W912DR-11-R-0033-0002 North Campus Amendment 2.pdf

PDF 28 KB Posted

Attached to
North Campus Electrical Utility Plant, Fort G Meade Maryland
Solicitation number
W912DR-11-R-0033
Issued by

About this file

The attached solicitation is hereby amended to provide answers to additional request for information and Provide general information to bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THE ABOVE REFERENCED SOLICITATION IS HEREBY AMENDED TO PROVIDE THE FOLLOWING:

1) ANSWERS ADDITIONAL REQUEST FOR INFORMATION (RFI)

2) PROVIDE INFORMATION TO BIDDERS

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jun-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-11-R-0033

X 9B. DATED (SEE ITEM 11)

10-Jun-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jun-2011

CODE

USACE, BALTIMORE

10 S. HOWARD STREET

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR-11-R-0033

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

RESPONSE TO RFIS #2

North Campus Substation, Fort George G. Meade, MD

Solicitation Number W912DR-11-R-0033

Amendment 2: Responses to Request for Information

Information for Bidders

1. The sole supplier of the OSI Monarch platform, Open Systems International Inc., shall perform all programming and updates associated to the SCADA front end system. All programming of graphics and database for the OSI Monarch software shall be performed on site.

Responses to Request for Information

13) Question: Specification Section 01 05 00 Job Conditions paragraph 1.16 indicates that no concrete pours shall be allowed on weekends or government holidays. Please confirm whether this requirement applies to concrete pours associated with duct banks located in parking lots where work is restricted to weekday nights/ weekends only.

Answer: These requirements do not necessarily apply to concrete pours associated with duct banks located in parking lots. However the pours must be coordinated in advance with the Government representative.

14) Question: Please confirm whether documents can be scanned and uploaded to a password protected ftp site for use by subcontractors and vendors interested in bidding on the work of this project. General Contractor will require any interested subcontractor/vendor to sign and return the same certification statement required for personal pick-up.

Answer: No, the documents must not be uploaded to any ftp site. The General Contractor has been permitted to make copy already.

15) Question: For subcontractors or vendors located outside of the Greater Baltimore Washington area, picking up drawings in person poses a significant hardship and expense. Is it acceptable for a subcontractor/vendor to provide a power of attorney to a General Contractor to sign for and pick up the documents on their behalf and then ship the documents to that subcontractor/vendor?

Answer: It is acceptable as long as they fill the certification attached to the furnished contracting documents.

18) Question: Please provide information on the elevation of the site water table.

Answer: Information on the site water table can be derived from the geotechnical and environmental borings. Locations of these borings are shown on sheet C-007, C-056 –C-062 and the boring logs are included on sheets C-008 through C-014.

19) Question: What is the required capacity volume for each of the fuel tanks shown on drawing S-036?

Answer: See Specification Section 33 56 13.13, paragraph 1.5.e stating "The useable capacity of AST-1 and AST-2 shall be not less than 240,000 U.S. liquid gallons."

20) Question: Please clarify the soil compaction requirements. There are conflicting requirements in specifications 03 30 00, §3.2.3 and 31 00 00, §3.10.

Answer: For both specification section 31 00 00 paragraph 3.10 and Section 03 30 00 paragraph 3.2.3, compaction requirements should be at least 95 percent maximum density in accordance with ASTM D 1557.

21) Question: Please provide drawings for the overall site general excavation.

Answer: Final grades of the site shall be as shown on sheet C-027. Request for overall site general excavation plan is unclear and will not be provided.

22) Question: The required submittals for concrete formwork exceed typical requirements. Please confirm the specification 03 30 00 requirements for formwork shop drawings (§1.3), formwork calculations (§1.6.1.1), and formwork fabrication drawings (§1.6.2.1)

Answer: The requirements for submitting formwork shop drawings, calculations, and fabrication drawings shall apply as stated in specification 03 30 00.

23) Question: What is the allowable bearing pressure for the soil of the tank ring wall foundations shown on drawing S-036?

Answer: The allowable bearing pressure for the soil under the tank ring wall foundations is 3000 psf.

24) Question: Please define the services during construction to be provided by the Architect of Record/Engineer of Record. Please confirm that these services will be supplied by the Corps of Engineers and need not be included in the proposal.

Answer: Title II services will be provided by the Designer of Record contracted by the Corps of Engineers.

25) Question: It is noted that several designs are incomplete and must be completed based on final equipment data. Will the design completion be provided by the Architect of Record/Engineer of Record?

If not, please explain the division of responsibility for this design work.

Answer: The request is to general and needs to be more specific. Drawings and Specification are complete and AE will not be supplying any design work for final equipment selection.

26) Question: Can any of the underground duct banks be capped and abandoned, left in place? (see Dwg C28)

Answer: Underground electrical duct banks, manholes and substations shall be demolished and removed as per drawings C-028, E-003 and E-004.

27) Question: Specification section 01 33 00 is confusing regarding the terms "AE" and "AR" for Submittals. Please clarify.

Answer: AE is a reference to the design Architect-Engineer. AR is a reference to the USACE Area Office. When used following the "G" designation identifies the office that will review the submittal for the Government

28) Question: Specification sections (e.g. 03 30 00 section 1.3) under Product Data have the term "LEED" in parenthesis for some items. What are the LEED requirements applicable to these items.

Answer: The “LEED” designation next to a section identifies those sections which have been specified to meet the design intent of LEED Requirements / Sustainable Strategies for the Client. This project is not applying for LEED Certification, and there are no requirements for submission of LEED documentation or data.

29) Question: Specification section 03 33 00 in several places references "ACI/MCP-#", which invokes all the standards of an entire volume of the ACI Manual of Concrete Practice. Will the Government specify the specific ACI standards that apply and delete the generic references to ACI/MCP?

Answer: The government will NOT delete the general references to ACI/MCP.

30) Question: Specification section 03 33 00 §3.2.3 requires sub grade compaction to 100% density (ASTM D1557). This requirement is excessive and impractical. Please provide clarification on how it is to be achieved under average site conditions.

Answer: For Specification Section 03 30 00 paragraph 3.2.3, compaction requirements should be at least 95 percent maximum density in accordance with ASTM D 1557.

31) Question: Specification sections 03 33 00 §3.6.12 and 3.6.13 require the Contractor to determine that reinforcement spacing and protection for reinforcement comply with ACI requirements. Please confirm that the Engineer will specify this information if it is missing from the drawings.

Answer: The rebar spacing and cover requirements are stated in the drawing general notes S-001 and S- 002 and drawing details. The contractor is to adhere to the provisions of the ACI/MCP items such as, but not limited to, rebar placement tolerances.

36) Question: The footing schedule on S-022 does not show a F5.5 footing. There is a F5.5 footing at column line F/3 on S-003. Please provide details for this footing.

Answer: Footing mark F5.5 shall be 5’-6”x5’-6”x15” thick with 6-#5 bottom reinforcement each way.

37) Question: The footing schedule on S-022 does not show a F11.0 footing. There is a F11.0 footing at column line C/10 on S-003. Please provide details for this footing.

Answer: Footing mark F11.0 shall be 11’-0” x 11’-0”x36” thick with 12-#8 top and bottom reinforcement each way.

38) Question: Plan view drawings S-003 & S-004 indicate the trench drain installed directly against the generator foundation slab. However, the detail 10/S-015 for the trench drain require an approximate 6 inch wide trench sidewall to provide sufficient width for angle embedment as well as allow for a monolithic pour of the trench drain. Please confirm the trench drain edge will be approximately 6 inches from the generator slab foundation. If this is not correct, please provide details where the trench drains about the generator slab.

Answer: The trenches will be moved 8” away from the generator pads to accommodate the trench drain sidewall construction.

39) Question: Specification Section 26 11 14.00 10 – Main Electric Supply Station and Substation page 39, paragraph 3.4 – Grounding starting midway through line 4 reads in part “A normal grid design to achieve 1ohm grid resistance per Technical Manual TM-5-691 was proved to be impractical. So according to the direction from the client, it was decided to replace the top 7.5 ft. of soil with an engineered 50 ohm meter soil and design a grid to provide a grid resistance closer to 1 ohm. Contractor shall provide a ground grid calculation that complies with IEEE Std 80 using………..If the resistivity readings are still very high and a 1 ohm grid resistance is impractical, contractor shall prepare the site with the engineered soil as designed.” Since the over excavation and replacement of the 300 ft. x 150 ft.

x 7.5 ft. deep area (reference General Note 2. on Drawing ES-054) may or may not be necessary, would the owner consider a revision to the bid form where the base bid would exclude this over excavation and replacement of material at the substation and provide an add alternate bid item to the bid form to accommodate the cost for the over excavation and replacement should it be necessary.

Answer: No additional bid items will be added to the contract for separating this work as a bid option.

Please bid this work under the overall bid item.

(End of Summary of Changes)