W912DS19B0002-0007.pdf
PDF 466 KB Posted
- Attached to
- Fire Island Maintenance 3B2 Federal contract opportunity
- Solicitation number
- W912DS19B0002
About this file
Amendment 0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| W912DS19B0002-0006.pdf | ||
| FIMI_3B2_Amend__6_03182019.pdf | ||
| FIMI_3B2_SPECS_PACKAGE_Amend_6_03-19-2019.pdf | ||
| FIMI_3B2_Amend_5_Plans_03132019.pdf | ||
| FIMI_3B2_SPECS_PACKAGE_Amend_5_03-13-2019.pdf | ||
| W912DS19B0002-0005.pdf | ||
| W912DS19B0002-0004.pdf | ||
| 2017_4561-FIMI-3B-PROFILE-ELEV.XYZ | XYZ file | |
| W912DS19B0002-0003.pdf | ||
| 2018_4775-PROFILES-15FT-ELEV.XYZ | XYZ file | |
| 2018_4775-LiDAR-35FT-SORTED-MED-ELEV.XYZ | XYZ file | |
| FIMI_3B2_SPECS_PACKAGE_02-15-2019.pdf | ||
| FIMI_3B2_RTA_Amend_2_02132019.pdf | ||
| W912DS19B0002-Amendment_0002.pdf | ||
| W912DS19B0002-01.pdf | ||
| A.07.23_Solicitation_W912DS19B0002.pdf | ||
| FIMI_3B2_SPECS_PACKAGE_2018-10-31.pdf | ||
| FIMI_3B2_90__Submission_11092018_Compressed.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise and reissue bid schedule.
2. Answer questions from prospective bidders for informational purposes only.
Bid opening date remains Tuesday, 26-March-2019 at 2PM EST.
NOTE: Bidders must acknowledge receipt of this amendment by date specified in the bid (or as amended) by one of the following methods:
In the space provided on the SF 1442, by separate letter, or by signing block 15 below. FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION
OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Mar-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS19B0002
X 9B. DATED (SEE ITEM 11)
10-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Mar-2019
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS19B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0007
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Mobilization/Demobilization
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Sand Placement
FFP
Not Separately Priced
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AA 2,300,000 Cubic
Yard
Hydraulic Beach Fill
FFP
STA 456+66 to STA 903+00. (Estimated Quantities) FOB: Destination
0002AB 1,000 Cubic
Sand Placement by hand at 81DW (Heaton), 83DW (Rothburg), 112AT (Vasey) (ct3A). (Estimated Quantities)
Demolition and Disposal
0003AA 38 Each Existing Crossover
0003AB 9 Each Bulkhead Wall
FFP
at 386FP (Dunkelman) (ct3B1) 391FP (D'Antonio), 403FP (Wagner), 405FP (Boskind), 408FP (Pfeifle), 413FP (DeFalco & Matthews), 420 FP (Stimmel), 435FP (Gersch) 396FP (Tortora)
0003AC 100 Short Ton Existing Debris on Beach
FFP
(Estimated Quantities)
PED Crossovers
- Base CLIN
0004AA 1 Each PED Crossover
FFP
- Type A
0004AB 11 Each PED Crossover
FFP
- Type B
0004AC 22 Each PED Crossover
FFP
- Type C
0004AD 5 Each PED Crossover
FFP
- Type E
0004AE 575 Linear
Foot
Galvanized Metal Handrails at Saltaire and Kismet (ct2). (Estimated Quantities)
0004AF 500 Each Trim existing bolts on
FFP
all ADA-accessible crossovers at Kismet through Seaview (ct3A)
Vehicle Crossovers
0005AA 3 Each Construction of Crossovers
0005AB 825 Square
Geotextile
0006 48 Acre Dune Planting
FFP
0007 25,500 Linear
Sand Fence
0008 1 Job Vibration Monitoring
0009 3,500 Linear
Stabilization Mats
0010 1 Job Submit As-Built Drawings
FFP
for Approval (this CLIN is pre-priced)
$50,000.00
0011 1 Job OPTION Additional Insurance
FFP
State, County, Town and City in accordance with para "Insurance Procured by Contractor", section 007300 18
BID SCHEDULE NOTES
TOTALS:
TOTAL BASE – NO OPTIONS (ITEMS 0001 thru 0010) $________________
TOTAL OPTION (ITEM 0011) $________________
TOTAL BASE PLUS OPTION (ITEMS 0001 thru 0011) $________________
NOTES:
1. Tapering are included in the items and exact locations are on the plan sheets.
2. Low bidder for the purpose of award will be the conforming bidder offering the lowest amount for the total base bid and optional bid items.
3. Any bid which is materially unbalanced may be rejected. An unbalanced bid is one, which is based on the prices significantly less than cost for some work and prices, which are significantly overstated for other work.
4. Bidders are required to bid on all items or their bids will be rejected.
5. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions, or attachments made by the bidder himself thereto may render the bid non-responsive and may be caused for its rejection.
6. All work is to commence within 5 days of the Notice to Proceed date and conclude within 400 days of the
Notice to Proceed.
7. Option may be exercised within 60 days of base item NTP. Option is concurrent with base period of performance.
8. Contractor shall complete the Record ("As-Built") CAD submittal as required by Specification Section 01
78 00 CLOSEOUT SUBMITTALS for Record Drawings (“As-Built”) Requirements and Section 01 12 00 DESIGN AND RECORD DRAWING REQUIREMENTS for CADD standards and compliance.
BID SCHEDULE:
1. The following changes are made to the bid schedule:
a. Revised bid schedule to change CLIN 5AB from 4,600 to 825 Square Yard.
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.)
Bidder’s Questions Government Response
Dredging Safety Personnel Requirements, Page 10 states that; for a project involving multiple work shifts, provide one full-time SSHO for each additional shift. Paragraph 1.6.1.4.2 SSHO Requirements for Dredging states; In addition to requirements stated elsewhere in this specification, an individual serving as a SSHO must be present at the project site, located so that they have full mobility and reasonable access to all major work operations, for at least one shift in each 24 hour period when work is being performed.
Will a full time standalone SSHO be required for every project working shift when working 24 hrs per day? Or will a CDSO be acceptable for a non primary shift?
A Full-Time SSHO meeting all the qualifications stated in the specifications is required for ALL shifts. A CDSO IS NOT to be used as an alternative for an SSHO on any shift. Additionally, the SSHO must be on site at all times, when working is being performed. The job duties of the SSHO are spelled out in the specifications. These duties require the SSHO to be on site in order to perform them.
(End of Summary of Changes)