W912DS18B0022-0004 - Amendment 4

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Revise and reissue the plans and specifications.

2) Provide answ ers to questions received.

3) See additional changes below

Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, by telegram, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIEDMAY RESULT OF REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304). Except as provided herein, all terms and conditions ofthe document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS18B0022

X 9B. DATED (SEE ITEM 11)

10-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Sep-2018

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS18B0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 4

TO OFFORERS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- Drawing S-301

- Drawing E-602

3. The following DRAWINGS have been ADDED:

- None

4. The following DRAWINGS have been DELETED:

- None

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- Section 07 27 36 – Spray Foam Air Barriers

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- Section 32 93 00 – Exterior Plants

- Section 32 92 19 – Seeding

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

- None

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

- None

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

1. What type of cable tray is being used, basket or ladder type. Response: Basket type cable tray will be used for all areas outside of the new comm room. In the new comm room, ladder type cable tray will be used. Please refer to “T” drawings.

2. What floor box is specified for furniture connections? Response: Basis of design is Legrand #RFB2 with one duplex receptacle and one two-port telecommunications outlet, with #FPCTCBK faceplate. An equivalent floor box will be considered.

3. What type of power pole is specified? Response: Basis of design is Legrand Wiremold #25DTC.

4. Who is the fire alarm vendor in the existing building? Response: The existing fire alarm panel is Fire-

Lite Alarms, Inc. model no. MS-9200 and the signal transceiver is a Monaco Enterprises, Inc. model

no. BT2-8.

5. For telecommunications, We interpret that Contractor is to provide box, sleeve and infrastructure only. Tele data devices, cabling & terminations, fiber, etc. are by others. Please confirm. Response: Contractor is to

W912DS18B0022

provide all portions of telecommunications installation including devices, outlet, jack, termination, cabling, conduit, etc. as shown on the plans and specifications.

6. Please provide specification for the "3" CLOSED CELL SPRAY FOAM INSULATION (R-20)" depicted on AE120. Also clarify if the whole under side of the affected existing building get the foam insulation per detail 5/AE505 or only the dotted area per the legend of AE120 to be foam sprayed. Response:

Specification section 07 27 36, Spray Foam Air Barriers, is issued via Amendment. Only the dotted area per the legend on sheet AE120 is to be applied with spray foam other than any other voids or gaps in the building perimeter requiring spray foam for air barrier continuity.

7. There are Landscaping Specifications but no Landscaping Drawings.Please clarify. Response:

Specification Sections 32 93 00 and 32 92 19 (Seeding and Exterior Plants) are not required and will be omitted from the project manual. However, section 32 92 23 (Sodding) is to remain. Grassed areas disturbed by construction activities are to be re-sodded in accordance with sheet C-001, General Civil Note 17.

8. Drawing C-130 shows two existing transformers being re-fed from the relocated switchgear. It appears that drawing E-602 (Single line diagram) is not consistent with drawing C-130. Please clarify. Response:

Drawing E-602 has been revised. Please refer to attached revised drawing.

9. Drawing AD102 shows to demo the existing lights in most of the space, but drawing EL103 shows to install new circuits to the existing lights. Are these rooms getting new light fixtures? Response: These rooms are not getting new light fixtures, drawing EL103 indicated existing lighting.

10. Title: Concrete. Please take a look at the Combined Footing Schedule on S-301 and we think that the Longitudinal and Transverse bars may need to be reversed. Also with the bar spacing as shown, long bars for an FC-7 footing would be #7 an inch and 11/16 on center. This would be about 13/16 inches between bars. Please advise. Response: Bars for the Combined Footing Schedule were transposed. Drawing S- 301 with updated Combined Footing Schedule has been provided in this Amendment with the titles in the correct location.

11. Drg AE-503 & 505 calls for 3" Closed cell Spray foam insulation please provide us specs for bidding purposes. Response: Specification section 07 27 36, Spray Foam Air Barriers, is issued via this Amendment.

12. The Combined Footing Schedule on S-301 and the Longitudinal and Transverse bars may need to be reversed. Also with the bar spacing as shown, long bars for an FC-7 footing would be #7 an inch and 11/16 on center. This would be about 13/16 inches between bars. Please advise Response: Bars for the Combined Footing Schedule were transposed. Drawing S-301 with updated Combined Footing Schedule has been provided in this Amendment with the titles in the correct location.

13. Please confirm that sealed bids will be publicly opened at date and time stated in SF 1442. Response:

Correct, this is an Invitation for Bids and those will be opened at a time and date and location as noted in SF1442.

14. Detail 5/AE505 calls for 3" Closed cell spray foan insulation and we need to know if it requires Intumescent Barrier or Theraml Barrier. Please clarify, if so please provide us specs. Response: A thermal barrier is to be provided at any areas exposed to the building interior per Specification section 07 27 36, Spray Foam Air Barriers, issued via Amendment.

(End of Summary of Changes)