W912DS-17-R-0008
W16ROE70891767
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. To revise draw ings A-202 and M-001.
2.Answ er Offerors Questions. Responses to offerors inquiries are provided "for info purposes only" and does not revise solicitation, plans and specifications.
3. Update Wage rates NY170007 07/14/2017 NY7
Proposal Due Date is 25 July 2017 at 2:00 P.M. (EST) at 26 Federal Plaza, Room1843, New York N.Y. 10278.
NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION,REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 38
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-17-R-0008
X 9B. DATED (SEE ITEM 11)
07-Jun-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jul-2017
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
Davis Barracks – Chilled Water Plant and Cooling Tower US Military Academy, West Point NY
Amendment 0004, 7/13/2017
AMENDMENT 0004 to DRAWINGS and SPECIFICATIONS for W912DS-17-R-0008.
TO OFFORERS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- A-202: Add General Note “1” as follows:
“Start the top of the screen wall with the 3’-0” high factory edge panel(s) as shown on C1/A402. Field cut the bottom metal panel(s).”
- M-001: Add General Note “36” as follows:
“The contractor shall be responsible for maintaining chilled water service to the Davis Barracks during construction. Where new valves and/or new piping connections to existing piping are required, the contractor shall install new valved pipe connections to existing piping during the 2017-2018 winter break; Davis Barracks chilled water system outages will be allowed on a limited basis during this period for installation of the new valved connections.
The contractor shall be responsible for draining down systems, refilling systems and replacement system chemicals during the approved outages. The contractor shall coordinate all outages with the USACE NYD COR and West Point Directorate of Public Works. Control of the existing plant equipment shall be transferred over to the new network/JACE for controls commissioning after the new work is commissioned and functional.”
2. The following DRAWINGS have been REVISED and REISSUED:
- None.
3. The following DRAWINGS have been ADDED:
- None
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- None
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- None
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
1. It looks as though the existing Honeywell controllers and some field devices do not meet the new specification requirements for this project. Will these items need to be upgraded to meet the current specifications?
Response: All controllers connected to the network indicated on M-803 of the Contract Documents are required to comply with the Contract Specifications. Also refer to Amendment 0003, Question “12” Government Reply.
2. The USACE representative present during the pre-bid site walk through stated; the existing chilled water system (Chillers, CT-1 & Pumps) had to stay online and operational until the new system was ready to be turned over. Since the existing controls, LON network, control valves and program have to be modified, it will not be possible to get that done until the new system is operational. At that point, we can take chillers 1 & 2 out of service. This will not be possible to get completed in the project duration as valves and devices have to be added/ replaced to the existing chillers in order to meet the contract requirements. We may have to perform this work during the winter and reinstall the existing program in order to keep it running. Please advise if this is the intent for scope of work.
Response: The contractor shall be responsible for maintaining chilled water service to the Davis Barracks during construction. The existing chillers and cooling tower do not need to be taken out of service to program and install the new plant network controllers. Where new valves and/or new piping connections to existing piping are required, the contractor shall install new valved pipe connections to existing piping during the 2017-2018 winter break; Davis Barracks chilled water system outages will be allowed on a limited basis for installation of the new valved connections.
The contractor shall be responsible for draining down systems, refilling systems and replacement system chemicals during the approved outage. The contractor shall coordinate all outages with the USACE NYD COR and West Point Directorate of Public Works. Control of the existing plant equipment shall be transferred over to the new network/JACE for controls commissioning after the new work is commissioned and functional.
3. The Screen Enclosure for the cooling tower structure is 29 feet high and the documents indicate the metal wall panels (cladding) are to be 3’-0” high panels. This means that the tops of the metal wall panel would have to have a field cut. This would remove the male end of the panel and not allow for the detail as indicated on C1/A402 (factory edges). A custom panel can be ordered but a minimum square footage is required and this shall drive up the cost. Please direct us as to the architect’s intent.
Response: Start the top of the screen wall with the 3’-0” high factory edge panel(s) as shown on C1/A402. Field cut the bottom metal panel(s).
4. Please confirm that form A-1 is to be included in Volume 1- Technical Proposal.
Response: Yes A-1 form is to be submitted with Volume 1.
5. Please confirm that Standard Form 1442 is to be included in Vol 1- Technical Proposal.
Response: Yes, SF 1442 is to be included in Volume 1.
6. Where can the offeror locate the “specialized experience forms (attachment 2 for construction experience)” required to be submitted with Volume 1?
Response: Please refer to paragraph 6.0, the form is shown there.
7. Where can the offeror locate the “Experience Information Fact Sheet, Form A2?”
Response: Please refer to paragraph 6.0, the form is shown there.
8. Where can the offeror locate the “past performance questionnaires”? Are these forms what is being referenced in “section 7.0 Past Performance Customer Questionnaire” and NAVFAC/USAGE Past Performance Questionnaire PPQ-0)?
Response: Correct, paragraph 7.0 contains the form.
9. The forms clearly state that the client must return directly to US Army Corps of Engineers. How then, can offeror comply? Is offeror supposed to show proof that it was requested?
Response: The offeror may ask the client to submit their review to GOV directly or they can send copy of the evaluation to the offeror, whom will include it with their proposal. As stated in 3.1.2 Gov may use other sources for determining the past performance if none are received from the offeror.
10. What happens if the client chooses not to complete and return?
Response: this scenario is explained in evaluation criteria for factor 2, stated in the NOTE, last paragraph of 3.1.2.
11. Is the offeror supposed to complete this section and include it in Volume 1 or Volume 2? Is this form supposed to be Form A2 (mentioned in RFI question 5)?
Response: The relevant project information is to be submitted with Volume 1, yes it is the A2 form.
12. Paragraph 7.0, Is this what is being referred in Factor 2 Past Performance?
Response: Correct.
13. Is the offeror supposed to send it to past clients? Is this what is being referred in Factor 2 Past Performance?
Response: The blank page is a result of formatting, yes this form and subsequent pages are to be used for past performance evaluation.
14. Please confirm that Volume II Price Proposal should be 6 copies and one original?
Response: Correct.
15. Please clarify what material you specify.
Response: please refer to table in paragraph 3.3 and subsequent paragraphs detailing each item from that table.
16. Please advise what is considered Pro Forma information.
Response: As noted in 3.3.1, everything else other than price proposal.
17. Is Volume II price Proposal to only contain Form 1442 and the rest in Volume II Proforma?
Response: The price proposal to include SF1442/bid schedule (and any backup to the cost proposal), rest of the information in Proforma.
18. Should there be one CD-Rom containing both Volumes 1 &2?
Response: Correct.
19. The offeror hereby requests that another site visit be scheduled.
Response: Another Site visit has been conducted, no other site visits will be scheduled.
20. Please clarify the Responsibility of the bidders with respect to design of this project. The Solicitation states this is a design-bid procurement. Is it the intent of the solicitation to have the bidding contractors design any portion of the work?
Response: This project is fully designed, it is solicited as Design-Bid-Build, there will not be a need for a designer agent for this project.
21. Please clarify if the bidding contractors should anticipate a long period of time between date of bid and contract award. The Solicitation states there could be a period of up to 9 months for funds to be appropriated.
Response: Correct, the project is going thru reprogramming thus the duration for obtaining funds can take upto 9 months.
22. Please provide attendance log for all previously scheduled site visits and/or /pre-bid meetings.
Response: Please see attached sign in sheet from the site visit.
23. Section 2.5 of the RFP (Format Requirements) states in part, “All proposals shall contain the volume number and the name, address and telephone number of the Prime and Subcontractors, Joint Venture, or other entity identified on the cover.” Please consider that a project of this magnitude and complexity will have dozens of sub-contractors engaged to develop scope and pricing – there will not be enough space on the cover sheet of the proposal to include all their names, addresses and telephone numbers.
Furthermore, projects solicited using LPTA do not lend themselves to partnering with sub-contractors prior to award, since price is such a large factor in the selection process – as such, we will be soliciting pricing for multiple subcontractors for each trade, and will not finalize selection of these subcontractors until after award. If the USACE requires provision of potential subcontractor information, please consider identifying which specific trade(s) are desired (e.g., mechanical, electrical, etc.), and allow this information to be provided in the body of the technical proposal – rather than on the cover sheet.
Response: The intent of this requirement is for the offeror to identify the subcontractors that the prime is planning on using AND is taking advantage of those subcontractors experience in order to satisfy requirement of factor 1.
24. For 3.1.1 Factor 1 – Specialized Experience Submission Requirements, we would like to submit in our Technical Proposal, pre-qualifications of mechanical contractors that we would use on the job to satisfy the specified requirements listed in the Evaluation Criteria (Scope/Complexity/Magnitude). Is this acceptable?
Response: Early submissions for pre-qualifications will not be accepted. If the intent of this question is to allow for use of the mechanical contractors experience to satisfy the RFP’s requirement, then it is acceptable.
WAGE RATES 14-JUL-2017
General Decision Number: NY170007 07/14/2017 NY7
Superseded General Decision Number: NY20160007
State: New York aed 07/14/2017
Construction Types: Building, Heavy and Highway
Counties: Dutchess, Orange, Sullivan and Ulster Counties in New York.
BUILDING CONSTRUCTION PROJECTS FOR ALL COUNTIES EXCEPT
SULLIVAN (does not include single family homes and apartment up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION
PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 01/13/2017 2 02/03/2017 3 02/10/2017 4 02/17/2017 5 03/03/2017 6 03/24/2017 7 04/07/2017 8 04/28/2017 9 05/12/2017 10 06/02/2017 11 06/09/2017 12 06/16/2017 13 06/23/2017 14 07/07/2017 15 07/14/2017
ASBE0040‐003 05/01/2017
SULLIVAN AND ULSTER COUNTIES
Rates Fringes
HAZARDOUS MATERIAL HANDLER
Duties limited to preparation wetting;
stripping; removal;
scrapping; vacuuming;
bagging; and disposing of all insulation materials whether they contain asbestos or not from mechanical systems..........$ 34.10 21.47 Insulator/asbestos worker (includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)....................$ 34.10 21.47
ASBE0091‐002 05/29/2017
DUTCHESS AND ORANGE COUNTIES
Rates Fringes
HAZARDOUS MATERIAL HANDLER
Duties limited to preparation, wetting, stripping, removal scrapping, vacuuming, bagging and disposing of all insulation materials;
whether they contain asbestos or not from mechancial systems..........$ 40.72 39.20 Insulator/asbestos worker (Includes application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)....................$ 40.72 39.20
BOIL0005‐001 01/01/2017
Rates Fringes
BOILERMAKER......................$ 55.23 33%+24.12+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve
BRNY0005‐001 06/01/2016
Rates Fringes
BRICKLAYER (BUILDING
CONSTRUCTION)
DUTCHESS, ORANGE
(Excluding the town of Tuxedo) and ULSTER COUNTIES Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 39.89 30.86
ORANGE COUNTY (Town of Tuxedo) Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 40.68 31.41
BRICKLAYER (HEAVY
CONSTRUCTION)
DUTCHESS, ORANGE
(Excluding the town of Tuxedo) and ULSTER COUNTIES Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 40.39 30.86 ORANGE COUNTY (Town of Tuxedo) Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 41.18 31.41
BRICKLAYER (HIGHWAY
CONSTRUCTION)
DUTCHESS, ORANGE
(Excluding the town of Tuxedo), SULLIVAN and
ULSTER COUNTIES
Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 40.39 30.86
CARP0279‐005 07/01/2017
Rates Fringes
Carpenters:
BUILDING CONSTRUCTION
Carpenters, Millwrights, Pile Drivers...............$ 36.09 26.18
HEAVY & HIGHWAY
CONSTRUCTION
Carpenters, Millwrights, Pile Drivers...............$ 36.09 26.18
CARP0740‐002 07/01/2016
DUTCHESS AND ORANGE COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 40.89 38.37
CARP1556‐005 07/01/2016
DUTCHESS AND ORANGE COUNTIES
Rates Fringes
Diver Tender.....................$ 46.44 47.95 Diver............................$ 65.38 47.95 Dock Builder & Piledrivermen
DOCKBUILDER.................$ 51.63 47.95
ELEC0363‐001 04/01/2017
Rates Fringes
ELECTRICIAN
DUTCHESS (Remaining Townships), ULSTER AND SULLIVAN COUNTIES...........$ 38.50 6%+25.20+a ORANGE and DUTCHESS (Townships of Fishkill, East Fishkill and Beacon) COUNTIES....................$ 42.50 6%+25.20+a
FOOTNOTE:
a. Paid Holidays: New Year's Day, President's Day, Memorial Day, Fourth of July, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day
ELEC1249‐002 05/02/2016
Rates Fringes
ELECTRICIAN (LINE
CONSTRUCTION‐LIGHTING AND
TRAFFIC SIGNAL INCLUDING ANY
AND ALL FIBER OPTIC CABLE
NECESSARY FOR THE TRAFFIC
SIGNAL SYSTEMS, AND TRAFFIC
MONITORING SYSTEMS, ROAD
WEATHER INFORMATION SYSTEMS)
Flagman.....................$ 25.76 7.25%+21.75 Groundman (Digging Machine Operator)...................$ 38.64 7.25%+21.75 Groundman (Truck Driver)....$ 34.34 7.25%+21.75 Groundman Truck Driver (Tractor Trailer Unit)......$ 36.49 7.25%+21.75 Lineman and Technician......$ 42.93 7.25%+21.75 Mechanic....................$ 34.34 7.25%+21.75
PAID HOLIDAYS:
a. Memorial Day, New Year's Day, President's Day, Good
Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.
ELEC1249‐004 05/01/2017
Rates Fringes
ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :
Flagman....................$ 29.52 6.75%+22.65+a Groundman digging machine operator...................$ 44.28 6.75%+22.65+a Groundman truck driver (tractor trailer unit).....$ 41.82 6.75%+22.65+a Groundman Truck driver.....$ 39.36 6.75%+22.65+a Lineman and Technician.....$ 49.20 6.75%+22.65+a Mechanic...................$ 39.36 6.75%+22.65+a Substation:
Cable Splicer..............$ 52.75 7.25%+21.75+a Flagman....................$ 28.77 7.25%+21.75+a Ground man truck driver....$ 38.36 7.25%+21.75+a Groundman digging machine operator...................$ 43.16 7.25%+21.75+a Groundman truck driver (tractor trailer unit).....$ 40.76 7.25%+21.75+a Lineman & Technician.......$ 47.95 7.25%+21.75+a Mechanic...................$ 38.36 7.25%+21.75+a Switching structures;
railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 54.20 7.25%+21.75+a Flagman....................$ 29.56 7.25%+21.75+a Groundman Digging Machine Operator...................$ 44.34 7.25%+21.75+a Groundman Truck Driver (tractor‐trailer unit).....$ 41.88 7.25%+21.75+a Groundman Truck Driver.....$ 39.42 7.25%+21.75+a Lineman & Technician.......$ 49.27 7.25%+21.75+a Mechanic...................$ 39.42 7.25%+21.75+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.
ELEC1249‐005 05/01/2017
SULLIVAN COUNTY
Rates Fringes
ELECTRICIAN (LIGHTING AND
TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER
OPTIC CABLE NECESSARY FOR THE
TRAFFIC SIGNAL SYSTEM,
TRAFFIC MONITORING SYSTEMS
AND ROAD WEATHER INFORMATION
SYSTEMS.)
Flagman.....................$ 25.59 6.75%+22.65+a Groundman (Digging Machine Operator)...................$ 38.39 6.75%+22.65+a Groundman (Truck Driver)....$ 34.12 6.75%+22.65+a Groundman Truck Driver
(tractor trailer unit)......$ 36.25 6.75%+22.65+a Lineman & Technician........$ 42.65 6.75%+22.65+a Mechanic....................$ 34.12 6.75%+22.65+a
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.
ELEC1249‐008 01/01/2017
Rates Fringes
ELECTRICIAN (Line Construction)
TELEPHONE, CATV
FIBEROPTICS CABLE AND
EQUIPMENT
Cable splicer..............$ 30.90 3%+4.43 Groundman..................$ 15.56 3%+4.43 Installer Repairman‐ Teledata Lineman/Technician‐ Equipment Operator.........$ 29.33 3%+4.43 Tree Trimmer................$ 23.95 3%+9.98+a
a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.
ELEV0138‐001 01/01/2017
Rates Fringes
ELEVATOR MECHANIC................$ 55.02 31.585+a+b
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0106‐004 07/01/2016
NORTHERN PART OF DUTCHESS (To The Northern Boundary line of the City of Poughkeepsie)
Power Equipment Operator
HEAVY & HIGHWAY
GROUP 1....................$ 40.46 24.75+a GROUP 2....................$ 39.55 24.75+a GROUP 3....................$ 36.98 24.75+a GROUP 4....................$ 44.46 24.75+a GROUP 5....................$ 43.46 24.75+a GROUP 6....................$ 42.46 24.75+a GROUP 7....................$ 42.07 24.75+a
POWER EQUIPMENT OPERATORS HEAVY & HIGHWAY CLASSIFICATIONS
GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB‐4 and similar type, Power Grader, Profiler (over 105 H.P.)
Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self‐propelled), Hydra‐Spiker, ride‐on, Hydraulic Pump (jacking system), Hydro‐Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel
GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self‐contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro‐Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride‐on, Shell Winder, Skid steer loader (Bobcat or similar), Span‐Saw, ride‐on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self‐contained Ride‐on Rock Drill, Excluding Air‐Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.
Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat
GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride‐on Boiler (used in conjunction with production), Bituminous Heater, self‐propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands‐off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self‐propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride‐on, Tie Extractor, ride‐on, Tie Handler, ride‐on, Tie Inserter, ride‐on, Tie Spacer, ride‐on, Tire Repair, Track Liner, ride‐on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point
GROUP 4: Tower Cranes
GROUP 5: Cranes 50 tons and over
GROUP 6: Cranes 49 tons and below
GROUP 7: Master Mechanic
FOOTNOTES:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holiday.
ENGI0106‐008 07/01/2016
NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE
CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION
Power equipment operators:
GROUP A(1)..................$ 41.08 24.40+a 1..........................$ 42.08 24.40+a 2..........................$ 43.08 24.40+a GROUP A.....................$ 40.61 24.40+a GROUP B.....................$ 39.65 24.40+a GROUP C.....................$ 36.92 24.40+a
Hazardous work ‐ Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.
FOOTNOTE:
a. Paid Holiday: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)
GROUP A(1): Crane Premiums
1 over 150' :add $1.00 2 over 200': add $2.00
GROUP A: Shovel, All excavator (except tractor mounted rubber tired John Deere 510 or smaller), gradalls, power road grader, all CMI equipment, front‐end rubber tire loader, tractor‐mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under).
GROUP B: Backhoe, (tractor mounted rubber tired equivalent to John Deere 510 or less), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hosting (single drum), hoist ‐ two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A‐L frame winches, cord and well drillers (one drum), post hole digger, model CHB Vibro‐Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller.
GROUP C: Fork lift, high lift, lull, Oiler, fireman and heavy‐ duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack (belcrete system), seeding, and mulching machines, pumps.
ENGI0137‐001 03/04/2013
DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)
BUILDING CONSTRUCTION
GROUP 1A....................$ 48.17 25.87+a GROUP 1B....................$ 44.35 25.87+a GROUP 2A....................$ 46.45 25.87+a GROUP 3A....................$ 44.73 25.87+a GROUP 3B....................$ 42.55 25.87+a GROUP 4A....................$ 44.27 25.87+a GROUP 4B....................$ 37.34 25.87+a GROUP 5.....................$ 40.31 25.87+a GROUP 5A....................$ 50.57 25.87+a GROUP 5B....................$ 38.21 25.87+a GROUP 6.....................$ 40.08 25.87+a
NOTES: Hazmat: 20% above regular rate Pumping operation Premium .50
Crane Operators (100‐149 ft) 2.00
Crane Operators (149 ft +) 3.00
Loader Operators (over 5 cu y) .50 Shovel Operators (over 4 cu yd)1.00
FOOTNOTE:
a. New Years Day, Memorial Day, Independence Day, Labor Day Thanksgiving Day, Christmas Day, plus Lincoln's Birthday, Washington's Birthday, Good Friday, Columbus Day, November Election Day, Veteran's Day.
POWER EQUIPMENT OPERATORS CLASSIFICATION
GROUP 1‐A: Carrier‐ trailer horse; concret‐portable hoist;
crane & hoist engineer‐steel (concrete, material, super structure sub‐ structure); derrick (stone‐steel); elevator & cage; hoist‐ single/double or triple drum; hoist‐portable mobile unit; hoist engineer‐concert (crane‐derrick‐mine hoist); hoist engineer‐ material; overhead crane; power house plant; telephies (cableway); whirly; maintenance engineer; Lull hilift or similar; hydraulic crane 25 ton and over; cherry picker 25 tons and over; backhoe Oliver 88; fordson; dynahoe; dual purpose and similar machines;
Barber Green Loader‐euclid loader or similar type; conway or similar mucking macking machines; dragline; gradall;
shovel; backhoe etc. (crawler or truck); front end loaders;
hydraulic boom; jersey spreader; lift slab console;
letournequ or tounapull (scrapers over 20 yds struck);
mucking machines; pavement breaker (air ram); paver (concrete); road boring machine; road mix machines; ross carrier and similar machines; post hole digger; shovel (tunnels); side boom; spreader (asphalt);
scoopmobile‐tractor‐shovel over 1 1/2 yds. trenching machines vermeer concrete saw trencher and similar; tractor type demolition equipment; winch truck (a frame); hydraulic crane over 10 ton up to 25 ton); cherry picker over 10 ton up to 25 ton)
GROUP 1‐B: Compressor (steel erection); pulse meter and push button buzz box; elevator; mechanic (outside) all types;
welder; scrapers 20 yds struck and under; machine pulling sheep's foot roller; vibratory rollers; roller 4 tons and over.
GROUP 2‐A: Compactor self‐propelled; grader; bulldoze D7 and similar tractors with a draw bar horsepower of 100 or over;
bulldozer D6 and under; welder; scraper 20 yds struck and under; machine pulling sheep's foot roller; vibratory rollers.
GROUP 3‐A: Asphalt plant; boiler (high pressure); concrete mixing plants; concrete pump; firemen; forklift; forklift (electric); joy drill or similar tractor drilling machine;
loader ‐ 1 1/2 yards and under; locomotive (all sizes);
mixer concrete ‐ 21E and over; portable asphalt plant;
portable batch plant; portable crusher; quarry master;
stone crusher; well drilling machine and well point system;
cherry picker under 10 tons; hydraulic crane under 10 tons;
concert buffy; one yard an up ride on dumper (benford or similar).
GROUP 3‐B: Compressor over 125 cu. feet; conveyor belt machine regardless of size; lighting unit (portable & generator); welding machine (steel erection and excavation); and compressor plant; stud machine; ladder hoist.
GROUP 4‐A: Air tractor drill; batch plant; bending machine;
concrete breaker; concrete spreader; curb cutter machine;
farm tractor (all types); finishing machine‐concrete;
hepavac clean air machine (all similar types: removal of asbestos etc.); material hopper‐sand‐stone‐cement;
mixer‐concrete‐under 21E; mulching grass spreader;
pump‐gypsum, etc., pump‐plaster‐grout ‐fireproofing; shop mechanic (not employed on job site); roller under 4 ton;
spreading and fine grading machine; steel cutting machine;
syphon pump‐air‐steam; tar joint machine; turbo jet burner or similar equipment; vibrator (1 to 5); fine grading machine; roof hoist (tugger hoist); television cameras‐water‐ sewer‐gas‐etc.
GROUP 4‐B: Compressor to 125 feet; dust; dust collector;
heater all types; pump; pump station (water and sewer);
steam jenny; sweeper; chipper; mulcher.
GROUP 5: Motorized roller (walk behind)
GROUP 5‐A: Master Mechanic
GROUP 5‐B: Utility Man
GROUP 6: Warehouse Man
ENGI0137‐007 03/04/2013
Poughkeepsie and South thereof
Rates Fringes
Power Equipment Operator
(HEAVY & HIGHWAY)
GROUP 1.....................$ 53.38 25.87+a GROUP 1‐A...................$ 47.17 25.87+a GROUP 1‐B...................$ 49.65 25.87+a GROUP 2‐A...................$ 45.21 25.87+a GROUP 2‐B...................$ 46.60 25.87+a GROUP 3.....................$ 44.44 25.87+a GROUP 4‐A...................$ 40.48 25.87+a GROUP 4‐B...................$ 34.89 25.87+a GROUP 5.....................$ 46.45 25.87+a GROUP 5‐A‐1.................$ 49.89 25.87+a
GROUP 5‐A‐2.................$ 60.34 25.87+a GROUP 5‐A‐3.................$ 58.30 25.87+a GROUP 5‐A‐4.................$ 54.73 25.87+a GROUP 5‐A‐5.................$ 46.24 25.87+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Boom Truck; Cherry Picker; Clamshell; Crane, (Crawler, Truck); Dragline; Rough Terrain Crane
GROUP 1‐A: Auger; Auto Grader; Dynahoe and Dual purpose and similar machines; Boat Captain; Boring Machine (all types);
Bull Dozer‐all sizes; Central Mix Plant Operator;
Chipper‐all types; Close circuit t.v.; Compactor with Blade; Concrete Portable Hoist; C.M.I. or similar; Conway or similar mucking machines; Gradall, Shovel Backhoe, etc.
Grader; Derrick, (Stone‐ Steel; Elevator & cage, materials or passengers; Front end loaders over 1 1/2 yds.; Hoist Single, Double, Triple Drum, Hoist Portable Mobile Unit;
Hoist Engineer‐Concrete (Crane‐Derrick‐Mine Hoist); Hoist Engineer‐Material, Hydraulic Boom; Letourneau or Tournapull (Scrapers over 20 yds. struck); Log Skidder; Movable Concrete Barrier Transfer & Transport Vehicle; mucking machines; overhead crane; paver (conccrete); pulsemeter;
push button (buzz box) elevator; road mix machines; Robot Hammer (brock or similar), Ross carrier and similar machines; shovels (tunnels); side boom; Slip Form Machine;
spreader (asphalt); scoopmobile‐tractor‐shovel over 1 1/2 yards; trenching machines; telephies‐ vermeer concrete saw trencher and/or similar; tractor‐type demolition equipment, Whirly
GROUP 1‐B: Road Paver, Asphalt
GROUP 2‐A: Ballast Regulators; Compactor self‐propelled; Cow Tracks; Fusion Machine; Rail Anchor Machines; Roller 4 ton and over; Scrapers ‐ 20 yards struck; Switch Tampers;
Vibratory roller, etc.
GROUP 2‐B: Mechanic (outside) all types
GROUP 3‐A: Air tractor drill; asphalt plant; batch plant;
boiler (high pressure; concrete breaker; concrete pump concrete spreader; curb cutter machine; farm tractor (all types); finishing machine (concrete); fine grading machine;
fireman; forklift; forklift (electric); joy drill or similar tractor drilling machine; loader ‐ 1 1/2 yards and under; locomotive (all sizes), maintenance engineer;
machine pulling sheeps foot roller; material hopper; mixer concrete ‐ 21‐E and over; mulching grass spreader; portable asphalt plant, portable batch plant, portable crusher;
powerhouse plant; quarry master; roller under 4 ton;
spreading and fine grading machine; steel cutting machine;
stone crusher; sweeper; turbojet burner or similar; well drilling machine ; winch truck "A" frame. John Henry Drill or similar.
GROUP 4‐A: Service men (fuel or grease truck).
GROUP 4‐B: Oiler; Compressor ‐ compressor plant; paint compressor‐steel erection; conveyor belt machine; lighting unit (portable & generator); oiler; pumps ‐ pump station‐water‐sewer‐ gypsum‐ plaster, etc.;
roller‐motorized (walk‐behind); welding machine (steel erection excavation); well point system; bending machine;
dust collector; mixer ‐ concrete under 21‐E; heater all types; steam jenny; syphon pump‐air‐steam; tar joint machine; vibrator (1 to 5); Compressor Truck Mounted (2‐6)
GROUP 5: Oiler GROUP 5‐A‐1: Master Mechanic
GROUP 5‐A‐2: Engineer ‐ all tower cranes, all climbing cranes and all cranes of 100 ton capacity or greater (3900 Manitowac or similar) irrespective of manufacturer and regardless of how the same is rigged (except for pile rigs).
GROUP 5‐A‐3: Engineer‐‐ Pile Driver
GROUP 5‐A‐4: Hoist Engineer‐ Steel ‐Sub Structure
GROUP 5‐A‐5: Jersey‐spreader, pavement breaker (air ram);
Post Hole Digger
NOTES:
Loader Operator (over 5 cu yds) .50 Shoval Operators (over 4 cu yd) 1.00 Hazmat premium over regular rate 20%
CRANES:
100 ft‐ 149 ft: receive $2.00 more than Group 1 rate 149 ft and over receive $300 more than Group 1 rate
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day; Lincoln's Birthday; Good Friday; Memorial Day; Independence Day; Labor Day; Veterans Day; Columbus Day; November Election Day; Thanksgiving Day;
and Christmas Day
ENGI0825‐007 01/01/2017
ORANGE, ULSTER AND SULLIVAN COUNTIES
BUILDING, HEAVY & HIGHWAY
GROUP 1....................$ 49.22 29.30+a GROUP 2....................$ 47.63 29.30+a GROUP 3....................$ 45.72 29.30+a GROUP 4....................$ 44.09 29.30+a GROUP 5....................$ 42.38 29.30+a GROUP 6....................$ 51.04 29.30+a
NOTES:
Hazmat Premium 20% Hydrographic Premium .50
POWER EQUIPMENT OPERATORS CLASSIFICATIONS (BLDG, HEAVY & HWY)
GROUP 1: Autograde‐Pavement‐Profiler (CMI and Similar Type);
utograde‐Pavement‐Profiler (CMI and Similar Types);Autograde Slipform Paver (CMI and Similar Types);
Backhoe; Central Power Plants (all types); Concrete Paving Machine (s‐240 and Similar Types); Cranes (All Types, Including Overhead and Straddle Traveling Type); Cranes, Gantry; Derricks (Land, Floating or Chicago Boom Type);
Drillmaster/Quartmaster (Down the Hole Drill) Rotary Drill;
Self‐Propelled, Hydraulic Drill, Self‐Powered Drill Draglines, Elevator Graders, Front End Loaders (5 yds. and over), Gradalls, Grader: Rago, Helicopters (Copilot), Helicopters, (Communication Engineer), Locomotive (large), Mucking Machines, Pavement and Concrete Breaker (Superhammer, Hoe Ram, Brokk 250 and Similar Types), Pile Driver (length of boom including length of leads shall determine premium rate applicable), Roadway Surface Grinder Scooper (loader and shovel), Shovels, Tree Chooper with Boom, Trench Machines, Tunnel Boring Machines.
GROUP 2: "A" Frame; Backhoe (Combination); Boom Attachment on Loaders (Rate based on size of bucket) not applicable to Pipehook) Boring and Drilling Machines, Brush Chopper, Shredder and Tree Shredder Tree Shearer, Cableways, Carry‐alls, Concrete Pump, Concrete Pumping System, Pumpcrete and Similar Types, Conveyors, 125 ft and over;
Drill Doctor (duties include dust collector, maintenance), Front End Loader (22 yds. but less than 2 yds.), Graders (Finish); Groove Cutting Machine (ride on type), Heater Planer; Hoists: (all type hoists, Shall Also Include Steam, Gas, Diesel, Electric, Air Hydraulic, Single and Double Drum, Concrete, Brick Shaft, Caisson, Snorkel Roof, and or any other similar type Hoisting Machines, Portable or Stationary, Except Chicago Boom Type). Long Boom Rate to Be Applied if Hoist is "outside material lower hoist";
Hydraulic Cranes‐10tons and Under; Hydro‐Axe;
Hydro‐Blaster; Jacket (Screw Air Hydraulic Power Operated Unit or Console Type: Not Hand Jack or Pile Load Test Type), Log Skidder; Pans, Pavers (all) Concrete; Plate and Frame Filter Press; Pumpcrete Machines; Squeeze Crete and Concrete Pumping (regardless of size); Scrapers; Sidebooms;
Straddle Carrier, Ross and Similar Types; Vacuum Truck;
Whip Hammer; Winch Trucks (Hoisting).
GROUP 3: Asphalt Curbing Machine, Asphalt Plant Engineer, Asphalt Spreader; Autograde Tube Finisher & Texturing Machine (CMI and Similar types) Autograde Curecrete Machine (CMI and Similar Types); Bar Bending Machines (power), Batchers, Batching Plant and Crusher on‐site; Belt Conveyor Systems; Boom Type Skimmer Machines; Bridge Deck Finisher;
Bulldozers (all); Car Dumpers (A:road); Chief of Party;
Compressor and Blower Type Units (used) Independenty or Mounted On Dual Purpose Trucks, On Job Site or In Conduction with Job Site, In Loading and Unloading of Concrete, Cement, Fly Ash, Instantcrete, or Similar Type Materials); Compressor 92 or 3 in Battery); Concrete Finishing Machines; Concrete Saws and Cutters (ride on type); Concrete Spreaders, Hetzel, Rexomatic and Similar types; Concrete Vibrators; Conveyors, Under 125 ft), Crushing Machines, Ditching Machine, Small (ditchwitch, Vermeer or Similar type); Dope Dots (mechanical with or without pump), dumpsters; Elevator; Fireman; Forklifts (economobile, lull, and similar types of equipment); Front End Loaders (1 yd. and over but less than 2 yds.);
Generators (2 or 3 in Battery/ within 100 ft); Giraffe Grinders, Graders and Motor Patrols; Grout Pump; Gunnite Machines (excluding nozzle); Hammer Vibratory (in conduction with generators); Hoists (Roof, Tuggeraerial Platfrom Hoist and House Cars), Hoppers, Hoppers Doors (power operated); Hydro‐Blaster (where required); Ladders (Motorized); Laddervator; Locomotive, Dinky type;
Maintenance, Utility Man; Mechanics; Mixers (Excepting Paving Mixers); Motor Patrols and Graders; Pavement Breakers, Small, Self‐Propelled ride on type (also maintains compressor or hydraulic unit); Pavement Breaker, Truck Mounted; Pipe Bending Machine (power); Pitch Pump;
Plaster Pump (regardless of size); Post Hole Digger (post pounder and auger); Rod Bending Machines (power); Roller, Black Top; Scales, (power); Seaman Pulverizing Mixer;
Shoulder Widener; Silos; Skimmer Machines (Boom Type);
Steel Cutting Machine, Services and Maintains; Tamrock Drill; Tractors; Tug Captain; Vibrating Plants (used in conduction with unloading); welder and Repair Machines.
Concrete cleaning/decontamination machine operator;
Directional boring machine; Heavy equipment robotics operator; Master environmental maintenance operator; Ultra high pressure waterjet cutting tool system operator;
maintenance operator; Vacuum blasting machine operator
GROUP 4: Brooms and Sweepers; Chippers; Compressors (single);
Concrete Spreaders (small type); Conveyor Loaders (not including Elevator Graders); Engines, Large Diesel (1620 h.p.) and Staging Pump; Farm Tractors; Fertilizing Equipment (Operator and Maintenance of); Fine Grade Machine (small type); Form Line Graders (small type); Front End Loader (under 1 yd); Generator (single); Grease, Gas, Fuel and Oil Supply Trucks; Heaters (Nelson or Other Type Including Propane, Natural Gas or Flowtype Units); Lights, Portable Generating Light Plants; Mixers, Concrete Small;
Mulching Equipment (Operation and Maintenance of); Pumps (2 of Less Than 4 Inch Suction); Pumps 94 Inch Suction and Over Including Submersible Pumps); Pumps (Diesel Engine and Hydraulic); Immaterial of Power; Road Finishing Machines (Small Type); Rollers, Grade, Full Or Stone Base; Seeding Equipment (Operation and maintence of); Sprinkler and Water Pump Trucks (Used on job Site or in conduction with Job Site); Steam Jennies and Boilers, Irrespective of Use;
Stone Spreader; Tamping Machines, Vibrating Ride On;
Temporary Heating Plant (nelson or Other Type, Including Propane, Natural Gas or Flow Type Units); Water and Sprinkler Trucks (Used On Job Site In Conduction with Job Site); Welding Machines‐Within 100 ft (Gas, and /or Electric Converters of any type, single, tow or three in a battery). welding system, multiple (rectifier transformer type) well point systems (including installation by bull gang and maintenance of); Off Road back dumps.
GROUP 5: Oiler
GROUP 6: Helicopter Pilot
a. PAID HOLIDAYS: New Years Day, Washington's Birthday Memorial Day, July 4th, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day during the calendar week in which the holiday occurs.
ENGI0825‐008 01/01/2017
ORANGE, ULSTER AND SULLIVAN COUNTIES
Rates Fringes
Power equipment operators:
BUILDING CONSTRUCTION
STEEL ERECTION
GROUP 1....................$ 57.74 29.30+a
GROUP 2....................$ 56.08 29.30+a GROUP 3....................$ 48.79 29.30+a GROUP 4....................$ 46.13 29.30+a GROUP 5....................$ 44.60 29.30+a GROUP 6....................$ 42.84 29.30+a GROUP 7....................$ 52.85 29.30+a
BUILDING CONSTRUCTION TANK
ERECTION
GROUP 1....................$ 57.46 29.30+a GROUP 2....................$ 55.87 29.30+a GROUP 3....................$ 52.35 29.30+a GROUP 4....................$ 48.78 29.30+a GROUP 5....................$ 43.57 29.30+a
OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES
GROIUP 6...................$ 45.88 27.75
GROUP 1....................$ 49.85 29.30+a GROUP 2....................$ 48.20 29.30+a GROUP 3....................$ 46.06 29.30+a GROUP 4....................$ 44.56 29.30+a GROUP 5....................$ 42.84 29.30+a GROUP 6....................$ 51.78 29.30+a
NOTES:
Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75
STEEL ERECTION CLASSIFICATIONS
GROUP 1: Cranes (All Cranes, Land or Floating with Booms Including Jib 140 ft and over, Above Ground); Derricks, Land, Floating or Chicago Boom Type with Booms including Jib 140 ft and over above ground).
GROUP 2: Cranes (All Cranes, Land or Floating with Booms Including Jib Less Than 140 ft Above Ground); Derricks, Land, Floating or Chicago Boom Type with Booms Including Jib Less Than 140 ft above Ground).
GROUP 3: "A" Frame, Cherry Pickers 10 tons and under, Hoists Shall Also Include Steam, Gas, Desel, Electric, Air Hydraulic, Single and Double Drum Concrete, Brick Shaft Caisson, or Any Other Similar Type Hoisting Machines, Portable or Stationary, Except Chicago Boom Type; Jacks:
Screw Air Hydraulic Power Operated unit or Console Type (not hand Jack or Pile Load Test Type); Side Booms.
GROUP 4: Aerial Platform used as Hoist; Compressor: 2 or 3 in Battery; Elevators or House Cars; Conveyors and Tugger Hosits; Chief of Party; Firemanp; Forklift; Generators (2 or 3); Maintenance (Utility Man); Rod Bending Machine
(power); Welding Machines (Gas or Electric, 2 or 3 in Battery, Including Diesels); Captain: Power Boats: Tug Master: Power Boats.
GROUP 5: Compressor, Single; Welding Machine, Single, Gas, Diesel, and Electric Converters of any Type: Welding System Multple (Rectifier Transformer Type); Generator, Single.
GROUP 6: Oiler
GROUP 7: Helicopter Pilot .
FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works…