This document contains a Cost Plus Incentive Fee contract template and information on a related federal contract opportunity with the U.S. Army Corps of Engineers.

The template outlines a Cost Plus Incentive Fee contract with no target cost, target fee, minimum fee, or maximum fee defined. It specifies sharing ratios of 75% for the government and 25% for the contractor if actual costs are below or above the target cost. The related federal contract opportunity is solicitation number W912DR18R0021 for decommissioning and disposal activities at the SM-1 Reactor Facility at Fort Belvoir, Virginia. The scope of work includes planning, engineering, construction, demolition, and support activities to decommission and dispose of deactivated nuclear reactor facilities. The U.S. Army Corps of Engineers Baltimore District is the contracting agency.

Attachment 5 - CPIF Model

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CPIF - Unprotected

RWW CPI with: Target Cost $0; Target Fee $0; Min Fee $0; Max Fee $0. Share 75/25 Under & 75/25 Over.

Target Cost$ - 0
Target Fee %/$0.00%$ - 0
Total Initial Funding Target$ - 0
Minimum Fee %/$
DAU User: Minimum fee must be less than target fee.0.00%$ - 0
Maximum Fee %/$
DAU User: Maximum Fee must be greater than target fee.0.00%$ - 0

Assigned Shares DAU User: Shares assigned here take precedence over calculated shares below using optimistic and pessimistic values.

Govt/Ktr
Under Target75.0%/25.0%
Over Target75.0%/25.0%

Calculated Shares DAU User: For calculated shares to be used, any assigned shares above must be cleared.

CostFee
Optimistic

DAU User: Optimistic cost must be less than target cost and optimistic fee must be greater than target fee.

Pessimistic DAU User: Pessimistic cost must be greater than target cost and pessimistic fee must be less than target fee.

DAU User: Minimum fee must be less than target fee.

DAU User: Maximum Fee must be greater than target fee.

DAU User: Shares assigned here take precedence over calculated shares below using optimistic and pessimistic values.

Govt/Ktr
Under Target/
Over Target/
Range of Incentive Effectiveness (RIE)% of Target Cost
Cost at Maximum Fee:$ - 0ERROR:#DIV/0!
Cost at Minimum Fee:$ - 0ERROR:#DIV/0!
Government CR Adjustments:$ - 0
MPC (Target cost, net adjustments):$ - 0

Calculated Fee (FAR 52.216-10): $ - 0

Evaluated Cost to the Government: $ - 0

Enter your analysis notes here.

Dollar

TC$0
T-Fee$0
Tentative Fee$ - 0Govt/Ktr
Min-Fee$075%25%Under752575/25 Under
Max-Fee$075%25%Over752575/25 Over
Final Cost - Fee VerticalFinal Cost - Fee Horizontal
$ - 000$ - 0
$ - 0$ - 0$ - 0$ - 0
Max Fee$ - 0Max-Target-MinMin Fee$ - 0
Left Scaler$ - 0$ - 0$ - 0$ - 0Scaler$ - 0$ - 0
1.5$ - 0$ - 0$ - 0$ - 01.5$ - 0$ - 0
RIE Left$ - 0$ - 0Target-Min
2$ - 00$ - 0$ - 0
$ - 0$ - 0
RIE Right$ - 0$ - 0
$ - 00
RIE$ - 0$ - 0
2$ - 0$ - 0
Max-Target-Min0000Max Fee $-0000Min Fee $-0000Target-Min0000Final
0000Final Vertical
0000RIE0000RIE Right0000RIE

0 0 0 0 Analyst Notes

File details come from the government source that posted it. Updated .