This document contains a Cost Plus Incentive Fee contract template and information on a related federal contract opportunity with the U.S. Army Corps of Engineers.
The template outlines a Cost Plus Incentive Fee contract with no target cost, target fee, minimum fee, or maximum fee defined. It specifies sharing ratios of 75% for the government and 25% for the contractor if actual costs are below or above the target cost. The related federal contract opportunity is solicitation number W912DR18R0021 for decommissioning and disposal activities at the SM-1 Reactor Facility at Fort Belvoir, Virginia. The scope of work includes planning, engineering, construction, demolition, and support activities to decommission and dispose of deactivated nuclear reactor facilities. The U.S. Army Corps of Engineers Baltimore District is the contracting agency.
Attachment 5 - CPIF Model
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CPIF - Unprotected
RWW CPI with: Target Cost $0; Target Fee $0; Min Fee $0; Max Fee $0. Share 75/25 Under & 75/25 Over.
| Target Cost | $ - 0 | |||
| Target Fee %/$ | 0.00% | $ - 0 | ||
| Total Initial Funding Target | $ - 0 | |||
| Minimum Fee %/$ | ||||
| DAU User: Minimum fee must be less than target fee. | 0.00% | $ - 0 | ||
| Maximum Fee %/$ | ||||
| DAU User: Maximum Fee must be greater than target fee. | 0.00% | $ - 0 |
Assigned Shares DAU User: Shares assigned here take precedence over calculated shares below using optimistic and pessimistic values.
| Govt | / | Ktr | |||
| Under Target | 75.0% | / | 25.0% | ||
| Over Target | 75.0% | / | 25.0% |
Calculated Shares DAU User: For calculated shares to be used, any assigned shares above must be cleared.
| Cost | Fee |
| Optimistic |
DAU User: Optimistic cost must be less than target cost and optimistic fee must be greater than target fee.
Pessimistic DAU User: Pessimistic cost must be greater than target cost and pessimistic fee must be less than target fee.
DAU User: Minimum fee must be less than target fee.
DAU User: Maximum Fee must be greater than target fee.
DAU User: Shares assigned here take precedence over calculated shares below using optimistic and pessimistic values.
| Govt | / | Ktr | |
| Under Target | / | ||
| Over Target | / |
| Range of Incentive Effectiveness (RIE) | % of Target Cost | ||
| Cost at Maximum Fee: | $ - 0 | ERROR:#DIV/0! | |
| Cost at Minimum Fee: | $ - 0 | ERROR:#DIV/0! |
| Government CR Adjustments: | $ - 0 |
| MPC (Target cost, net adjustments): | $ - 0 |
Calculated Fee (FAR 52.216-10): $ - 0
Evaluated Cost to the Government: $ - 0
Enter your analysis notes here.
Dollar
| TC | $0 | ||||||||
| T-Fee | $0 | ||||||||
| Tentative Fee | $ - 0 | Govt | /Ktr | ||||||
| Min-Fee | $0 | 75% | 25% | Under | 75 | 25 | 75/25 Under | ||
| Max-Fee | $0 | 75% | 25% | Over | 75 | 25 | 75/25 Over | ||
| Final Cost - Fee Vertical | Final Cost - Fee Horizontal | ||||||||
| $ - 0 | 0 | 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Max Fee | $ - 0 | Max-Target-Min | Min Fee | $ - 0 | |||
| Left Scaler | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Scaler | $ - 0 | $ - 0 |
| 1.5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1.5 | $ - 0 | $ - 0 |
| RIE Left | $ - 0 | $ - 0 | Target-Min | ||||
| 2 | $ - 0 | 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | ||||||
| RIE Right | $ - 0 | $ - 0 | |||||
| $ - 0 | 0 | ||||||
| RIE | $ - 0 | $ - 0 | |||||
| 2 | $ - 0 | $ - 0 |
| Max-Target-Min | 0 | 0 | 0 | 0 | Max Fee $- | 0 | 0 | 0 | 0 | Min Fee $- | 0 | 0 | 0 | 0 | Target-Min | 0 | 0 | 0 | 0 | Final |
| 0 | 0 | 0 | 0 | Final Vertical | ||||||||||||||||
| 0 | 0 | 0 | 0 | RIE | 0 | 0 | 0 | 0 | RIE Right | 0 | 0 | 0 | 0 | RIE |
0 0 0 0 Analyst Notes
File details come from the government source that posted it. Updated .