Amendment_4_-_KC46_B2324_MX_Training_Facility_-_Specs.pdf
PDF 55 KB Posted
- Solicitation number
- W912DS-18-B-0022
About this file
Specs - Amendment 0004
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Regional MX Training JBMDLPTFL163005
SECTION 07 27 36
SPRAY FOAM AIR BARRIERS
05/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR BARRIER ASSOCIATION OF AMERICA (ABAA)
ABAA Accreditation Accreditation
ABAA QAP Quality Assurance Program
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE Z88.2 (2015) American National Standard Practices for Respiratory Protection
ASSE/SAFE Z9.2 (2012) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems
ASTM INTERNATIONAL (ASTM)
ASTM C1029 (2015) Standard Specification for Spray-Applied Rigid Cellular Polyurethane Thermal Insulation
ASTM C1060 (2015) Standard Practice for Thermographic Inspection of Insulation Installations in Envelope Cavities of Frame Buildings
ASTM C1303/C1303M (2015) Standard Test Method for Predicting Long-Term Thermal Resistance of Closed-Cell Foam Insulation
ASTM C1338 (2014) Standard Test Method for Determining Fungi Resistance of Insulation Materials and Facings
ASTM C518 (2017) Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus
ASTM D1621 (2016) Standard Test Method for Compressive Properties of Rigid Cellular Plastics
ASTM D1622 (2014) Apparent Density of Rigid Cellular Plastics
ASTM D1623 (2009) Tensile and Tensile Adhesion
SECTION 07 27 36 Page 1
Properties of Rigid Cellular Plastics
ASTM D2126 (2009) Response of Rigid Cellular Plastics to Thermal and Humid Aging
ASTM D2842 (2012) Water Absorption of Rigid Cellular Plastics
ASTM D6226 (2010) Standard Test Method for Open Cell Content of Rigid Cellular Plastics
ASTM E119 (2016a) Standard Test Methods for Fire Tests of Building Construction and Materials
ASTM E2178 (2013) Standard Test Method for Air Permeance of Building Materials
ASTM E2357 (2011) Standard Test Method for Determining Air Leakage of Air Barrier Assemblies
ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
ASTM E736 (2000; R 2011) Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members
ASTM E84 (2017) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
ICC EVALUATION SERVICE, INC. (ICC-ES)
ICC-ES AC377 (2009) Acceptance Criteria for Spray-Applied Foam Plastic Insulation
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2015) International Building Code
ICC IECC (2015) International Energy Conservation Code
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
ANSI/ISEA Z87.1 (2015) Occupational and Educational Personal Eye and Face Protection Devices
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2013) Standard for Portable Fire Extinguishers
SECTION 07 27 36 Page 2
NFPA 211 (2016) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
NFPA 275 (2017) Standard Method of Fire Tests for the Evaluation of Thermal Barriers
NFPA 285 (2012) Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-Load-Bearing Wall Assemblies Containing Combustible Components
NFPA 31 (2016) Standard for the Installation of Oil-Burning Equipment
NFPA 54 (2015) National Fuel Gas Code
SPRAY POLYURETHANE FOAM ALLIANCE (SPFA)
SPFA TechDocs (2015) SPFA Technical Documents Library, four categories: General, Insulation, Roofing, Specialty
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-600-01 (2016; with Change 1) Fire Protection Engineering for Facilities
UNDERWRITERS LABORATORIES OF CANADA (ULC)
ULC S705.2 (2005) Standard for Thermal Insulation - Spray Applied Rigid Polyurethane Foam, Medium Density - Application
1.2 RELATED REQUIREMENTS
Coordinate the requirements of Section 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM, Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS, and SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS to provide a complete air barrier system. Submit all materials, components, and assemblies of the air barrier system together as one complete submittal package.
1.3 DEFINITIONS
1.3.1 Long Term Thermal Resistance (LTTR)
The thermal resistance value of a closed cell foam insulation product measured using accelerated aging ASTM C1303/C1303M equivalent to the time-weighted average thermal resistance value over 15 years. Loss in thermal resistance is attributable to changes in cell gas composition caused by diffusion of air into and blowing agent out of the foam cells.
1.3.2 SPFA TechDocs
Reformatted documents, named SPFA TechDocs ( http://www.sprayfoam.org/technical/spfa-technical-documents), places each document in one of four categories for easy reference and identification:
SECTION 07 27 36 Page 3
Roofing, Insulation, Specialty and General.
Spray Polyurethane Foam: Thermal and air/vapor barrier system consisting of sprayed polyurethane foam (SPF).
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Qualification of Manufacturer; G
Qualification of Installer; G
Quality Control Plan; G
Safety Plan; G
Fire Prevention Plan; G
Respirator Plan; G
SD-02 Shop Drawings
Spray Foam Air Barrier System
Foam Air Barrier System; G
Fire-Rated Assemblies; G
SD-03 Product Data
Closed Cell SPF; G
Primers, Adhesives, and Mastics; G
Sealants; G
Safety Data Sheets; G
Thermal Barrier Materials; G
SD-06 Test Reports
Field Peel Adhesion Test; G
Thermographic Test; G
Air Barrier Test; G
Primers; G
SECTION 07 27 36 Page 4
Fire-Ratings Of Thermal Barrier Materials; G
Flame Spread And Smoke Developed Index Ratings Of SPF Products; G
Site Inspections Reports; G
SD-07 Certificates
Closed cell SPF; G
Qualification of Manufacturer; G
Qualification of Installer; G
SD-08 Manufacturer's Instructions
SPF Handling, Storage, and Spray Procedures; G
Substrate Preparation; G
Thermal Barrier; G
Primers, Adhesives, and Mastics; G
SD-09 Manufacturer's Field Reports
Core Samples; G
Daily Work Record; G
Visual Inspection and Thermal Scanning; G
SD-11 Closeout Submittals
Volatile Organic Compound (VOC) Content; S
Recycled Content; S
1.5 MISCELLANEOUS REQUIREMENTS
For the spray foam air barrier system provide the following:
1.5.1 Shop Drawings
Submit spray foam air barrier shop drawings showing locations, detailing, and extent of spray foam air barrier assemblies. Provide details of all typical conditions, intersections with other envelope assemblies and materials, membrane counter-flashings. Provide details for fire-rated assemblies and indicate materials for thermal barriers. Show details for bridging of gaps in construction, treatment of inside and outside corners, expansion joints, methods of attachment of materials covering the SPF without compromising the barrier. Indicate how miscellaneous penetrations such as conduit, pipes, electric boxes, brick ties, and similar items will be sealed.
1.5.2 Product Data
Submit manufacturer's technical data indicating compliance with performance and environmental requirements, manufacturer's printed instructions for
SECTION 07 27 36 Page 5 evaluating, preparing, and treating substrates, temperature and other limitations of installation conditions, safety requirements for installation, and Safety Data Sheets. Indicate flame and smoke spread ratings for all products. Submit thermal barrier literature including material description, physical properties, and fire-ratings.
1.5.3 Test Reports
Submit test reports indicating that field peel adhesion tests on all materials have been performed and the changes made, if required, in order to achieve successful and lasting adhesion. Submit test reports for flame spread and smoke developed index ratings of SPF products tested in accordance with ASTM E84. Submit test reports for fire-ratings of thermal barrier materials tested in accordance with ASTM E84.
1.6 DELIVERY, STORAGE, AND HANDLING
1.6.1 Delivery
Deliver and store materials in sufficient quantity to allow for uninterrupted flow of work. Inspect materials delivered to the site for damage; unload and store out of weather. Deliver materials to the jobsite in their original unopened packages, clearly marked with the manufacturer's name, brand designation, description of contents, and shelf life of containerized materials. Store and handle to protect from damage. Submit SPF Handling, Storage, and Spray Procedures in accordance with submittal procedures.
1.6.2 Storage
Store materials in clean, dry areas, away from excessive heat, sparks, and open flame. Maintain temperatures in the storage area below the materials' flash point(s) and within limits recommended by the manufacturer's printed instructions. Provide ventilation in accordance with ASSE/SAFE Z9.2 to prevent build-up of flammable gases. Store MDI (A-side) drums in locations that limit the risk of contact with water, acids, caustics (such as lye), alcohols, and strong oxidizing and reducing agents.
1.6.3 Handling
Handle materials and containers safely and in accordance with manufacturer's recommendations. Store liquids in airtight containers and keep containers closed except when removing materials. Do not use equipment or containers containing remains of dissimilar materials. Do not expose foam component containers to direct sunlight. Do not use materials from containers with content temperatures in excess of 80 degrees F.
Containers exposed to long periods of cold may also exhibit separation and poor performance. Do not use materials exposed to temperature ranges outside of manufacturer's instructions for exposure limits.
Mark and remove from job site materials which have been exposed to moisture, that exceed shelf life limits, or that have been exposed to temperature extremes.
1.6.3.1 Venting and Handling of Material Containers
Partially unscrew material container and drum caps to gradually vent the containers prior to opening. Do not inhale vapors. Decontaminate empty
SECTION 07 27 36 Page 6 component containers by filling with water and allowing to stand for 48 hours with bung caps removed. Do not, under any circumstances seal, stop, or close containers which have been emptied of foam components.
1.7 AIR BARRIER TESTING
Perform air barrier testing in accordance with Section 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM and Section 07 05 23 PRESSURE TESTING AN AIR
BARRIER SYSTEM FOR AIR TIGHTNESS.
1.8 SAFETY PROVISIONS
1.8.1 Fire Prevention
Provide a written fire prevention plan for the SPF application. Address specific fire hazards such as spontaneous combustion from exothermic heat build-up of SPF components during curing. Provide a continuous fire watch during mixing and spraying of SPF and for a minimum of 30 minutes after completion of work at the end of each day. Maintain fire watch for additional time as required to ensure no potential ignition conditions exist.
1.8.1.1 Fire Extinguishers
Furnish two fire extinguishers of minimum 15 pounds capacity each, in accordance with NFPA 10, in the immediate vicinity of the work. CAUTION:
Do not discharge high pressure carbon dioxide extinguishers where explosive vapors exist since the discharge can cause a spark which will ignite the vapors.
1.8.2 Respirator Plan
Provide a written respirator plan in accordance with OSHA regulations that protects installers during application and addresses separation of the area to prevent other workers from entering the work area during spraying.
1.8.3 Isolation
Isolate the work area as recommended by spray foam manufacturer's written requirements. Prevent workers without respiratory, skin, and eye Personal Protective Equipment (PPE) or training from entering the work area or otherwise being exposed to off-gassing of the insulation in excess of permissible exposure limits.
1.8.4 Respirators and Eye Protection
Respiratory protective devices (respirators) must meet the requirements of ASSE/SAFE Z88.2. Eye and face protective equipment must meet the requirements of ANSI/ISEA Z87.1. Additionally, sprayers and workers in the immediate vicinity of the spray must wear NIOSH-approved, full-face, supplied air respirators (SAR) operated in positive pressure or continuous flow mode. Workers not in the immediate vicinity of the sprayer must wear air purifying respirators (APR) with an organic gas / P100 particulate cartridge. Instruct personnel in the use of devices. Maintain such equipment and inspect regularly. All workers are required to have undergone pulmonary function testing and fit testing and must provide certification that they have done so. Change APR cartridges in accordance with manufacturer's written recommendations.
SECTION 07 27 36 Page 7
1.8.5 Clothing and Gloves
Sprayers and workers must wear protective clothing and gloves in accordance with OSHA requirements during materials application. Disposable coveralls must be worn and must cover all exposed skin. Sprayers and workers must wear fabric gloves coated with nitrile, neoprene, butyl or PVC.
1.8.6 Additional Requirements
Require personnel to review the Health, Safety and Environmental Aspects of Spray Polyurethane Foam and Coverings published by the Spray Polyurethane Foam Alliance (SPFA). Verify compliance prior to allowing personnel on site for installation work. http://www.sprayfoam.org.
1.9 QUALITY ASSURANCE
1.9.1 Qualification of Manufacturer
Submit documentation verifying that the manufacturer of the SPF is currently accredited by the Air Barrier Association of America ( ABAA Accreditation https://www.airbarrier.org/) and by the Spray Polyurethane Foam Alliance (SPFA).
1.9.2 Qualification of Installer
Submit documentation verifying that installers of the spray foam air barrier are currently certified by ABAA/BPQI (Building Performance Quality Institute) or by the Spray Polyurethane Foam Alliance (SPFA) Professional Certification Program (PCP). Installers must provide photo identification certification cards for inspection upon request.
1.9.3 General Quality Requirements
Provide all products and installation in accordance with SPFA TechDocs requirements (http://www.sprayfoam.org/technical/spfa-technical-documents) and documented best practices.
1.10 PRECONSTRUCTION MEETING
Conduct a preconstruction meeting after approval of submittals and a minimum of two weeks prior to commencing work specified in this Section.
Attendance is required by the Contracting Officer's designated personnel, Contractor, and representatives of related trades including covering materials, substrate materials, adjacent materials, and materials and components of the air/vapor/thermal barrier system. Agenda must include, at a minimum, the following items:
a. Drawings, specifications and submittals related to the SPF work;
b. Sequence of construction;
c. Coordination with substrate preparation work and responsibility of repairing defects in substrates. Determine method of ensuring SPF work does not begin until substrates have been inspected and accepted;
d. Compatibility of materials;
e. Construction and testing of construction mockup;
SECTION 07 27 36 Page 8
f. Application of self-adhering air barrier transitions strips and primer as required for sealing the spray foam air barrier system at openings including but not limited to windows, doors and louvers;
g. Spray foam air barrier system installation; including methods to be used to provide a continuous barrier at thru-wall flashing, penetrations, and covering of embed items;
h. Quality control plan including methods of applying the product so that a consistent thickness across the face of the substrate is achieved.
i. Procedures for SPF manufacturer's technical representative's onsite inspection and acceptance of substrates, contact info for the representative, frequency of visits, and distribution of copies of inspection reports. Determine where core samples will be taken and review procedures for daily documentation of SPF application.
j. Property protection measures, including isolation of the work, and prevention of overspray and clean-up should overspray occur.
k. Safety requirements, including review of PPE, fire prevention, safety plan, respirator plan, ventilation and separation of the work area, fall protection, and posting of warning signs. Provide a complete schedule and a detailed, written fire protection plan including temporary isolation of the product and the work area until permanent isolation or thermal barrier is in place.
1.11 ENVIRONMENTAL CONDITIONS
1.11.1 Temperature and Weather
Install SPF within the range of ambient and substrate surface temperatures in accordance with manufacturer's written instructions. Do not apply SPF to damp or wet substrates. Do not apply SPF during inclement weather or when ice, frost, surface moisture, or visible dampness is present on surfaces to be covered, or when precipitation is imminent. Do not apply SPF to exterior building surfaces when wind speeds exceed 25 miles per hour. Use moisture measuring methods and equipment to verify that the moisture conditions of substrate surfaces are in accordance with SPF manufacturer requirements prior to application. Substrate temperatures must be within limits recommended by the manufacturer's printed instructions.
1.11.2 Conditions for Primers
Follow manufacturer's printed application and curing instructions. Do not apply primer when ambient temperature is below 40 degrees F or when ambient temperature is expected to fall below 35 degrees F for the duration of the drying or curing period.
1.11.3 Conditions for Ignition Barriers
Ensure that sprayed surfaces comply with manufacturer's written requirements for application coverage, thickness, and curing prior to application of ignition barrier coatings.
1.11.4 Temporary Ventilation
Provide temporary ventilation for work of this section in accordance with
SECTION 07 27 36 Page 9 manufacturer's written instructions and with OSHA requirements for this type of application.
1.12 FOAM SPRAY EQUIPMENT
1.12.1 Applicator
Use an air purge foam spray gun.
1.12.2 Equipment Calibration
Fully calibrate the foam metering equipment to monitor each liquid component to within 2 percent of the SPF manufacturer's required metering ratio. Calibrate spray equipment each day at the start of operations, after each restart if spraying operations have been terminated for more than one hour, whenever there is a change in fan pattern or pressure, whenever slow curing areas are noticed, whenever a change is made in hose length or working height, and after changeover between materials.
Calibration consists of demonstrating that the equipment is adjusted to deliver components in proper mix and proportion. Conduct calibration tests on cardboard or plywood on a wall adjacent to the area to be sprayed.
1.12.3 Metering Equipment Requirements
Use foam metering equipment capable of developing and maintaining the SPF manufacturer's required liquid component pressures and temperatures. Foam metering equipment must have gages for visual monitoring. Equipment must provide temperature control of foam components to within the temperature ranges recommended by the foam manufacturer's printed instructions.
1.12.4 Moisture Protection
Protect surfaces of supply containers and tanks used to feed foam metering equipment from moisture.
1.12.5 Compressed Air
Supply compressed air that is in contact with SPF during mixing or atomization through moisture traps that are continuously bled.
1.12.6 Dispense Excess Materials
Do not deposit materials used for cleaning of equipment or materials dispensed for calibration purposes and establishment of spray gun pattern onto the ground. Dispense such materials into scrap containers or onto plastic film, or cardboard, and dispose of in accordance with safety requirements and jobsite regulations.
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY
2.1.1 Reduced Volatile Organic Compound (VOC) Content
Provide products with reduced VOC content and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING.
SECTION 07 27 36 Page 10
2.1.2 Recycled Content
Provide products with recycled content and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING.
2.2 SPRAY FOAM AIR BARRIER
2.2.1 General
Provide a closed cell, sprayed in place, SPF that forms a continuous air /vapor/thermal barrier at the building enclosure. Provide in accordance with ASTM C1029, with the requirements of UFC 3-600-01, ICC IBC Chapter 26, ICC-ES AC377, and NFPA 285. In the event of a conflict, the most stringent requirement applies. Provide all system components necessary for a complete, code compliant installation, whether indicated or not, including material support components, expansion and contraction joints,thermal barrier materials, and accessories.
2.2.2 Physical Properties
Provide a closed cell product with the following characteristics:
a. Density (ASTM D1622): 2.0 lb per cf, nominal
b. Thermal Resistance (ASTM C518)
(1) Initial R-value per inch thickness: 7 sf·degrees F h per Btu
(2) Aged R-value per inch thickness (180 days at 76 degrees F): 6.6 sf·degrees F·h per Btu
c. Air Permeance (ASTM E2178): Less than 0.004 CFM per sf at 1.57 psf.
d. Air Leakage (ASTM E2357, ASTM E283): less than 0.004 CFM per sf at
1.57 psf at one inch.
e. Compressive Strength (ASTM D1621): Minimum 28.3 psi
f. Tensile Strength (ASTM D1623)
(1) Medium density: 15 psi
(2) Roofing: 40 psi
g. Water Vapor Permeance (ASTM E96/E96M, water method): less than 1.2 US Perms at one inch thickness
h. Vapor Retarder (ICC IBC, ICC IECC) Class III
i. Surface Burning Characteristics (ASTM E84) 3 inch thickness:
(1) Flame Spread (FS) Index Rating less than 75.
(2) Smoke Developed (SD) Index Rating less than 150. SPF with an SD rating greater than 150 but less than 450 may be used when fully encapsulated. Approval of SPF product is contingent upon approval of encapsulation products and assemblies..
j. Closed Cell Content (ASTM D6226): 90 percent
SECTION 07 27 36 Page 11
k. Dimensional Stability (Humid Aging) (ASTM D2126): 15 percent at 28 days at 158 degrees F with 97 percent relative humidity.
l. Water Absorption (ASTM D2842): Maximum 1.0 per volume
m. Fungi Resistance (ASTM C1338): Pass, with no growth
n. Recycled Content: Minimum 9 percent (pre- and post-consumer)
2.2.3 Expansion and Contraction
Provide an assembly that allows for relative movement due to temperature, moisture, and air pressure changes. Provide expansion and contraction measures as required by the manufacturer's written recommendations.
2.2.4 Fire-ratings, Flame Spread and Smoke Developed Index Ratings
Where fire-rated materials are indicated, provide products with the appropriate markings of a qualified testing agency. Submit fire-rating test reports. Submit flame spread (FS) and smoke developed (SD) index data. Where FS and SD values of foam products do not meet requirements, provide corresponding thermal barrier products or assemblies and verify complete encapsulation of the spray foam air barrier through product data or on shop drawings. Submit for approval in accordance with Section
01 33 00 SUBMITTAL PROCEDURES.
2.2.5 Prohibited Materials
Products that contain hexabromocyclododecane (HBCD) flame retardants are prohibited. Products that contain hydrochlorofluorocarbons (HCFCs), chlorofluorocarbons (CFCs), or other high ozone depleting blowing agents, are prohibited. For a list of acceptable substitute foam blowing agents see https://www.epa.gov/snap/foam-blowing-agents.
2.2.6 Thermal Barrier
Provide a thermal barrier in locations where SPF is exposed to the interior of the building, including attics and plenum spaces. Provide thermal barriers in accordance with ICC IBC Chapter 26 "Plastics," with ICC-ES AC377, ASTM E736, and NFPA 275. Choose one or more of the following methods of separation:
a. Building interior, other than fire-rated enclosures: Separate the SPF from the occupied interior of a building by an intumescent thermal barrier coating or thermal barrier board identical to a third party tested thermal barrier to limit the average temperature rise of the surface of the SPF to not more than 250 degrees F after 15 minutes of fire exposure (using the standard time-temperature curve of ASTM E119).
Provide in accordance with NFPA 275.
2.3 PRIMERS, ADHESIVES, AND MASTICS
Provide primers, adhesives, mastics and other accessory materials as recommended by spray foam manufacturer's printed literature.
2.4 JOINT SEALANTS
As specified in Section 07 92 00 JOINT SEALANTS. Verify compatibility with
SECTION 07 27 36 Page 12 other system products.
PART 3 EXECUTION
3.1 EXAMINATION
Before installing the spray foam air barrier and with the installer present, examine substrates, areas, and conditions under which SPF will be applied, for compliance with requirements. Ensure that surfaces are sound, dry, even, and free of oil, grease, dirt, excess mortar or other contaminants. Correct defects that adversely affect the spray foam application or performance. Verify that work by other trades is in place and complete prior to application of spray foam.
3.2 PREPARATION
3.2.1 Substrate Preparation
Clean, prepare, and treat substrate according to manufacturer's written instructions. Provide clean, dust-free, and dry substrate for spray foam application.
a. Prepare surfaces by brushing, scrubbing, scraping, or grinding to remove loose mortar, dust, oil, grease, oxidation, mill scale and other contaminants which will affect adhesion of the SPF.
b. Wipe down metal surfaces to remove release agents or other non-compatible coatings, using clean sponges or rags soaked in a solvent compatible with the SPF.
3.2.2 Protection
Protect adjacent areas and surfaces from spray applied materials in accordance with the following:
a. Mask and cover adjacent areas to protect from over spray.
b. Ensure required foam stops and back up materials are in place to achieve a complete seal.
c. Seal off ventilation equipment. Install temporary ducting and fans to provide required exhaust of spray fumes. Provide make-up air as required.
d. Erect barriers, isolate area, and post warning signs to notify non-protected personnel of the requirement to avoid the spray area.
3.2.3 Blocking Around Heat Producing Devices
Install non-combustible blocking around heat producing devices to provide the following clearances:
a. Vents and vent connectors used for venting products of combustion, flues, and chimneys other than masonry chimneys: Minimum clearances in accordance with NFPA 211.
b. Gas Fired Appliances: Clearances in accordance with NFPA 54.
c. Oil Fired Appliances: Clearances in accordance with NFPA 31. Blocking
SECTION 07 27 36 Page 13 is not required if chimneys or flues are certified by the manufacturer for use in contact with insulating materials.
3.2.4 Fire and Explosion Hazards
Prohibit open flames, sparks, welding, and smoking in the application area.
Provide and maintain fire extinguishers of appropriate type, size and distance, as required by NFPA, in the application area. Mix batches in small enough quantities to avoid spontaneous combustion from exothermic heat build-up of SPF components during curing.
3.2.5 Warning Signs
Post warning signs at ground level adjacent to the work area and a minimum of 150 feet from the application area stating the area is off limits to unauthorized persons and warning of potential hazards. Place clearly visible and legible warning sign at entrance to primary road leading to the project facility warning of presence of flammable materials, irritating fumes, and potential of overspray damage.
3.2.6 Prime Substrate
Provide as recommended by the manufacturer for each substrate to be primed. Use primers at full strength. Do not dilute primers unless required and as recommended in writing by the manufacturer. Do not use cleaning solvents for thinning primers or other materials. Ensure that diluted primer(s) meet VOC requirements.
3.3 INSTALLATION
3.3.1 Sequencing and Coordination
Sequence the work so as to prevent access to the work area by other trades during foam application and curing. Limit access of non-essential workers during application. Notify the Contracting Officer 24 hours in advance of spraying operations. Sequence spray foam work with other trades to permit continuous self-flashing of the spray foam air barrier. Ensure expansion and control joints are provided as detailed on the manufacturer's shop drawings to accommodate the expansion of each layer of the air/vapor /thermal envelope. Provide temporary fire protection of uncured foam, and isolate the work area, until foam application is isolated with a permanent thermal barrier.
3.3.2 Installation of Spray Foam Air Barrier
Install materials in accordance with paragraph SAFETY PROVISIONS, in accordance with manufacturer's recommendations, ULC S705.2 Installation Standard, and in accordance with the following:
a. Use spray equipment that complies with foam manufacturer's recommendations for the specific type of application, and as specified herein. Record equipment settings on the Daily Work Record. Each proportioned unit can supply only one spray gun.
b. Apply only when surfaces and environmental conditions are within limits prescribed by the material manufacturer.
c. Continuously connect the spray foam air barrier between walls, roof, floor, and below grade assemblies to form a continuous integrated air
SECTION 07 27 36 Page 14 barrier system around the entire building enclosure. Extend the spray foam air barrier into rough openings such as doors, windows, louvers, and other exterior penetrations. Use self-adhering air barrier transition strips if necessary to achieve full extension and continuity of the barrier at these locations. Seal edges of barrier at junctures with rough openings.
d. Install within manufacturer's tolerances, but not more than minus 1/4 inch or plus 1/2 inch.
e. Sequence work so as to completely seal all penetrations resulting from pipes, vents, wires, conduit, electrical fixtures, structural members, or other construction. If penetrations through the spray foam air barrier are made after the initial SPF application, reapply in accordance with manufacturer's written instructions for such remedial work.
f. Do not install SPF within 3 inches of heat emitting devices such as light fixtures and chimneys.
g. Finished surface of SPF must be free of voids and embedded foreign objects.
h. Remove masking materials and over spray from adjacent areas immediately after foam surface has hardened. Ensure cleaning methods do not damage work performed by other sections.
i. Trim, as required, any excess thickness that would interfere with the application of cladding and covering system by other trades.
j. Clean and restore surfaces soiled or damaged by work of other trades.
Before cleaning and restoring damaged work, consult with other trades for appropriate and approved methods for cleaning and restoration to prevent further damage.
k. Complete connections to other components and repair any gaps, holes or other damage using material approved by the manufacturer.
l. Provide expansion joints in the SPF application aligned with expansion joints in the building enclosure, where substrate materials change, and in accordance with manufacturer's recommendations.
m. Provide a continuous fire watch in accordance with paragraph SAFETY
PROVISIONS.
3.4 FIELD QUALITY CONTROL
3.4.1 General Site Inspections and Testing
Provide site inspections and testing in accordance with ABAA protocol to verify conformance with the manufacturer's instructions, the ABAA QAP Quality Assurance Program (https://www.airbarrier.org/qap/), Section 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM, Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS, and this section.
a. Conduct inspections and testing at 5, 50, and 95 percent of completion of this scope of work. Forward written inspection reports to the Contracting Officer within 5 working days of the inspection and test being performed.
SECTION 07 27 36 Page 15
b. If inspections reveal any defects, promptly remove and replace defective work at no additional expense to the Government.
3.4.2 Manufacturer Site Inspections
Manufacturer's technical representative must visit the site during the installation process to ensure the SPF and accessories are being applied in compliance with requirements. At a minimum, manufacturer's technical representative must be present at work startup and perform field inspection of the first day's completed application and at substantial completion, prior to demobilization. After each inspection, submit an inspection report signed by the manufacturer's technical representative, to the Contracting Officer within five working days. The inspection report must note overall quality of work, deficiencies, and recommended corrective actions in detail. Notify the Contracting Officer a minimum of two working days prior to site visits by manufacturer's technical representative.
3.4.3 Contractor's Site Inspections
Establish and maintain an inspection procedure to ensure compliance of the foam installation with contract requirements. Conduct inspections and testing at 5, 50, and 95 percent completion of application. Forward written inspection reports to the Contracting Officer within five working days of the inspection and test being performed. Work not in compliance must be promptly removed and replaced or corrected, in an approved manner, at no additional cost to the Government. Quality control must include, but is not limited to, the following:
a. Observation of environmental conditions; number and skill level of insulation workers.
b. Verification of certification, listing, or label.
c. Verification of proper storage and handling of materials before, during, and after installation.
d. Inspection of SPF, support structure, primer, expansion joints, thermal barrier, vapor retarder, and accessories.
3.4.4 Field Peel Adhesion Test
Conduct in accordance with test protocol indicated in Part 1 paragraph
FIELD PEEL ADHENSION TEST.
3.4.5 Visual Inspection and Thermal Scanning
Following completion of installation, inspect the SPF surface or cavity using infrared (IR) scanning as specified in ASTM C1060,. Where the IR inspection indicates construction inconsistencies including wet insulation, remove inconsistent portions of the assembly and replace insulation to correct thermal anomalies. Reinspect and document corrections to the satisfaction of the Contracting Officer.
3.4.5.1 Thermographic Test Report
Include thermographs in color and a color temperature scale to define the temperature indicated by the various colors. Identify the high temperature reading, the outdoor air temperature, the building indoor air temperature, SECTION 07 27 36 Page 16 and the wind speed and direction. Note areas of compromise in the building enclosure, and note actions required and taken to correct those areas.
Final thermography test report must demonstrate that the problem areas have been corrected. Submit the complete test and analysis.
3.5 CORRECTION OF DEFICIENCIES
Upon completion of inspection, testing, or sample taking, repair damaged construction, restore substrates and finishes, and protect repaired construction. Deficiencies found during inspection must be corrected within 5 working days following notification.
3.6 CLEANUP OF SPILLS
Conduct cleanup of uncured product spillage in accordance with paragraph SAFETY PROVISIONS and the manufacturer's written safe handling instructions. In the event of a conflict, the most stringent requirement governs.
3.7 PROTECTION AND CLEANING
3.7.1 Protection of Installed Work
Protect SPF installation from damage during application and remainder of construction period in accordance with manufacturer's written instructions. Repair damaged areas to new condition.
3.7.2 Cleaning of Adjacent Surfaces
Clean overspray from adjacent construction using cleaning agents and procedures as recommended in writing by the manufacturer of each type of affected construction and as acceptable to same.
-- End of Section --
SECTION 07 27 36 Page 17
File details come from the government source that posted it.