Chiller_Amendment_6_Dwgs.pdf
PDF 883 KB Posted
- Solicitation number
- W912DS-17-R-0008
About this file
Amendment 0006 - Drawings
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:
SCALE:SCALE:
NOT USED
B
NTS
SCALE:
PEDESTAL SUPPORT- SPRING OR CONSTANT (PS-1 & PS-2)
E
H04-05
COUPON RACK
C
NTS
CHEMICAL FEED (SHOT FEEDER)
A
NTS
TERMINAL WATER COIL PIPING
D
NTS
PT
X" DIA
NOTES:
1. TYPICAL FOR COND WATER & CHILLED WATER.
LOCATE IN MECH ROOM AS INSTRUCTED
BY CHEMICAL TREATMENT CONTRACTOR AND OWNER.
BALL VALVE
1 X 1 TEE WITH PLUGGED END
TYPICAL FOR 6RETURN MAIN
SUPPLY MAIN
ECT DRAIN
SHUNT
WITH MEMORY STOP
BALANCING VALVE
SHUT OFF/
RETURN
SUPPLY
NC
5 GALLON SHOT
FEEDER TANK OR
OTHER SIZE AS
SPECIFIED ASME
RATED
TO CHILLED OR
HOT WATER RETURN
3/4"
FROM CHILLED
OR HOT WATER
SUPPLY
3/4"
REFER TO CONDENSATE TRAP DETAIL
COIL
RETURNSUPPLY
AIRFLOW
NOTES:
2. PIPING FOR MULTIPLE ROW COILS SHALL BE CONNECTED IN COUNTERFLOW ARRANGEMENT.
3. RELOCATE MANUAL AIR VENT TO COIL IF CONNECTION IS PROVIDED BY THE COIL MANUFACTURER.
4. SUBSTITUTE BUTTERFLY VALVES FOR BALL VALVES IF PIPING IS 2-1/2" NPS OR LARGER.
5. RELOCATE DRAIN OFF VALVE TO COIL IF CONNECTION IS PROVIDED BY THE COIL MANUFACTURER.
6. PROVIDE DRAIN OFF VALVES AND VENTS IN PIPING SYSTEM AS SPECIFIED.
7. REMOVE STRAINER BASKETS AFTER INITIAL STARTUP AND SYSTEM FLUSH IS COMPLETE.
8. WHERE COIL CONNECTIONS ARE IN SAME VERTICAL PLANE, PROVIDE COIL VENT AND DRAIN OFF
CONNECTIONS.
9. WHERE COIL CONNECTIONS ARE NOT IN SAME VERTICAL PLANE, SUPPLY SHALL BE THROUGH
THE BOTTOM CONNECTION.
10. WHERE WATER COIL IS INSTALLED IN A FAN COIL UNIT, ALL VALVES SHALL FIT WITHIN THE FAN
COIL UNIT ENCLOSURE. COOLING COIL PIPING AND VALVES NOT LOCATED OVER AN EXTENDED
COIL DRAIN PAN SHALL BE INSULATED, INCLUDING WITHIN THE TERMINAL UNIT CABINET.
MV
1. DETAIL APPLIES TO SINGLE DUCT MOUNTED OR VAV BOX COILS, TERMINAL HEATING AND COOLING
UNIT COILS INCLUDING FAN COIL UNITS, CABINET HEATERS, UNIT HEATERS, ETC...
PT
PT
TWO-WAY CONTROL VALVE
DRAIN PAN
APPLIES TO
COOLING COILS
CONNECTED TO THE
42 DEG F CHW LOOP
11. WHERE FAN COIL UNITS ARE CONNECTED TO THE 57 DEG F OR 60 DEG F CHW LOOPS, CAP
OR PLUG DRAIN PAN CONNECTION AND PROVIDE A MOISTURE SENSOR IN THE DRAIN CONNECTION
TO SHUT DOWN THE UNIT UPON SENSING OF CONDENSATE IN THE PAN.
SENSOR POCKET (FURNISHED BY
CHILLER MFG; INSTALLED BY
CONTACTOR) MIN. OF 36" FROM
EQUIP. CONNECTION (TYP.4)
FRAMING W/ NEOPRENE PADS (TYP)
FROM FLOOR MOUNTED STEEL
12. PROVIDE AT LEAST THREE ELBOW SWING FOR PIPE TAKE-OFF TO TERMINAL EQUIPMENT.
G= GALVANIZED
P= RED OXIDE
B= BLACK
1/4
ALT. FLANGE ATTACHMENT
(TYP.)
3/16
ALT. BASE ARRANGEMENT
1/4
FLOOR
(TYP)
PSH.1
PSH.2A
LPS TO DEAER.
NOTES:
1. HANGER LOCATIONS SEE MARKED-UP PIPING DRAWINGS.
2. CONTRACTOR TO VERIFY ALL ELEVATIONS AND LOCATIONS BEFORE
FABRICATION.
3. ACTUAL DIMENSIONS TO BE FIELD DETERMINED
4. AT CONTRACTORS OPTION AN ANVIL FIG 167 INSULATION SHIELD
WITH LOAD BEARING INSULATION MAY BE SUBSTITUTED.
1/4
1/4
BASE PLATE
2" MIN
1/4" VENT HOLE
TO SUIT
4"+R3
0.75"
5.0"
0.75"
R1 R2
HEAVY HEX NUTS16
ANCHOR BOLTS15
BASE PLATE14
CSPCONTRACTOR SUPPLIED PIPE STANCHION AS REQ.13
CSPANVIL SPRING OR CONSTANT SUPPORT12
CSPANVIL PIPE PROTECTION SADDLE (SEE NOTE 4)11
MATL.FIN.DESCRIPTIONQTY.NO.
1" GROUT
1 1/2" 7 1/2"
PRELOAD
PIPE
SIZE
SPRING
SIZE
HOT LOAD
(LBS)
COLD LOAD
(LBS)
DEF.
(IN)
FIG
MARK NO.
CONTRACTOR SHALL PERFORM PIPE STRESS
ANALYSIS FOR HPS PIPING TO THE CHILLER AND
EXHAUST PIPING BETWEEN THE CHILLER AND
CONDENSER. PIPING AND SUPPORTS SHALL BE
CONFIGURED AS REQUIRED TO MAINTAIN PIPE
STRESSES BELOW CODE ALLOWABLE LIMITS AND
CHILLER NOZZLE LOADS LESS THAN CHILLER
MANUFACTURER'S MAXIMUM LIMITS. STRESS
ANALYSIS SHALL BE STAMPED BY A PROFESSIONAL
ENGINEER REGISTERED IN THE STATE WHERE THE
PROJECT IS LOCATED. SUBMIT STRESS ANALYSIS
FLOOR STAND
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S B
M T
B Y
S
IZ
E
C K
D B
Y
"X
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
P L O
T D
A T
E
P L O
T S
C A
L E
M
IL
L S
R O
A D
S
U
IT
E
A L E
X A
N D
R
IA
V A
R .G
.V A
N D
E R
W E
IL
L
L P
A
V E
N U
E O
F T
H E
A M
E R
IC
A
S s t F
L O
O R
N E
W Y
O R
K N
Y
IS
S
U E
F O
R B
ID
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
/1
/2
:0
:1
P
M
M-504
D E
T A
IL
S
U S
M A
-D A
V
IS
B A
R R
A C
K S
C H
IL
L E
D W
A T
E R
P L A
N T
N E
W Y
O R
K D
IS
T
R
IC
T P o in t o f C o n ta ct J e ff re y F ri e s e
(8
-2
R D
S
R D
S D
R K
A P
R
IL
A
M E
N D
M E
N T
N O
-1
-2
DRIP LEG DETAIL - STEAM TURBINE INLET
(B
A
LSLLSH
NOTES:
1. CONDENSATE BRANCH LINE SHALL TIE INTO TOP OF RETURN MAIN.
2. PROVIDE ISOLATION VALVE AT MAIN IF DISTANCE TO TRAP STATION IS GREATER THAN 10 FEET FROM THE MAIN. SEE
SYSTEM P&ID DRAWINGS FOR ADDITIONAL VALVING.
3. STEAM TRAPS SHALL NOT BE INSULATED.
4. SEE SPECIFICATIONS AND SCHEDULE SHEETS FOR FURTHER REQUIREMENTS.
5. LOCATE/ORIENT TRAP ASSEMBLY TO FACILITATE ACCESS FOR MAINTENANCE.
6. THREADED PIPE CAP. DRILL 1/8" DIA. HOLE IN CENTER OF CAP TO PREVENT PRESSURE BUILD-UP OVER TIME SHOULD VALVE
LEAK. (TYP)
7. LOCATE DRIP LEG AS SHOWN ON THE PIPING PANS, AND AS CLOSE AS POSSIBLE TO THE STEAM TURBINE INLET
CONNECTION WHILE ALLOWING FOR ACCESS AND SERVICE CLEARANCES.
8. DRIP LEG BOTTOM BLOWDOWN CONNECTION: DESIGN PRESSURE LESS THAN 400 PSIG USE THE THREADED CAP, DESIGN
PRESSURE 400 PSIG TO 800 PSIG USE THREADED PLUG, DESIGN PRESSURE ABOVE 800 PSIG USE WELDED CAP. ALTERNATE
LOCATION TO BE USED WHEN SPACE PREVENTS INSTALLATION OF BOTTOM BLOWDOWN & CLEANOUT MAINTENANCE.
CONNECTION TO DRIP LEG SHALL BE CLOSE COUPLED. THIS CLEAN-OUT IS TO BE USED DURING NON OPERATING
CONDITIONS. DRILL 1/8" HOLE IN CAP TO PREVENT PRESSURE BUILD UP OVER TIME, SHOULD VALVE LEAK.
9. LEVEL SWITCH SHALL BE 300 SERIES STAINLESS STEEL FLOAT WITH HERMETICALLY SEALED SNAP (DPDT) MECHANISM.
SWITCH RATING WILL BE 13A @ 120 VAC (RESISTIVE). HIGH PRESSURE AND TEMPERATURE LIMITS ARE 1668 PSIG AND 800 DEG
F, RESPECTIVELY. CAGE CHAMBER SHALL BE POLYMER COATED ALUMINUM WITH 1” SOCKET WELD CONNECTIONS.
ELECTRICAL CLASSIFICATION SHALL BE NEMA 4X/7/9 ALUMINUM ENCLOSURE, CLASS I, DIV. 1, GROUPS C & D. ELECTRICAL
CONNECTION SHALL BE 1” FNPT.
10. XCV SHALL OPEN / CLOSE IN RESPONSE TO SIGNAL FROM LSH / LSL.
11. STEAM BLOW REQUIREMENTS:
11.1. REMOVE ALL SCALE, WELD SLAG, SOLVENTS, OILS AND ALL OTHER FOREIGN MATERIAL FROM ALL NEW AND EXISTING
STEAM PIPING UPSTREAM, OF THE STEAM TURBINES UTILIZING STEAM AT HIGH VELOCITY; A PROCEDURE KNOWN AS
“STEAM BLOW”. THE STEAM BLOW SHOULD BE DONE BEFORE THE PIPING IS INSULATED, PROVIDE EXPANDED METAL
SCREENING FOR PERSONNEL PROTECTION WHERE NECESSARY. PROVIDE ALL TEMPORARY PIPING, VALVES, CONNECTIONS, SUPPORTS AND RESTRAINTS AS REQUIRED FOR THE STEAM BLOW. EXISTING OR NEW VALVES SHALL BE
FULLY OPEN DURING THE STEAM BLOW. REMOVE ALL GLOBE VALVES, BUTTERFLY VALVES, CONTROL VALVES, EXPANSION JOINTS AND IN-LINE INSTRUMENTS FROM THE PIPING DURING THE STEAM BLOW. VALVES REQUIRED TO
THROTTLE THE STEAM TO ACHIEVE THE REQUIRED FLOW CONDITIONS FOR STEAM BLOW SHALL BE TEMPORARY AND
SHALL BE PROVIDED BY THE CONTRACTOR. DO NOT USE EXISTING OR NEW VALVES THAT ARE PART OF THE PERMANENT
INSTALLATION FOR THIS PURPOSE. THE TEMPORARY PIPE CONNECTION TO THE NEW PIPING SHALL BE AS CLOSE TO THE
TURBINE INLET AS POSSIBLE. THE SIZE OF THE TEMPORARY PIPING AND OF THE STEAM BLOW CONNECTION TO THE NEW
PIPING SHALL BE AS REQUIRED TO FLOW THE NECESSARY CLEANING STEAM MASS FLOW AND SHALL BE A MINIMUM OF
ONE-HALF THE DIAMETER OF THE LINE BEING BLOWN TO ENSURE THAT STEAM VELOCITY AND MASS FLOW IS HIGH
ENOUGH TO BREAK LOOSE AND CARRY AWAY ANY FOREIGN MATERIAL.
11.2. GENERAL PROCEDURE: WARM UP THE STEAM PIPING WITH A BYPASS VALVE PRIOR TO EXECUTING THE STEAM BLOW.
AFTER THE PIPING HAS BEEN WARMED UP, THE TEMPORARY VALVE USED TO CONTROL STEAM INTO THE LINE SHOULD
BE OPENED WIDE FOR ABOUT 15 SECONDS TO ALLOW LIVE STEAM TO BLOW OUT ANY LOOSE MATERIAL IN THE PIPING.
PIPING SHOULD THEN BE ALLOWED TO COOL DOWN TO ROOM TEMPERATURE, ABOUT 6-8 HOURS. THE ABOVE
PROCEDURES OF WARM-UP, BLOW-DOWN, AND COOL OFF SHOULD BE REPEATED AS MANY TIMES AS NECESSARY TO
CLEAN ALL FOREIGN MATERIALS OUT OF THE PIPING. TO CHECK FOR CLEAN PIPING, A TARGET SHALL BE PLACED
DOWNSTREAM OF THE PIPING TO BE CLEANED. THE TARGET SHALL BE OF POLISHED BRASS. AT LEAST THREE STEAM
BLOWS SHALL BE EXECUTED WITH TARGETS INSERTED INTO THE STEAM PATH. PIPING CAN BE CONSIDERED CLEAN
WHEN NO EMBEDDED PARTICLES AND INDENTATIONS ARE FOUND IN THE TARGET AFTER A 15 SECOND BLOW-DOWN FOR
TWO CONSECUTIVE BLOWS.
11.3. PROVIDE ALL ENGINEERING AND DESIGN OF NEW, TEMPORARY AND EXISTING SYSTEMS AND SUPPORTS NECESSARY
FOR AND AFFECTED BY THE STEAM BLOW. CONDUCT A COMPLETE STRESS ANALYSIS OF THE SYSTEMS AFFECTED BY
THE STEAM BLOW TO DEMONSTRATE THE SYSTEM STRESSES ARE WITHIN CODE ALLOWABLE LIMITS AND PRESENT THE
FORCES AT SUPPORT AND RESTRAINT POINTS AND SYSTEM DEFLECTIONS. ANALYZE THE BUILDING STRUCTURE TO
CONFIRM IT CAN WITHSTAND THE LOADS IMPOSED FROM THE STEAM BLOW ACTIVITIES. REINFORCE THE BUILDING
STRUCTURE AS REQUIRED. PROVIDE A HYDRAULIC ANALYSIS OF THE NEW, TEMPORARY AND EXISTING PIPING TO
DEMONSTRATE THAT THE FLUID DYNAMICS ARE ADEQUATE TO CLEAN THE PIPING AND THAT THE SOURCE OF STEAM IS
APPROPRIATE. PROVIDE SILENCERS, NOISE BARRIERS AND BLANKETS, QUENCHING AND OTHER COMPONENTS AS
REQUIRED TO REDUCE THE NOISE GENERATED BY THE STEAM BLOW DOWN TO 85 DBA AT THREE (3) FT. CONDENSATE
GENERATED BY THE STEAM BLOW SHALL BE QUENCHED AND DISCHRGED TO THE PLANT WASTE WATER SYSTEM
ACCORDING TO OWNER'S REQUIREMENTS. COORDINATE AND OBTAIN APPROVAL OF ALL ASPECTS OF THE STEAM BLOW
WITH THE OWNER WITH PARTICULAR ATTENTION PAID TO THE SCHEDULE, THE SOURCE OF STEAM, THE OUTLET OF THE
STEAM BLOW PIPING TO ATMOSPHERE, AND THE CONFIGURATION AND SUPPORT OF THE TEMPORARY PIPING. SUBMIT A
DETAILED STEAM BLOW PROCEDURE DESCRIBING ALL ASPECTS OF THE STEAM BLOW. ALL CALCULATIONS (HYDRAULIC
ANALYSIS, PIPE STRESS, BUILDING STRUCTURE, ETC.) SHALL BE STAMPED BY A PROFESSIONAL ENGINEER REGISTERED
IN THE STATE OF NEW YORK AND SUBMITTED TO THE ENGINEER. THE STEAM BLOW SHALL BE WITNESSED BY THE
OWNER'S REPRESENTATIVE AND A FULL REPORT DOCUMENTING THE RESULTS OF THE STEAM SUBMITTED. ALL PIPING
NOT SUBJECTED TO THE STEAM BLOW SHALL BE HAND CLEANED TO REMOVE ALL WELD SLAG, SCALE, DEBRIS, FLUIDS
(OILS AND SOLVENTS) AND FORIGN MATERIALS. SUBJECT TO COMPLIANCE WITH THE CONTRACT DOCUMENTS, ENTITY
EXECUTING THE STEAM BLOW SHALL HAVE A MINIMUM OF FIVE (5) YEARS' EXPERIENCE ENGINEERING AND EXECUTING
STEAM BLOWS. REFER TO STEAM CHILLER MANUFACTURER IOM FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
11.4. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY PIPING, VALVES AND ANCHORS AS REQUIRED FOR THE
RECOMMENDED BLOWDOWN PROCEDURE. TEMPORARY PIPING DESIGN SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR AND SHALL BE DESIGNED IN ACCORDANCE WITH ASME 31.1. THE TARGET LOCATION AND SCHEDULE FOR
THIS PROCEDURE SHALL BE SUBMITTED TO THE COR FOR APPROVAL 2 WEEKS IN ADVANCE. REMOVAL OF ALL
TEMPORARY WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.
DRIP LEG
(SEE TABLE FOR PIPE
SIZE "A" DIAMETER)
GATE VALVE
(TYP.)
BLOWDOWN (E) (NOTES 8 & 11)
ELEVATION VIEW
PIPE SIZE (C)
(TYP.)
(NOTE 2)
(NOTE 4)
CONDENSATE RETURN
MAIN (NOTE 1).
(NOTE 6)
(TYP.)
STEAM TRAP
(TYP.)
UNION (TYP.)
REDUCER AS
REQUIRED (TYP.)
ST-1
DR
DR
PI
DR
DR
STEAM CONDENSATE
GATE VALVE
(TYP.)
CHECK VALVE
(NOTE 6)
XCV
FREE DRAIN
VALVE (D)
PIPE NIPPLE (TYP.)
GATE VALVE (TYP.)
ALTERNATE
LOCATION (E)
(NOTES 8 & 11)
CL
STEAM LINE
TO STEAM TURBINE
DRIP LEG DIMENTIONS TABLE
STEAM LINE
SIZE
DIAMETER
(A)
LENGTH (B)
TRAP LINE
SIZE (C)
FREE DRAIN SIZE
(D)
BLOWDOWN SIZE
(E)
1" TO 3" 1" TO 3" 18 1" 1 1/4" 1"
4 4 18 1" 1 1/4" 2"
6 6 18 1" 1 1/4" 2"
8 8 18 1" 1 1/2" 2"
10 10 18 1" 1 1/2" 2"
12 13 18 1" 1 1/2" 2"
14 14 18 1" 1 1/2" 2"
16 16 18 1" 1 1/2" 2"
DN
DR
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S B
M T
B Y
S
IZ
E
C K
D B
Y
"X
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
P L O
T D
A T
E
P L O
T S
C A
L E
M
IL
L S
R O
A D
S
U
IT
E
A L E
X A
N D
R
IA
V A
R .G
.V A
N D
E R
W E
IL
L
L P
A
V E
N U
E O
F T
H E
A M
E R
IC
A
S s t F
L O
O R
N E
W Y
O R
K N
Y
IS
S
U E
F O
R B
ID
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
/2
/2
:0
:3
P
M
M-507
D E
T A
IL
S
U S
M A
-D A
V
IS
B A
R R
A C
K S
C H
IL
L E
D W
A T
E R
P L A
N T
N E
W Y
O R
K D
IS
T
R
IC
T P o in t o f C o n ta c t:
J e ff re y F ri e s e
(8
-2
R D
S
R D
S D
R K
A P
R
IL
A
M E
N D
M E
N T
N O
-1
-2
LINE SYMBOLS
PIPING SYMBOLS
ABBREVIATIONS
VALVES
CONTROL VALVES
INSTRUMENT FUNCTIONAL IDENTIFICATION
INSTRUMENTATION SYMBOLS
RELAY SYMBOLS
MISCELLANEOUS SYMBOLS
INSULATION
STEAM CHILLER STEAM AND CONDENSATE DETAIL
A
SCALE:
PNEUMATIC TUBING
ELECTRICAL LEAD
CAPILLARY TUBING
PRINCIPAL PIPING
SUPPLEMENTARY PIPING/TUBING
LOGIC CONNECTION
SEE DETAILED PIPING AND UNIT ARRG'T. DRAWINGS
FOR SCOPE OF SUPPLY AND DEGREE OF ASSEMBLY.
FLANGES
LINE SIZE CHANGE
BLIND FLANGE
Y TYPE STRAINER
CONE TYPE STRAINER
LIQUID INJECTION NOZZLE
BULLS EYE SIGHT GLASS
FILTER DRIER
OIL FILTER
GAS FILTER
BRAIDED HOSE
FLOW STRAIGHTENING VANES
EXPANSION JOINTS
ORIFICE PLATE
UNION
TUBING CONNECTION
VENTURI TUBE
LOCAL
LOCAL PANEL OR BOARD
LOCAL MICROPROCESSOR OR
PC CONTROL FUNCTION
LOCAL ALPHA-NUMERIC DISPLAY
CODE
REMOTE PANEL OR BOARD
INSTRUMENT WITH TWO
SERVICES OR FUNCTIONS
IN THE SAME CASE
* PNEUMATIC CONTROL SUPPLY
(* SPECIFY A,G OR N;
* * INDICATE PRESSURE 20,35,100 ETC.)
INSTRUMENT WITH
SEPARABLE WELL
ALARM HIGH (ALARM)
ALARM HIGH (SHUTDOWN)
ALARM LOW (ALARM)
ALARM LOW (SHUTDOWN)
CONTROLLER
CONTROL VALVE
PRIMARY ELEMENT
GLASS
INDICATOR
INDICATING CONTROLLER
ORIFICE RESTRICTION
TOTALIZED / QUANTITY
RECORDER
MANIFLOD VALVE
RELAY OR COMPUTE
WELL
VALVE
TRANSMITTER
SAFETY VALVE
SWITCH LOW (SHUTDOWN)
SWITCH LOW (ALARM)
SWITCH HIGH (SHUTDOWN)
SWITCH HIGH (ALARM)
SAFETY ELEMENT
SWITCH
RECORDING CONTROLLERALARM
EXTRACT SQUARE ROOT
ADD
SUBRACT
MULTIPLY
HIGH SELECT
LOW SELECT
BIAS
DIVIDE
% OR 1:3 OR 2:1 (TYPICAL) - GAIN OR ATTENUATE
XN OR X1/N - RAISE TO POWER
D OR d/dt - DERIVATIVE OR RATE
- INTEGRATE
INPUT / OUTPUT : P/I (TYPICAL)
GATE
GLOBE
ANGLE
THREE WAY
MULTIPORT
ANGLE TYPE
RELIEF
STRAIGHT
THROUGH
RELIEF
NEEDLE
VALVE
INSTR. BLOCK,
INTERNAL BLEED
CHECK
BUTTERFLY
BALL OR PLUG
MULTI-PORT
BALL OR PLUG
COULD BE EITHER STYLE DEPENDENT
UPON LINE CONFIGURATION
TWO VALVE
MANIFOLD
THREE VAVLE
MANIFOLD
FIVE VALVE
MANIFOLD
SIX WAY
MULTI-PORT
FLOAT
INSULATION COLD * *
INSULATION HOT
INSULATION ACOUSTICAL
HEAT TRACING
CHANGE IN INSULATION
THICKNESS
* RECOMENDED INSULATION THICKNESS
* * RECOMENDED COLD INSULATION THICKNESS
BASED ON "K" VALUE .22 @ 0°F; 90°f AMBIENT;
85% R.H.; ZERO MPH WIND VELOCITY
( INSULATION AND HEAT TRACING NOT BY YORK
FACTORY )
PUMP
COMPRESSOR PREROTATION VANES
HEATER (HTR)
RUPTURE DISK
YORK SUPPLIED ITEM SHIPPED
FOR FIELD ASSEMBLY
(CUSTOMER INSTALLED)
FLANGE OR TUBING
CONNECTION DESIGNATION
S - CONNECTION ON THE SYSTEM
C - CONNECTION ON THE COMPRESSOR
G - CONNECTION ON THE GEAR
P - CONNECTION ON THE PURGE UNIT
T - CONNECTION ON THE TRANSFER UNIT
W - INDICATES WATER, BRINE OR PROCESS
CONNECTION
-- INDICATES CONTRACTOR'S SCOPE OF SUPPLY
-- INDICATES YORK SCOPE OF SUPPLY
-- INDICATES PIPING
-- INDICATES TUBING
PNEUMATICALLY ACTUATED
DIAPHRAGM CONTROL
VALVE WITH POSITIONER
PNEUMATICALLY ACTUATED
DIAPHRAGM CONTROL
VALVE WITHOUT POSITIONER
SOLENOID VALVE
HAND ACTUATOR OR (MOUNTED AT
TOP SIDE OR BOTTOM OF ACTUATED
DEVICE AS APPLICABLE
CYLINDER OPERATED VALVE
PRESSURE REDUCING REGULATOR
WITH EXTERNAL TAP
PRESSURE REDUCING REGULATOR
SELF CONTAINED
BACK PRESSURE REGULATOR
WITH EXTERNAL TAP
BACK PRESSURE REGULATOR
SELF CONTAINED
DIFFERENTIAL - PRESSURE REDUCING
REGULATOR WITH INTERNAL
AND EXTERNAL PRESSURE TAPS
MULTI-PORT SOLENOID VALVE
ELECTRIC ACTUATOR
* INDICATE VALVE SIZE
* * INDICATE FAILURE MODE OF VALVE ( F.O. OR F.C. )
F/D
F O
F G
AS
SV SV
S
MOTOR
S
* FIRST LETTERS
E VOLTAGE (EMF) M MOISTURE
F FLOW P PRESSURE
H HAND (MANUAL) Pd PRESSURE (DIFFERENTIAL)
I CURRENT (ELECTRICAL) S SPEED
J POWER T TEMPERATURE
K TIME V VIBRATION
L LEVEL Z POSITION
FC FAIL CLOSED
FO FAIL OPEN
REV REVERSE ACTING
DIR DIRECT ACTING
NC NORMALLY CLOSED
NO NOARMALLY OPEN
C COMMON
NL NORMAL LEVEL
HL HIGH LEVEL
HHL HIGH HIGH LEVEL
LL LOW LEVEL
LLL LOW LOW LEVEL
HP HIGH PRESSURE PORT
LP LOW PRESSURE PORT
AS AIR SUPPLY
GS GAS SUPPLY
NS NITROGEN SUPPLY
SS STEAM SUPPLY
WS WATER SUPPLY
ES ELECTRIC SUPPLY
IC INSULATION COLD
IH INSULATION HOT
IA INSULATION ACOUSTICAL
HT HEAT TRACE
HTR HEATER
HV HAND VALVE
CV CHECK VALVE
STR STRAINER
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S B
M T
B Y
S
IZ
E
C K
D B
Y
"X
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
P L O
T D
A T
E
P L O
T S
C A
L E
M
IL
L S
R O
A D
S
U
IT
E
A L E
X A
N D
R
IA
V A
R .G
.V A
N D
E R
W E
IL
L
L P
A
V E
N U
E O
F T
H E
A M
E R
IC
A
S s t F
L O
O R
N E
W Y
O R
K N
Y
IS
S
U E
F O
R B
ID
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
/1
/2
:2
:2
P
M
M-508
D E
T A
IL
S
U S
M A
-D A
V
IS
B A
R R
A C
K S
C H
IL
L E
D W
A T
E R
P L A
N T
N E
W Y
O R
K D
IS
T
R
IC
T P o in t o f C o n ta c t:
J e ff re y F ri e s e
(8
-2
R D
S
R D
S D
R K
A P
R
IL
A
M E
N D
M E
N T
N O
-1
-2
YY
S
DO NOT MOVE BORDERS
PI
S 12A
S 12B
STEAM CHILLER STEAM AND CONDENSATE DETAIL
A
SCALE:
REFER TO M-509 FOR NOTES & FIELD
INSTALLED COMPONENTS &
PROCEDURES BY INSTALLER
PCV
190D
PI
190D 180C
W
W
S
W
S
S
W
S
S
W
S
Y C
YC
YC
Y
YC
C
C
C
C
C
C
C
C
C
Y
Y
Y
Y
Y
Y
Y
Y
C = CONTRACTOR
Y = CHILLER MANUFACTURER
WATER IN
RECIRCULATION
VALVE
3/4"
VENT
CONDENSER, STEAM
SENTRY WARNING
VALVE SET AT 5 PSIG
3/4"
VENT
3/4" NPT
RELIEF VALVE
WATER
OVERFLOW
TO SEWER/DRAIN
STEAM EXHAUST
TRUNK FURNISHED
FO
FC
3/4"
DRAIN
PSV
PSV
LCV
LCV
SEE NOTE 7
GLAND
L.P. H.P.
GLAND
1-1/2" NPT CONN,
GLAND LEAK-OFF
CONN. PIPE
TO SEWER WITHOUT
POSITIVE HEAD
S
2" NPT
DRAIN
FCV
PI
180B
OVERBOARD VALVE
FCV
DISCHARGE
SEPARATOR
S
PI
FLEXIBLE
CONNECTOR
DISCHARGE
SEPARATOR
VACUUM PUMP
MOTOR 460-3-60
FSL
FSL
2" NPT
ATMOSPHERIC VENT
SEE NOTE 6
S TO TRIP OUTPUT
(SEE SHT. 4)
2" NPT
DRAIN
FLEXIBLE
CONNECTOR
VACUUM PUMP
MOTOR 460-3-60
2" NPT
ATMOSPHERIC VENT
SEE NOTE 6
STAND-BY
VACUUM PUMP
TEHP
3/4" NPT
CASING DRAIN
DWP=150 PSIG TUBESIDE
CONDENSATE
OUT TO STEAM
CONDENSER HOTWELL
(PIPING BY CONTRACTOR)
NPT
DRAIN
AUTOMATIC
PRESSURE
POWERED
PUMP
SEE
NOTE 10
COUPLING IN STEAM EXHAUST FOR EQUALIZING LINE TO BE
LOCATED AND PROVIDED TO SUIT INSTALLATION
E Q
U A
L
IZ
IN
G
L
IN
E
1/2" NPT
MOTIVE
SUPPLY
200 PSIG MAX.
AUTOMATIC PRESSURE
POWERED PUMP
HOTWELL
TT
PI
3/4"
DRAIN
WATER OUT
CONDENSATE PUMP
MOTOR 460-3-60
CONDENSATE PUMP
MOTOR 460-3-60
I/P
STAND-BY
CONDENSATE PUMP
PUMP
VENT LINES
SEE NOTE 5
G F
AS
25 PSIG
PUMP
DISCHARGE LINE
REV
1-1/2" NPT DRAIN
TI
1/2" NPT
YY
FOR
GAUGE BOARD
SEE NOTE 12
1-1/2" NPT PIPE TO
SEWER/DRAIN
3/4" NPT
STEAM RING
DRAIN
1/2" NPT FOR
GAUGE BOARD
SEE NOTE 12
WATER FILL
START UP CONN.
PUMP
VENT LINE
SEE NOTE 5
TO TURBINE
CONDENSATE OUT
I/P
GF
AS
TO FCV-160A TRIP
SOLENOID VALVE
(SEE SHEET 4)
4-20 MA SIGNAL
FROM SC-160
(SEE SHEET 4)
MOISTURE
SEPARATOR
FULL FLOW STEAM
STRAINER (FINE MESH
STAINLESS STEEL WITH
3/64" PERFORATIONS,
SUITABLE FOR STEAM
SERVICE).
T
STEAM
TRAP
TE TT
Y
Y
1/2"
NPT
FOR
GAUGE BOARD
SEE NOTE 12
PIPE TO
SEWER/DRAIN
STEAM TURBINE
108B 108B
108A
PI
182A
180A
108B 108B
108B
PI
182B
C
Y
TI
PI
LY
LSL
LSH
LIC
LAL
LT
LI
LAHH
PI
PSV
PSHPAH
PI
PT
PAHH PAHH
PT
FCV
PI
PI
FCV
SCV
FCV
190A
PSH
PI
PI
PT
TI
SY
170170
ENGINEER AND PROVIDE HANGERS AND
RESTRAINTS INCLUDING CALIBRATED
SPRING HANGER SUPPORT AS REQD. TO
SUPPORT PIPE AND MAINTAIN LOADS AT
EQUIP NOZZLES WITHIN ALLOWABLE
LIMITS. SUBMIT DESIGN FOR REVIEW.
BY CHILLER MANUFACTURER
COMPRESSED AIR SUPPLY
PROVIDED BY CHILLER
MANUFACTURER
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S B
M T
B Y
S
IZ
E
C K
D B
Y
"X
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
P L O
T D
A T
E
P L O
T S
C A
L E
M
IL
L S
R O
A D
S
U
IT
E
A L E
X A
N D
R
IA
V A
R .G
.V A
N D
E R
W E
IL
L
L P
A
V E
N U
E O
F T
H E
A M
E R
IC
A
S s t F
L O
O R
N E
W Y
O R
K N
Y
IS
S
U E
F O
R B
ID
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
/1
/2
:4
:2
P
M
M-510
D E
T A
IL
S
U S
M A
-D A
V
IS
B A
R R
A C
K S
C H
IL
L E
D W
A T
E R
P L A
N T
N E
W Y
O R
K D
IS
T
R
IC
T P o in t o f C o n ta c t:
J e ff re y F ri e s e
(8
-2
R D
S
R D
S D
R K
A P
R
IL
A
M E
N D
M E
N T
N O
-1
-2
DO NOT MOVE BORDER
VFD
CHILLER
(CH-1, CH-2, CH-5 & CH-6
COOLING TOWERS
(CT-1 THRU 6)
CONDENSER
EVAPORATOR
VFD
CHWR
CHWS
CWR
CWS
BASIN HEATER
CONTROL PANEL
CONDENSER
EVAPORATOR
CWR
STEAM
480 VOLT
BTU METER /
BMS MONITOR
SENSOR
CHWR
CHWS
CONTROL PANEL
(REFER TO SEQUENCES OF OPERATION)
START
SIGNAL
CHILLER
CONTROL
PANEL ALARM
TO BAS
FACTORY
MOUNTED
CONTROL PANEL
FACTORY
MOUNTED
CWS
EQUALIZER
CWR
INFORMATION SHARING W/ LONWORKS
(REFER TO SEQUENCES OF OPERATION)
INFORMATION SHARING W/ LONWORKS
PUMPSPLATE & FRAME HEAT EXCHANGER
VFD
CWR
CWS
CHWR
CHWS
CHWP HX-1 & HX-2
CWS
CHILLER
CHILLER INSTRUMET NUMBERS
CHW FCV CHW FT CHW PDT CHWS TT CHWR TT CW FCV CW FT CW PDT CWS TT CWR TT
CH-1
CH-2
CH-5
CH-6
COOLING TOWER
COOLING TOWER INSTRUMENT NUMBERS
CWR FCV CWS FCV EQ FCV LSL LSH VT
CT-1
CT-2
CT-3
CT-4
CT-5
CT-6
CW FCV ZSCHW FCV ZS
CWR FCV ZS CWS FCV ZS EQ FCV ZS
BASIN TT
DRAIN
BTU METER /
BMS MONITOR
SENSOR
CHILLER
(CH-3 & CH-4)
CHILLER
CHILLER INSTRUMET NUMBERS
CHW FCV CHW FT CHW PDT CHWS TT CHWR TT CW FCV CW FT CW PDT CWS TT CWR TT
CH-3
CH-4
CW FCV ZSCHW FCV ZS
DRAIN FCV DRAIN FCV ZS
REFRIGERANT
CONDENSER
STEAM
TURBINE
STEAM
WELL
HOT
HPS FCV
(EXIST)
(EXIST)
(EXIST)
(EXIST)
(EXIST)
(EXIST)
(EXIST)
(EXIST)
(EXIST)
(EXIST)
ENABLE
(EXIST)
(EXIST)
STATUS
(EXIST)
(EXIST)
(EXIST)
(EXIST)
(EXIST) (EXIST)(EXIST) (EXIST) (EXIST) (EXIST)
(EXIST)
(EXIST)
(EXIST)
LSA
CWR FT
HPS FT
NOTES:
1. FLOW ELEMENT/ TRANSMITTER SHALL HAVE PRESSURE/TEMPERATURE
COMPENSATION. PROVIDE TEMPERATURE AND PRESSURE SIGNALS AND
CONVERSION TO TRUE LB/HR CORRECTED FOR PRESSURE AND TEMPERATURE.
2. CHW AND CW MODULATING FCV'S SHALL BE HIGH PERFORMANCE BUTTERFLY TYPE.
HX
HX INSTRUMET NUMBERS
CHW FT CHW PDT CHW FCV CHW FCV ZS CWR FT
HX-1
HX-2
CHWS TT CWS TT CW FCV CW FCV ZS
CHWS TEMP
SETPOINT
NOTES:
1. CHW AND CW
MODULATING
FCV'S SHALL BE
HIGH
PERFORMANCE
BUTTERFLY
TYPE.
NOTES:
1. CHW AND CW MODULATING
FCV'S SHALL BE HIGH
PERFORMANCE BUTTERFLY
TYPE.
NOTES:
1. CHW AND CW MODULATING
FCV'S SHALL BE HIGH
PERFORMANCE BUTTERFLY
TYPE.
CHWS TEMP
SETPOINT
CHILLER
PRESSURE
CONTROL
HEAD
CHILLER
CONTROL
PANEL
ALARM TO
BAS
CHILLER
START
SIGNAL
PRESSURE
CONTROL
HEAD
HPS
IT
XXXX
IIA
AI
PDT
XXXX AI
PDI
PDT
XXXXAI
PDI
TT
XXXX
TIC
AI
IT
XXXX
FIA
AI FCV
XXXX
FC
DO
FCV
XXXX
FC
DO
FCV
XXXX
FC
DO
LSH
XXXX
LI
AI
VT
XXXX
VIT
DI
YS
XXXX
TT
XXXX
TIC
AI
YIC
DO
PDT
XXXXAI
PDI
TT
XXXX
TIC
AI
PDT
XXXX AI
PDI
YIA
DI
YIA
DO
TC
AO
YIA
DI
YIA
DO
TC
AO
IT
XXXX
FIA
AI
TT
XXXX
TIC
AI
TT
XXXX
TIC
AI
FCV
XXXX
PDT
XXXXAI
PDI
FCV
XXXX
FIC
AO
FCV
XXXX
FIC
AO
FCV
XXXX
FIC
AO
FCV
XXXX
FIC
AO
ZI
XXXX
ZI
AI
ZI
XXXX
ZI
AI
ZI
XXXX
ZI
AI
ZI
XXXX
ZI
AI
TT
XXXX
TIC
AI
TT
XXXX
TIC
AI
TT
XXXX
TIC
AI
ZS
XXXX
ZI
DI
ZI
XXXX
ZI
DI
ZSC
XXXX
ZIC
DI
ZSO
XXXX
ZIO
DI
FCV
XXXX
FC
DO
ZSO
XXXX
ZIO
DI
FT
XXXX
FIC
AI
FT
XXXX
FIC
AI
TT
XXXX
TIC
AI
TT
XXXX
TIC
AI
FT
XXXX
FIC
AI
TT
XXXX
TIC
AI
FT
XXXX
FIC
AI
FCV
XXXX
FIC
AO
LSA
LA
DI
XXXX
FT
XXXX
FIC
AI
FCV
XXXX
FIC
AO
ZI
XXXX
ZI
DI
ZI
ZI
AI
AI
FIC
AI
FIC
FT
XXXX
FT
XXXX
XXXX
FIC
AO
YIA
AI
YIA
AI HS HS ZSO ZSC
CLOSEDOPEN
ZIC
DI
ZIO
DI
TI
TT
TE
PSH
PI
PT
FIC
AI
FT
XXXX
MOISTURE
SEPARATOR
LSH
DI
LSL
DI
XCV
LAH LAL
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S B
M T
B Y
S
IZ
E
C K
D B
Y
"X
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
P L O
T D
A T
E
P L O
T S
C A
L E
M
IL
L S
R O
A D
S
U
IT
E
A L E
X A
N D
R
IA
V A
R .G
.V A
N D
E R
W E
IL
L
L P
A
V E
N U
E O
F T
H E
A M
E R
IC
A
S s t F
L O
O R
N E
W Y
O R
K N
Y
IS
S
U E
F O
R B
ID
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
/1
/2
:4
:2
P
M
M-806
C O
N T
R O
L S
U S
M A
-D A
V
IS
B A
R R
A C
K S
C H
IL
L E
D W
A T
E R
P L A
N T
N E
W Y
O R
K D
IS
T
R
IC
T P o in t o f C o n ta c t:
J e ff re y F ri e s e
(8
-2
R D
S
R D
S D
R K
A P
R
IL
A
M E
N D
M E
N T
N O
-1
-2
File details come from the government source that posted it. Updated .