Bid_Abstract.pdf

PDF 128 KB Posted

Attached to
Fire Island Maintenance 3B2 Federal contract opportunity
Solicitation number
W912DS19B0002
Issued by
Department of the Army Corps of Engineers Engineering District New York

View the file

Other files for this federal contract opportunity

Other files attached to Fire Island Maintenance 3B2, newest first.
File Type Posted
W912DS19B0002-0007.pdf PDF
W912DS19B0002-0006.pdf PDF
FIMI_3B2_Amend__6_03182019.pdf PDF
FIMI_3B2_SPECS_PACKAGE_Amend_6_03-19-2019.pdf PDF
FIMI_3B2_Amend_5_Plans_03132019.pdf PDF
FIMI_3B2_SPECS_PACKAGE_Amend_5_03-13-2019.pdf PDF
W912DS19B0002-0005.pdf PDF
W912DS19B0002-0004.pdf PDF
2017_4561-FIMI-3B-PROFILE-ELEV.XYZ XYZ file
W912DS19B0002-0003.pdf PDF
2018_4775-PROFILES-15FT-ELEV.XYZ XYZ file
2018_4775-LiDAR-35FT-SORTED-MED-ELEV.XYZ XYZ file
FIMI_3B2_SPECS_PACKAGE_02-15-2019.pdf PDF
FIMI_3B2_RTA_Amend_2_02132019.pdf PDF
W912DS19B0002-Amendment_0002.pdf PDF
W912DS19B0002-01.pdf PDF
A.07.23_Solicitation_W912DS19B0002.pdf PDF
FIMI_3B2_SPECS_PACKAGE_2018-10-31.pdf PDF
FIMI_3B2_90__Submission_11092018_Compressed.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT AND LOCATION: OPENED BY: DATE: TIME:

Monica Chahary 26-Mar-19 2:00PM EST

TOTAL AMENDMENTS: 7 RECORDED BY: Mohenda Surage

BID #: 1 BID #: 2 BID #: 3 BID #: 4

Mobilization/Demobilization 1 Job $7,227,100.00 $7,160,000.00 $5,400,000.00 $6,525,000.00 $13,950,000.00

Hydraulic Beach Fill 2,300,000 Cubic Yard $13.94 $16.00 $11.60 $9.30 $17.00

Sand Placement by Hand 1000 Cubic Yard $24.45 $191.00 $125.00 $150.00 $190.00

Existing Crossover 38 Each $79,993.27 $11,592.00 $18,000.00 $11,500.00 $14,250.00

Bulkhead Wall 9 Each $4,027.65 $47,565.00 $9,000.00 $50,000.00 $58,600.00

Existing Debris on Beach 100 Short Ton $532.02 $948.00 $500.00 $1,000.00 $1,200.00

PED Crossover Type A 1 Each $94,402.96 $120,000.00 $117,000.00 $120,000.00 $150,000.00

PED Crossover Type B 11 Each $113,398.42 $119,385.00 $120,000.00 $120,000.00 $150,000.00

PED Crossover Type C 22 Each $243,158.72 $119,015.00 $135,000.00 $120,000.00 $150,000.00

PED Crossover Type E 5 Each $235,000.30 $274,369.00 $215,000.00 $275,000.00 $335,000.00

Galvanized Metal Handrails 575 Linear Feet $62.31 $36.80 $50.00 $40.00 $46.00

Trim Existing Bolts 500 Each $11.03 $12.60 $30.00 $100.00 $16.00

Construction of Crossovers 3 Each $61,292.62 $54,117.00 $57,000.00 $55,000.00 $67,000.00

Geotextile 825 Square Yard $3.98 $6.50 $10.00 $10.00 $8.00

Dune Planting 48 Acre $24,549.26 $23,100.00 $19,000.00 $32,000.00 $28,500.00

Sand Fence 25,500 Linear Foot $16.80 $7.88 $9.00 $10.00 $9.70

Vibration Monitoring 1 Job $214,800.00 $171,465.00 $250,000.00 $200,000.00 $390,000.00

Stabilization Mats 3,500 Linear Foot $127.62 $67.14 $55.00 $70.00 $83.00

Submit As-Built Drawings 1 Job $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00

Additional Insurance 1 Job $10,000.00 $1,000.00 $15,000.00 $5,000.00 $10,000.00

Unit Price

INVITATION FOR BID #:

W912DS19B0002

FIMI Contract 3B2, Ocean Bay Park to Davis Park, Suffolk County, NY

Base Total (0001 - 0010) $52,847,000.00 $52,499,159.50 $40,359,000.00 $37,039,250.00 $63,791,800.00

$50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00

$10,000.00 $1,000.00 $15,000.00 $5,000.00 $10,000.00

0011 (Option 1)

BID ITEM #: GOV'T ESTIMATE

0004AA

0004AB

$214,800.00

$446,700.00

DESCRIPTION OF

OFFERED ITEM Quantity Unit Unit Price

$94,400.00

$1,247,400.00

$5,349,500.00

$1,175,000.00

$35,800.00

$5,500.00

$183,900.00

0004AC

0004AD

0002AA $32,053,200.00 $36,800,000.00 $26,680,000.00 $21,390,000.00 $39,100,000.00

$6,525,000.00 $13,950,000.00$7,227,100.00 $7,160,000.00 $5,400,000.00

The Dutra Group

Great Lakes Dredge & Dock Company Weeks Marine Manson

ConstructionUnit Price Unit Price Unit Price

0002AB $24,450.00 $191,000.00 $125,000.00 $150,000.00 $190,000.00

0003AC $53,200.00 $94,800.00

0003AB $36,250.00 $428,085.00 $81,000.00 $450,000.00 $527,400.00

0003AA $3,039,700.00 $440,496.00 $684,000.00

0004AE

0004AF

0005AA

0005AB $3,300.00

$1,178,400.00

$428,400.00

$437,000.00 $541,500.00

$2,640,000.00

$1,375,000.00

$171,000.00

$8,250.00

$912,000.00

$229,500.00

$120,000.00

$1,313,235.00

$2,618,330.00

$1,371,845.00

$21,160.00

$6,300.00

$162,351.00

$28,750.00

$15,000.00

$250,000.00

$192,500.00

$5,362.50

$1,108,800.00

$200,940.00

$50,000.00

$117,000.00

$1,320,000.00

$2,970,000.00

$1,075,000.00

$171,465.00

$234,990.00

$200,000.00

$245,000.00

$120,000.00

$150,000.00

$1,650,000.00

$3,300,000.00

$1,675,000.00

$26,450.00

$8,000.00

$201,000.00

$23,000.00

$50,000.00

$165,000.00

$8,250.00

$1,536,000.00

$255,000.00

$6,600.00

$1,368,000.00

$247,350.00

$390,000.00

$290,500.00

$100,000.00

$120,000.00

$1,320,000.00

Option Total (0011)

Base + Option Total

(0001 - 0011)

$10,000.00 $1,000.00 $15,000.00 $5,000.00 $10,000.00

$52,857,000.00 $52,500,159.50 $40,374,000.00 $37,044,250.00 $63,801,800.00

File details come from the government source that posted it.