About this file
Amendment 0013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_-_W912DS-16-B-0019.pdf | ||
| W912DS-16-B-0019_Amendment_0012.pdf | ||
| W912DS-16-B-0019-0011.pdf | ||
| W912DS-16-B-0019-0010.pdf | ||
| W912DS-16-B-0019-Amendment_0009.pdf | ||
| 02_32_00.pdf | ||
| 01_22_00.00_10.pdf | ||
| Green_Brook_Segment_B-2_Amend_8_Drawings.pdf | ||
| W912DS-16-B-0019-Amendment.pdf | ||
| W912DS-16-B-0019-0006.pdf | ||
| W912DS-16-B-0019-0005.pdf | ||
| W912DS-16-B-0019-0004.pdf | ||
| W912DS-16-B-0019-0003.pdf | ||
| W912DS-16-B-0019-0002.pdf | ||
| Green_Brook_B2_AMEND_2.pdf | ||
| final-report-URS-geotech.pdf | ||
| GB_SEGB1B2S-501-Default-000.pdf | ||
| GB_SEGB1B2S-201-Default-000.pdf | ||
| FHA_and_FWI_Permit_.pdf | ||
| GB_SEGB1B2S-502-Default-000.pdf | ||
| W912DS-16-B-0019_AMENDMENT_0001.pdf | ||
| EM_1110-2-6056.pdf | ||
| Green_Brook_Segment_B-2_SPECIFICATIONS.pdf | ||
| W912DS-16-B-0019_SOLICITATION.pdf | ||
| Green_Brook_Segment_B-2_(W912DS-16-B-0019).pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Extend the bid opening date to Friday 03 February 2017 at 2:00PM EST.
2. Provide responses to questions from interested vendors, for informational purposes only.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing Methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Feb-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0019
X 9B. DATED (SEE ITEM 11)
31-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Feb-2017
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-16-B-0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 02-Feb-2017 02:00 PM to 03-Feb-2017 02:00 PM.
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0013
W912DS-16-B-0019
Amendment No. 0013
USACE, NYD Corps of Engineers New York, NY 10278
AMENDMENT NO.13 FOR RFP NO. W912DS-16-B-0019
QUESTIONS AND ANSWERS:
The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.
This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents. Contract award will be based on what is contained in the printed Plans and Specifications.
Question 1: In reviewing the subject amendment (Amendment 12), we note that we now have an
Option Item 0018 for Borrow Material which furnishes the material to the site. There still is not an item that addresses excavation of the contaminated or unsuitable materials and placement and compaction of the replacement imported material. The response to question #2 in Amendment 12 would indicated line items for imported materials include placement. Would this include the base bid materials and the imported materials (CLIN 16B, 17B and 18B)?
Answer: The backfill materials indicated in Item No. 0016AB, Item No. 0017AB and Item No.
0018AB include placement and compaction.
Question 2: Referring to answer to question 3 of Amendment 12, we assume that the material must meet Spec Section 35 41 00, 2.1.2, not 2.1.1, if not please clarify.
Answer: For, Levee Inspection Trenches - backfill with "embankment materials" as specified in 35 41
00, paragraph 1.3.1.
W912DS-16-B-0019
For, Floodwall Inspection Trenches - backfill with "satisfactory materials" as specified in 31 00 00, and as detailed on Plan sheets C-304, 305, and 306.
(End of Summary of Changes)