Text version

W16ROE90852917

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Include a revised bid schedule for Task Order No. 0001 (Fire Station II) and Task Order No. 0002 (Child Development Center)

2) Include revisions to the Specif ications

3) Include answ ers to Contractor's Questions. FOR INFORMATIONAL PURPOSES ONLY.

4) Include Site Visit Sign-in sheets and Project Location Map

The proposal due date remains unchanged, 15 June 2009 at 2:00PM EST.

NOTE: Offerors must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, by telegram, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR PROPOSAL IN ACCORDANCE WITH THE LATE PROPOSAL, LATE MODIFICATION OF PROPOSAL, OR LATE WITHDRAWAL OF PROPOSAL (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-May-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-09-R-0012

X 9B. DATED (SEE ITEM 11)

14-May-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-May-2009

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-09-R-0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT NO. 0004

1. PRICE SCHEDULE

TASK ORDER NO. 0001

FIRE STATION II

FORT DRUM, NY

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum

All work required to design the Two Company Fire Station II.

FOB: Destination

NET AMOUNT

0002 1 Lump Sum

All work required to construct the Two Company Fire Station II.

0003 1 Lump Sum

All work required to construct the 6000 SF Storage Building.

ESTIMATED

ITEM NO SUPPLIES/SERVICES QUANTITY UNITS UNIT PRICE AMOUNT

0004 10 Cubic Yards

Petroleum Contaminated Soil All work required to remove and dispose off site of Petroleum Contaminated Soil in place quantity disposal per all State, Local and Federal Regulations.

Includes all testing, removal and disposal.

NOTE: This line item is provided in case Contaminated soil is discovered during Removal of the USTs.

0005 1 Lump Sum

All work required to complete demolition of buildings As identified in Appendix J; Drawing D-100, Demolition.

TOTAL BASE BID (LINE ITEMS 0001 thru 0005) $___________________________

TASK ORDER NO. 0002

CHILD DEVELOPMENT CENTER

FORT DRUM, NY

0001 1 Lump Sum

All work required to design the Child Development Center-under 6 years old.

0002 1 Lump Sum

All work required to construct the Child Development Center-under 6 years old.

0003 1 Lump Sum

Design and construct a Geothermal Building and Site Requirements Heating/Cooling System to include but not limited to the wells, pumps, distribution and control system, etc. to make for a complete and usable system. See requirements in preference number 3 in section 00 22 30.

1 Lump Sum

OPTION Option 1 - LEED GOLD: Design and build the facility to a meet LEED GOLD standards.

Provide external certifcation from USGBC (US Green Building Council) for a GOLD rating.

TOTAL BASE BID (LINE ITEMS 0001 & 0003) $___________________________

TOTAL OPTIONS (LINE ITEM 0004) $___________________________

TOTAL BASE BID INCLUDING OPTIONS

(LINE ITEMS 0001 through 0004) $___________________________

2. SPECIFICATIONS CHANGES

The following specifications have been REVISED and are NOT RE-ISSUED with this amendment:

CHANGES TO MATOC

Section 00 22 11 Paragraph 4.3 Change from “VOLUME 1 – PERFORMANCE CAPABILITY & PRO FORMA INFORMATION” to “VOLUME 1 – PERFORMANCE CAPABILITY”

Section 00 22 11 Paragraph 4.3 Change from “VOLUME 3 – PRICE” to “VOLUME 3 – PRICE

& PRO FORMA INFORMATION”.

CHANGES TO TASKS ORDER 0001 (PN 57711 Fire Station II)

Section 01 10 00 Paragraph 3.9: Change “Attachment A – The Army Standards for Fire Stations Construction (Draft)” to “Attachment A – The Army Standards for Fire Stations Construction”

Section 01 10 00 Pages 16 of 172 thru Pages 25 of 172 The Army Standard for Fire Stations, Delete the water mark “DRAFT” on each page.

Section 01 10 00 Paragraph 6.3.1.4: Drainage: Change first sentence from “Slope grade away from the exterior of all buildings at 1:10 for 20 feet to maintain positive site drainage.” to “Slope grade away from the exterior of all buildings to maintain positive site drainage.”

Section 01 10 00 Add the following paragraph under 6.3.3.3 Vehicular Circulation: “6.3.3.3.3:

Concrete Apron: The concrete apron on the north side of the site shall be 48”-0” long and on the south side shall be 5’-0” long.”

Section 01 10 00 Paragraph 6.4.6.3.1 Sanitary Sewer: Delete in its entirety and replace with the following: “6.4.6.3.1 Sanitary Sewer: Provide sewer connect as shown on drawing C-101 with connection to existing manhole.”

Section 01 10 00 Drawing A6 – HQ Delete in its entirety.

CHANGES TO TASKS ORDER 0002 (PN 69812 Child Development Center)

Section 01 10 00 Paragraph 6.3.1.3: Drainage: Change first sentence from “Slope grade away from the exterior of all buildings at 1:10 for 20 feet to maintain positive site drainage.” to “Slope grade away from the exterior of all buildings to maintain positive site drainage.”

Section 01 10 00 Appendix T Add the appropriate emblem to the Project Sign per guidelines provided in the “General Guidelines for Emblem and Logo Applications”, Version I.0, dated 20 Mar 09, an attachment to Amendment #4.

Section 01 10 00 Paragraph 6.3.1.3 Quantity Treatment: Delete ”If quantity treatment is required, than construct an appropriately size detention basin with a vinyl coated fence restricting access to the pond.” Add “Detention basin shall not be constructed unless required by the down stream analysis. If a detention basin is constructed a vinyl coated fence shall be erected restrict access to the pond.”

3. RESPONSES TO QUESTIONS AND ANSWERS SUBMITTED BY PROSPECTIVE

OFFERORS:

Reference MATOC Solicitation:

1. Question: With regards to the scheduled bid date - We are asking that the bid date be extended so that we have sufficient time to adequately decipher the above information.

Answer: Your other questions, which are listed below have little impact on you preparation of the proposal and no extension needs be provided.

2. Question: I would like to get clarification on what is considered Pro Forma Information.

Page 26 of 103 lists “Volume I – Performance Capability & Pro Forma Information” but the Elements listed for Volume I don’t seem to be Pro Forma type of information. Should Pro Forma materials be included with Volume 3?

Answer: Correct, will change under amendment 4.

3. Question: In a typical NY District ACOE design build RFP, the second to last 2 sentence of Pararaph 5.4.1.1 reads: Both the prime contractor and the design firm(s) shall each submit no more than five (5) projects. In the case where the Prime contractor adds 2 design firms (1 Architecture & 1 Engineering), can both of these design firms submit up to 5 projects sheets individually? Or are they limited to 5 total between them?

Answer: Both of the design firms can submit up to 5 projects.

4. Question: Is the Government looking for one (1) aggregate bid bond or two (2) separate bid bonds, one for each project?

Answer: The Government is looking for two separate bid bonds.

Reference Task Orders 0001 Fire Station & 0002 Child Development Center:

5. Question: Reference Task Order 1 and 2 - Fire Station and CDC NYSDEC Stormwater Design Manual, paragraph 4.8, describes the "10% Rule" to conduct downstream drainage analysis to determine if stormwater impacts resulting from the site development require quantity treatment. To conduct such analysis locations, sizes and elevations of drainage facilities (culverts, storm drains, inlets, open channels, etc.) that are downstream of the project site are required. Drawing C-100 does not indicate existing downstream drainage facilities nor depict how stormwater from the site is conveyed across Gasoline Alley (in the case of the Fire Station).

Can a larger overall topographic plan be provided that includes the existing downstream drainage facilities so that a drainage analysis as described in the NYSDEC Design Manual be performed to identify impacts on downstream facilities? Also, if downstream impacts exist due to the proposed development, will the contract limit lines be adjusted to include these improvements?

Answer: The topographical data and storm system structure information necessary to conduct the downstream analysis for both jobs will be provided upon award of the contract. Decisions with respect to improvements outside the current contract limits will be made upon completion of analysis prior to SWPPP submission.

6. Question: 6.3.1.4 (Fire Station) 6.3.1.3 (CDC) Drainage. Section requires a slope away from the exterior of buildings at 1:10 for 20 feet (2 ft drop plus the 6" from Fin Floor to grade). This requirement conflicts with maximum allowable pavement slope of 2.5% and maximum sidewalk slope of 5%. Can this requirement be modified to meet the program of both buildings?

Answer: These paragraphs will be corrected to delete the 1:10 for 20 feet.

Reference Task Order 0001 Fire Station:

7. Question: The package for the Fire Crash Rescue Station has two completely different drawings. One drawing indicates 3 Bays and the other 5 Bays. It is our understanding that the 5 Bay building will be considered and not the 3 Bay.

Answer: Correct, see paragraph 6.2.2 approved deviations and Amendment 4 for deletion of Drawing A6 – HQ.

8. Question: In regards to Force Protection - Will a "Progressive Collapse Design" be required?

Answer: Review the technical requirements of the RFP and the UFC for AT/FP.

9. Question: We are looking for a copy of the Ft. Drum Installation Design Guild.

Answer: All information required for this project from the Ft Drum Installation Design Guild is included in the RFP.

10. Question: Drawing C-100. Can the fence located along the west side of Fifth Street Middle be removed/relocated if it interferes with grading or potential stormwater detention pond?

Answer: The fence along the west side of Fifth Street Middle maybe removed and or relocated but temporary security and site controlled access must be maintained for the site located next to the fire station site during this period.

11. Question: Drawing C-100. What are the dimensions required for the concrete aprons located adjacent to the apparatus bays?

Answer: The concrete apron on the north side of the site shall be 48”-0” long and on the south side shall be 5’-0” long.

12. Question: Army Standard For Fire Stations, pg 17 of 172. Standard indicates the need for a service road/drive on the side of the building adjacent to the mechanical room with a controlled access point. Drawing C-100 does not indicate a service drive. Is one required?

Answer: Although not shown on the drawings it is still a requirement of the solicitation and must be provided.

13. Question: 6.4.6.3.1 Section indicates point of connection for sanitary sewer is east of Fifth Street Middle. Dwg C-101 indicates point of connection is west of Fifth Street West. Can the COE confirm if there is a preferred location, or if it is to be determined by the Contractor?

Answer: The drawing is correct and will revise paragraph 6.4.6.3.1 accordingly.

14. Question: The 22,438 square feet shown on the plan does not actually say this is the maximum gross square feet allowed for this building. There is just a number with the words SQ.

FT. It could be net or gross, maximum or minimum. Please clarify.

Answer: This is the maximum gross square footage.

15. Question: The Storage Building is shown as 6,000 square feet. Is the Storage building a Net Minimum or 6,000 square feet Gross maximum? Please advice.

Answer: This is the maximum gross square footage.

16. Question: Are there any PBC's involved with the demolition of the five (5) existing buildings?

Answer: I believe you are referring to PCB’s and no the light ballasts and all other items which may contain PCB’s will be removed prior to the contractor demolishing the buildings under this contract.

17 Question: We understand that the design of the FF&E is our responsibility, however, is the supply and install of the FF&E also ours?

Answer: Paragraph 2.4 indicates procurement in not included in this contract. Paragraph

6.5.2.3.7 requires the contractor to make final connects to workstations.

18. Question: Contaminated Soils: is the 10 cubic yards associated with the two (2) tanks being removed or in a different area?

Answer: Correct, it is for the two tanks being removed.

19. Question: Contaminated Soils: was the testing conducted and only uncovered 10 cubic yards of materials?

Answer: No test was conducted, this is only in case contaminated soil is found during excavation.

Reference Task Order 0002 Child Development Center:

20. Question: Sections 3.2.1.2 and The Army Standard For Child Development Centers, pg 21 and pg 87 discuss the need to provide safe passage for children from parked cars to the building entrance while minimizing crossing main vehicular travel lanes. Sidewalks are to be provided from the parked cars that lead directly to the entrance. Crosswalks are to be limited in use.

Drawing C-100 would require that all pedestrians would need to cross the main travel lane from the parking lot to the building. Please confirm that Drawing C-100 indicates the required parking/circulation configuration or if the COE will make modifications to reorient the parking so that pedestrians are not crossing the travel lane.

Answer: The drawings are identified as “concept drawings” and “not for construction”. The contractor may adjust the parking lot footprint to minimize pedestrian crossings of main vehicle traffic lanes as long as they remain in compliance with the solicitation.

21. Question: Reference Task Order 1 and 2 - Fire Station and CDC NYSDEC Stormwater Design Manual, paragraph 4.8, describes the "10% Rule" to conduct downstream drainage analysis to determine if stormwater impacts resulting from the site development require quantity treatment. To conduct such analysis locations, sizes and elevations of drainage facilities (culverts, storm drains, inlets, open channels, etc.) that are downstream of the project site are required. Drawing C-100 does not indicate existing downstream drainage facilities nor depict how stormwater from the site is conveyed across Gasoline Alley (in the case of the Fire Station).

Can a larger overall topographic plan be provided that includes the existing downstream drainage facilities so that a drainage analysis as described in the NYSDEC Design Manual be performed to identify impacts on downstream facilities? Also, if downstream impacts exist due to the proposed development, will the contract limit lines be adjusted to include these improvements?

Answer: The topographical data and storm system structure information necessary to conduct the downstream analysis for both jobs will be provided upon award of the contract. See Amendment 4, CDC, Task Order 002, Sec 01 10 00 Paragraph 6.3.1.3 Quantity Treatment.

(End of Summary of Changes)