar y Test s; G

Fi nal Accept ance Test ; G

Onsi t e Tr ai ni ng; G

Fi r e Pr ot ect i on Speci al i s t ; G

Spr i nkl er Syst em I nst al l er ; G

SD- 05 Desi gn Dat a

SECTI ON 21 13 13. 00 10 Page 4

Sway Bracing; G

Hydraulic Calculations; G

SD-06 Test Reports

Preliminary Test Report

Final Acceptance Test Report

SD-07 Certificates

Inspection by Fire Protection Specialist

SD-10 Operation and Maintenance Data

Operating and Maintenance Manuals; G

1.4 QUALITY ASSURANCE

Compliance with referenced NFPA standards is mandatory. In the event of a conflict between specific provisions of this specification and applicable NFPA standards, this specification governs. Interpret reference to "authority having jurisdiction" to mean the Contracting Officer.

1.4.1 Fire Protection Specialist

Perform work specified in this section under the supervision of and certified by the Fire Protection Specialist who is an individual registered professional engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES) or who is certified as a Level III Technician by National Institute for Certification in Engineering Technologies (NICET) in the Automatic Sprinkler System Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7 .

Submit the name and documentation of certification of the proposed Fire Protection Specialists, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations. The Fire Protection Specialist shall prepare and submit a list of the fire protection related submittals, no later than 7 days after the approval of the Fire Protection Specialist, from the Contract Submittal Register that relate to the successful installation of the sprinkler systems(s). The submittals identified on this list shall be accompanied by a letter of approval signed and dated by the Fire Protection Specialist when submitted to the Government. The Fire Protection Specialist shall be regularly engaged in the design and installation of the type and complexity of system specified in the contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.

1.4.2 Sprinkler System Installer

Work specified in this section shall be performed by the Sprinkler System Installer who is regularly engaged in the installation of the type and complexity of system specified in the contract documents, and who has served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months. Submit the name and documentation of certification of the proposed Sprinkler System

SECTION 21 13 13.00 10 Page 5

Installer, concurrent with submittal of the Fire Protection Specialist Qualifications.

1.4.3 Shop Drawings

Shop Drawings shall conform to the requirements established for working plans as prescribed in NFPA 13 . Submit 3 copies of the Sprinkler System shop drawings, no later than 21 days prior to the start of sprinkler system installation. Drawings shall include plan and elevation views demonstrating that the equipment will fit the allotted spaces with clearance for installation and maintenance. Each set of drawings shall include the following:

a. Descriptive index of drawings in the submittal with drawings listed in sequence by drawing number. A legend identifying device symbols, nomenclature, and conventions used.

b. Floor plans drawn to a scale not less than 1/8" = 1'-0" which clearly show locations of sprinklers, risers, pipe hangers, seismic separation assemblies, sway bracing, inspector's test connections, drains, and other applicable details necessary to clearly describe the proposed arrangement. Each type of fitting used and the locations of bushings, reducing couplings, and welded joints shall be indicated.

c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross-mains and branch lines to finished floor and roof or ceiling. A detail shall show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.

d. Longitudinal and transverse building sections showing typical branch line and cross-main pipe routing as well as elevation of each typical sprinkler above finished floor.

e. Details of each type of riser assembly; pipe hanger; sway bracing for earthquake protection, and restraint of underground water main at point-of-entry into the building, and electrical devices and interconnecting wiring. Submit load calculations for sizing of sway bracing, for systems that are required to be protected against damage from earthquakes.

1.5 DELIVERY, STORAGE, AND HANDLING

All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall either be capped or plugged until installed.

1.6 EXTRA MATERIALS

Submit spare parts data for each different item of material and equipment specified. The data shall include a complete list of parts and supplies, with current unit prices and source of supply, and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied.

SECTION 21 13 13.00 10 Page 6

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.

2.2 NAMEPLATES

All equipment shall have a nameplate that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number.

2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE

Provide Materials and Equipment that have been tested by Underwriters Laboratories, Inc. and are listed in UL Fire Prot Dir or approved by Factory Mutual and listed in FM APP GUIDE. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Prot Dir or FM APP GUIDE. Submit manufacturer's catalog data included with the Sprinkler System Drawings for all items specified herein. The data shall be highlighted to show model, size, options, etc., that are intended for consideration. Data shall be adequate to demonstrate compliance with all contract requirements. In addition, provide a complete equipment list that includes equipment description, model number and quantity.

2.4 ABOVEGROUND PIPING COMPONENTS

Aboveground piping shall be steel.

2.4.1 Steel Piping Components

2.4.1.1 Steel Pipe

Except as modified herein, steel pipe shall be blackas permitted by NFPA 13 and shall conform to applicable provisions of ASTM A795/A795M , ASTM A53/A53M, or ASTM A135/A135M . Pipe in which threads or grooves are cut or rolled formed shall be Schedule 40 or shall be listed by Underwriters' Laboratories to have a corrosion resistance ratio (CRR) of 1.0 or greater after threads or grooves are cut or rolled formed. Pipe shall be marked with the name of the manufacturer, kind of pipe, and ASTM designation.

2.4.1.2 Fittings for Non-Grooved Steel Pipe

Fittings shall be cast iron conforming to ASME B16.4 , steel conforming to ASME B16.9 or ASME B16.11 , or malleable iron conforming to ASME B16.3 .

Fittings into which sprinklers, drop nipples or riser nipples (sprigs) are screwed shall be threaded type. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe and segmented welded fittings shall not be used.

2.4.1.3 Grooved Mechanical Joints and Fittings

Joints and fittings shall be designed for not less than 175 psi service and shall be the product of the same manufacturer;segmented welded fittings shall not be used. Fitting and coupling houses shall be malleable iron conforming to ASTM A47/A47M, Grade 32510; ductile iron conforming to

SECTION 21 13 13.00 10 Page 7

ASTM A536, Gr ade 65- 45- 12. Gasket shal l be t he f l ush t ype t hat f i l l s t he ent i r e cavi t y bet ween t he f i t t i ng and t he pi pe. Nut s and bol t s shal l be heat - t r eat ed st eel conf or mi ng t o ASTM A183 and shal l be cadmi um pl at ed or z i nc el ect r opl at ed.

2. 4. 1. 4 Flanges

Fl anges shal l conf or m t o NFPA 13 and ASME B16. 1. Gasket s shal l be non- asbest os compr essed mat er i al i n accor dance wi t h ASME B16. 21, 1/ 16 i nch t hi ck, and f ul l f ace or sel f - cent er i ng f l at r i ng t ype.

2. 4. 1. 5 Bol t s, Nut , and Washer s

Bol t s shal l be conf or m t o ASTM A449, Type 1 and shal l ext end no l ess t han t hr ee f ul l t hr eads beyond t he nut wi t h bol t s t i ght ened t o t he r equi r ed t or que. Nut s shal l be hexagon t ype conf or mi ng t o ASME B18. 2. 2. Washer s shal l meet t he r equi r ement s of ASTM F436. Fl at c i r cul ar washer s shal l be pr ovi ded under al l bol t heads and nut s.

2. 4. 2 Pi pe Hanger s

Hanger s shal l be l i s t ed i n UL Fi r e Pr ot Di r or FM APP GUI DE and of t he t ype sui t abl e f or t he appl i cat i on, const r uct i on, and pi pe t ype and si zed t o be supported.

2. 4. 3 Valves

2. 4. 3. 1 Cont r ol Val ve and Gat e Val ve

Manual l y oper at ed spr i nkl er cont r ol val ve and gat e val ve shal l be out s i de st em and yoke ( OS&Y) t ype and shal l be l i s t ed i n UL Bl d Mat Di r or

FM APP GUI DE.

2. 4. 3. 2 Check Val ve

Check val ve 2 i nches and l ar ger shal l be l i s t ed i n UL Bl d Mat Di r or FM APP GUI DE. Check val ves 4 i nches and l ar ger shal l be of t he swi ng t ype wi t h f l anged cast i r on body and f l anged i nspect i on pl at e, shal l have a c l ear wat er way and shal l meet t he r equi r ement s of MSS SP- 71, f or Type 3 or 4.

2. 5 RI SER CHECK VALVE ASSEMBLY

Assembl y shal l i ncl ude a r i ser check val ve, st andar d t r i m pi pi ng, pr essur e gauges, bal l val ve and ot her component s as r equi r ed f or a f ul l y oper at i onal system.

2. 6 WATERFLOW ALARM

El ect r i cal l y oper at ed, ext er i or - mount ed, wat er f l ow al ar m bel l shal l be pr ovi ded and i nst al l ed i n accor dance wi t h NFPA 13. Wat er f l ow al ar m bel l shal l be r at ed 24 VDC and shal l be connect ed t o t he Fi r e Al ar m Cont r ol Panel ( FACP) i n accor dance wi t h Sect i on 28 31 64. 00 10 FI RE DETECTI ON AND

ALARM SYSTEM, ADDRESSABLE.

SECTI ON 21 13 13. 00 10 Page 8

2.7 ALARM INITIATING AND SUPERVISORY DEVICES

2.7.1 Sprinkler Waterflow Indicator Switch, Vane Type

Switch shall be vane type with a pipe saddle and cast aluminum housing.

The electro-mechanical device shall include a flexible, low-density polyethylene paddle conforming to the inside diameter of the fire protection pipe. The device shall sense water movements and be capable of detecting a sustained flow of 10 gpm or greater. The device shall contain a retard device adjustable from 0 to 90 seconds to reduce the possibility of false alarms caused by transient flow surges. The switch shall be tamper resistant and contain two SPDT (Form C) contacts arranged to transfer upon removal of the housing cover, and shall be equipped with a silicone rubber gasket to assure positive water seal and a dustproof cover and gasket to seal the mechanism from dirt and moisture.

2.7.2 Valve Supervisory (Tamper) Switch

Switch shall be suitable for mounting to the type of control valve to be supervised open. The switch shall be tamper resistant and contain one set of SPDT (Form C) contacts arranged to transfer upon removal of the housing cover or closure of the valve of more than two rotations of the valve stem.

2.8 SPRINKLERS

Sprinklers with internal O-rings shall not be used. Sprinklers shall be used in accordance with their listed coverage limitations. Temperature classification shall be ordinary. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters shall have temperature classification in accordance with NFPA 13 . Extended coverage sprinklers shall not be used.

2.8.1 Recessed Sprinkler

Recessed sprinkler shall be chrome-plated, quick-response type and shall have a nominal 1/2 inch orifice.

2.8.2 Pendent Sprinkler

Pendent sprinkler shall be of the fusible strut or glass bulb type, quick-response type with nominal 1/2 inch or 17/32 inch orifice.

2.8.3 Upright Sprinkler

Upright sprinkler shall be brass, quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.

2.8.4 Intermediate Level Sprinkler

Intermediate level sprinkler shall be of the upright or pendent type with nominal 1/2 inch orifice and minimum "K" factor of 5.5. The sprinkler shall be equipped with a deflector plate to shield the fusible element from water discharged above it.

2.9 ACCESSORIES

2.9.1 Sprinkler Cabinet

Spare sprinklers shall be provided in accordance with NFPA 13 and shall be

SECTION 21 13 13.00 10 Page 9 packed in a suitable metal or plastic cabinet. Spare sprinklers shall be representative of, and in proportion to, the number of each type and temperature rating of the sprinklers installed. At least one wrench of each type required shall be provided.

2.9.2 Pendent Sprinkler Escutcheon

Escutcheon shall be one-piece metallic type with a depth of less than 3/4 inch and suitable for installation on pendent sprinklers. The escutcheon shall have a factory finish that matches the pendent sprinkler heads.

2.9.3 Pipe Escutcheon

Escutcheon shall be polished chromium-plated zinc alloy, or polished chromium-plated copper alloy. Escutcheons shall be either one-piece or split-pattern, held in place by internal spring tension or set screw.

2.9.4 Sprinkler Guard

Guard shall be a steel wire cage designed to encase the sprinkler and protect it from mechanical damage. Guards shall be provided on sprinklers located as indicated.

2.9.5 Identification Sign

Valve identification sign shall be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gauge steel or 0.024 inch aluminum with red letters on a white background or white letters on red background.

Wording of sign shall include, but not be limited to "main drain," "auxiliary drain," "inspector's test," "alarm test," "alarm line," and similar wording as required to identify operational components.

2.10 DOUBLE-CHECK VALVE BACKFLOW PREVENTION ASSEMBLY

Double-check backflow prevention assembly shall comply with ASSE 1015 . The assembly shall have a bronze, cast-iron or stainless steel body with flanged ends. The assembly shall include pressure gauge test ports and OS&Y shutoff valves on the inlet and outlet, 2-positive-seating check valve for continuous pressure application, and four test cocks. Assemblies shall be rated for working pressure of 175 psi. The maximum pressure loss shall be 6 psi at a flow rate equal to the sprinkler water demand, at the location of the assembly. A test port for a pressure gauge shall be provided both upstream and downstream of the double check backflow prevention assembly valves.

PART 3 EXECUTION

3.1 FIELD MEASUREMENTS

After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.

3.2 INSTALLATION REQUIREMENTS

The installation shall be in accordance with the applicable provisions of NFPA 13 , NFPA 24 and publications referenced therein.

SECTION 21 13 13.00 10 Page 10

3. 3 I NSPECTI ON BY FI RE PROTECTI ON SPECI ALI ST

Pr i or t o cei l i ng i nst al l at i on and concur r ent wi t h t he Fi nal Accept ance Test Repor t , cer t i f i cat i on by t he Fi r e Pr ot ect i on Speci al i s t t hat t he spr i nkl er syst em i s i nst al l ed i n accor dance wi t h t he cont r act r equi r ement s, i ncl udi ng s i gned appr oval of t he Pr el i mi nar y and Fi nal Accept ance Test Repor t s. The Fi r e Pr ot ect i on Speci al i s t shal l : 1) i nspect t he spr i nkl er syst em per i odi cal l y dur i ng t he i nst al l at i on t o assur e t hat t he spr i nkl er syst em i s bei ng pr ovi ded and i nst al l ed i n accor dance wi t h t he cont r act r equi r ement s,

2) wi t ness t he pr el i mi nar y and f i nal t est s, and s i gn t he t est r esul t s, 3) af t er compl et i on of t he syst em i nspect i ons and a successf ul f i nal t est , cer t i f y i n wr i t i ng t hat t he syst em has been i nst al l ed i n accor dance wi t h t he cont r act r equi r ement s. Any di scr epancy shal l be br ought t o t he at t ent i on of t he Cont r act i ng Of f i cer i n wr i t i ng, no l at er t han t hr ee wor ki ng days af t er t he di scr epancy i s di scover ed.

3. 4 ABOVEGROUND PI PI NG I NSTALLATI ON

3. 4. 1 Pr ot ect i on of Pi pi ng Agai nst Ear t hquake Damage

Sei smi cal l y pr ot ect t he syst em pi pi ng agai nst damage f r om ear t hquakes.

Thi s r equi r ement i s not subj ect t o det er mi nat i on under NFPA 13. I nst al l t he sei smi c pr ot ect i on of t he syst em pi pi ng i n accor dance wi t h UFC 3- 310- 04, NFPA 13 and Annex A. I ncl ude t he r equi r ed f eat ur es i dent i f i ed t her ei n t hat ar e appl i cabl e t o t he speci f i c pi pi ng syst em.

3. 4. 2 Pi pi ng i n Exposed Ar eas

I nst al l exposed pi pi ng wi t hout di mi ni shi ng exi t access wi dt hs, cor r i dor s or equi pment access. Exposed hor i zont al pi pi ng, i ncl udi ng dr ai n pi pi ng, shal l be i nst al l ed t o pr ovi de maxi mum headr oom.

3. 4. 3 Pi pi ng i n Fi ni shed Ar eas

I n ar eas wi t h suspended or dr opped cei l i ngs and i n ar eas wi t h conceal ed spaces above t he cei l i ng, pi pi ng shal l be conceal ed above cei l i ngs. Pi pi ng shal l be i nspect ed, t est ed and appr oved bef or e bei ng conceal ed. Ri ser s and si mi l ar ver t i cal r uns of pi pi ng i n f i ni shed ar eas shal l be conceal ed.

3. 4. 4 Pendent Spr i nkl er s

Dr op ni ppl es t o pendent spr i nkl er s shal l consi st of mi ni mum 1 i nch pi pe wi t h a r educi ng coupl i ng i nt o whi ch t he spr i nkl er shal l be t hr eaded.

Hanger s shal l be pr ovi ded on ar m- over s t o dr op ni ppl es suppl y i ng pendent spr i nkl er s when t he ar m- over exceeds 12 i nches f or st eel pi pe. Wher e spr i nkl er s ar e i nst al l ed bel ow suspended or dr opped cei l i ngs, dr op ni ppl es shal l be cut such t hat spr i nkl er cei l i ng pl at es or escut cheons ar e of a uni f or m dept h t hr oughout t he f i ni shed space. The out l et of t he r educi ng coupl i ng shal l not ext end mor e t han 1 i nch bel ow t he under si de of t he cei l i ng. On pendent spr i nkl er s i nst al l ed bel ow suspended or dr opped cei l i ngs, t he di st ance f r om t he spr i nkl er def l ect or t o t he under si de of t he cei l i ng shal l not exceed 4 i nches. Recessed pendent spr i nkl er s shal l be i nst al l ed such t hat t he di st ance f r om t he spr i nkl er def l ect or t o t he under si de of t he cei l i ng shal l not exceed t he manuf act ur er ' s l i s t ed r ange and shal l be of uni f or m dept h t hr oughout t he f i ni shed ar ea. Pendent spr i nkl er s i n suspended cei l i ngs shal l be a mi ni mum of 6 i nches f r om cei l i ng gr i d.

SECTI ON 21 13 13. 00 10 Page 11

3.4.5 Upright Sprinklers

Riser nipples or "sprigs" to upright sprinklers shall contain no fittings between the branch line tee and the reducing coupling at the sprinkler.

Riser nipples exceeding 30 inches in length shall be individually supported.

3.4.6 Pipe Joints

Pipe joints shall conform to NFPA 13 , except as modified herein. Not more than four threads shall show after joint is made up. Welded joints will be permitted, only if welding operations are performed as required by NFPA 13 at the Contractor's fabrication shop, not at the project construction site. Flanged joints shall be provided where indicated or required by NFPA 13 . Grooved pipe and fittings shall be prepared in accordance with the manufacturer's latest published specification according to pipe material, wall thickness and size. Grooved couplings, fittings and grooving tools shall be products of the same manufacturer. For copper tubing, pipe and groove dimensions shall comply with the tolerances specified by the coupling manufacturer. The diameter of grooves made in the field shall be measured using a "go/no-go" gauge, vernier or dial caliper, narrow-land micrometer, or other method specifically approved by the coupling manufacturer for the intended application. Groove width and dimension of groove from end of pipe shall be measured and recorded for each change in grooving tool setup to verify compliance with coupling manufacturer's tolerances. Grooved joints shall not be used in concealed locations, such as behind solid walls or ceilings, unless an access panel is shown on the drawings for servicing or adjusting the joint.

3.4.7 Reducers

Reductions in pipe sizes shall be made with one-piece tapered reducing fittings. The use of grooved-end or rubber-gasketed reducing couplings will not be permitted. When standard fittings of the required size are not manufactured, single bushings of the face type will be permitted. Where used, face bushings shall be installed with the outer face flush with the face of the fitting opening being reduced. Bushings shall not be used in elbow fittings, in more than one outlet of a tee, in more than two outlets of a cross, or where the reduction in size is less than 1/2 inch.

3.4.8 Pipe Penetrations

Cutting structural members for passage of pipes or for pipe-hanger fastenings will not be permitted. Pipes that must penetrate concrete or masonry walls or concrete floors shall be core-drilled and provided with pipe sleeves. Each sleeve shall be Schedule 40 galvanized steel, ductile iron or cast iron pipe and shall extend through its respective wall or floor and be cut flush with each wall surface. Sleeves shall provide required clearance between the pipe and the sleeve per NFPA 13 . The space between the sleeve and the pipe shall be firmly packed with mineral wool insulation. In penetrations that are not fire-rated or not a floor penetration, the space between the sleeve and the pipe shall be sealed at both ends with plastic waterproof cement that will dry to a firm but pliable mass or with a mechanically adjustable segmented elastomer seal.

3.4.9 Escutcheons

Escutcheons shall be provided for pipe penetration of ceilings and walls.

Escutcheons shall be securely fastened to the pipe at surfaces through which piping passes.

SECTION 21 13 13.00 10 Page 12

3. 4. 10 I nspect or ' s Test Connect i on

Unl ess ot her wi se i ndi cat ed, t est connect i on shal l consi st of 1 i nch pi pe connect ed at t he r i ser as a combi nat i on t est and dr ai n val ve; a t est val ve l ocat ed appr oxi mat el y 7 f eet above t he f l oor ; a smoot h bor e br ass out l et equi val ent t o t he smal l est or i f i ce spr i nkl er used i n t he syst em; and a pai nt ed met al i dent i f i cat i on s i gn af f i xed t o t he val ve wi t h t he wor ds " I nspect or ' s Test . " The di schar ge or i f i ce shal l be l ocat ed out s i de t he bui l di ng wal l di r ect ed so as not t o cause damage t o adj acent const r uct i on or l andscapi ng dur i ng f ul l f l ow di schar ge.

3. 4. 11 Drains

Mai n dr ai n pi pi ng shal l be pr ovi ded t o di schar ge at t he l ocat i on i ndi cat ed.

Auxi l i ar y dr ai ns shal l be pr ovi ded as r equi r ed by NFPA 13.

3. 4. 12 I dent i f i cat i on Si gns

Si gns shal l be af f i xed t o each cont r ol val ve, i nspect or t est val ve, mai n dr ai n, auxi l i ar y dr ai n, t est val ve, and si mi l ar val ves as appr opr i at e or as r equi r ed by NFPA 13. Hydr aul i c desi gn dat a namepl at es shal l be per manent l y af f i xed t o each spr i nkl er r i ser as speci f i ed i n NFPA 13.

3. 5 ELECTRI CAL WORK

Except as modi f i ed her ei n, el ect r i c equi pment and wi r i ng shal l be i n accor dance wi t h Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM. Al ar m si gnal wi r i ng connect ed t o t he bui l di ng f i r e al ar m cont r ol syst em shal l be i n accor dance wi t h Sect i on 28 31 64. 00 10 FI RE DETECTI ON AND ALARM SYSTEM, ADDRESSABLE. Wi r i ng col or code shal l r emai n uni f or m t hr oughout t he syst em.

3. 6 PI PE COLOR CODE MARKI NG

Col or code mar k pi pi ng as speci f i ed i n Sect i on 09 90 00 PAI NTS AND COATI NGS.

3. 7 PRELI MI NARY TESTS

The syst em, i ncl udi ng t he under gr ound wat er mai ns, and t he abovegr ound pi pi ng and syst em component s, shal l be t est ed t o assur e t hat equi pment and component s f unct i on as i nt ended. Submi t pr oposed pr ocedur es f or Pr el i mi nar y Test s, no l at er t han 14 days pr i or t o t he pr oposed st ar t of t he t est s and pr oposed dat e and t i me t o begi n t he pr el i mi nar y t est s. The abovegr ound i nt er i or pi pi ng syst ems and at t ached appur t enances subj ect ed t o syst em wor ki ng pr essur e shal l be t est ed i n accor dance wi t h NFPA 13 and NFPA 24. Upon compl et i on of speci f i ed t est s, submi t 3 copi es of t he compl et ed Pr el i mi nar y Test Repor t , no l at er t han 7 days af t er t he compl et i on of t he Test s. The Repor t shal l i ncl ude t he Cont r act or ' s Mat er i al and Test Cer t i f i cat e f or Abovegr ound Pi pi ng. Al l i t ems i n t he Pr el i mi nar y Test s Repor t shal l be s i gned by t he Fi r e Pr ot ect i on Speci al i s t .

3. 7. 1 Abovegr ound Pi pi ng

3. 7. 1. 1 Hydr ost at i c Test i ng

Abovegr ound pi pi ng shal l be hydr ost at i cal l y t est ed i n accor dance wi t h NFPA 13 at not l ess t han 200 psi or 50 psi i n excess of maxi mum syst em oper at i ng pr essur e and shal l mai nt ai n t hat pr essur e wi t hout l oss f or 2 hour s. Ther e shal l be no dr op i n gauge pr essur e or v i s i bl e l eakage when

SECTI ON 21 13 13. 00 10 Page 13 the system is subjected to the hydrostatic test. The test pressure shall be read from a gauge located at the low elevation point of the system or portion being tested.

3.7.1.2 Backflow Prevention Assembly Forward Flow Test

Each backflow prevention assembly shall be tested at system flow demand, including all applicable hose streams, as specified in NFPA 13 . Provide all equipment and instruments necessary to conduct a complete forward flow test, including 2.5 inch diameter hoses, playpipe nozzles, calibrated pressure gauges, pitot tube gauge, plus all necessary supports to safely secure hoses and nozzles during the test. At the system demand flow, the pressure readings and pressure drop (friction) across the assembly shall be recorded. Provide a metal placard on the backflow prevention assembly that lists the pressure readings both upstream and downstream of the assembly, total pressure drop, and the system test flow rate. The pressure drop shall be compared to the manufacturer's data.

3.7.2 Testing of Alarm Devices

Each alarm switch shall be tested by flowing water through the inspector's test connection. Each water-operated alarm devices shall be tested to verify proper operation.

3.7.3 Main Drain Flow Test

Following flushing of the underground piping, a main drain test shall be made to verify the adequacy of the water supply. Static and residual pressures shall be recorded on the certificate specified in paragraph SUBMITTALS. In addition, a main drain test shall be conducted each time after a main control valve is shut and opened.

3.8 FINAL ACCEPTANCE TEST

Begin the Final Acceptance Test only when the Preliminary Test Report has been approved. Submit proposed procedures for Final Acceptance Test, no later than 14 days prior to the proposed start of the tests, and proposed date and time to begin the Test, submitted with the procedures.

Notification shall be provided at least 14 days prior to the proposed start of the test. Notification shall include a copy of the Contractor's Material & Test Certificates. The Fire Protection Specialist shall conduct the Final Acceptance Test and shall provide a complete demonstration of the operation of the system. This shall include operation of control valves and flowing of inspector's test connections to verify operation of associated waterflow alarm switches. After operation of control valves has been completed, the main drain test shall be repeated to assure that control valves are in the open position. Submit as-built shop drawings, at least 14 days after completion of the Final Tests, updated to reflect as-built conditions after all related work is completed. Drawings shall be on reproducible full-size mylar film. In addition, the representative shall have available copies of as-built drawings and certificates of tests previously conducted. The installation shall not be considered accepted until identified discrepancies have been corrected and test documentation is properly completed and received. Submit 3 copies of the completed Final Acceptance Test Report no later than 7 days after the completion of the Final Acceptance Tests. All items in the Final Acceptance Report shall be signed by the Fire Protection Specialist.as specified.

SECTION 21 13 13.00 10 Page 14

3.9 ONSITE TRAINING

The Fire Protection Specialist shall conduct a training course for operating and maintenance personnel as designated by the Contracting Officer. Submit proposed schedule, at least 14 days prior to the start of related training. Four training sessions shall be provided, separated at one-week intervals for a period of 2 hours of normal working time each and shall start after the system is functionally complete and after the Final Acceptance Test. Submit 6 Operating and Maintenance Manuals listing step-by-step procedures required for system startup, operation, shutdown, and routine maintenance, at least 14 days prior to field training. The manuals shall include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for routine maintenance including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment. Each service organization submitted shall be capable of providing 4 hour on-site response to a service call on an emergency basis.

The Onsite Training shall cover all of the items contained in the approved manuals.

-- End of Section --

SECTION 21 13 13.00 10 Page 15

SECTION 21 13 18.00 10

PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION

05/09

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASME INTERNATIONAL (ASME)

ASME B16.1 (2015) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250

ASME B16.11 (2016) Forged Fittings, Socket-Welding and Threaded

ASME B16.21 (2016) Nonmetallic Flat Gaskets for Pipe Flanges

ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300

ASME B16.4 (2011) Standard for Gray Iron Threaded Fittings; Classes 125 and 250

ASME B16.9 (2018) Factory-Made Wrought Buttwelding Fittings

ASME B18.2.2 (2015) Nuts for General Applications:

Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)

ASTM INTERNATIONAL (ASTM)

ASTM A135/A135M (2009; R2014) Standard Specification for Electric-Resistance-Welded Steel Pipe

ASTM A183 (2014) Standard Specification for Carbon Steel Track Bolts and Nuts

ASTM A449 (2014) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use

ASTM A47/A47M (1999; R 2018; E 2018) Standard Specification for Ferritic Malleable Iron Castings

ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

SECTION 21 13 18.00 10 Page 1

ASTM A536 (1984; R 2014) Standard Specification for Ductile Iron Castings

ASTM A795/A795M (2013) Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use

ASTM F436 (2011) Hardened Steel Washers

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C62.41.1 (2002; R 2008) Guide on the Surges Environment in Low-Voltage (1000 V and Less) AC Power Circuits

IEEE C62.41.2 (2002) Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS)

MSS SP-71 (2011; Errata 2013) Gray Iron Swing Check Valves, Flanged and Threaded Ends

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 13 (2016; TIA 16-1; TIA 16-2; TIA 16-3 2016;

Errata 17-1; Errata 17-2) Standard for the Installation of Sprinkler Systems

NFPA 24 (2016; ERTA 2016) Standard for the Installation of Private Fire Service Mains and Their Appurtenances

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14; TIA 17-15; TIA 17-16; TIA 17-17 )

National Electrical Code

NFPA 72 (2019; TIA 19-1; ERTA 2019) National Fire Alarm and Signaling Code

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES

(NICET)

NICET 1014-7 (2012) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler

SECTION 21 13 18.00 10 Page 2

System Layout

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-310-04 (2013; with Change 1, 2016) Seismic Design of Buildings

UNDERWRITERS LABORATORIES (UL)

UL Bld Mat Dir (updated continuously online) Building Materials Directory

UL Fire Prot Dir (2012) Fire Protection Equipment Directory

1.2 SYSTEM DESCRIPTION

a. Furnish piping offsets, fittings, and any other accessories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler over and under ducts, piping and platforms when such equipment can negatively affect or disrupt the sprinkler discharge pattern and coverage.

b. Provide preaction sprinkler system in areas indicated on the drawings.

The sprinkler system shall provide fire sprinkler protection for the entire area. Except as modified herein, the system shall meet the requirements of NFPA 13 and NFPA 72 . The sprinkler system shall be a single interlocked system that requires the actuation of an alarm initiating device to open the water control (deluge) valve.

c. Design any portions of the sprinkler system that are not indicated on the drawings or are not specified herein, including locating sprinklers, piping, and equipment, and size piping and equipment.

Determine pipe sizes which are not indicated on the drawings by hydraulic calculations.

1.2.1 Hydraulic Design

Hydraulically design the system to discharge a minimum density of 0.20 gpm/square foot over the entire system. Hydraulic calculations shall be in accordance with the Area/Density Method of NFPA 13 . Water velocity in the piping shall not exceed 20 ft/s.

1.2.1.1 Hose Demand

Add an allowance for exterior hose streams of 250 gpm to the sprinkler system demand at the point of connection to the existing water system.

1.2.1.2 Basis for Calculations

Base the design of the system upon a water supply with a static pressure of 58 psi, and a flow of 1,062 gpm at a residual pressure of 35 psi. Water supply shall be presumed available at the point of connection to existing.

Base hydraulic calculations upon the Hazen-Williams formula with a "C" value of 120 for steel piping and 100 for existing underground piping on operation of the fire pump(s) provided in Section 21 30 00 FIRE PUMPS.

a. Outline hydraulic calculations as in NFPA 13 , except that calculations shall be performed by computer using software intended specifically for fire protection system design using the design data shown on the

SECTION 21 13 18.00 10 Page 3 drawings. Submit hydraulic calculations, including a drawing showing hydraulic reference points and pipe segments. Software that uses k-factors for typical branch lines is not acceptable. Calculations shall substantiate that the design area used in the calculations is the most demanding hydraulically.

b. Plot water supply curves and system requirements on semi-logarithmic graph paper so as to present a summary of the complete hydraulic calculation. Provide a summary sheet listing sprinklers in the design area and their respective hydraulic reference points, elevations, actual discharge pressures and actual flows. Indicate elevations of hydraulic reference points (nodes). Documentation shall identify each pipe individually and the nodes connected thereto. Indicate for each pipe the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient.

1.2.2 Sprinkler Coverage

Uniformly space sprinklers on branch lines. In buildings protected by automatic sprinklers, provide coverage throughout 100 percent of the building. This includes, but is not limited to, telephone rooms, electrical equipment rooms, boiler rooms, switchgear rooms, transformer rooms, and other electrical and mechanical spaces. Coverage per sprinkler shall be in accordance with NFPA 13 , but shall not exceed 130 square feet for ordinary hazard occupancies.

1.2.3 Control System

The control system shall meet the requirements of NFPA 72 . The control panel shall be listed in UL Fire Prot Dir or FM APP GUIDE for "Releasing Device Service". The control panel and the solenoid valve that activates the water control valves shall be compatible with each other.

Compatibility shall be in accordance with specific UL listing or FM approval of the control equipment.

1.2.3.1 Power Supply

Provide the primary operating power from two single-phase 120 VAC circuits. Transfer from normal to backup power and restoration from backup to normal power shall be fully automatic and shall not initiate a false alarm. Loss of primary power shall not prevent actuation of the respective automatic water control valve upon activation of any alarm initiating device. Provide backup power through use of rechargeable, sealed, lead calcium storage batteries.

1.2.3.2 Circuit Requirements

Connect alarm initiating devices to initiating device circuits (IDC), Style D or to signal line circuits (SLC), Style 6, in accordance with NFPA 72 .

Alarm notification or indicating appliances shall be connected to indicating appliance circuit (IAC), Style W in accordance with NFPA 72 .

Provide a separate circuit for actuation of each individual automatic water control valve. Fully supervise the circuits that actuate the water control valves so that the occurrence of a single open or a single ground fault condition in the interconnecting conductors will be indicated at the control panel.

SECTION 21 13 18.00 10 Page 4

1.2.4 System Operational Features

Include in the system a heat detection system, supervisory and alarm switches, control panel and associated equipment. Provide preaction sprinkler system piping with supervisory air pressure not to exceed 30 psig.

1.2.4.1 System Actuation

Activation of any single heat detector shall actuate alarm zone circuits of the control panel that, in turn, shall actuate the corresponding automatic water control valve. Actuation of the automatic water control valve shall cause water to fill the preaction system piping and be discharged from fused sprinklers.

1.2.4.2 Alarm Functions

Activation of any heat detector or sprinkler pressure alarm switch or manual actuation station shall cause the illumination of the respective zone annunciator, activation of the building fire alarm system and transmission of the alarm to the base-wide fire reporting system. Valve tamper alarm shall be monitored by the system control panel and transmitted to the building fire alarm system as a trouble alarm.

1.2.4.3 Supervisory Functions

The reduction of supervisory air pressure within the sprinkler system piping to less than 10 psi or the occurrence of a single open or a single ground fault in any alarm initiating device circuit, in the automatic water control valve actuation circuit, in any alarm indicating appliance circuit or in other electrically supervised circuit shall cause the individually labelled control panel trouble light to be illuminated, the audible trouble alarm to be activated, and a trouble alarm to be transmitted to the building fire alarm control panel and to base-wide fire reporting system.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-02 Shop Drawings

Shop Drawings; G

As-Built Drawings

SD-03 Product Data

Fire Protection Specialist; G

Installer Qualifications

List of Submittals

Materials and Equipment; G

SECTION 21 13 18.00 10 Page 5

Spare Parts

OnSite Training; G

SD-05 Design Data

Sway Bracing

Hydraulic Calculations; G

Storage Batteries; G

SD-06 Test Reports

Preliminary Tests; G

Final Acceptance Tests

SD-07 Certificates

Inspection by Fire Protection Specialist; G

SD-10 Operation and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.