W912DS18B0022_-_0007.pdf
PDF 281 KB Posted
- Solicitation number
- W912DS-18-B-0022
About this file
W912DS18B0022-0007
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1)Revise and reissue the plans and specifications.
2)Correct updatesd Wage Rates from Amendment 0005 - NJ27 (Updated 7/13/18) 3)Provide answ ers to questions received.
4)See additional changes below
Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, by telegram, or by signing the block 15 below . FAILURETO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT OF REJECTION OF YOUR BID IN ACCORDANCEWITH THE LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304). Except as provided herein, all terms and conditions ofthe document referenced in Item9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS18B0022
X 9B. DATED (SEE ITEM 11)
10-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Sep-2018
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS18B0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 7
TO OFFORERS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
2. The following DRAWINGS have been REVISED and REISSUED:
- None
3. The following DRAWINGS have been ADDED:
- None
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- Section 32 92 19 – Seeding (the deletion of the spec section is hereby retracted as noted in amendment #4.)
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- Section 32 92 23 - Sodding
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- Project Table of Content
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- Section 01 45 00.00 10 Quality Control – add the following to paragraph 3.10 “If the RESIDENT
MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM) is required for CQC as indicated elsewhere in this contract, generate all reports in the RMS CM System. Attached forms will serve as guidance only. Otherwise forms contained herein will be used by the CQC Staff for CQC System reporting ).
a. The 2-page form at the end of the section will be used for the basic CQC Report. CQC personnel shall attach continuation sheets as required for any entries which cannot fit on the basic form. Preparatory and Initial Inspections, when performed, shall be indicated on the basic CQC report and minutes for each inspection shall be attached. Minutes will consist of a list of specific requirements for materials, procedures or equipment to be employed and shall also include any understandings reached or items of special importance discussed.
b. In addition, outstanding deficiencies shall be listed on the form "List of Outstanding Deficiencies" at the end of this section and shall be attached to each CQC report. As deficiencies are corrected, they are to be acknowledged on the basic CQC report and shall be deleted from the list.
c. Form at the end of this section entitled "CQC Test Report List" shall be used by the Contractor to track testing to be done as the project progresses, and also to summarize the Contractor's Quality Control testing to be reported on the CQC Plan.
d. Form "Record of Preparatory and Initial Inspections" at the end of this section shall be used by the Contractor to track Preparatory and Initial inspections as the project progresses and also to summarize these required inspections as part of the CQC Plan.
e. Additional reporting forms pertaining to specialized activities may be included herein or elsewhere in the contract, and shall be used for reporting as indicated”
- Section 01 45 00.00 10 Quality Control – add the following to end of paragraph 3.11 “Deficiencies cited and verbal instructions given to the Contractor by the Government Representative shall be entered into that day's CQC Report.”
- Section 01 50 00 Temporary Construction Facilities and Controls – replace paragraph 3.6.1 in its entirety with “NOT USED”
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
1. Please advise if Classroom 016 can be used as one of the four classrooms in east wing to be kept in operation at all times, as per Note #4. Response: Yes, classroom 016 is used as one of the 4 classrooms to remain in operation at all times. Refer to A drawings for more details.
2. Does the governemnt have an area on base for disposal of fill excavated from building footprint?
Response: No, all unsuitable material, if it can’t be reused within project area, is to be disposed off base.
3. As a follow up to question 76 49 615 placed yesterday,9/10/2018, my intent was to get spec and/or basis of design on the items for which the GC is responsible. Specifically CH1, CL1, CR1, MB1, MB2, SC1, TA1 and WS1. Thank you. Response: Please refer to the Package 4 - FFE, each of the items is described within that document.
4. If gas company POC is to be provided by government after award to the winning bidder, how can we account for the utility company costs? Please confirm that contractor is to carry no cost for the gas utility work else than excavation, backfill and restore. Response: The contractor is responsible for all aspects of the work. Point of Contact for Amaresco is Brian Venet bvenet@ameresco.com
5. Please advise if Bituminous Dampproofing is required and if so please provide spec 07 11 13 for bidding purposes. Response: Bituminous dampproofing is not required.
6. As per Amendment #5 Question #6 it states that all damaged areas to be re-sodded. In reviewing the plans the GC is to change the grades and re-top soil to new elevations. Is this area to be seeded or sodded? If sodded is there an irrigation system designed and installed? Please advise. Response: All areas to be seeded with approved Burlington Mix. No irrigation is included in the scope of this project.
7. Are section details 1 and 2 standard for exterior walls with brick veneer at high room bays (Specifically: 160, 159, 158, 161 and 162.) They call for FRP on 5/8" dry wall. Room finish Schedule calls for paint. Please clarify. Response: Details 1, 2 /AE501 are similar details for all the high bay areas (158, 159, 160, 161 & 162). All these areas (158, 159, 160, 161 & 162) get FRP up to 9’-0” AFF.
8. Please advise with any special building access requirements for hand carrying bids. Response:
You need to arrive early to allow time for getting thru security. You need to be prepared to be screened at the doors, similar to airport security. Wait times vary depending on time of day.
9. Please advise if temporary heating is needed for existing buildings after demolition of existing gas line is removed and disconnected. Response: New gas lines are to be provided prior to removal of the existing to minimize downtime (RE: Specification Section 01 11 00, Paragraph 1.3.1, drawing sheet G-004, Sequence of Work, Note C, and drawing sheet C-
130, General Note I.) With this minimized down time, temporary heat should not be required.
10. Section 00 21 16 is missing from solicitation. See attached regarding Electronic Submission.
Please advise where paragraph 3.5 is. Response: As this is an IFB solicitation Section 00 21 16 is not required. Section 00 21 13 is the Instruction to Bidders section. Removed reference to paragraph 3.5 in Electronic Submission section of “GENERAL
INSTRUCTIONS”
The following is a clarification on response to RFI #7 as issued in amendment #4.
7. There are Landscaping Specifications but no Landscaping Drawings.Please clarify.
Response: Specification Sections 32 93 00 and 32 92 23 (Exterior Plants and Sodding) are not required and will be omitted from the project manual. However, section 32 92 19 (Seeding) is to remain. Grassed areas disturbed by construction activities are to be seeded in accordance with sheet C-001, General Civil Note 17.
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been modified:
CPARS
The Federal Acquisition Regulation (FAR) requires that Past Performance Information (PPI) be collected on DoD contracts. The Contractor Performance Assessment Reporting System (CPARS) is a web‐enabled application the supports the completion, distribution and retrieval of all contract performance evaluations. Contractor Representative are responsible for reviewing and commenting on evaluations submitted on the Contractor Performance Assessment Reporting System (CPARS) website at https://www.cpars.gov/index.htm.
GENERAL INSTRUCTIONS
Electronic Submission: All bidders shall submit their bid on a CD-ROM. Written portions of the bid shall be in MS Word or AdobeAcrobat PDF format. The electronic version shall be either a single file tabbed in the same order as the hard copy or multiple files hyperlinked to a single table of contents. Any portion ofthe bid not available in electronic format, i.e. cut sheets, if applicable, should be scanned in Adobe Acrobat PDF format, thus making it available electronically. The CDROM must be clearly labeled by solicitation number, project name, installation, and bidder’s name. The CD-ROM shall be marked with a label stating “Unclassified//Controlled Unclassified Info.” In the event of any conflict between the electronic submission and the hard copy submission, the hard copy submission will govern and will be the material upon which the Government bases its evaluation and ultimately, its decision. Electronic media may be submitted in an un-editable format. NOTE: Bidders are requested to submit the CD-ROM with their bid but no later than 24 hours after the time and date for receipt of bids. Failure to submit the CD-ROM may impact the timeliness of the award.
NOTICE REGARDING BID BONDS, PEFORMANCE BONDS, AND PAYMENT BONDS
The Standard Forms (SF24, SF25, and SF25A) for these bonds have been revised as of August 2016. When including your bid/offer, contractors/sureties shall use the revised versions. No other version will be valid and thus may render your bid/offer nonresponsive.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
WAGE RATES 7/13
General Decision Number: NJ180027 07/13/2018 NJ27
Superseded General Decision Number: NJ20170027
State: New Jersey
Construction Type: Building
County: Burlington County in New Jersey.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/09/2018 3 03/16/2018 4 05/04/2018 5 06/01/2018 6 07/13/2018
ASBE0014-003 05/01/2018
BURLINGTON COUNTY (City of Beverly; Townships of Cinnaminson, Delanco, Delron, Edgewater Park, Evesham, Hainesport and Lumberton; Borough of Maple Shade; Township of Medford; Borough of Medford Lakes; Townships of Moorestown and Mt. Laurel;
Borough of Palmyra; Township of Riverside; Borough of Riverton;
Townships of Shamong, Southampton, Tabernacle, Westhampton and
Willingboro)
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement).......................$ 49.30 35.64
ASBE0089-003 07/01/2016
BURLINGTON COUNTY (Townships of Bordentown, Burlington, Chesterfield, Easthampton, Florence, Mansfield, Mt. Holly, New Hanover, North Hanover, Pemberton, Springfield and Woodland)
ASBESTOS WORKER/HEAT & FROST
INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 42.02 31.83
PAID HOLIDAYS:
The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.
BRNJ0002-013 11/01/2016
Rates Fringes
Bricklayer.....................$ 40.00 29.29
Work on high stacks: 22% per hour additional.
BRNJ0007-012 07/01/2016
Marble setter...................$ 57.32 37.08
BRNJ0007-014 06/06/2016
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 46.50 31.38
BRNJ0007-017 11/22/2016
Rates Fringes
Tile finisher..................$ 40.17 25.88 Tile setter....................$ 46.50 31.38
Tile finisher:
Work grouting all epoxy: $10.00 additional per day.
CARP0006-009 11/01/2017
Rates Fringes
CARPENTER (Scaffold Builder).....$ 47.92 57%
The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
CARP0006-010 11/01/2017
Rates Fringes
CARPENTER
Including Acoustical Ceiling Installation, Drywall Hanging, Formwork, Batt and Blown Insulation...$ 47.92 57%
CARP0029-006 11/01/2017
Rates Fringes
Soft floor layer...............$ 47.92 57%
CARP0454-009 05/01/2016
PILEDRIVERMAN....................$ 43.95 31.32
PAID HOLIDAYS:
New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday.
CARP0715-007 05/01/2018
Rates Fringes
Millwright.....................$ 48.80 58%+0.20
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
ELEC0269-017 10/01/2017
BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road;
then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line)
Electrician and cable splicer (Includes Low Voltage Wiring)....$ 49.79 61.48%
ELEC0351-001 10/02/2017
ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington
- Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt.
Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line);
CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES:
Electricians:
Cable splicer on lead cable.$ 46.51 72.54% + .65 Electrician and cable splicer.....................$ 46.55 77.03%+0.65
ELEV0005-004 01/01/2018
Rates Fringes
Elevator mechanic..............$ 55.76 32.65
PAID HOLIDAYS:
New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.
PAID VACATION:
Employer contributes 2% of basic hourly rate as vacation pay credit for 6 months to 5 years of service, and 4% for 5 years or more of service.
* ENGI0825-020 07/01/2018
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 51.77 30.45
GROUP 2.....................$ 50.18 30.45
GROUP 3.....................$ 48.27 30.45
GROUP 4.....................$ 46.64 30.45
GROUP 5.....................$ 44.93 30.45
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.
New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided
1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.
DEFINITION OF GROUPS:
GROUP 1:
Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);
Elevating Grader; Excavator; Front End Loader (5 cu. yd.
and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher
GROUP 2:
Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);
Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom
GROUP 3:
Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd.
and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;
GROUP 4:
Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;
Pump, Hydraulic
GROUP 5:
Oiler
IRON0068-011 07/01/2016
(Lumberton)
Rates Fringes
IRONWORKER
Reinforcing.................$ 44.55 20.88 Structural and Ornamental...$ 46.54 20.88
IRON0350-009 07/01/2016
BURLINGTON COUNTY (south and east of a line starting from the point on the Atlantic-Burlington county line where the Atlantic-Burlington county line crosses Route 206; then, following a line northeast through Wharton State Park to the town of Chatsworth; then, continuing along the same line, to the Burlington-Ocean county line)
Ironworkers:
Reinforcing.................$ 47.02 37.75 Structural and Ornamental...$ 48.02 37.75
IRON0399-005 07/01/2015
BURLINGTON COUNTY (north and west of a line starting from the point on the Atlantic-Burlington county line where the Atlantic-Burlington county line crosses Route 206; then, following a line northeast through Wharton State Park to the town of Chatsworth; then, continuing along the same line, to the Burlington-Ocean county line)
IRONWORKER (Structural, Reinforcing and Ornamental)......$ 44.60 27.25
LABO0008-001 05/01/2011
Rates Fringes
Asbestos Removal Laborer.........$ 28.37 21.62
The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)
LABO0222-006 07/01/2012
Rates Fringes
LABORER
MASON TENDER:
Brick/Cement/Concrete.......$ 29.85 23.07
LABO0222-008 07/01/2012
Rates Fringes
Laborers:
Asphalt Shoveler, Asphalt Spreader, Landscape
Laborer, Pipelayer, Power Toole Operator and Screedman...................$ 29.35 23.07
PAIN0021-032 05/01/2017
BURLINGTON COUNTY (south of a line drawn between these cities:
Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Heights)
Glazier........................$ 41.30 31.15
Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional.
PAIN0711-011 05/01/2017
BURLINGTON COUNTY (north of a line drawn between these cities:
Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Heights)
Glazier........................$ 44.81 23.16
Work welding or using a cutting torch: $1.00 per hour additional.
Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:
$1.00 per hour additional.
PAIN0711-018 05/01/2017
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 39.50 23.20
PAIN0711-019 05/01/2017
Rates Fringes
PAINTER (Brush & Roller).........$ 39.25 22.66 PAINTER (Spray)..................$ 40.28 19.98
PLAS0592-036 05/01/2018
CEMENT MASON/CONCRETE FINISHER...$ 42.09 32.82
* PLUM0009-015 07/01/2018
BURLINGTON COUNTY (north of a line drawn from the town of Burlington City, includes Burlington City; then, along County Road Route 541 East, also known as High St., until it reaches the city of Mt. Holly, includes the city of Mt. Holly; then, along Madison Ave. in Mt. Holly to State Road Route 38 East;
then, along State Road Route 38 East until it crosses over State Road Route 206 and becomes County Road Route 530; then, along County Road Route 530 to Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)
PIPEFITTER (Including HVAC Pipe Installation)...............$ 48.74 38.56 Service and Repair..........$ 37.48 21.08 PLUMBER (Excluding HVAC Pipe Installation)....................$ 48.74 38.56 Service and Repair..........$ 37.48 21.08
PLUM0322-008 05/01/2018
BURLINGTON COUNTY (south of a line drawn from the town of Burlington City, does not include Burlington City; then, along County Road Route 541 East, also known as High St., until it reaches the city of Mt. Holly, does not include the city of Mt.
Holly; then, along Madison Ave. in Mt. Holly to State Road Route 38 East; then, along State Road Route 38 East until it crosses over State Road Route 206 and becomes County Road Route 530, does not include Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Rd. to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)
PIPEFITTER (Including HVAC Pipe Installation)...............$ 46.17 40.34 PLUMBER (Excluding HVAC Pipe Installation)....................$ 46.17 40.34
ROOF0030-027 05/01/2017
Roofer
SHINGLES....................$ 36.15 29.76
SLATE AND TILE..............$ 36.15 29.76
ALL OTHER WORK..............$ 36.15 29.76
Mopper, and operator of felt-laying machine: $.50 per hour additional.
Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour additional.
PAID HOLIDAY:
The last working day before Christmas, to be paid at the rate of four hours pay.
SFNJ0669-006 04/01/2017
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 49.15 23.08
SFNJ0692-002 01/01/2018
Within 15 miles beyond the city limits of Philadelphia.
Rates Fringes
Sprinkler fitter (Fire Sprinklers)......................$ 53.60 26.27
SHEE0027-009 06/01/2012
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 43.08 32.52
TEAM0469-003 11/01/2017
BURLINGTON COUNTY (east of a line drawn from the New Jersey Turnpike to the Delaware River)
Truck drivers:
Dump Truck..................$ 39.90 31.385 Off the Road Truck..........$ 40.05 31.385
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.
New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.
VACATION PAY CREDIT:
Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).
TEAM0676-002 05/01/2017
BURLINGTON COUNTY (west of a line drawn from the New Jersey Turnpike to the Delaware River)
Truck drivers:
Dump Truck Drivers..........$ 34.20 25.485 Off the Road Truck..........$ 34.55 25.485
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required:
$1.00 per hour additional.
SHIFT WORK:
An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of pay.
PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday occurs.
BEREAVEMENT PAY:
In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays.
SUNJ2004-003 01/02/2009
Rates Fringes
LABORER: Common or General......$ 19.27 12.42
PLASTERER........................$ 42.33 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it.