Amendment_0006.pdf
PDF 196 KB Posted
- Solicitation number
- W912DS-17-R-0008
About this file
Amendment 0006
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DS-17-R-0008
W16ROE70891767
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise and reissue draw ings M-504, M-507, M-508, M-510 and M-806
2. Answ er Offerors Questions. Responses to offerors inquiries are provided "for info purposes only" and does not revise solicitation, plansand specifications.
Proposal Due Date is 25 July 2017 at 2:00 P.M. (EST) at 26 Federal Plaza, Room1843, New York N.Y. 10278.
NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION,REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-17-R-0008
X 9B. DATED (SEE ITEM 11)
07-Jun-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jul-2017
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0006
Davis Barracks – Chilled Water Plant and Cooling Tower US Military Academy, West Point NY
Amendment 0006, 7/18/2017
AMENDMENT 0006 to DRAWINGS and SPECIFICATIONS for W912DS-17-R-0008.
TO OFFORERS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None.
2. The following DRAWINGS have been REVISED and REISSUED:
- M-504
- M-507
- M-508
- M-510
- M-806
3. The following DRAWINGS have been ADDED:
- None
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- None
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- None
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
1. Question: The chemical shot feeder needs to be floor mounted. The blown down needs to be full size and unobstructed. The detail B on drawing M-504 will not work as detailed. Please advise.
Government Reply: Detail “A” has been revised to include a floor stand, Detail “B” does not apply and has been deleted.
2. Question: Please advise as to where the domestic water service is located in regards to the Open Cell Cooling Towers. No domestic water pipe is indicated on the contract documents in association with the Cooling Towers. Please reference detail C on drawing M-506.
Government Reply: Domestic make-up water is not provided at the cooling towers because it is connected to the condenser water system within the Chiller Plant. Refer to Sheet M-703 in the Contract Documents for point of connection and requirements.
3. Question: Drawing M-807 – Condenser water and tower operation note # 24 (Tower Status and Level Control) makes reference to Cold Water make –up sequence of operation for cooling towers. No domestic cold water piping is shown other than what is indicated on drawing P-113 where it shows a 4” Cold water pipe ending and being capped.
Government Reply: Domestic make-up water is not provided at the cooling towers because it is connected to the condenser water system within the Chiller Plant. Refer to Sheet M-703 in the Contract Documents for point of connection and requirements.
4. Question: Does the Cold water make up pipe need to be insulated, heat traced, jacketed etc.?
Government Reply: Refer to specification 230700 3.2.1.6 Table 1 for make-up water insulation requirements. Refer to specification 230700 for jacketing requirements.
5. Question: Can you please provide more details for the Drip Leg Detail- Steam Turbine Inlet as detailed on A/M-507. We are of the understanding that you need a full size blow off located just before the turbine with a separate valve that is vented to the atmosphere. This is not indicated on the contract documents. The furnishing and installation of the Steam Chillers are far more involved and complex than the Electric Chillers. Can more details be provided?
Government Reply: “Drip Leg Detail – Steam Turbine” has been revised in this Amendment. The referenced blow off is required by the steam turbine manufacturer to remove particulates and debris from the new steam piping just upstream of the steam turbine connection in order to not damage the turbine blades, it is temporary for steam pipe cleaning purposes only. Requirements for the temporary blow off have been clarified on M-507 in this Amendment. Also refer to Contract Drawings M-508 through M-512 for steam turbine chiller installation requirements.
6. Question: What is the required finish for the structural steel to be installed in the Davis Barracks? Per the specifications (2.6.2); we assume this steel is not exposed to weather and will have a shop applied "zinc rich" primer. We also do not find any reference that the aforementioned steel is to receive fireproofing, or an epoxy coating. Please confirm.
Government Reply: Specification Section 05 12 00 requires either galvanized steel or a shop applied zinc rich primer. Field preparation and coating/painting shall be in accordance with Specification Section 09 90 00; see paragraph 1.11.1.2 for scope of interior painting. Fire proofing is not required.
7. Question: Who provides testing for shotcrete?
Government Reply:: See; 33713.1.3 - Contractor is responsible for testing Shotcrete as per specifications.
8. Question: Will there be additional site visits scheduled?
Answer - No additional site visits have been scheduled.
9. Question: Is drawing GE-110 available? See C-401 match line A-A. Can we assume shotcrete work starts at 11+50?
Government Reply: Shotcrete work starts at station 11+50. GE are existing dwgs not required for bidding.
10. Question: Does our scope include "demolition of existing temporary rock fall protection barriers" as referenced in 7300.0018/1.2/C? If so, what are they?
Government Reply: Yes. Barrier consists of jersey barriers with fencing above.