Green_Brook_Segment_B-2_(W912DS-16-B-0019).pdf

PDF 30 MB Posted

Attached to
Green Brook Flood Risk Management Project-Segment B2 Federal contract opportunity
Solicitation number
W912DS-16-B-0019
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

W912DS-16-B-0019 PLANS

View the file

Other files for this federal contract opportunity

Other files attached to Green Brook Flood Risk Management Project-Segment B2, newest first.
File Type Posted
Bid_Abstract_-_W912DS-16-B-0019.pdf PDF
W912DS-16-B-0019_Amendment_0013.pdf PDF
W912DS-16-B-0019_Amendment_0012.pdf PDF
W912DS-16-B-0019-0011.pdf PDF
W912DS-16-B-0019-0010.pdf PDF
W912DS-16-B-0019-Amendment_0009.pdf PDF
01_22_00.00_10.pdf PDF
02_32_00.pdf PDF
Green_Brook_Segment_B-2_Amend_8_Drawings.pdf PDF
W912DS-16-B-0019-Amendment.pdf PDF
W912DS-16-B-0019-0006.pdf PDF
W912DS-16-B-0019-0005.pdf PDF
W912DS-16-B-0019-0004.pdf PDF
W912DS-16-B-0019-0003.pdf PDF
W912DS-16-B-0019-0002.pdf PDF
Green_Brook_B2_AMEND_2.pdf PDF
GB_SEGB1B2S-201-Default-000.pdf PDF
final-report-URS-geotech.pdf PDF
GB_SEGB1B2S-501-Default-000.pdf PDF
FHA_and_FWI_Permit_.pdf PDF
GB_SEGB1B2S-502-Default-000.pdf PDF
W912DS-16-B-0019_AMENDMENT_0001.pdf PDF
EM_1110-2-6056.pdf PDF
Green_Brook_Segment_B-2_SPECIFICATIONS.pdf PDF
W912DS-16-B-0019_SOLICITATION.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N A

S

N A

S

N A

S

G-001

M I

D D L E S E

X

C

O

Project Location

S O

M E R S E T

C

O

LOCATION MAP

D E

L A

W A

R E

R H

O D

E

I

S L el a w e a r v e

Lon g I sla nd

Sou nd

Cape

Cod

Bay

Blo ck

I S oun d

Nantucket Sound

Montauk Point

Lon g I sla nd

N E W Y O R K MASSACHUSETTS

CONNECTICUT

P E

N N

S Y

L V

A N I

A

N

H u d s o n R

D

R i r JERSEY

NEW

T

IT

L E A

N D I

N D

E X S

H E

E T

G B S

E G

B

B

G .d g n

GREEN

BROOK

B O

U

D

B R

O O

K

UNIO

B O

U N

D

B R

O O

K

R

D

MIDDLESEX

BORO OF

GREEN BROOK

TWP. OF

G R

E E

O O

K R

D

AVE.

VICINITY MAP

BOROUGH OF MIDDLESEX AND GREEN BROOK TOWNSHIP, NEW JERSEY

GREEN BROOK SUB-BASIN OF THE RARITAN RIVER

This Project

15 AUGUST 2016

W912DS-16-B-0019

SEGMENT B-2 CONTRACT

FLOOD RISK MANAGEMENT REDUCTION PROJECT

GREEN BROOK

DATE

DATE

DATE

APPROVED BY:

scope of their employment as required by ER 1110-1-8152.

and registration designations of individuals appear on these project documents, within the

This project was designed by the U.S. Army Corps of Engineers. The initials or signatures

OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET

SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL

CHIEF, DESIGN BRANCH

CHIEF, ENGINEERING DIVISION

APPROVAL RECOMMENDED BY:

APPROVAL RECOMMENDED BY:

CHIEF, CIVIL ENGINEERING DESIGN SECTION

JOHN M. WONG, P.E.

ENCER R. SHAFFER, P.E.

ARTHUR J. CONNOLLY, P.E.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

NTS NTS

0 30 30 60FT

HORIZ SCALE: 1’’= 30’

07.5 7.5 15FT

VERT SCALE: 1" = 7.5’

3.25

0 30 30 60FT

SCALE: 1’’= 30’

Note: Levee detail shown on Sheet C-507.

HANDHOLE

EXISTING HANDHOLE

EXISTING

0.57%

22+00 23+00 24+00

3 3

T

L

V

S T

A

T

P

F

V

E R

F L

W

T C

H

C H

A N

N

S T

A

B O

T T

M

E R

F L

T C

H

C H

A N

N

S T

A

B O

T T

E R

F L

T C

H

GEOTEXTILE

NON-WOVEN

REMOVE

REVETMENT PROTECTION

REMOVE RIPRAP 9" D50

RELOCATE CONDUIT

EXISTING

R=35’(TYP.)

REMOVE PAVEMENT

INTERIOR DRAINAGE SWALE

BOTTOM OF EXISTING

0.57%

22+00 23+00 24+00

T

V

S T

A

T

E R

F L

T C

H

T

V

S T

A

T

E R

F L

T C

H

INTERIOR DRAINAGE SWALE

BOTTOM OF EXISTING

EXISTING

PAVEMENT

FINAL VIEW

T

V

S T

A

T

E R

F L

T C

H

AT >

EL. 38.87

NOTCH

OVERFLOW

EXISTING

FILL

EMBANKMENT

CONDUIT

RELOCATE

LIMITS OF RAISED WEIR (STA. 22+63.6 TO 24+30)

ORIGINAL GRADE ORIGINAL GRADE

LIMITS OF LEVEE WEIR (STA. 22+40 TO 24+30)

N A

S

N A

S

N A

S

C-103

S E

G M

E N

T B -1

L E

V E

E W

E

IR

R

A

IS

IN

G G

B S

E G

B

B

C .d g n

P L

A N A

N D P

R O

F

IL

E

(LOOKING NORTH)

SEGMENT B-1 LEVEE WEIR ELEVATION VIEW

(NOT AS-BUILT)

EXISTING SEGMENT B-1 LEVEE WEIR PLAN VIEW (LOOKING WEST) NTS

EXISTING SEGMENT B-1 LEVEE WEIR ELEVATION VIEW

EL. 49.78

STA. 22+50

OVERFLOW NOTCH

TOP OF

S L

O P

E

S L

O P

E

S L

O P

E

EL. 49.50

PVI STA. 21+80

EL. 38.87

STA. 22+83

OVERFLOW NOTCH

BOTTOM OF

157.5’

EL. 38.87

STA. 23+28

> OVERFLOW NOTCH

EL. 38.87

STA. 23+73

OVERFLOW NOTCH

BOTTOM OF

EL. 50.38

STA. 24+07.5

OVERFLOW NOTCH

TOP OF

EL. 50.60

PVI STA. 24+63.48

S L

O P

E

S L

O P

E

TOP OF LEVEE

RIPRAP 9" D50

LEVEE TOE SWALE

2’ WIDE VEGETATED

EL. 49.50

PVI STA. 20+60

S L

O P

E

S L

O P

E

PUMP STATION GL-4

N 638300

E

N 638300

E

N

INV.

.64

INV.

.29

C

IP

Wetland L imits

IN

V.

9.

IN

V.

0.

CHAMBER

VERITCAL PIPE

WATER

W

21+00

22+00

23+00

24+00

25+00 W

Dispose Riprap

Remove and

FINAL VIEW

shown in the

Elevation as

Full Design and Raise to

Remove Pavement

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

31.0

31.2

31.2

31.3

31.6

31.6

31.7 31.8

31.8

31.8

31.8

31.9

32.1

32.1

32.2

32.2

32.2

32.4

32.4

32.4

32.5

32.6

32.7

32.7

32.8 32.9

33.7

33.7

33.8

34.1

35.1

GREEN BROOK FLOW

RCP @ 0.62%

3’

8’

NTS

SHEETPILE CUTOFF WITH TURF REINFORCEMENT MAT (MAT)

OHW

TRM

E

C B

P os tP os t P os t

MH

M H

M H

M H

P

IN

V

.8

R

IM

.5

G R

.9

WASHINGTON AVE

IN

V

.9

IN

V

.9

W e t la n d im it s

.01

INV

IN

V

.9

15" R

CP

IN

V

.9

R C P

G R

.8

RIM

.54

RCP

R

IM

.0

V E R

IT

C A L

P

IP

E

W A T E R

X

FF 42.73

41.85

42.02

X

X

X

X

X

41.

41.

FF

41.

X

X X

42.50

43.27

FF 43.

R

IM

.6

IN

V

N

A

P o s t

P o s t

W

C B

S

S

S

D R

Y W E L L

IN

V

.1

MOVABLE

BALL

NET

M H

A B

A N

D O

N E D

G a s

1/

2:

1 SLOPE

S L

O P E

S L

O P E5

1/

2:

1 SLOPE

S L

O P E

S L

O P E5

E

E

N

N

N

N

E

E

E

N

N

N

N

N

N

N

N

N

N

E

E

E

E

E

E

E

E

E

N

N A

S

N A

S

N A

S

GREEN BROOK

G R E E

N

B R

O O

K

030 30 60

SCALE: 1"=30’

3’ wide swale

2’ wide swale into

Transition Existing

LEGEND

Grade to Drain

Levee Toe

Flow

Longitudinal Grade (1.51%)

Fill

Swale Bottom

Slope (Top to Bottom)

R = 22.75

R = 22.75

G B S

E G

B

B

C .d g n

C-105

S

IT

E P

L A

N L E

V E

E S

Y S

T E

M to Station 28+00 Pavement as needed Restore Existing

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

+0

34+4934+49

E l

30+00

SEE

PLAN

SHEET

C-

START

STA.

7+9

REALI

GN

EXI

STI

NG

SEGMENT

B-

LEVEE

W E I

S

H

E

T

M A I

N

E X

C E

V E

E

E X I

S T I

G M

E

V

34+00

31+00

NORTHINGNORTHINGNORTHING

2044955.77638113.342

2045003.90638099.141

.3

.4

.7

.9

1.2

1.4

1.4

1.6

1.6

1.6

1.9

.1

.2

.7

.8

.8

.8

.8

.9

.9

.1

.2

.2

.5

.5

.7

.7

.7

.0

.2

.3

.3

2’

.7

.2

.4

.1 be approved by COR

Grade to swale to w/ utility owner

Contractor to coordinate

Invert n/a

Existing Abandoned MH

.6

.7

33+00

39 39

.3

.9

.1

.4

.5

.8

1.2

.3

32+00

.4

.7

.8

.8

.7

POINT EASTINGPOINT EASTINGPOINT EASTING

SWALE ALIGNMENT DATA - TRANSITION AREA

.0

6 4

.2

.1

Top of Floodwall

Sta 28+00 to 34+49

Grassed Top of Levee

Cutoff Wall

TRM

Sheetpile Cutoff

5’

2.5

ANCHOR VARIES

LENGTH OF

(8’ DEEP MIN.)

INSPECTION TRENCH

EXISTING GRADE

SWALE BOTTOM

Varies

EL. 34

EL. 15

S L

O P

E

S L

O P

E

32.00

30.00

X

32.00

X X

32.00

X

C-106

SHEET OF 14

G B S

E G

B

B

C .d g n

D E

M O

L

IT

IO

N P

L A

N

S

IZ

E

IDENTIFICATION

SHEET

X

A N

S I

D

X-000

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

SHEET OF

N A

S

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N M

A R

K

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

IS

S U

E D

A T

E

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

S E

G M

E N

T B -2 C

O N

T R

A C

T

A

U G

N A

S

N A

S

S O

L

IC

IT

A T

IO

N N

O

D W

N B

Y

C K

D B

Y

A P

P R

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S

IG

N E

D B

Y

D A

T E

D A

T E

A P

P R

A

U G

U S

T fiof Engineers

US Army Corps

New York District

54321

A

M .B

Flag Pole

M .B

M .B

PAVED DWY.

B

IT

U M

P A

V E

M E

N T

C O

N C

S

ID

E W

A L

K

PAVED DWY.

PAVED D

WY.

C O

N C

S

ID

E W

A L

K

C O

N C

S

ID

E W

A L

K

ABUTMENT

ABUTMENT

OLD

BI

T.

P

AVE

G A

T

GRAVEL

ROAD

V

IN

Y

N C

E

V

IN

Y L

F

E B

C E

W O

O D

P

IC

K E

T

F

E N

C E

W O

O D

P

IC

K E T

F E N C E

6’ WOOD PI

CKET

C O

N C

C U

U

T T

E R

CONC. S

IDEWALK

CONC. S

IDEWALK

6’ WOOD PI

CKET FE

NCE

W O

O D

P

IC

K E T

F E

N C

E

6’ IRON FENCE

IR

O N

F

E N

C E

W O

O D

P

IC

K E

T

F

E N

C E

S T A

R

IT

IV

E

W A

S H

IN

G T

E

STARLIT DRIVE

W O

O D

P

IC

K E

T

F

E N

C E

EDGE O

F DECK

Wetla nd

Lim its

.5

.9

.2

.2

.9

.5

P

IC

K E

T

F E

N C

E

W O

X

.7

.8

.0

X

X

X

X

X

1.4

1.5

F F

1.8

X

X

X

.5

.2

F F

.6

X

X X

X

X X

41.48

41.63

BASEMENT 38.75

42.60

42.59

FF 42.64

XX

X

X

LOT 1

LOT 2

LOT 1

LOT 2

LOT 3

20’ JO

INT MEETING SEWER R.O

.W.

LOT 2

S A

N

IT

A R

Y

S

E W

S E

M E

N T

R .O .W

E X

IS

T

IN

E

E X

IS

T

E

EXISTING LIN

E

LOT 3

LOT 4

LOT 5

LOT 6

LOT 7

LOT 8

LOT 9

LOT 10

LOT 11

LOT 12

LOT 13

LOT 15

LOT 16

LOT 17

LOT 18

LOT 21

LOT 2

LOT 14

LOT 1

LOT 16

LOT 19

LOT 21A

LOT 1

LOT 18

LOT 15

LOT 21

LOT 23

LOT 13

LOT 11

(50’ R.O.W

EXISTING LINE

EXISTING LINE

BLOCK 3

BLOCK 7

0-

F

BLOCK 7

0-

F

BLOCK 7

0-

F

BLOCK 3

BLOCK 7

0-

F

Iron Pip e ( fd.)

Iron Pip e ( fd.)

Iron Pip e ( fd.)

15’ SANITARY SEWER R.O.W.

TO

W

N S H

IP

O

F G R

EEN

B R

O O

K

M

ID

D

LE

EX

R

O U

G H

GREENBROOK

Post

Post

Post

W O

O D

P

IC

K E

T

F

E N

C E

4’ C.L.F.

4’ C.L.F.

M O

V A

B L E

B

A L L

N E T

C .L .F

4’ C.L.F.

V

IN

Y L

FE

N C E

C .L .F

6’ V

IN

YL

FE

NCE

MH

V

IN

Y L

F

E N

C E

5’ C.L .F.

6’

VIN

YL F

ENCE

C .L .F

5’ C.L.F.

C .L .F

ABANDONED

Protection

Inlet

Protection

Inlet

Inlet Protection

Net Structure

Remove Ball

Remove Structure

General Notes:

free of dirt and debris at all times.

rights-of-way or existing pavement. Roads and walks shall be entrance to reduce the tracking of sediment on to public

7. The Contractor shall maintain a stabilized construction and shall be performed during site/earthwork construction.

indicated on this drawing. Turbidity monitoring may be required, from sediment laden water entering the storm drain system as work is to be performed. Existing catch basins shall be protected be installed along slope contours and down the slope from where installed before intiating construction work. Silt fence shall

6. Erosion and sediment control protection measures shall be shown provided on C-102.

5. Clearing is limited to the areas within the project limits

COR for review and approval.

the Contractor. The Contractor shall submit a stakeout to the filled and the limits of existing wetlands shall be staked by area to be cleared and grubbed, including the area to be

4. Prior to any work on the site, the project limits and the relocated by the Contractor at no cost to the Government.

inadequate or erroneous survey layout shall be properly construction work improperly constructed as a result of of disturbance as indicated in these contract drawings. All control within the project limits and confirm the site limits

3. The Contractor shall establish the horizontal and vertical layout.

and so forth). Refer to Sheet C-104 for the utility locaton the accuracy of all utility locations (MCI fiber optic line, The Contractor is responsible for independently verifying the locations are approximate and not necessarily complete.

field survey or obtained from available records. Therefore,

2. Locations for the existing utilities were established by ambiguities which appear to exist.

and notify the COR immediately regarding any discrepancies or

1. The Contractor shall review the plans and specifications

SECTION 35 41 00

SECTION 35 31 19.20

SECTION 32 31 13

SECTION 32 12 16

SECTION 32 11 27

SECTION 31 11 26

SECTION 31 41 16

SECTION 31 00 00

SECTION 05 50 14

SECTION 05 05 23

SECTION 03 31 01.00 10

SECTION 03 20 00.00 10

SECTION 03 11 13.00 10

features:

tolerances listed in the specifications for the following project

13. Construction Tolerances. The Contractor shall comply with the and sheetpile.

vertical control for the elevation and location of the floodwall

12. Walls. Set stakes or other devices to set the horizontal and typical section.

foot (50’) stations, terrain breaks, and at changes in the and references on both sides of the project baseline at fifty

11. Slope Stakes. The Contractor shall set the slope stakes lines.

be set on a fify foot (50’) grid, and intermediate grade break information and for volume computations. The grade stakes shall the appropriate ties for the purpose of recording as-built

10. Grade Stakes. The Contractor shall create a baseline with control points.

The Contractor shall be responsible for the preservation of the the project control points throughout the life of the contract.

9. The Contractor shall establish and check on a weekly basis

Gate and Pavement at close of contract

Secure Chain Link Gate; Restore

Remove Gate and Replace with weir area and geotextile in levee riprap, pavement, Remove and dispose of

Concrete Block Area

Protect Articulated and Riprap the Gabion Berm

Remove and dispose of Riprap on levee

Remove and dispose

28+00

Remove pavement

Remove Guiderail

Structure

Remove and replace with utility owner of abandoned manhole

Coordinate relocation

Replace Structure

Remove and chain link fence (160LF)

Remove and Replace

(110LF)

chain link fence

Remove and Replace fence (40 LF) chain link

Remove and Replace

B

S L

O P

E S

L O

P E

S L

O P

E S

L O

P E

SLOPE

4:1

SLOPE

5:1

S L

O P

E

S L

O P

E S

L O

P E

S L

O P

E

S L

O P

E

S L

O P

E

S L

O P

E

X

X

X

X

49.50

49.90

49.20

X

49.20

X 49.50

X 49.50

X 49.50

X49.90

34.50 X

W

X 49.90

(C)

(C)

C

(F)

5(F

H

P

X

L.P.

(F)

F

F

C

X

X

X

X

X

49.50

49.90

49.20

X

49.20

X 49.50

X 49.50

X 49.50

X49.90

34.50 X

W

X 49.90

S L

O P

E S

L O

P E

S L

O P

E S

L O

P E

SLOPE

4:1

SLOPE

5:1

S L

O P

E

S L

O P

E S

L O

P E

S L

O P

E

S L

O P

E

S L

O P

E

S L

O P

E

D

C B

C B

C B

C

D

050 50 100

SCALE: 1"=50’

as appropriate perimeter of work site

Fence barrier around

Establish Chain Link

29.3

30.4

30.5

30.7

30.7

30.9

31.0

31.1

31.1

31.2

31.2

31.2

31.2

31.3

31.4

31.6

31.6

31.6

31.7

31.8

31.8

31.8

31.8

31.8

31.9

31.9

31.9

32.1

32.1

32.1

32.2

32.2

32.2

32.2

32.3

32.432.4

32.4

32.5

32.6

32.7

32.7

32.7

32.8

32.8

32.8

32.8

32.8

32.8

32.9

32.9 vinyl fence (100LF)

Remove and Replace

33.1

33.1

33.1

33.1

33.2

33.2

33.5

33.5

33.6

33.6

33.7

33.7

33.7

33.7

33.8

33.8

34.2

34.2

34.3

34.3

34.5

34.6

34.7

35.1

35.2

35.4

36.1

37.9

38.3

38.6

38.7 fence (150LF)

4’ chain link

Remove and replace

39.1

39.2

39.3

39.9

40.1

40.1

40.2

40.2

40.2

40.4

40.5

40.5

40.6

40.8

40.8

40.9

41.2

41.4

41.6

42.3

42.3

42.6

42.8

42.9

43.2

43.3

43.4

43.4

43.4

43.6

44.1

44.1

44.2

44.5

44.5

44.6

44.7

44.8

44.8

45.7

46.0

46.2

46.6

47.1 47.2

48.1

49.8

Replace Shed

Remove and

Replace Shed

Remove and 5%

16.7

40.3

@ 0.62%

V E

E S

Y S

T E

M P

R O

F

IL

E

C-201

G B S

E G

B

B

C .d g n

N A

S N

A S

N A

S

025 25 50FT

SCALE: 1"=25’

12.5

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

El 51.50 Sta 29+30 B-1 Levee End of Existing

S t a o p l

L e v e n s t r u c t i o n

B e g i g m e t

E l

P

I a

27+50

Existing 2’ Wide Swale

Transition 3’ Wide Swale into

Temporary Berm Tie-Off

Remove Existing B-1

28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

42.41 51.7034+49.0042.4451.6934+27.0019

42.44 51.6934+27.0042.1151.6834+05.0018

42.11 51.6834+05.0041.7751.6733+83.0017

41.77 51.6733+83.0041.4451.6733+61.0016

41.44 51.6733+61.0041.1151.6633+39.0015

41.11 51.6633+39.0040.7851.6533+17.0014

40.78 51.6533+17.0040.4551.6432+95.0013

40.45 51.6432+95.0040.1251.6332+73.0012

40.12 51.6332+73.0039.7951.6232+51.0011

39.79 51.6232+51.0039.4651.6232+29.0010

39.46 51.6232+29.0039.1251.6132+07.009

39.12 51.6132+07.0038.7951.6031+85.008

38.79 51.6031+85.0038.4651.5931+63.007

38.46 51.5931+63.0038.1351.5831+41.006

38.13 51.5831+41.0037.8051.5731+19.005

37.80 51.5731+19.0037.8051.5630+97.004

37.80 51.5630+97.0038.6451.5630+75.003

38.64 51.5630+75.0047.4451.5530+53.002

47.44 51.5530+53.00 -- 51.5430+31.001

El 51.54

Sta 30+42.73

End of B-2 Levee

S t a

F l o o d w a n s t r u c t i o n

B e g g m e

2.5

2.5

Monolith ID

S t a

F l o o d w a n s t r u c t i o n

E g m e

Existing

Grade -0.57%

Fill El. 37.8

Approx. Limits

S t a

C u t o f l l

S t a

C u t o l l

S t a

L e v n s t r u c t i o n

E g m e

27+50

Existing Grade

Trench Invert

Top El. 45

Approx. Swale Invert

Material Embankment

Overtopping Area B-1 Levee Protect Existing

S t a t t o m E x i s t i g w a l e to Design Grade Place Embankment Material on Sheet C-105 and replace to limits Remove Top Surface from Centerline Berm Offset construction work to be relocated by others prior to

Approx. Projected MCI conduit alignment,

3. Refer to Sheet S-201 for the Structural Profile.

2. Refer to Sheets C-103 and C-104 for Plan View information.

as part of the pre-survey and prior to clearing and grubbing operations.

1. The Contractor is responsible for surveying the as-built conditions

Notes:

BEGIN STATION END STATIONWALL EL. (FT)

BEGIN TOP OF

WALL EL. (FT)

END TOP OF

SEGMENT B-2 GENERAL FLOODWALL DATA

MONOLITH

WALL EL. (FT)

BEGIN TOE OF

WALL EL. (FT)

END TOE OF

BEGIN STATION END STATIONWALL EL. (FT)

BEGIN TOP OF

WALL EL. (FT)

END TOP OF

SEGMENT B-2 GENERAL FLOODWALL DATA

MONOLITH

WALL EL. (FT)

BEGIN TOE OF

WALL EL. (FT)

END TOE OF

2.5

2.5

2.5

0.50%

EX. SLOPE

2.5 2.5

10’

PLACING EMBANKMENT FILL

STRIP EXISTING TOPSOIL BEFORE

0 25 50 75 100-25-50-75-100

STA 23+00

(EXPOSED)

RIVERSIDE

PROTECTED

0 25 50 75 100-25-50-75-100

STA 23+50

(EXPOSED)

RIVERSIDE

PROTECTED

0 25 50 75 100-25-50-75-100

STA 24+00

(EXPOSED)

RIVERSIDE

PROTECTED

design elevations.

2. Refer to the Profile on Sheet C-201 for the levee

1. Refer to Sheet C-104 for the Site Plan.

NOTES:

NEW LEVEE

NEW LEVEE

PLACING EMBANKMENT FILL

STRIP 1’ BELOW TOPSOIL BEFORE

0.50%

EX. SLOPE

0.50%

EX. SLOPE

0.50%

EX. SLOPE

2.5

10’

NEW LEVEE

RESTORE SWALE

PAVE TOP OF LEVEE

RAISE TO EL. 50.54

EMBANKMENT FILL

EXISTING GRADE

EXISTING GRADE

RESTORE SWALE

PAVE TOP OF LEVEE

RAISE TO EL. 50.31

10’

EMBANKMENT FILL

EXISTING GRADE

EMBANKMENT FILL

RESTORE SWALE

PAVE TOP OF LEVEE

RAISE TO EL. 50.09

REMOVE PAVEMENT

REMOVE RIPRAP 9" D

REMOVE RIPRAP 9" D

REMOVE PAVEMENT

REMOVE PAVEMENT

0 10 10 20FT

SCALE: 1’’= 10’

N A

S

N A

S

G B S

E G

B

B

C .d g n

N A

S

C-301

L E

V E

E S

Y S

T E

M

C R

O S

S -S

E C

T

IO

N S

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

0 25 50 75 100-25-50-75-100

*STA 28+00

0 25 50 75 100-25-50-75-100

*STA 28+50

0 25 50 75 100-25-50-75-100

STA 29+00

10’

10’

3’ (typ.)

3’ (typ.)

2.5 2.5

2.5 2.5

2.5

Gr ad e

Gra de

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

PAVED TOP EL. 51.24

PAVED TOP EL. 51.34

PAVED TOP EL. 51.44

RESTORED LEVEE

2.5

REMOVE EX. PAVED B-1 LEVEE TOP

REMOVE EX. B-1 LEVEE

NOTES:

10’

0 10 10 20FT

SCALE: 1’’= 10’

2.5

2.5

RESTORED LEVEE

PLACING EMBANKMENT FILL

STRIP EXISTING TOPSOIL BEFORE

PLACING EMBANKMENT FILL

STRIP 1’ BELOW TOPSOIL BEFORE

RESTORED LEVEE

*Implement only if levee is damaged and requires repair.

design elevations.

2. Refer to the Profile on Sheet C-201 for the levee

1. Refer to Sheet C-104 for the Site Plan.

PLACING EMBANKMENT FILL

STRIP EXISTING TOPSOIL BEFORE

PLACING EMBANKMENT FILL

STRIP 1’ BELOW TOPSOIL BEFORE

EXISTING GRADE

(NOT SHOWN)

CONNECT TO EXISTING SWALE

EXISTING GRADE

SWALE BOTTOM

FILL TO EL. 40

SWALE BOTTOM

FILL TO EL. 40

EXISTING GRADE

EMBANKMENT FILL

REMOVE EX, GUIDERAIL

N A

S

N A

S

G B S

E G

B

B

C .d g n

N A

S

C-302

L E

V E

E S

Y S

T E

M

C R

O S

S -S

E C

T

IO

N S

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

0 25 50 75 100 125-25-50-75

STA 29+50

0 25 50 75 100-25-50-75

STA 30+00

10’

10’

3’

3’

8’

2.5

2.5

2.5

2.5

Gr ad e

Gr ad e

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

PAVED TOP EL. 51.51

PAVED TOP EL. 51.53

BERM TIE-OFF

REMOVE EX. SEG B-1

REMOVE EXISTING

B-1 LEVEE

NOTES:

for the levee and floodwall design elevations.

2. Refer to the Profiles on Sheet C-201 and Sheet S-201

1. Refer to Sheet C-104 for the Site Plan.

0 10 10 20FT

SCALE: 1’’= 10’

FILL TO EL. 40

EMBANKMENT FILL

EXISTING GRADE

BOTTOM

SWALE

EXISTING GRADE

EMBANKMENT FILL

BOTTOM

SWALE

FILL TO EL. 40

(8’ DEEP MIN)

INSPECTION TRENCH

REMOVE EX. LAYERED

GABION MATTRESS

N A

S

N A

S

G B S

E G

B

B

C .d g n

N A

S

C-303

L E

V E

E S

Y S

T E

M

C R

O S

S -S

E C

T

IO

N S

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

S

N A

S

G B S

E G

B

B

C .d g n

N A

S

C-304

L E

V E

E S

Y S

T E

M

C R

O S

S -S

E C

T

IO

N S

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

0 25 50 75 100-25-50-75

0 25 50 75

3’

3’

3’

3’ 5’

TOP EL. 51.57 TOP EL. 51.58

8’

8’

8’

2.5 2.5

Gr ad e

Gr ad e

Grade 1

2.5

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

-10

-10

STA 30+50

-10

-10

-10 -10

EL. 15

EL. -6

(EXPOSED) (EXPOSED)

EL. 15

EL. -6

EL. 15

EL. -6

STA 31+00

STA 31+50

EL. 34

EL. 34 EL. 34

5’

2.5

2.5

-30 -30 30

NOTES:

0 10 10 20FT

SCALE: 1’’= 10’

design elevations.

and Sheet S-201 for the levee and floodwall

2. Refer to the Profiles on Sheet C-201

1. Refer to Sheet C-104 for the Site Plan.

-25

BOTTOM

SWALE

EXISTING GRADE

EMBANKMENT FILL

FILL TO EL. 40

(8’ DEEP MIN)

INSPECTION TRENCH

BOTTOM

SWALE

FILL TO EL. 40

(8’ DEEP MIN)

INSPECTION TRENCH

BOTTOM

SWALE

(8’ DEEP MIN)

INSPECTION TRENCH

EL. 40

FILL TO

OF SWALE

3’ TOP

GRASSED PATH

GRASSED PATH

TOP EL. 51.55

(EXPOSED)

S

N A

S

G B S

E G

B

B

C .d g n

N A

S

C-305

L E

V E

E S

Y S

T E

M

C R

O S

S -S

E C

T

IO

N S

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

3’

3’

3’

’ 8

TOP EL. 51.60 TOP EL. 51.62

8’

8’

8’

2.5

2.5

2.5

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

3’

TOP EL. 51.66

8’

2.5

(EXPOSED)

RIVERSIDE

PROTECTED

-10

0 250

-10

-10

0 250

-10

-10

0-25-50 0

-10

-10

0 25-25-50 0

-10

(EXPOSED) (EXPOSED)

(EXPOSED)

EL. 15

EL. -6

EL. 15

EL. -6

EL. 15

EL. -6

EL. 15

EL. -6

STA 32+00

STA 32+50

STA 33+00

STA 33+50

EL. 34EL. 34

EL. 37

EL. 34.68

5’ 5’

5’ 5’

2.5

2.5

2.5

Gra de

-20 -20

NOTES:

design elevations.

and Sheet S-201 for the levee and floodwall

2. Refer to the Profiles on Sheet C-201

1. Refer to Sheet C-104 for the Site Plan.

0 10 10 20FT

SCALE: 1’’= 10’

BOTTOM

SWALE

PATH

GRASSED

PATH

GRASSED

BOTTOM

SWALE

PATH

GRASSED

BOTTOM

SWALE

PATH

GRASSED

BOTTOM

SWALE

INSPECTION TRENCH

(8’ DEEP MIN)

INSPECTION TRENCH

(8’ DEEP MIN)

INSPECTION TRENCH

(8’ DEEP MIN)

INSPECTION TRENCH

(8’ DEEP MIN)

TOP EL. 51.64

(EXPOSED)

S

N A

S

G B S

E G

B

B

C .d g n

N A

S

C-306

L E

V E

E S

Y S

T E

M

C R

O S

S -S

E C

T

IO

N S

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

TOP EL. 51.70

8’

8’

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

3’

8’

2.5

(EXPOSED)

RIVERSIDE

PROTECTED

-10

0-50 0

-10

-10

0 25-25-50 0

-10

-10

0 50-50 0

-10

(EXPOSED)

EL. 15

EL. -6

EL. 15

EL. -6

EL. 15

EL. -6

STA 34+00

STA 34+38

STA 34+49

40 40

EL. 37 EL. 37

EL. 37

23.5’

5’ 5’

2.5

2.5

0 10 10 20FT

SCALE: 1’’= 10’

40 40

EL. 45.0

TOP

NOTES:

for the levee and floodwall design elevations.

2. Refer to the Profiles on Sheet C-201 and Sheet S-201

1. Refer to Sheet C-104 for the Site Plan.

0 25-25 00

0000 25-25 00

INSPECTION TRENCH

(8’ DEEP MIN)

INSPECTION TRENCH

(8’ DEEP MIN)

INSPECTION TRENCH

(8’ DEEP MIN)

PATH

GRASSED

BOTTOM

SWALE

(EXPOSED)

TOP EL. 51.68

(EXPOSED)

TOP EL. 51.70

PATH

GRASSED

CUTOFF WALL

NORTHING

S 58°32’15" E 227 - 82045146.94638019.658

S 56°02’57" E 226 - 72045128.17638031.137

S 43°19’53" E 225 - 62045109.92638043.426

S 28°46’53" E 224 - 52045094.82638059.425

S 19°58’33" E 223 - 42045084.23638078.74

S 6°04’23" E 222 - 32045076.72638099.383

S 12°36’40" E 221 - 22045074.39638121.252

----------2045069.58638142.721

NORTHING

S 58°32’15" E 227 - 82045146.94638019.658

S 56°02’57" E 226 - 72045128.17638031.137

S 43°19’53" E 225 - 62045109.92638043.426

S 28°46’53" E 224 - 52045094.82638059.425

S 19°58’33" E 223 - 42045084.23638078.74

S 6°04’23" E 222 - 32045076.72638099.383

S 12°36’40" E 221 - 22045074.39638121.252

----------2045069.58638142.721

4 5

M H

R

IM

.0

7 X

FF

.73

42.

X

X

X

X

.50

.27

FF

3.6

R

IM

.6

A

L O

T

L O

T

L O

T

L O

T

B L

O C

K

F

C B

D R

Y W

E L L

IN

V

.1

MOVABLE

B

ALL

N

ET

V

IN

Y L

F E

N C

E

6’ C .L.

F.

V

IN

Y L

F E

N C

E

M H

6’ VINYL FENCE

C .L .F

V

IN

N C

E

5’ C.L.F.

C .L .F

C .L .F

A B

A N

D O

N E

D

M C I

LI

N E

,1

.1

"2

"1

" 2

4 5

A

B

C D E F G H I J K L

M

NA

B

C D E F G H I J K L

M

N

POINT EASTING COURSE DISTANCE (FT) BEARING

SHEETPILE CUTOFF ALIGNMENT TABLE

POINT EASTING COURSE DISTANCE (FT) BEARING

SHEETPILE CUTOFF ALIGNMENT TABLE

.3

.7

1.

.2

.8

.8

.9

.1

.1

.2

.2

.5

.6

.7

.7

.3

.4

N A

S

N A

S

N A

S

030 30 60

SCALE: 1"=30’

G B S

E G

B

B

C .d g n

C-107

A L

IG

N M

E N

T P

L A

N S

H E

E T P

IL

E C

U T

O F F

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

.8

.5

.8

.7

.0

S

N A

S

G B S

E G

B

B

C .d g n

N A

S

C-307

C R

O S

S -S

E C

T

IO

N S

C H

A N

N E

L B

E N

D T

R M

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

(EXPOSED)

RIVERSIDE

0 10 10 20FT

SCALE: 1’’= 10’

(EXPOSED)

RIVERSIDE

0+60

0+70

SECT A-A

SECT B-B

0000 25 50-25-50 00-75-90

(EXPOSED)

RIVERSIDE

-10 -10

00 25 50-25-50 00-75-90

0+60

0+70

SECT A-A

SECT B-B

00000-100

-95

00 0

BOTTOM OF CONCRETE CAP

EL. 34

BOTTOM OF CONCRETE CAP

EL. 34

EL. 16

SHEETPILE CUTOFF

PROTECTED

EL. 34

SHEETPILE CUTOFF

EL. 16

EL. 34

BOTTOM OF CONCRETE CAP

AWD (TYP.)

AWD (TYP.)

-10-10

S

N A

S

G B S

E G

B

B

C .d g n

N A

S

C-308

C R

O S

S -S

E C

T

IO

N S

C H

A N

N E

L B

E N

D T

R M

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

(EXPOSED)

RIVERSIDE

0 10 10 20FT

SCALE: 1’’= 10’

0+80

0+90

SECT C-C

SECT D-D

(EXPOSED)

RIVERSIDE

-10 -10

00 25 50-25-50 00-75-90

(EXPOSED)

RIVERSIDE

-10 -10

00 25 50-25-50 00-75-90

0+80

0+90

SECT C-C

SECT D-D

PROTECTED

EL. 34

BOTTOM OF CONCRETE CAP

EL. 34

SHEETPILE CUTOFF

EL. 16

SHEETPILE CUTOFF

EL. 34

EL. 16

EL. 34

BOTTOM OF CONCRETE CAP

S

N A

S

G B S

E G

B

B

C .d g n

N A

S

C-309

C R

O S

S -S

E C

T

IO

N S

C H

A N

N E

L B

E N

D T

R M

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

0 10 10 20FT

SCALE: 1’’= 10’

1+00

1+10

SECT E-E

SECT F-F

-10 -10

00 25 50-25-50 00-75-90

-10 -10

00 25 50-25-50 00-75-90

1+00

1+10

SECT E-E

SECT F-F

(EXPOSED)

RIVERSIDE

(EXPOSED)

RIVERSIDE

PROTECTED

PROTECTED

SHEETPILE CUTOFF

EL. 34

EL. 16

SHEETPILE CUTOFF

EL. 34

EL. 16

AWD (TYP.)

AWD (TYP.)

EL. 34

CONCRETE CAP

BOTTOM OF

EL. 34

CONCRETE CAP

BOTTOM OF

S

N A

S

G B S

E G

B

B

C .d g n

N A

S

C-310

C R

O S

S -S

E C

T

IO

N S

C H

A N

N E

L B

E N

D T

R M

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

0 10 10 20FT

SCALE: 1’’= 10’

1+20SECT G-G 1+30SECT H-H

1+40SECT I-I 1+50SECT J-J

-10 -10

00 25 50-25-50 00-75

1+20SECT G-G

-10 -10

00 25 50-25-50 00-75

1+30SECT H-H

-10 -10

00 25 50-25-50 00-75

1+40SECT I-I

-10 -10

00 25 50-25-50 00-75

1+50SECT J-J

(RIM 39.66)

FROM PLAN

RIM ELEV.

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

SHEETPILE CUTOFF

EL. 34

EL. 16

SHEETPILE CUTOFF

EL. 34

EL. 16

EL. 34

EL. 16

SHEETPILE CUTOFF

EL. 34

EL. 16

AWD (TYP.)

AWD (TYP.)

AWD (TYP.)

AWD (TYP.)

EL. 34

CONCRETE CAP

BOTTOM OF

EL. 34

CONCRETE CAP

BOTTOM OF

SHEETPILE CUTOFF

EL. 35.88

CONCRETE CAP

BOTTOM OF

EL. 36.03

CONCRETE CAP

S

N A

S

G B S

E G

B

B

C .d g n

N A

S

C-311

C R

O S

S -S

E C

T

IO

N S

C H

A N

N E

L B

E N

D T

R M

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

0 10 10 20FT

SCALE: 1’’= 10’

1+60SECT K-K 1+70SECT L-L

1+80SECT M-M 1+90SECT N-N

-10 -10

00 25 50-25-50 00-75

1+60SECT K-K

-10 -10

00 25 50-25-50 00-75

1+70SECT L-L

-10 -10

00 25 50-25-50 00-75

1+80SECT M-M

-10 -10

00 25 50-25-50 00-75

1+90SECT N-N

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

PROTECTED

(EXPOSED)

RIVERSIDE

SHEETPILE CUTOFF

EL. 34

EL. 16

SHEETPILE CUTOFF

EL. 34

EL. 16

SHEETPILE CUTOFF

EL. 34

EL. 16

SHEETPILE CUTOFF

EL. 34

EL. 16

AWD (TYP.)

AWD (TYP.)

AWD (TYP.)

AWD (TYP.)

EL. 36.18

CONCRETE CAP

BOTTOM OF

EL. 36.33

CONCRETE CAP

BOTTOM OF

EL. 36.48

CAP

CONCRETE

BOTTOM OF

EL. 36.18

CAP

CONCRETE

LEGEND:

TEMPORARY TURBIDITY BARRIER

SILT FENCE

INLET PROTECTION

S L

O P

E

32.00

30.00

X

32.00

X X

32.00

X

C B

C B

CB

CB

C B

C B

C B

MH

MH

Post

Post Post

Post Post

Post

Post

W

W

W

W

W

W

M H

M H

W

G V

W

MH

W

CB

C B

CB

CB

CB

B

IT

U M

P A

V E

M E

N T

B

IT

U M

P A

V E

M E

N T

8"(D)

16"(D)

13"(D)

BITUM. PAVEMENT

INV 35.59 (

IN)

INV 30.91

INV N.A.

RIM 39.2

G R

.9

IN

V

.5

O U

T

IN

V

.9

G

R

.9

GR 44.67

INV 30.79

(IN)

S

6" WATER

4" GAS

15" RCP

P

10" CIP

R

IM

.9

42" RCP

T E

R

RIM 38.1

INV N.A.

42" RCP

RIM 44.6

INV N.A.

RIM 43.2

INV 31.99

O/PIPE

INV 30.50

24" RCP

INV 30.67

O/PIPE

12" RCP 12" RCP

PAVED DWY.

PAVED DWY.

T E

R

T E

R

T E

R

12" RCP

INV 30.69

OUT

RIM 38.9

INV 35.10

IN

V

.1

IN

V

.1

INV 34.11

RIM 37.81

INV 36.62

IN

V

.6

IN

IN

V

.5

IN

IN

V

.6

IN

GR 41.30

INV 32.60 (OUT)

IN

V

.3

O

U T

G R

.5

12" CM

P

INV 32.98 (12")

18" RCP

IN

V

.4

IN

INV 32.62 (IN)

30"(D)

30"(D)

7"(D) 26"(D)

16"(D)

40"(D)

9"(D)

10"(D)

15"(D)

15"(D)

B

" A

SB.

D

19"(D)

(CAN’T OPEN)

INV 33.61

O/PIPE

INV 35.48 (

OUT)

P

O/PIPE

INV 31.96

(CAN’T OPEN)

(CAN’T OPEN)

8" VCP

42" RCP

P

ABUTMENT

ABUTMENT

1733GBT

BT444GRB

V

IN

N C

E

W O

IC

K

N C

E

6’ WOOD PICKET

6’ WOOD PICKET FENCE

W O

O D

P

IC

K E

T

F E

N C

E

6’ IRON FENCE

IR

N C

E

W O

K

N C

E

W O

K

N C

E

15"(D)

TRIPLET

INV.

.64

EDGE OF DECK

UP61462

UP61463

UP61465

UP6222

U P

NO#

NO#

U P

M B

U P

G B

0G B T

G U

YP

O

LE

61483GBT

61486GBT

61762GB

61487GBT

61488GBT

61489GBT

Wetland L imits

Woods

Woods

Woods

RIM 39.00

INV XX.XX

.1

.5

.9

.9

.5

.1

61732GBT

BT445GRB

VERITCAL PIPE

WATER

8" WATER

GR 37.66

GR 36.97

P

GR 37.13

15"

CMP

P

P

IC

K E

T

F

E N

C E

W O

INV. 33.44

15" RCP

A S

B T

DRAIN

8" ASBT.10"

ASB.

GR 37.66

INV 34.40

(IN)

INV 34.31 (

OUT)

IN

V

.3

IN

IN

V

.0

7INV 33.9

X

X

X

LOT 1

LOT 2

LOT 1

LOT 2

LOT 3

LOT 4

20’ JOINT MEETING SEWER R.O.W.

LOT 1

LOT 20

S A

N

IT

A

W

S E

M E

N T

(50’ R.O.W

(50’ R.O.W.)

(50’ R.O

.W.)

R .O .W

EXISTING LINE

E X

IS

T

E

E X

IS

T

E

EXISTING LINE

EXISTING LINE

LOT 3

LOT 4 LOT 5 LOT 6 LOT 7 LOT 8LOT 2

BLOCK 3

BLOCK 71-A

BLOCK 70-F

BLOCK 70-F

Iron Pipe (fd.)

TOWNSHI

P

OF

GREEN

BROOK

MI

DDLE

SEX

B

OROUGH

CB

CB

CB

W

W

S

S

S

MCI POST

6" WATER

RIM 40.24

INV 36.86

N

RIM 39.75

IN

V

.9 t e r

16 WAT.LINE END

12 WAT.LINE END

12 WAT.LINE END

RIM 38.24

6"

6"

14"

13"

16"

14"

13"&

W

E

,0

,3

E

,0

,5

E

,0

,6

N 638,250

N 638,400

N 638,100

N 637,800

N 637,800

N 637,650

E

,0

,0

E

,0

,2

E

,0

,5

E

,0

,3

E

,0

,2

E

,0

,0

N 637,950

N 638,100

N 638,250

E

,0

,9

E

,0

,9

N 638,400

N 637,650

E

,0

,6

19+00

21+00

22+00

23+00

24+00

25+00

26+00

S L

O P

E S

L O

P E

S L

O P

E S

L O

P E

S L

O P

E

S L

O P

E

S L

O P

E

D

C B

C B

C B

19+00

21+00

22+00

23+00

24+00

25+00

26+00

G R

E E

N B

R O

K

A D

STARLIT

D

RIV

E

LOUISE

AVENUE

STARLIT DRIVE

FLOW

TOWNSHI

P

OF

GREEN

BROOK

MI

DDLE

SEX

B

OROUGH

LOT 1

LOT 2

LOT 1

LOT 2

LOT 3

LOT 4

20’ JOINT MEETING SEWER R.O.W.

LOT 1

LOT 20

(50’ R.O.W

(50’ R.O.W.)

(50’ R.O

.W.)

R .O .W

LOT 3

LOT 4 LOT 5 LOT 6 LOT 7 LOT 8LOT 2

BLOCK 3

BLOCK 71-A

BLOCK 70-F

BLOCK 70-F

GREEN BROOK

GREENBROOK ROAD EAST

7 4

2 4

8 4

V

C

X

X

X

H

P

X

L.P.

X

N

60’

SCALE:1"= 30’

0 30’

O .G .M

W .S

TOP OF LEVEEGL-4 PUMP STATION

LIMIT OF CONTRACTORS WORKING AREA

FLOODWALL

GL-4 CONTROL BUILDING

DRAINAGE STRUCTURE NO. 10

R .U

T .C .M

(TYP.)

SEE SHEET CG502

SILT FENCE

SEE SHEET CG504

INLET PROTECTION

S H

E E

T C

G

S T

A

T C

H L

2’ WIDE GRASSED SWALE

LEVEE WEIR

C-103.

FOR PROPOSED DESIGN FEATURES, SEE SHEET 2.

CONTRACTOR WHEN NO LONGER REQUIRED.

ARE TEMPORARY AND SHALL BE REMOVED BY

ALL SEDIMENT AND EROSION CONTROL MEASURES 1.

NOTES:

ALONG TOP OF TOE DITCH

PLACE SILT FENCE

DRIVEWAY

EXISTING PAVED

PROPOSED STAGING AREA

C O

N T

R O

L P

L A

N

E R

O S

IO

N A

N D S

E D

IM

E N

T

CG101

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D A

N S I

D n o n P

W .d g n

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

31.0

31.6

31.8

31.8

32.4

32.7

32.9

33.6

33.7

33.8

34.1

34.2

34.5

34.6

35.1

MH

37.9

37.9

38.3

38.3

38.3

38.4

38.5

38.7

39.1

39.1

39.3

39.4

39.6

40.2

40.2

40.2

40.3

40.5

40.5

40.5

40.9

41.8

42.6

43.2

43.4

43.6

44.2

5% 16.7%

40.3

SEE SHEET CG503 (TYP.)

STABILIZED CONSTRUCTION ENTRANCE

SOIL STOCK PILE AREA

LEGEND:

TEMPORARY TURBIDITY BARRIER

SILT FENCE

INLET PROTECTION

S E

G M

E N

T B -2 L

E V

E E

S E

G M

E N

T B -1 L

E V

E E E

X

IS

T

IN

G

34+49

C B

CB

CB

M H

F la g

P ol e

P os t

P os t

P os t

P os t

MH

M H

M H

W

W

W

M H

P

IN

V

.8

R

IM

.5

G R

.9

STARLIT D

RIVE

IN

V

.9

IN

V

.9

U P

W e t la im it s

.01

INV

IN

V

.9

15" R

CP

IN

V

.9

R C P

G R

.8

RIM

.54

RCP

R

IM

.0

X

FF 42.73

41.85

42.02

X

X

X

X

X

41.

.50

FF

41.

X

X X

42.50

43.27

FF 43

.67

R

IM

.6

IN

V

N

A

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

R .O .W

E X

IS

T

E

E X

IS

T

E

B L

O C

K

F

B L

O C

K

F

Ir o n

P ip e fd

Ir o n

P ip e fd

P o s t

P o s t

W

S

S

S

S

MOVABLE

BALL

NET

4’ C.L.F.

C .L .F

V

IN

Y L

F

E N

C E

6’ C .L.F.

V

IN

N C

E

M

H 6’ VINYL FENCE

C .L .F

V

IN

Y L

F

E N

C E

5’ C.L.F.

C .L .F

C .L .F

A B

A N

D O

N E D

R

IM

.7

M C I

LI

N E

MCI

LIN

E

"1

" 1

"1

"1

N

60’

SCALE:1"= 30’

0 30’

O .G .M

W .S

R .U

T .C .M

TOP OF LEVEE

/2

/2

/1

/2

/1

/2

SHEET CG101

STA. 26+50

MATCH LINE

FLOODWALL

BARRIER SEE SHEET CG501

TEMPORARY TURBIDITY

SEE SHEET CG502

SILT FENCE (TYP.)

SEE SHEET C-301.

3. FOR TURF REINFORCEMENT MAT (TRM) DETAIL,

C-105.

FOR PROPOSED DESIGN FEATURES, SEE SHEET 2.

CONTRACTOR WHEN NO LONGER REQUIRED.

ARE TEMPORARY AND SHALL BE REMOVED BY

ALL SEDIMENT AND EROSION CONTROL MEASURES 1.

NOTES:

LIMIT OF FILL

LIMIT OF CONTRACTORS WORKING AREA

TEMPORARY ACCESS BERM TO BE REMOVED AND AREA TO BE REGRADED

SHEET PILE CUTOFF

C O

N T

R O

L P

L A

N

E R

O S

IO

N A

N D S

E D

IM

E N

T

CG102

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D A

N S I

D n o n P

W .d g n

IS

S

U E D

A T

E

X-000

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

N

,5

N

,1

N

,2

N

,4

0 E

,0

,2

E

,0

,6

N

,4

N

,2

N

,1

N

,9

E

,0

,6

E

,0

,9

E

,0

,5

E

,0

,10

E

,0

,8

E

,0

,8

N

,9

E

,0

,2

E

,0

,9

N

,8

N

,6

E

,0

,4

E

,0

,10

E

,0

,4

N

,6

N

,8

STARLIT D

RIVE

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

L O

T

R .O .W

E X

IS

T

E

E X

IS

T

E

B L

O C

K

F

B L

O C

K

F

Ir o n

P ip e fd

Ir o n

P ip e fd

+0

30+00 34+0030+50

31+00

.3

.4

.7

.7

.9

.9

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.1

1.1

1.1

1.1

1.2

1.2

1.2

1.3

1.4

1.4

1.4

1.4

1.6

1.5

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.7

1.7

1.7

1.7

.1

.2

.3

.3

.4

.4

31+50

.6

.7

.8

.8

.8

.8

.9

.9

.1

.1

.1

.1

.2

.2

.5

.5

.6

.7

.7

.7

.7

.7

.8

.8

.9

.0

.2

.3

.3

.3

.4

.6

.9

.9

.0

.4

.5

.1

.6

GRASSED SWALE

2’ WIDE

3’ WIDE GRASSED SWALE

EXIST. 2’ WIDE SWALE

7.

33+00

7.

7.

7.

.0

.3

.5

.6

.7

.7

.7

.7

.7

.9

.0

.17

.3

.5

.5

.6

.9

.9

.1

.1

.18

.4

.5

.6

.8

1.2

32+00

1.2

1.5

1.6

1.7

TURF REINFORCEMENT MAT (TRM)

.3

.8

.9

.1

.5

.7

.8

33+50

32+50

EROSION AND SEDIMENTATION CONTROL NOTES

FREEHOLD SOIL CONSERVATION DISTRICT

SOMERSET - UNION SOIL CONSERVATION DISTRICT

STANDARDS.

HYDRO-MULCH, AS OPPOSED TO STRAW, IS LIMITED TO OPTIMUM SEEDING DATES AS LISTED IN THE NJ

HYDRO-MULCH SHOULD BE APPLIED AT A RATE OF 1500 LBS. PER ACRE IN SECOND STEP. THE USE OF

CONTACT, AND GIVE A VISUAL INDICATION OF COVERAGE. UPON COMPLETION OF SEEDING OPERATION, LIME, ETC., ALONG WITH MINIMAL AMOUNTS OF MULCH TO PROMOTE CONSISTENCY, GOOD SEED TO SOIL

HYDRO SEEDING IS A TWO- STEP PROCESS. THE FIRST STEP INCLUDES SEED, FERTILIZER, 18.

CONSERVATION DISTRICT.

THAT ARISE AS A RESULT OF ONGOING CONSTRUCTION AT THE REQUEST OF THE SOMERSET-UNION SOIL

THE DEVELOPER SHALL BE RESPONSIBLE FOR REMEDIATING ANY EROSION OR SEDIMENT PROBLEMS 17.

CONSTRUCTION PROJECT.

CONTRACTOR IS RESPONSIBLE FOR KEEPING ALL ADJACENT ROADS CLEAN DURING LIFE OF 16.

COMPLIANCE. CONDITIONALS ARE ONLY ISSUED WHEN THE SEASON PROHIBITS SEEDING.

MULCHING TO THE NJ STANDARDS IS REQUIRED FOR OBTAINING A CONDITIONAL REPORT OF 15.

OWNERSHIP.

THE SOMERSET-UNION SOIL CONSERVATION DISTRICT SHALL BE NOTIFIED OF ANY CHANGES IN 14.

SEDIMENT CONTROL STANDARDS.

RE-CERTIFICATION. THE REVISED PLANS MUST MEET ALL CURRENT NJ STATE SOIL EROSION &

SUBMISSION OF REVISED SOIL EROSION AND SEDIMENT CONTROL PLANS TO THE DISTRICT FOR

ANY CHANGES TO THE CERTIFIED SOIL EROSION AND SEDIMENT CONTROL PLAN WILL REQUIRE THE 13.

DRAINAGE SYSTEM BECOMING OPERATIONAL.

CONDUIT OUTLET PROTECTION MUST BE INSTALLED AT ALL REQUIRED OUTFALLS PRIOR TO THE 12.

MUNICIPALITY.

ISSUING A REPORT OF COMPLIANCE FOR THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY BY THE

AROUND INDIVIDUAL LOTS IN SUBDIVISIONS, WILL HAVE TO BE COMPLETED PRIOR TO THE DISTRICT

BEEN COMPLIED WITH FOR PERMANENT MEASURES, ALL SITE WORK FOR SITE PLANS AND ALL WORK

BEFORE THE PROVISIONS OF THE CERTIFIED PLAN FOR SOIL EROSION AND SEDIMENT CONTROL HAVE

IN THAT NJSA 4:24-39 ET SEQ., REQUIRES THAT NO CERTIFICATE OF OCCUPANCY BE ISSUED 11.

NON-VEGETATIVE MEANS OF PERMANENT GROUND STABILIZATION WILL HAVE TO BE EMPLOYED.

COVER. IF THE REMOVAL OR TREATMENT OF THE SOIL WILL NOT PROVIDE SUITABLE CONDITIONS, PERMANENTLY ADJUST THE SOIL CONDITIONS AND RENDER IT SUITABLE FOR VEGETATIVE GROUND

ADEQUATE VEGETATIVE GROUND COVER, SHALL BE REMOVED OR TREATED IN SUCH A WAY THAT WILL

TO BE ACCOMPLISHED, ANY SOIL THAT WILL NOT PROVIDE A SUITABLE ENVIRONMENT TO SUPPORT

AT THE TIME WHEN THE SITE PREPARATION FOR PERMANENT VEGETATIVE STABILIZATION IS GOING 10.

ADVANCE OF ANY LAND DISTURBING ACTIVITY.

THE SOMERSET-UNION SOIL CONSERVATION DISTRICT SHALL BE NOTIFIED IN WRITING 48 HOURS IN 9.

STONE, AT ALL CONSTRUCTION DRIVEWAYS, IMMEDIATELY AFTER INITIAL SITE DISTURBANCE.

TRAFFIC CONTROL STANDARDS REQUIRE THE INSTALLATION OF A 50’X30’X6"PAD OF 1 1/2" OR 2" 8.

DAILY, AS THE INSTALLATION PROCEEDS (I.E.: SLOPES GREATER THAT 3:1)

ANY STEEP SLOPES RECEIVING PIPELINE INSTALLATION WILL BE BACKFILLED AND STABILIZED 7.

ACRE, ACCORDING TO THE NJ STATE STANDARDS.

COMBINATION WITH STRAW MULCH OR A SUITABLE EQUIVALENT, AT A RATE OF TWO (2) TONS PER

TO EROSION (I.E.: STEEP SLOPES, ROADWAY EMBANKMENTS) WILL RECEIVE A TEMPORARY SEEDING IN

IMMEDIATELY FOLLOWING INITIAL DISTURBANCE OR ROUGH GRADING ALL CRITICAL AREAS SUBJECT 6.

PRELIMINARY GRADING.

AREAS WHERE NO UTILITIES ARE PRESENT, THE SUB-BASE SHALL BE INSTALLED WITHIN 15 DAYS OR

OF IMPROVEMENTS IN ORDER TO STABILIZE STREETS, ROADS, DRIVEWAYS AND PARKING AREAS. IN

A SUB-BASE COURSE WILL BE APPLIED IMMEDIATELY FOLLOWING ROUGH GRADING AND INSTALLATION 5.

SEDIMENT CONTROL IN NEW JERSEY.

ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE NJ STATE STANDARDS FOR SOIL EROSION AND 4.

DAYS AFTER FINAL GRADING. MULCH WILL BE USED FOR PROTECTION UNTIL SEEDING IS ESTABLISHED

PERMANENT VEGETATION SHALL BE SEEDED OR SODDED ON ALL EXPOSED AREAS WITHIN TEN (10) 3.

STANDARDS

STRAW, OR EQUIVALENT MATERIAL, AT A RATE OF TWO (2) TONS PER ACRE, ACCORDING TO NJ STATE

PREVENTS THE ESTABLISHMENT OF A TEMPORARY COVER, THE DISTURBED AREAS WILL BE MULCHED WITH

CONSTRUCTION TRAFFIC, WILL IMMEDIATELY RECEIVE A TEMPORARY SEEDING. IF THE SEASON

ANY DISTURBED AREAS THAT WILL BE LEFT EXPOSED MORE THAN 30 DAYS AND NOT SUBJECT TO 2.

IS ESTABLISHED.

SOIL DISTURBANCES, OR IN THEIR PROPER SEQUENCE AND MAINTAINED UNTIL PERMANENT PROTECTION

ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE INSTALLED PRIOR TO ANY MAJOR 1.

PROJECT.

MAY OCCUR BELOW STORMWATER OUTFALLS OR OFFSITE AS A RESULT OF CONSTRUCTION OF THE THE PROPERTY OWNER SHALL BE RESPONSIBLE FOR ANY EROSION OR SEDIMENTATION THAT 18.

EROSION AND SEDIMENT CONTROL NOTE #6.

ALL SOIL STOCKPILES ARE TO BE TEMPORARILY STABILIZED IN ACCORDANCE WITH SOIL 17.

SQUARE FEET IS DISTURBED.

CONTROL PLAN MAY BE REQUIRED FOR THESE ACTIVITIES IF AN AREA GREATER THAN 5,000

EROSION AND SEDIMENT CONTROL PLAN. CERTIFICATION OF A NEW SOIL EROSION AND SEDIMENT LOCATED WITHIN THE LIMIT OF DISTURBANCE WILL REQUIRE CERTIFICATION OF A REVISED SOIL THE LIMIT OF DISTURBANCE ACCORDING TO THE CERTIFIED PLAN. STAGING AND STOCKPILES NOT STOCKPILE AND STAGING LOCATIONS ESTABLISHED IN THE FIELD SHALL BE PLACED WITHIN 16.

SHALL BE APPLIED AS REQUIRED BY THE STANDARD FOR DUST CONTROL.

UNTIL THE SURFACE IS WET, TEMPORARY VEGETATIVE COVER SHALL BE ESTABLISHED OR MULCH SHOULD THE CONTROL OF DUST AT THE SITE BE NECESSARY, THE SITE WILL BE SPRINKLED 15.

METHODS USED MUST BE IN ACCORDANCE WITH THE STANDARD FOR DEWATERING.

DURING ALL DEWATERING OPERATIONS TO MINIMIZE SEDIMENT TRANSFER. ANY DEWATERING

UNFILTERED DEWATERING IS NOT PERMITTED. NECESSARY PRECAUTIONS MUST BE TAKEN 14.

THE DRAINAGE SYSTEM BECOMING OPERATIONAL.

CONDUIT OUTLET PROTECTION MUST BE INSTALLED AT ALL REQUIRED OUTFALLS PRIOR TO 13.

WITH A PH OF 5 OR MORE, OR 24" WHERE TREES OR SHRUBS ARE TO BE PLANTED.

LBS/1,000 SQ FT OF SURFACE AREA) AND COVERED WITH A MINIMUM OF 12" OF SETTLED SOIL

PLACED OR BURIED WITH LIMESTONE APPLIED AT THE RATE OF 10 TONS/ACRE, (OR 450

SOIL HAVING A PH OF 4 OR LESS OR CONTAINING IRON SULFIDES SHALL BE COVERD ULTIMATELY IN ACCORDANCE WITH THE STANDARD FOR MANAGEMENT OF HIGH ACID PRODUCING SOILS, ANY 12.

HAVE TO BE EMPLOYED.

SUITABLE CONDITIONS, NON-VEGETATIVE MEANS OF PERMANENT GROUND STABILIZATION WILL

VEGETATIVE GROUND COVER. IFTHE REMOVAL OR TREATMENT OF THE SOIL WILL NOT PROVIDE

THAT IT WILL PERMANENTLY ADJUST THE SOIL CONDITIONS AND RENDER IT SUITABLE FOR

SUPPORT ADEQUATE VEGETATIVE GROUND COVER SHALL BE REMOVED OR TREATED IN SUCH A WAY GOING TO BE ACCOMPLISHED, ANY SOIL THAT WILL NOT PROVIDE A SUITABLE ENVIRONMENT TO

AT THE TIME THAT SITE PREPARATION FOR PERMANENT VEGETATIVE STABILIZATION IS 11.

(10) DAYS AFTER FINAL GRADING.

PERMANENT VEGETATION IS TO BE SEEDED OR SODDED ON ALL EXPOSED AREAS WITHIN TEN 10.

ONTO PUBLIC RIGHT-OF-WAYS WILL BE REMOVED IMMEDIATELY.

ALL SOIL WASHED, DROPPED, SPILLED, OR TRACKED OUTSIDE THE LIMIT OF DISTURBANCE OR 9.

POINTS SHALL BE BLOCKED OFF.

A MINIMUM LENGTH OF TEN FEET (1O’) EQUAL TO THE LOT ENTRANCE WIDTH. ALL OTHER ACCESS STABILIZED CONSTRUCTION ACCESS CONSISTING OF ONE INCH TO TWO INCH (1" -2") STONE FOR

CONSTRUCTION SITE. AFTER INTERIOR ROADWAYS ARE PAVED, INDIVIDUAL LOTS REQUIRE A

PAD OF CLEAN CRUSHED STONE AT POINTS WHERE TRAFFIC WILL BE ACCESSING THE

THE STANDARD FOR STABILIZED CONSTRUCTION ACCESS REQUIRES THE INSTALLATION OF A 8.

WITHIN FIFTEEN (15) DAYS OF THE PRELIMINARY GRADING.

AREAS. IN AREAS WHERE NO UTILITIES ARE PRESENT, THE SUB-BASE SHALL BE INSTALLED

INSTALLATION OF IMPROVEMENTS TO STABILIZE STREETS, ROADS, DRIVEWAYS, AND PARKING

A SUB-BASE COURSE WILL BE APPLIED IMMEDIATELY FOLLOWING ROUGH GRADING AND 7.

AND A MULCH ANCHOR, IN ACCORDANCE WITH STATE STANDARDS.

RECEIVE TEMPORARY SEEDING IN COMBINATION WITH STRAW MULCH OR A SUITABLE EQUIVALENT, SUBJECT TO EROSION (I.E. SOIL STOCKPILES, STEEP SLOPES AND ROADWAY EMBANKMENTS) WILL IMMEDIATELY FOLLOWING INITIAL DISTURBANCE OR ROUGH GRADING, ALL CRITICAL AREAS 6.

PER ACRE, ACCORDING TO THE STANDARD FOR STABILIZATION WITH MULCH ONLY.

WILL BE MULCHED WITH STRAW, OR EQUIVALENT MATERIAL, AT A RATE OF 2 TO 2 YI TONS

IFTHE SEASON PREVENTS THE ESTABLISHMENT OF TEMPORARY COVER, THE DISTURBED AREAS

SUBJECT TO CONSTRUCTION TRAFFIC, WILL IMMEDIATELY RECEIVE A TEMPORARY SEEDING.

ANY DISTURBED AREAS THAT WILL BE LEFT EXPOSED MORE THAN SIXTY (60) DAYS, AND NOT 5.

INCLUDING PROVISIONS FOR STABILIZATION AND SITE WORK.

TEMPORARY MEASURES FOR SOIL EROSION AND SEDIMENT CONTROL HAVE BEEN IMPLEMENTED,

PORTION THEREOF IS IN SATISFACTORY COMPLIANCE WITH THE SEQUENCE OF DEVELOPMENT AND CONDITIONS ON A LOT-BY-LOT OR SECTION-BY-SECTION BASIS, PROVIDED THAT THE PROJECT OR

REQUEST FROM THE APPLICANT, THE DISTRICT MAY ISSUE A REPORT OF COMPLIANCE WITH

CONTROL IN NEW JERSEY AND A REPORT OF COMPLIANCE HAS BEEN ISSUED. UPON WRITTEN

COMPLIANCE WITH THE CERTIFIED PLAN AND STANDARDS FOR SOIL EROSION AND SEDIMENT

BEFORE THE DISTRICT DETERMINES THAT A PROJECT OR PORTION THEREOF IS IN FULL

N.J.S.A 4:24-39 ET. SEQ. REQUIRES THAT NO CERTIFICATES OF OCCUPANCY BE ISSUED 4.

SEDIMENT CONTROL STANDARDS.

RE-CERTIFICATION. THE REVISED PLANS MUST MEET ALL CURRENT STATE SOIL EROSION AND

THE SUBMISSION OFREVISED SOIL EROSION AND SEDIMENT CONTROL PLANS TO THE DISTRICT FOR ANY CHANGES TO THE CERTIFIED SOIL EROSION AND SEDIMENT CONTROL PLANS WILL REQUIRE 3.

IS ESTABLISHED.

DISTURBANCE, OR IN THEIR PROPER SEQUENCE, AND MAINTAINED UNTIL PERMANENT PROTECTION ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES ARE TO BE INSTALLED PRIOR TO SOIL 2.

IN ADVANCE OF ANY SOIL DISTURBING ACTIVITY.

THE FREEHOLD SOIL CONSERVATION DISTRICT SHALL BE NOTIFIED FORTY-EIGHT (48) HOURS 1.

CERTIFICATION.

THE SOIL CONSERVATION DISTRICTS TO OBTAIN THE REQUIRED

SEQUENCING PLAN AS APPROVED BY THE CONTRACTING OFFICER TO

4. THE CONTRACTOR SHALL SUBMIT APPLICATION FEES AND FINAL

DISTRICT.

REPRESENTATIVE PRIOR TO NOTIFYING THE SOIL CONSERVATION

3. THE CONTRACTOR SHALL INFORM THE CONTRACTING OFFICER

REPRESENTATIVE.

MEASURES TO BE DETERMINED BY THE CONTRACTING OFFICER

2. OFFSITE SEDIMENT DISTURBANCE MAY REQUIRE ADDITIONAL CONTROL

REPRESENTATIVE.

OF APPLICATION AT THE REQUEST OF THE CONTRACTING OFFICER

CONFIRMATION OF LIME, FERTILIZER, SEED APPLICATION AND RATES

1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE

ADDITIONAL NOTES

(908)526-2701

BRIDGEWATER, NJ 08807

308 MILLTOWN ROAD

SOMERSET COUNTY 4-H CENTER

SOMERSET-UNION SOIL CONSERVATION DISTRICT

(732)683-8500

FREEHOLD, NJ 07728

4000 KOZLOSKI ROAD

(FOR MIDDLESEX COUNTY)

FREEHOLD SOIL CONSERVATION DISTRICT

H .M

R .O .U

W .S

T .C .M

N O

T E

S

E R

O S

IO

N A

N D S

E D

IM

E N

T C

O N

T R

O L

CG001

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D A

N S I

D n o n P

W .d g n

IS

S

U E D

A T

E

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

B O

R

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

N E

W Y

O R

K D

IS

T R

IC

T

N E

W Y

O R

K

N E

W Y

O R

K

New York District

S E

G M

E N

T B -2 C

O N

T R

A C

T

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

D E

S

IG

N E

D B

Y

SHEET OF

A

U G

U S

T

A

U G

TEMPORARY VEGETATIVE COVER FOR SOIL STABILIZATION

FOR

REQUIREMENT

I V.

FOR PERMANENT VEGETATION ARE DESCRIBED IN SPECIFICATION 32 92 19 SEEDING.

2. SEED MIXTURES, SEEDING RATES AND WOODY VEGETATION SPACING REQUIREMENTS

IS NO DANGER TO UNDERGROUND UTILITIES (CABLES, IRRIGATION, SYSTEMS, ETC.).

THERE HAS BEEN SOIL COMPACTION. THIS PRACTICE IS PERMISSIBLE ONLY WHERE THERE

C. IMMEDIATELY PRIOR TO SEEDING, THE SURFACE SHALL BE SCARIFIED 6" TO 12" WHERE

CONTOUR. CONTINUE TILLAGE UNTIL A REASONABLE UNIFORM SEEDBED IS PREPARED.

THE FINAL HARROWING OR DISCING OPERATION SHOULD BE ON THE GENERAL

OF 4 INCHES WITH A DISC, SPRINGTOOTH HARROW, OR OTHER SUITABLE EQUIPMENT.

B. WORK LIME AND FERTILIZER INTO THE SOIL AS NEARLY AS PRACTICAL TO A DEPTH

1 45LOAMY SAND, SAND

2 90SANDY LOAM, LOAM, SILT LOAM

3 135CLAY, CLAY LOAM, AND HIGH ORGANIC SOIL

SOIL TEXTURE TONS/ACRE LBS/1000 SQ. FT.

LIMESTONE APPLICATION RATE BY SOIL TEXTURE

LIMESTONE APPLICATION.

GRASSES AND LEGUMES. THE TABLE BELOW IS A GENERAL GUIDELINE FOR

TO NEUTRALIZE SOIL ACIDITY AND SUPPLY CALCIUM AND MAGNESIUM TO

EQUIVALENT AND STANDARD FOR MEASURING THE ABILITY OF LIMING MATERIALS

BELOW AND THE RESULTS OF SOIL TESTING. CALCIUM CARBONATE IS THE

INDICATES OTHERWISE. APPLY LIMESTONE IN ACCORDANCE WITH THE TABLE

EQUIVALENT WITH 50% WATER INSOLUBLE NITROGEN UNLESS A SOIL TEST

POUNDS PER ACRE OR 11 POUNDS PER 1,000 SQUARE FEET OF 10-20-10 OR

EXTENSION OFFICES. FERTILIZER SHALL BE APPLIED AT THE RATE OF 500

SOIL SAMPLE MAILERS ARE AVAILABLE FROM THE LOCAL RUTGERS COOPERATIVE

RECOMMENDATIONS SUCH AS OFFERED BY RUTGERS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .