This attachment provides a bid schedule for the Decommissioning and Disposal Activities for the SM-1 Reactor Facility located at Fort Belvoir, VA. The bid schedule outlines both fixed-price and cost-plus-incentive-fee contract line items for project management and support services, site preparation, mobilization, demobilization, and project closure reporting. It also includes optional cost-plus-incentive-fee line items for infrastructure upgrades, asbestos abatement, area removal and decontamination, demolition, soil remediation, site restoration, and demolition of other structures. The total proposed price is requested to be provided for all fixed-price and cost-plus-incentive-fee tasks combined. Travel is designated as a cost-reimbursable item under the contract.
Attachment 3 - Bid Schedule
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised Bid Sheet
| Base Tasks | Contract Type | Target Cost | Price |
| 3.2 PROJECT MANAGEMENT AND SUPPORT SERVICES | |||
| 3.2.1- 3.2.6 PROJECT MANAGEMENT and WORK PLAN; (Excluding Travel)*** | FFP | $ - 0 | |
| TRAVEL (including Per Diem)*** | CR | $ - 0 | |
| 3.3 SITE PREPARATION | FFP | $ - 0 | |
| 3.4 MOBILIZATION | FFP | $ - 0 | |
| 3.7.1 INTERIM DEMOBILIZATION | FFP | $ - 0 | |
| 3.7.2 FINAL DEMOBILIZATION | FFP | ||
| 3.8 PROJECT CLOSURE REPORTING | FFP | $ - 0 |
| Option Tasks | Contract Type | Target Cost | Target Fee** | Min Fee** | Max Fee** | Price* |
| 3.5 BUILDING 372 DISPOSITION | $ - 0 | |||||
| 3.5.1 INFRASTRUCTURE UPGRADES | CPIF | |||||
| 3.5.2 ASBESTOS ABATEMENT | CPIF | $ - 0 | ||||
| 3.5.3 UNRESTRICTED AREA + HP MOD ROOM REMOVAL & DECON | CPIF | $ - 0 | ||||
| 3.5.4 RESTRICTED AREA M&E REMOVAL & DECONTAMINATION | CPIF | |||||
| 3.5.5 VESSEL CONTAINMENT (VC) M&E REMOVAL & DISPOSAL | CPIF | $ - 0 | ||||
| 3.5.6 UNRESTRICTED + HP MOD DEMOLITION | CPIF | $ - 0 | ||||
| 3.5.7 RESTRICTED AREA DEMOLITION | CPIF | $ - 0 | ||||
| 3.5.8 VESSEL CONTAINMENT (VC) DEMOLITION | CPIF | $ - 0 | ||||
| 3.5.9 SOIL REMEDIATION (UPPER SITE) | CPIF | $ - 0 | ||||
| 3.5.10 UPPER SITE RESTORATION | CPIF | $ - 0 | ||||
| 3.6 OTHER STRUCTURE DEMOLITION | $ - 0 | |||||
| 3.6.1 ENGINEERING (DEMO) | CPIF | $ - 0 | ||||
| 3.6.2 BUILDING 350/399 (LIFT STATION) DEMOLITION | CPIF | $ - 0 | ||||
| 3.6.3 INTAKE PIER DEMOLITION | CPIF | $ - 0 | ||||
| 3.6.4 BUILDING 349 (WAREHOUSE) DEMOLITION | CPIF | $ - 0 | ||||
| 3.6.5 LOWER SITE REMEDIATION | CPIF | $ - 0 |
Total Proposed Price (All FFP Tasks and CPIF Tasks) $ - 0
| ** Please insert one percentage fee rate |
| *** Travel is a Cost Reimbursable item that includes all loadings (excluding Fee) |
&"Times New Roman,Bold"&14SM-1 DRAFT Bid Schedule