SUBMITTAL REGISTER

View the file

Other files

File Type Posted
W912DS-13-B-0003_Amend_0006.pdf PDF
Plans_-_Amendment__5.pdf PDF
W912DS-13-B-0003_Amend_0005.pdf PDF
Appendix_T_-_FY13_Sealift_Rates_-_Amendment__5.pdf PDF
Specs_-_Amendment__5_(MTOC).pdf PDF
Plans_-_Amendment__4.pdf PDF
Specs_01_33_00_4_(Submittal_Register).pdf PDF
Specs_23_09_23_4.pdf PDF
Specs_-_Amendment__4_(MTOC).pdf PDF
W912DS-13-B-0003_Amend_0004.pdf PDF
Amendment_0003.pdf PDF
Plans_-_Amendment__2.pdf PDF
Appendix_M_-_DBA_Waiver_-_Amendment__2.pdf PDF
W912DS-13-B-0003_Amend_0002.pdf PDF
W912DS-13-B-0003_Amend_0001.pdf PDF
SF24-98_Bid_Bond.pdf PDF
Plans_-_Amendment__1.pdf PDF
Package_2_-_FY13_Thule_Dorm_48_Person_-_Plans.pdf PDF
Package_3_-_FY13_Thule_Dorm_48_Person_-_CID.pdf PDF
Appendix_S_-_Foundations_Governing_Forces.pdf PDF
Appendix_B_-_NFS_Material_Borrow_Site.pdf PDF
W912DS-13-B-0003_Solicitation.pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Appendix_P_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_Q_-_Shipping_Rates_Gov_Furnished_Transport.pdf PDF
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_M_-_DBA_Waiver.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_N_-_FY13_Thule_Dorm_Topo_Survey.dwg DWG drawing
Appendix_R_-_Geotechnical_Investigation.pdf PDF
Appendix_O_-_Survey_Photos_of_Project_Site.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Package_1_-_FY13_Thule_Dorm_48_Person_-_Specs.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 72 PAGES

FY13 Dormitory (48 Person), Thule AB, Greenland

01 32 01.00 18 G ROInitial Project Schedule G ROPreliminary Project Schedule G ROPeriodic Project Schedule G RONarrative Report

01 32 01.00 18 SD-07 Certificates Qualifications Statement

01 35 26 SD-01 Preconstruction Submittals

1.6 G ROAccident Prevention Plan (APP)

1.7 G ROActivity Hazard Analysis (AHA)

1.6.1 G ROCrane Critical Lift Plan

1.5.1.2 G ROCrane Operators

SD-06 Test Reports 1.11Reports 1.11.1Accident Reports 1.11.3Monthly Exposure Reports 1.11.4Crane Reports

Gas Protection SD-07 Certificates

1.8Confined Space Entry Permit 1.8Hot work permit

01 45 04.00 18 SD-01 Preconstruction Submittals G ROContractor Quality Plan (CQC)

01 52 60.00 18 SD-01 Preconstruction Submittals G ROConstruction Indoor Air Quality

(IAQ) Management Plan SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 72 PAGES

01 52 60.00 18 Photographs G ROFiltration Media

SD-11 Closeout Submittals G ROConformance with IAQ

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 G ROEnvironmental Protection Plan

01 74 19 SD-01 Preconstruction Submittals

1.6 G ROWaste Management Plan

SD-11 Closeout Submittals 1.7Records

01 78 00.00 18 SD-03 Product Data G ROAs-Built Record of Equipment and Materials Warranty Management Plan Warranty Tags Final Cleaning Spare Parts Data

SD-08 Manufacturer’s Instructions Preventative Maintenance Condition Monitoring (Predictive Testing) Inspection Posted Instructions

SD-10 Operation and Maintenance Data

G ROOperation and Maintenance Manuals

SD-11 Closeout Submittals G RORecord Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 72 PAGES

01 78 00.00 18 G ROCertification of EPA Designated Items

G ROInterim Form DD1354 G ROChecklist for Form DD135 G RONAVFAC Sustainable & Energy

Data Record Card 03 20 00.00 10 SD-02 Shop Drawings

3.1 G ROReinforcement

SD-03 Product Data Welding

SD-07 Certificates 2.3Reinforcing Steel

03 30 00 SD-02 Shop Drawings 1.6.1.1Fabrication Drawings 1.6.1.2Formwork 1.6.1.2Formwork

1.6.1.3 G ROReinforcing steel

SD-03 Product Data 2.4.6Materials for curing concrete 2.4.9Joint sealants 2.4.8Joint filler 2.1.2Plastic Forms 2.1.3Carton Forms 2.4.3.2Recycled Aggregate Materials 2.4.1Cement 2.4.1.3Portland Cement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 72 PAGES

03 30 00 2.3.2Ready-Mix Concrete 2.6Bonding Materials 2.7Floor Finish Materials 2.3.3Concrete Curing Materials 2.5Reinforcement 1.6.1.1Reinforcement Materials 2.7.1Liquid Chemical Floor Hardener 2.4.10Epoxy bonding compound

Waterstops 2.1.1Wood Forms 1.8.1Local/Regional Materials 2.4.11Biodegradable Form Release

Agent SD-05 Design Data

2.3.1 G ROmix design

SD-06 Test Reports

1.6.3.1 G ROConcrete mix design

1.6.3.2Fly ash 1.6.3.2Pozzolan 1.6.3.3Ground granulated blast-furnace slag Aggregates

3.9.2.1Tolerance report 3.11.2.3Compressive strength tests 3.11.2.5Unit weight of structural lightweight concrete

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 72 PAGES

03 30 00 2.8.4Slump 2.8.1Air Entrainment

SD-08 Manufacturer’s Instructions 1.6.3.2Fly ash 1.6.3.3Ground granulated blast-furnace slag 1.10Welding Procedures 1.10Welding Procedures 2.5.7Steel Bar 1.10Welder Qualifications

03 40 00.00 10 SD-01 Preconstruction Submittals

1.4.1.2 G ROQuality Control Procedures

SD-02 Shop Drawings

1.2.1 G ROStandard Precast Units

1.2.2 G ROCustom-Made Precast Units

SD-03 Product Data

1.2.1 G ROStandard Precast Units

1.2.3 G ROProprietary Precast Units

3.1.3 G ROEmbedded Items

2.1.10 G ROAccessories

SD-05 Design Data

1.2.2 G RODesign Calculations

1.2.5.1 G ROConcrete Mix Proportions

SD-06 Test Reports

1.4.1.2 G ROTest Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 72 PAGES

03 40 00.00 10 1.4.1.2 G ROQuality Control Procedures 03 41 16 SD-02 Shop Drawings

1.3Fabrication Drawings 1.3Installation Drawings 2.1.1Precast Concrete Slabs

Cast-in-Place Curb Units SD-03 Product Data

2.1.1Precast Concrete Slabs Packaged Concrete Materials

2.5Absorption Cover 2.5Moisture-Retaining Cover

SD-05 Design Data 2.1.1Precast Concrete Slabs

SD-06 Test Reports 2.1.1Test Reports 2.1.1Strength Tests

SD-07 Certificates 2.1.1Precast Concrete Slabs

Clips 2.2Threaded Fasteners 2.3Cement Grout Joint Sealing

Materials Bituminous Joint Sealing Materials

SD-08 Manufacturer’s Instructions 2.1.1Installation Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 72 PAGES

05 05 23 SD-03 Product Data

1.5 G ROWelding Procedure Qualifications

1.5.4Welder, Welding Operator, and

Tacker Qualification 1.5.5Inspector Qualification 1.5.1Previous Qualifications 1.5.2Pre-qualified Procedures

SD-06 Test Reports 3.2Quality Control

Quality Assurance 05 12 00 SD-02 Shop Drawings

1.5.2.1 G DOErection Plan

1.5.1 G DOFabrication drawings

SD-03 Product Data 2.4Shop primer

2.2.5 G DOLoad indicator bolts

SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers

SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 2.4Shop Primer 2.3.1Welding Electrodes and Rods 2.3.2Nonshrink Grout 2.5Galvanizing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 72 PAGES

05 12 00 1.5.2.2Welding procedures and qualifications

05 21 19 SD-02 Shop Drawings

1.5.1 G ROSteel joist framing

SD-07 Certificates G ROSteel joist

05 30 00 SD-02 Shop Drawings

1.3.5 G ROFabrication Drawings

SD-03 Product Data

2.2 G ROAccessories

2.3.1 G RODeck Units

2.2.10 G ROMechanical Fasteners

SD-05 Design Data

2.3.1 G RODeck Units

2.2 G ROAccessories

SD-07 Certificates G ROWelding Procedures

1.3.4.1 G ROFire Safety

G ROQualification of Welders

2.3.1 G RODeck Units

2.2 G ROAccessories

1.3.4.2 G ROWind Storm Resistance

05 40 00 SD-02 Shop Drawings

1.6.1 G DOFraming Components

SD-03 Product Data 2.1studs,joists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 72 PAGES

05 40 00 SD-05 Design Data

1.6.2 G DOMetal framing calculations

SD-07 Certificates 1.4Load-bearing cold-formed metal framing 3.1.1Welds

05 50 13 SD-02 Shop Drawings G ROFloor gratings G ROGalvanized Steel Fence/Security

Grille SD-03 Product Data

2.3Access doors and panels Cover plates and frames

2.4Control-joint covers Galvanized Steel Fence/Security Grille

Expansion joint covers Floor gratings Structural steel door frames

SD-04 Samples Expansion joint covers

2.4Control-joint covers 05 50 14 SD-02 Shop Drawings

1.4.2 G RODetail Drawings

SD-03 Product Data

2.2.2.1 G ROWelding of Structural Steel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 72 PAGES

05 50 14 1.4.1 G ROWelding of Aluminum G ROStructural Steel Welding Repairs

2.1.1Materials Orders 2.1.2Materials List 2.1.3Shipping Bill

SD-06 Test Reports 2.3Tests, Inspections, and

Verifications SD-07 Certificates

1.4.1Qualification of Welders and Welding Operators

2.2.2.3 G ROApplication Qualification for Steel

Studs

1.4.1 G ROWelding of Aluminum

05 51 00 SD-02 Shop Drawings

2.1Iron and Steel Hardware 2.1Steel Shapes, Plates, Bars and

Strips 2.16Metal Stair System

SD-03 Product Data 2.2Structural Steel Plates, Shapes, and Bars 2.3Structural Steel Tubing 2.6Hot-Rolled Carbon Steel Sheets and Strips 2.5Cold Finished Steel Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 72 PAGES

05 51 00 2.4Hot-Rolled Carbon Steel Bars 2.7Cold-Rolled Carbon Steel Sheets 2.8Galvanized Carbon Steel Sheets 2.9Cold-Drawn Steel Tubing 2.10Gray Iron Castings 2.11Malleable Iron Castings 2.13Concrete Inserts 2.14Masonry Anchorage Devices 2.17Protective Coating 2.18Steel Pan Stairs

Steel Stairs Steel Stairs, Circular

SD-07 Certificates 1.3Welding Procedures 1.3Welder Qualification

SD-08 Manufacturer’s Instructions 2.2Structural Steel Plates, Shapes, and Bars 2.3Structural Steel Tubing 2.6Hot-Rolled Carbon Steel Sheets and Strips 2.5Cold Finished Steel Bars 2.4Hot-Rolled Carbon Steel Bars 2.7Cold-Rolled Carbon Steel Sheets 2.8Galvanized Carbon Steel Sheets 2.9Cold-Drawn Steel Tubing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 72 PAGES

05 51 00 2.10Gray Iron Castings 2.11Malleable Iron Castings 2.17Protective Coating 2.14Masonry Anchorage Devices

05 52 00 SD-02 Shop Drawings

1.2.1 G ROFabrication Drawings

2.1 G ROIron and Steel Hardware

3.1 G ROIron and Steel Hardware

2.1Steel Shapes, Plates, Bars and

Strips 3.1Steel Shapes, Plates, Bars and

Strips SD-03 Product Data

1.2.1 G ROStructural Steel Plates, Shapes, and Bars

2.3 G ROStructural Steel Plates, Shapes, and Bars

1.2.1 G ROStructural Steel Tubing

2.4 G ROStructural Steel Tubing

1.2.1 G ROCold-Finished Steel Bars

2.6 G ROCold-Finished Steel Bars

1.2.1 G ROHot-Rolled Carbon Steel Bars

2.5 G ROHot-Rolled Carbon Steel Bars

1.2.1 G ROCold-Drawn Steel Tubing

2.7 G ROCold-Drawn Steel Tubing

1.2.1 G ROConcrete Inserts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 72 PAGES

05 52 00 2.9 G ROConcrete Inserts

1.2.1 G ROMasonry Anchorage Devices

2.10 G ROMasonry Anchorage Devices

1.2.1 G ROProtective Coating

2.12 G ROProtective Coating

1.2.1 G ROSteel Railings and Handrails

2.13 G ROSteel Railings and Handrails

1.2.1 G ROAnchorage and Fastening

Systems SD-07 Certificates

1.4.1 G ROWelding Procedures

1.4.2 G ROWelder Qualification

SD-08 Manufacturer’s Instructions

3.1 G ROInstallation Instructions

06 10 00 SD-03 Product Data Adhesives

SD-05 Design Data

1.9.2 G ROModifications of structural

members SD-06 Test Reports

1.4.3Preservative-treated SD-07 Certificates

1.11.2Forest Stewardship Council (FSC) Certification

1.9.3Certificates of grade 1.7Preservative treatment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 72 PAGES

06 10 00 SD-10 Operation and Maintenance Data

1.4.6Plastic 3.2Take-back program

SD-11 Closeout Submittals Local/Regional Materials Adhesives

1.11.1Certified Wood 1.11.2Certified Wood

06 20 00 SD-02 Shop Drawings 1.3Detail Drawings

SD-03 Product Data Wood

SD-04 Samples Moldings

2.2Fascias and Trim SD-07 Certificates

1.4Certificates of grade 1.4Certificates of compliance

06 61 16 SD-02 Shop Drawings

1.4.2 G RODetail Drawings

3.1 G ROInstallation

SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 72 PAGES

06 61 16 1.4.3Certification SD-04 Samples

2.1 G ROMaterial

2.3.6 G ROCounter and Vanity Tops

SD-06 Test Reports 2.1Solid polymer material

SD-07 Certificates 2.3Fabrications 1.4.1Qualifications

SD-10 Operation and Maintenance Data

3.2Clean-up 07 21 16 SD-03 Product Data

2.1Blanket insulation Sill sealer insulation

2.3Vapor retarder 2.4Pressure sensitive tape 2.5Accessories 1.3Certification

SD-08 Manufacturer’s Instructions 3.3.1Insulation

07 27 00.45 10 SD-03 Product Data

3.3 G DOBuilding Air Tightness Test

3.4.1 G DOThermography Test Procedures

SD-06 Test Reports 1.4.3Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 72 PAGES

07 27 00.45 10 3.3Building Air Tightness Test 3.4.2Thermography Test Report

SD-07 Certificates 1.6Air Barrier Inspector 1.5Building Air Tightness Test

Technician 07 41 13 SD-02 Shop Drawings

1.4.5 G RORoofing Panels

1.4.5 G ROFlashing and Accessories

SD-03 Product Data

2.1 G RORoof panels

1.4.5 G ROFactory-Applied Color Finish

2.4 G ROAccessories

1.4.5 G ROFasteners

1.4.5 G ROPressure Sensitive Tape

2.7 G ROUnderlayments

2.8 G ROGaskets and Sealing/Insulating

Compounds LEED Submittals Credit MR 4:

Product data indicating the following:

G ROa. Percentage by weight of post-consumer and pre-consumer recycled content

G ROb. Total weight of products provided

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 72 PAGES

07 41 13 G ROc. Include statement indicating costs for each product having recycled content

SD-04 Samples

2.1 G RORoof Panels

1.4.5 G ROFactory-applied Color Finish

2.4 G ROAccessories

1.4.5 G ROFasteners

1.4.5 G ROGaskets and Sealant/Insulating

Compounds SD-05 Design Data

1.2.1.2 G ROWind Uplift Resistance

SD-06 Test Reports

1.2.1.1Leakage Test Report 1.2.1.2Wind Uplift Test Report

Fire Rating Test Report 2.2Factory Finish and Color

Performance Requirements SD-07 Certificates

2.1 G RORoof Panels

1.4.1 G ROQualification of Manufacturer

1.4.2 G ROQualification of Applicator

SD-08 Manufacturer’s Instructions

G ROINSULATION

1.4.5 G ROINSTALLATION MANUAL

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 72 PAGES

07 41 13 SD-09 Manufacturer’s Field Reports

3.9.1Manufacturer's Field Inspection Reports

SD-11 Closeout Submittals 1.8Warranties 3.10Information Card 3.11Date Of Installation Wall-Mounted

Placard 07 41 63 SD-01 Preconstruction Submittals

1.5.1 G ROQualification of Manufacturer

1.5.3 G ROQualification of Manufacturer

1.5.1 G ROQualification of Installer

1.5.1Qualifications for Welding

SD-02 Shop Drawings

1.5.1 G RORoofing Panels

1.5.1 G ROFlashing and Accessories

G ROGutter/Downspout Assembly SD-03 Product Data

G ROInsulation Roof Panel (structural)

1.5.1 G ROCoil Stock

1.5.1 G ROFactory Color Finish

1.5.1 G ROSub-girts and Formed Shapes

1.5.1 G ROClosure Materials

1.5.1 G ROInsulation

1.5.1 G ROPressure Sensitive Tape

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 72 PAGES

07 41 63 1.5.1 G ROSealants and Caulking

1.5.1 G RORated Wall Assembly

1.5.1 G ROAccessories

SD-04 Samples

1.5.1 G ROCoil Stock

1.5.1 G RORoofing Panels

2.2.2 G ROFasteners

2.4.1 G ROMetal Closure Strips

1.5.1 G ROInsulation

1.5.1 G ROManufacturer s color charts and

chips SD-05 Design Data

1.5.1 G ROWind design analysis

1.5.1 G ROSeismic design analysis

SD-06 Test Reports

2.1.4 G ROtest reports

3.7.2 G ROLeakage Tests

1.5.1 G ROFire Rating Test Report

3.1 G ROCoatings and base metals of

metal roofing

1.5.1 G ROFactory Finish and Color

Performance Requirements

1.5.1 G ROWind Uplift Test Report

1.5.1 G ROSeismic Test Report

SD-07 Certificates

1.5.1 G ROCoil Stock

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 72 PAGES

07 41 63 2.2.2 G ROFasteners

1.5.1 G ROGalvanizing Repair Paint

1.5.1 G ROEnamel Repair Paint

SD-08 Manufacturer’s Instructions

1.5.1 G ROInstallation of Roof panel

assemblies SD-11 Closeout Submittals

1.8 G ROWarranty

3.10 G ROInformation Form and Placard

3.9.1 G ROManufacturer's field inspection

reports

1.5.1 G ROInstructions

1.5.1 G ROMaterial Safety Data Sheets

3.12 G RODate Of Installation Wall-Mounted

Placard

1.8.1 G RO20 year 'No-Dollar-Limit' warranty

for labor and materials 07 42 13 SD-01 Preconstruction Submittals

1.5.3 G ROQualification of Manufacturer

1.5.4 G ROQualification of Installation

Contractor

1.5.4.1 G ROQualification of Welders

1.8 G ROWarranty

SD-02 Shop Drawings

1.5.1.1 G ROInstallation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 72 PAGES

07 42 13 Recycled Content;

2.3.1 G ROWall Panels

2.3.2Factory Color Finish 1.5.5Closure Materials 2.6.4.4Pressure Sensitive Tape 2.6.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint 1.5.3.1Enamel Repair Paint 2.8Aluminized Steel Repair Paint 1.5.5Accessories 2.6Accessories

SD-04 Samples

2.3.1 G ROWall Panels

1.5.3.1 G ROFasteners

2.6.3 G ROMetal Closure Strips

G ROColor chart SD-05 Design Data

1.5.1.2 G ROWind load design analysis

SD-06 Test Reports

3.7.2 G ROLeakage Tests

1.3.2 G ROWind Load Tests

2.3.2.2 G ROCoating

2.3.2.2 G ROChalking

1.3.2 G ROSeismic Tests

SD-07 Certificates

1.5.3.1 G ROCoil Stock

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 72 PAGES

07 42 13 1.5.3.1 G ROFasteners

1.5.3.1 G ROGalvanizing Repair Paint

1.5.3.1 G ROEnamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3 G ROInstallation

SD-09 Manufacturer’s Field Reports

3.8.1 G ROManufacturer's Field Reports

SD-11 Closeout Submittals

1.8 G ROWarranty

1.5.6 G ROMaintenance Instructions

1.8.120 year 'No Dollar Limit' warranty for labor and material 07 60 00 SD-02 Shop Drawings

3.1.22 G ROCovering on flat, sloped, or

curved surfaces

3.1.23 G ROExpansion joints

3.1.15 G ROGravel stops and fascias

3.1.11 G ROBase flashing

3.1.12 G ROCounterflashing

3.1.24 G ROFlashing at roof penetrations

3.1.13 G ROReglets

G ROScuppers

3.1.27 G ROCopings

3.1.16 G RODrip edge

3.1.19Conductor heads

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 72 PAGES

07 60 00 3.1.20 G ROOpen valley flashing

3.1.21 G ROEave flashing

SD-11 Closeout Submittals 3.5Quality Control Plan

07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials

SD-07 Certificates 1.4.2Manufacturer's Technical

Representative 2.1Firestopping Materials 1.4.1Installer Qualifications 3.3Inspection

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-02 Shop Drawings

2.1 G RODoors

2.1 G RODoors

2.6 G ROFrames

2.6 G ROFrames

2.4Accessories 2.8Weatherstripping

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 72 PAGES

08 11 13 G RODoor Frames SD-03 Product Data

2.1 G RODoors

2.6 G ROFrames

2.4Accessories 2.8Weatherstripping

SD-04 Samples

2.10.4 G ROFactory-applied enamel finish

08 14 00 SD-02 Shop Drawings

2.1 G RODoors

SD-03 Product Data

2.1 G RODoors

2.2Accessories 2.3.7Water-resistant sealer 1.5warranty

2.1.2 G ROSound transmission class rating

G ROFire resistance rating 1.3Certification

SD-04 Samples 2.1Doors

2.3.6.3 G RODoor finish colors

SD-06 Test Reports 2.4Split resistance 2.4Cycle-slam 2.4Hinge loading resistance

08 53 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 72 PAGES

08 53 00 2.2.1 G ROWindows

2.2.1 G ROWindows

SD-03 Product Data

2.2.1 G ROWindows

2.4.8Fasteners 2.4.4Hardware 2.4.6Screens 2.4.5Weatherstripping 2.4.9Accessories 2.2.5Adhesives

Environmental Data SD-04 Samples

2.2.1 G ROWindows

SD-06 Test Reports

2.2.1 G ROWindows

SD-07 Certificates

2.2.1Windows SD-10 Operation and Maintenance Data

2.2.1 G ROWindows

1.6.1Plastic Identification

08 71 00 SD-02 Shop Drawings

1.3 G ROHardware schedule

2.3.5Keying system

SD-03 Product Data

2.3 G ROHardware items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 72 PAGES

08 71 00 SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.3 G ROHardware Schedule

SD-11 Closeout Submittals Key Bitting

08 81 00 SD-02 Shop Drawings Installation

SD-03 Product Data 1.6.1Insulating Glass 1.3Glazing Accessories

Environmental Data SD-08 Manufacturer’s Instructions

2.3Setting and sealing materials 3.2Glass setting

09 06 90 SD-04 Samples

2.2 G ROColor Schedule

09 22 00 SD-02 Shop Drawings

2.1 G ROMetal support systems

09 29 00 SD-03 Product Data Cementitious backer units Glass Mat Water-Resistant Gypsum Tile Backing Board

Water-Resistant Gypsum Backing Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 72 PAGES

09 29 00 Glass Mat Covered or Reinforced Gypsum Sheathing

Glass Mat Covered or Reinforced Gypsum Sheathing Sealant

Impact Resistant Gypsum Board 2.1.6Accessories 1.3Certification 2.1.1Gypsum Board 2.1.4Adhesives 2.1.3Joint Treatment Materials

SD-07 Certificates

2.1 G ROAsbestos Free Materials

SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets

SD-10 Operation and Maintenance Data

2.1Manufacturer maintenance instructions

Waste Management SD-11 Closeout Submittals

2.1.1Gypsum Board 2.1.4Adhesives

09 30 00 SD-02 Shop Drawings

1.4 G RODetail Drawings

SD-03 Product Data

2.1 G ROTile

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 72 PAGES

09 30 00 2.1 G ROTile

2.2 G ROSetting-Bed

2.4 G ROMortar, Grout, and Adhesive

2.2.6Reinforcing Wire Fabric 1.2.2Certification

SD-04 Samples

2.1 G ROTile

2.1.3 G ROAccessories

G ROMarble Thresholds

2.4 G ROGrout

SD-06 Test Reports 3.7Testing

SD-07 Certificates

2.1 G ROTile

2.4 G ROMortar, Grout, and Adhesive

SD-11 Closeout Submittals 2.1Tile 2.2.6Reinforcing Wire Fabric 2.4Adhesives

09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings

SD-03 Product Data 1.2.1Acoustical Ceiling Systems 1.4Certification

SD-04 Samples 2.1Acoustical Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 72 PAGES

09 51 00 2.1.1Acoustic Ceiling Tiles SD-06 Test Reports

1.2.1Fire Resistive Ceilings 1.2.2Ceiling Attenuation Class and

Test SD-07 Certificates

2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

09 65 00 SD-02 Shop Drawings

2.9 G ROResilient Flooring and

Accessories SD-03 Product Data

2.9 G ROResilient Flooring and

Accessories

2.5Adhesives Vinyl Composition Tile Sheet Vinyl Flooring Rubber Tile Rubber Sheet Flooring Solid Vinyl Tile Cement-Fiber Board

2.2Wall Base 2.3Stair Treads, Risers and

Stringers Environmental Data Sheet Linoleum

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 72 PAGES

09 65 00 Linoleum Tile Cork

1.4Certification SD-04 Samples

2.9 G ROResilient Flooring and

Accessories

SD-06 Test Reports

3.3 G ROMoisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2Surface Preparation 3.1Installation

SD-10 Operation and Maintenance Data

2.9 G ROResilient Flooring and

Accessories

SD-11 Closeout Submittals 2.9Resilient Flooring and

Accessories 2.5Adhesives

Sheet Linoleum Linoleum Tile Cork

09 68 00 SD-02 Shop Drawings 3.4Installation 2.5Moldings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 72 PAGES

09 68 00 SD-03 Product Data 2.1Carpet 2.3Carpet Cushion 2.5Moldings 3.1Surface Preparation 3.4Installation

1.4 G RORegulatory Requirements

2.1.1Physical Characteristics

SD-04 Samples 2.1Carpet 2.5Moldings

SD-06 Test Reports

3.2 G ROMoisture and Alkalinity Tests

SD-07 Certificates 2.1Carpet

SD-10 Operation and Maintenance Data

2.1Carpet 3.5Cleaning and Protection

Maintenance Service SD-11 Closeout Submittals

2.1Carpet 2.4Adhesives and Concrete Primer

09 72 00 SD-03 Product Data

2.1 G ROWall Coverings and Accessories

2.3Primer and Adhesive

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 72 PAGES

09 72 00 Vinyl Wall Covering 1.3Certification

SD-04 Samples

2.1 G ROWall Coverings and Accessories

2.1 G ROWall Coverings

SD-07 Certificates 2.1Wall Coverings and Accessories

SD-08 Manufacturer’s Instructions 2.1Wall Coverings and Accessories

SD-10 Operation and Maintenance Data

G ROVinyl Wall Covering 09 90 00 SD-02 Shop Drawings

Piping identification stencil

SD-03 Product Data 1.4.4Certification

Environmental Data 2.1Materials

2.1 G ROCoating

2.1Manufacturer's Technical Data

Sheets Sealant

SD-04 Samples

1.10 G ROColor

1.4.2 G ROTextured Wall Coating System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 72 PAGES

09 90 00 1.4.3 G ROSample Textured Wall Coating System Mock-Up

SD-07 Certificates 1.3Applicator's qualifications

1.4.1.2 G ROQualification Testing

SD-08 Manufacturer’s Instructions Application instructions

3.4.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

G ROCoatings 10 14 01 SD-02 Shop Drawings

3.1 G ROApproved Detail Drawings

SD-03 Product Data

3.1Installation

1.2 G ROExterior Signage

Wind Load Requirements SD-04 Samples

1.2 G ROExterior Signage

SD-10 Operation and Maintenance Data

3.1.2Protection and Cleaning 10 14 02 SD-02 Shop Drawings

1.2 G RODetail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 72 PAGES

10 14 02 SD-03 Product Data

3.1 G ROInstallation

SD-04 Samples 1.2Interior Signage

Software SD-10 Operation and Maintenance Data

3.1Approved Manufacturer's Instructions

3.1.2Protection and Cleaning 10 26 13 SD-02 Shop Drawings

2.2 G ROCorner Guards

G ROWall Guards (Bumper Guards) G RODoor Protectors G ROWall Covering/Panels

SD-03 Product Data 1.3Certification

SD-04 Samples 2.4Finish

SD-06 Test Reports 2.2Corner Guards

Wall Guards (Bumper Guards) Door Protectors Wall Covering/Panels

SD-07 Certificates 2.2Corner Guards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 72 PAGES

10 26 13 Wall Guards (Bumper Guards) Door Protectors Wall Covering/Panels

10 28 13 SD-03 Product Data 2.1.2Finishes 2.2Accessory Items

SD-04 Samples 2.1.2Finishes 2.2Accessory Items

SD-07 Certificates 2.2Accessory Items

SD-10 Operation and Maintenance Data Electric Hand Dryer

10 44 16 SD-01 Preconstruction Submittals 2.1Manufacturer's Data

SD-02 Shop Drawings 2.1Fire Extinguishers 2.4Accessories 2.5Cabinets

SD-03 Product Data 2.1Fire Extinguishers 2.4Accessories 2.5Cabinets 3.2.1Replacement Parts

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 72 PAGES

10 44 16 2.1Fire Extinguisher 2.1Cabinet

Wall Brackets 2.4Accessories

SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with

Inspection Tag 10 51 13 SD-02 Shop Drawings

2.1 G DOTypes

1.4 G DOLocation

3.1Installation 3.2Numbering system

SD-03 Product Data 2.2Material

Locking Devices Lock Control Chart Handles Finish

2.3components 3.1Assembly

SD-04 Samples

1.5.1 G DOColor chips

11 13 13 SD-02 Shop Drawings

1.4.1 G RODetail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 72 PAGES

11 13 13 G RODock Bumpers SD-04 Samples

2.2Fastening Materials 2.2Angles 2.2Rods 2.2Fastening Hardware

Dock Bumpers 2.2Rubber 2.2Rubberized Fabric

SD-07 Certificates 2.2Fastening Materials 2.2Rubberized Fabric 2.2Steel Angles 2.2Hardware Items

SD-11 Closeout Submittals

1.4.2 G RORecord Drawings

12 22 00 SD-02 Shop Drawings

1.3 G RODrawings

SD-03 Product Data 1.5Certification

SD-04 Samples

2.1.1.1 G RODrapery fabric

G ROMotor and Controller 3.2Finished drapery

SD-06 Test Reports 2.1.1.3Flame resistance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 72 PAGES

12 22 00 SD-08 Manufacturer’s Instructions 2.1.4Drapery hardware

Motor and Controller 2.2.1fabrication

SD-10 Operation and Maintenance Data

1.4 G RODrapery system

12 24 13 SD-03 Product Data

2.1Window Shades 1.4.5Certification

SD-04 Samples 2.1Window Shades

SD-06 Test Reports 2.1Window Shades

SD-08 Manufacturer’s Instructions 2.1Window Shades

SD-10 Operation and Maintenance Data

2.1Window Shades SD-11 Closeout Submittals Recycled Content (LEED)

1.4.4Shade Cloth (LEED) 13 48 00.00 10 SD-02 Shop Drawings

3.1Coupling and Bracing 3.3Flexible Couplings or Joints 1.3Equipment Requirements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 72 PAGES

13 48 00.00 10 1.2.4Contractor Designed Bracing

G RO;

SD-03 Product Data

3.1 G ROCoupling and Bracing

1.3 G ROEquipment Requirements

1.2.4 G ROContractor Designed Bracing

SD-07 Certificates 2.2Flexible Ball Joints

13 48 00 SD-02 Shop Drawings

3.1 G ROBracing

3.4 G ROResilient Vibration Isolation

Devices

1.3 G ROEquipment Requirements

SD-03 Product Data

3.1 G ROBracing

1.3 G ROEquipment Requirements

SD-06 Test Reports

3.3 G ROAnchor Bolts

21 13 13.00 10 SD-02 Shop Drawings 1.4.3Shop Drawings;

3.9As-Built Drawings

SD-03 Product Data 1.4.1Fire Protection Related

Submittals

2.3 G ROMaterials and Equipment

1.6Spare Parts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 72 PAGES

21 13 13.00 10 3.8 G ROPreliminary Tests

3.9 G ROFinal Acceptance Test

3.10 G ROOnsite Training

1.4.1 G ROFire Protection Specialist

1.4.2Sprinkler System Installer

SD-05 Design Data 1.4.3Sway Bracing 1.2.1.3Hydraulic Calculations

SD-06 Test Reports

3.8 G ROPreliminary Test Report

3.9 G ROFinal Acceptance Test Report

SD-07 Certificates 3.3Inspection by Fire Protection

Specialist SD-10 Operation and Maintenance Data

3.10Operating and Maintenance Manuals

22 00 00 SD-02 Shop Drawings

3.7.1 G ROPlumbing System

SD-03 Product Data 2.4Fixtures 2.4.2Flush tank water closets

Wall hung lavatories 2.4.4Kitchen sinks

Plastic bathtubs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 72 PAGES

22 00 00 2.9 G ROPumps

3.7.1.1 G DOBackflow prevention assemblies

2.6.2 G ROShower Faucets

3.7.1Plumbing System

SD-06 Test Reports 3.7Tests, Flushing and Disinfection

3.7.1.1 G ROTest of Backflow Prevention

Assemblies SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.7.1 G ROPlumbing System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 72 PAGES

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 72 PAGES

23 00 00 SD-02 Shop Drawings

1.4.5 G RODetail Drawings

SD-03 Product Data 2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible

Duct Runouts 2.9.1.2Duct Connectors

2.9.2 G RODuct Access Doors

2.9.3Fire Dampers

2.9.4 G ROManual Balancing Dampers

2.9.5 G ROManual Balancing Dampers

Automatic Smoke-Fire Dampers Automatic Smoke Dampers

2.9.10Sound Attenuation Equipment 2.9.10Acoustical Duct Liner 2.9.11.1Diffusers 2.9.11.2Registers and Grilles

Louvers Air Vents, Penthouses, and Goosenecks

2.10.1.1Centrifugal Fans 2.10.1.2In-Line Centrifugal Fans 2.10.1.3Axial Flow Fans 2.10.1.4Panel Type Power Wall

Ventilators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 72 PAGES

23 00 00 2.10.1.5Centrifugal Type Power Wall Ventilators

2.10.1.6Centrifugal Type Power Roof Ventilators

Propeller Type Power Roof Ventilators

Air-Curtain Fans 2.10.1.7Ceiling Exhaust Fans

2.11 G ROAir Handling Units

G ROCabinet Unit Heaters & Unit Heaters

2.12 G ROEnergy Recovery Devices

1.4.6Test Procedures

1.2.1.2 G RODiagrams

SD-06 Test Reports

3.12 G ROPerformance Tests

3.10 G RODamper Acceptance Test

SD-07 Certificates 1.4.1Bolts 1.4.7Certification

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions 3.14.2Operation and Maintenance

Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 45 OF 72 PAGES

23 00 00 SD-10 Operation and Maintenance Data

3.14.1Operation and Maintenance Manuals

2.9.3 G ROFire Dampers

2.9.4 G ROManual Balancing Dampers

2.9.5 G ROManual Balancing Dampers

G ROAutomatic Smoke-Fire Dampers G ROAutomatic Smoke Dampers

2.10.1.1 G ROCentrifugal Fans

2.10.1.2 G ROIn-Line Centrifugal Fans

2.10.1.3 G ROAxial Flow Fans

2.10.1.4 G ROPanel Type Power Wall

Ventilators

2.10.1.5 G ROCentrifugal Type Power Wall

Ventilators

2.10.1.6 G ROCentrifugal Type Power Roof

Ventilators G ROPropeller Type Power Roof

Ventilators

2.10.1.7 G ROCeiling Exhaust Fans

2.11 G…