US Army Corps of Engineers Kansas City District Building Strong

W912DQ-18-R-1007

Vegetation and Herbicide Management

Stockton Lake Cedar County, Missouri

Request for Quote Solicitation Attachments

January 2018

Bid Schedule

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Each

Vegetation and Herbicide Mgmt Services – Base Year FY 2018

The contractor shall furnish all labor, equipment, and materials to provide Vegetation and Herbicide Management Services in accordance with the Performance Work Statement (PWS) dated 01 January 2018.

FFP

Period of Performance: 1 April 2018 through 31 March 2019 FOB: Destination

TOTAL AMT

ITEM NO

SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

0001AA 5 Each

Herbicide Application 5.4

The contractor shall performing Vegetation and Herbicide Management Services in accordance with the Performance Work Statement. Minimum of 3 rounds of application maximum of 5 rounds.

FFP

NET AMT

0001AB 1 Each

Sewage Lagoon 5.5

The Contractor shall provide herbicide application services in accordance with the Performance Work Statement. 1 round of herbicide application at all sewage lagoons.

0001AC 3 Each Damn Rip Rap 5.6

The Contractor shall provide equipment and labor for chemical application to unwanted woody vegetation and broadleaves in accordance with the Performance Work Statement. 3 Rounds of herbicide application for Dam Rip Rap Only areas will be performed.

0002 Each

OPTION

Vegetation and Herbicide Mgmt Services – Option Year FY 2019

Statement (PWS) dated 01 January 2018.

FFP

Period of Performance: 1 April 2019 through 30 September 2019

0002AA 5 Each

Herbicide Application 5.4 application maximum of 5 rounds.

0002AB 1 Each

Sewage Lagoon 5.5 lagoons.

FFP

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002AC 3 Each

Work Statement.

0003 Each

Vegetation and Herbicide Mgmt Services – Option Year FY 2020

Statement (PWS) dated 01 January 2018.

FFP

Period of Performance: 1 April 2020 through 30 September 2020

0003AA 5 Each

Herbicide Application – 5.4 application maximum of 5 rounds.

FFP

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003AB 1 Each

Sewage Lagoon – 5.5 lagoons.

0003AC 3 Each

Work Statement. 3 Rounds of herbicide application for Dam Rip Rap Only areas will be performed.

FFP

GRAND TOTAL BASE PLUS ALL OPTION YEARS

PERFORMANCE WORK STATEMENT

Herbicide Application Services

STOCKTON LAKE PROJECT OFFICE

01 January 2018

1. General: This is a non-personnel services contract to provide Herbicide Application

Services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Herbicide Application Services as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2. Background: Stockton Lake is a flood control reservoir located on the Sac River in southwest Missouri, tucked into the foothills of the scenic Ozark Mountain range. The lake spans three county boundaries: Cedar, Dade, and Polk. It is approximately 50 miles northwest of the metropolitan area of Springfield, Missouri, and approximately 130 miles south of Kansas City, MO. A map of Stockton Lake can be found on the Internet at: http://www.nwk.usace.army.mil/st/. Stockton Lake provides flood protection for downstream areas and is part of a network of Corps of Engineer Lakes that help control flooding in the Missouri and Mississippi River basins. Stockton Lake encompasses approximately 25,000 acres of surface water. Federal land surrounding Stockton Lake totals 36,047 acres, of which 16,572 acres are leased to the Missouri Department of Conservation (MDC) for management. Land management practices used by the Corps of Engineers and MDC are engineered to preserve their natural value, providing benefits to the nation in areas of flood damage reduction, recreation, fish and wildlife management, hydroelectric power, and water quality improvement. Eight parks around the lake are managed and maintained by the Corps of Engineers. These parks include roads, utility systems, campsites, beaches, boat ramps, picnic grounds, and playground areas. In addition to Corps-managed areas, the Corps also maintains active lease agreements with the Missouri Department of Natural Resources and private entities. The lessees provide a full range of marina services, restaurants, and camping to the public.

Additional services contracted to the private sector include mowing, refuse collection, facility cleaning, and park attendant. The Corps manages the contracts and conducts inspections to insure that the services are provided for visitors to the lake.

1.3. Scope: The contractor shall provide herbicide application services to areas at various locations at Stockton Lake as defined in this performance work statement (PWS). The Contractor shall comply with all Federal, state, and local laws, ordinances, statutes and regulations pertaining to the provided services.

http://www.nwk.usace.army.mil/st/

1.4. Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and, if exercised two (2) 12-month option years. The Period of Performance reads as follows:

Base Year – 1 April 2018 through 31 March 2019 Option Year 1 – 1 April 2019 through 31 March 2020 Option Year 2 – 1 April 2020 through 31 March 2021

1.5. General Information

1.5.1. Required Insurance: Contractors shall obtain and maintain the following insurance policies* during the period of performance and shall provide proof of insurance to the Contracting Officer (or representative) prior to commencement of duties:

Workmen’s Compensation: Coverage complying with applicable State statute** Employer’s Liability: Minimum $100,000 per occurrence (only IF you hire employees)

Commercial General Liability: Minimum $100,000 per person, $300,000 per occurrence for bodily injury, $20,000 per accident for property damage.

Motor Vehicle Liability: Minimum $300,000 per person, $500,000 per occurrence for bodily injury, $100,000 per accident for property damage

* Reference FAR 28.307-2 Liability, subparagraphs (a), (b), and (c).

** Missouri Division of Insurance, telephone (573) 751-4126, Division of Workers Compensation, telephone (800) 775-2667

1.5.2. Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

1.5.2.1. A copy of the contractor’s quality control plan will be submitted to the Contracting Officers Representative within 15 days after award of the contract.

After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

1.5.2.2. The Contractor shall designate in writing in the QC Plan, a responsible on-site

Quality Control Representative for each work crew who will serve as a contact for matters involving quality, performance or non-performance of the required work assigned to that crew. The Contracting Officer may disapprove any individual whom he or she considers to be incompetent to perform the work required. Such disapproval will be given in writing and the decision will be final.

1.5.2.3. The Contractor shall furnish to the COR, a telephone number attended during normal business hours (7:30 a.m. – 4:00 p.m. C.S.T.) to which calls concerning performance or other contractual matters can be placed. For the purpose of time and date, a message will be deemed delivered to the Contractor, at such time as it is delivered to the number provided by the Contractor.

1.5.2.4. Daily Herbicide Application Reports will be submitted to the COR detailing work performed for that day. Reports should include what, when, who and where information as well as any safety issues that arise, weather conditions, equipment calibration and application rates, equipment malfunction etc.

1.5.2.5. In the event of unsatisfactory performance of specified work, the Contractor may be requested to re-perform the unsatisfactory services at no additional cost to the Government. Failure of the Contractor to perform the work will result in withholding of payment for the portion(s) of the work not accomplished. Amounts to be withheld for work not performed or not performed to standard will be determined by prorating the amount of services satisfactorily performed against the amount of services required.

1.5.2.6. The Government reserves the right to cause the specified unsatisfactory work to be performed by a third party or Government personnel. The cost incurred thereby will be levied against the Contractor. Any time Government personnel are used because of Contractor's nonperformance, the cost levied against the Contractor will include all direct costs associated with the performance of the specified. Such inefficiencies are determined as the direct cost to the Government for substitution of the Government personnel removed from their normal duties computed on an hourly basis at the applicable wage rate. Government personnel will be used only when time is of the essence and the interests of the Government would not be served by securing a third party to perform the specified work.

1.5.3. Quality Assurance: Quality Assurance is the Governments Responsibility. The primary focus of quality assurance is to evaluate the effectiveness of the Contractors Quality Control program. The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.5.4. Recognized Holidays: The contractor will not be required to work on the following Federal Holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.5.5. Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:00 AM CST and 8:00 PM CST Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Hours of operation will be strictly adhered to unless this restriction is specifically waived in writing by the Contracting Officer or his authorized representative. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.5.5.1. All work shall be accomplished within the timeframes specified above.

Services rendered outside the time periods specified will not be compensated unless specifically approved in writing by the Contracting Officer or his authorized representative.

1.5.5.2. In the event adverse weather or ground conditions occur during scheduled services that would create unsafe working conditions or result in damage to vegetation or turf, the Contractor shall cease operations and contact project personnel. Work affected by adverse conditions shall be stopped, restarted, or rescheduled as directed by the Contracting Officer or his authorized representative. Rescheduled work shall be accomplished at a mutually agreed upon time, to the extent possible.

1.5.5.3. This is a flood control project. Occasional retention of floodwaters may inundate portions of the public use areas, other areas, or access roads thereto, being serviced by this contract. In the event that inundation materially affects the scope of work, the Contractor will be requested to submit a pricing proposal covering the unserviceable or affected portion of his work in order that an equitable adjustment to contract price can be negotiated and an adjustment made in accordance with the appropriate contract clause entitled "Changes." Payment for services not performed as a result of conditions stated above will be initially withheld until execution of an equitable adjustment can be made by contract modification.

1.5.6. Place of Performance: The work to be performed under this contract will be performed various areas under the responsibility of the U.S. Army Corps of Engineers, Stockton Lake Project Office.

1.5.7. Security Requirements: Contractor personnel performing work under this contract must be in compliance with AT-OPSEC security requirements set forth for this contract and must maintain the level of security required for the life of the contract.

1.5.7.1. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.5.7.2. Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.5.7.2.1. In the event keys, other than master keys, are lost or duplicated, the

Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.5.7.2.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees.

The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.5.7.2.3. Gates: The Contractor shall open and close gates within the contract boundary areas. The Contractor shall securely lock any gate that is opened by him/her, upon completion of the required work, or upon completion of the workday

1.5.7.2.4. Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.5.8. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart

42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.5.9. Contracting Officers Representative: The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies;

coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.5.10. Contractor Personnel:

1.5.10.1. Minimum Manpower Requirements: The Contractor and employees/staff shall personally perform, or provide personal superintendence of the performance of, duties under this contract (no subcontracting). The Contractor shall maintain a sufficient number of staff/employees to perform the required services. In the event the Contractor is unable to perform contract duties as required, the Government reserves the right to terminate the contract.

1.5.10.2. Contractor Personnel: Contractor personnel shall present a neat appearance and be fully clothed at all times while performing services ordered under the contract. “Fully clothed” shall be deemed to mean that a sleeved shirt (or T-shirt), trousers, and shoes shall be worn at all times: except that this requirement shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required for the safe performance of services or for the application of various approved chemicals (if any). The Contractor shall provide own attire. Contractor personnel shall utilize tact, diplomacy, and courtesy at all times during contact with the public and with Government personnel. The Contracting Officer’s Representative reserves the right to disapprove any individual whom he/she considers to be incompetent to perform the work required. Such disapproval will be given to the Contractor by written notice. Any such decision is final.

Any illegal or criminal activity on the part of the Contractor or staff, employees, or other personnel may result in termination of the contract. In order to assure that the required services be performed at an acceptable level, the Contractor shall designate in writing a responsible on-site representative of each work crew, who shall serve as a contact for matters involving quality, performance, or nonperformance of required services assigned to that crew. In the absence of a designated on-site representative, or if the designated on-site representative is not present, the Contractor warrants that any and all members of each work crew are qualified and fully competent with full authority to act for, and on behalf of, the Contractor, to insure the required work is performed in strict accordance with the contract specifications. The Government reserves the right to discuss herbicide application matters with any Contractor employee on-site and currently employed by the Contractor.

1.5.10.3. Key Personnel: The following personnel are considered key personnel by the government: Contract Manager and Quality Control Manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:30 AM and 4:00 PM CST, Monday thru Friday accept Federal holidays or when the government facility is closed for administrative reasons.

1.5.10.4. Special Qualifications: Contractor must provide proof of being Certified

Commercial Applicator in the State of Missouri in the application of herbicides. Contractor must possess both a Category 3 and Category 5 certification to perform work under this contract.

1.5.10.5. All contractor personnel will be required to show proof of a valid driver’s license prior to performance of work under this contract.

1.5.11. Lost and Found Items, Vandalism, and Facilities Malfunction: To assist the visiting public in reclaiming lost articles, all property left by visitors and found during operations shall be turned in daily to the project office where it may be claimed by the owner. Any evidence of vandalism and instances where facilities are not operating properly or are in need of repair shall be reported to Project personnel.

1.5.12. Other Contracts/Volunteers: The Government may undertake or award other contracts or have lessees, Government employees, or volunteers performing certain work, and the Contractor shall fully cooperate with such other Contractors, lessees, volunteers and Government employees. The Contractor shall not commit or permit any act that will interfere with the performance of work by another Contractor, by a lessee, by volunteers or by Government employees. The COR can alter the work schedules of the Contractor to avoid possible conflicts. Any such change or failure to make such a change by the COR shall not be the basis for a claim by the Contractor.

1.5.13. Title 36 Rules and Regulations: While performing work under this contract the

Contractor and his/her employees will abide by Title 36 Rules and Regulations for conduct on Federal lands, as well as all other Federal, State and Local laws.

1.5.14. Safety Requirements: The contractor is expected to take a vital interest in safety and to educate and develop a culture of safe work habits among their employees. All work under this contract shall be performed in accordance with safety requirements set forth by OSHA and the Corps of Engineers Manual, EM 385-1-1, entitled "Safety and Health Requirements Manual", a PDF copy of this manual can be provided to the contractor upon request. There is also an EM 385-1-1 mobile app that can be downloaded from the app store if the contractor so chooses. Particular emphasis shall be placed on the contractor’s accident prevention plan. A basic outline for this plan can be found in the manual. A copy of the Contractors Accident Prevention Plan must be submitted prior to the start of services. If the contractor fails or refuses to promptly comply with the safety requirements as specified herein;

the COR may stop all or part of the work until proper correction action has been taken. No part of the time lost due to any such stop shall be made subject to claim for extension of time or for excess costs or damages to the contractor. No additional payment shall be made for work not performed as a result of work stoppage due to failure to comply with safety requirements.

1.5.14.1. Particular emphasis should be placed on EM 385-1-1 sections concerning

PPE and Operation of Vehicles, Machines and Equipment.

1.5.14.2. The Contractor shall perform work requirements in a manner to protect buildings, vehicles, and Government and public personal property from damage, and employees and project visitors from any harm or injury. Work shall be scheduled and completed to afford this protection.

1.5.14.3. The Contractor shall maintain an accurate record of, and shall report to the

COR, all accidents, injury, property damage, equipment malfunction or safety hazard immediately.

1.5.14.4. The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the Quality Assurance Representative, and shall notify the COR of the corrective action to be taken. Such notice when delivered to the Contractor or his representative at the site of work shall be deemed sufficient for this purpose. The Government assumes no responsibility or duty to inspect. The contractor is responsible for ensuring that the equipment is in a safe operating condition, that it is used in a safe manner, and that it is used in a safe environment and condition. Any equipment or materials not in conformity with the safety manual will be placed out of service and will not be operated on Government Property.

1.5.14.5. The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. In addition to this, each crew of workers shall be provided with first aid kits complying with OSHA and other Federal and State requirements and a minimum of two crew members trained and certified in first aid and CPR to care for minor injuries normally sustained in the type of work required.

1.5.14.6. The Contractor shall conduct safety briefs with all personnel before each at a minimum of weekly intervals to discuss potential safety hazards, etc.

Weekly safety brief can be notated on the Contractor Daily Report for that day including who attended the brief. When a new employee is hired, the Contractor shall furnish a statement that the new employee was briefed on safety procedures.

1.5.15. Environmental Controls

1.5.15.1. Compliance with Laws and Regulations: The Contractor shall be knowledgeable of, and shall comply with, all Federal, State and Local laws, environmental requirements, and instructions. The Contractor shall ensure policies and procedures are established that protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.

1.5.15.2. Hazardous Materials: The Contractor is responsible for advising his/her employees of all Environmental and Hazardous Materials Handling, and is also required to provide to the COR the Safety Data Sheets (SDS) for all materials used by the Contractor in accordance with Federal, State and Local laws and/or regulations.

1.5.15.3. Notification of Environmental Spills: If the Contractor or employee(s) of the Contractor spill or releases any substance into the environment, the Contractor shall immediately report the incident to the Environmental Compliance Coordinator in accordance with local procedures, and shall also notify the Contracting Officers Representative (COR), or in his absence the Contracting Officer. The Contractor shall be liable for containment and environmental cleanup of the spill or release of such substances.

1.6. Payment: Payment will not be made for services not performed, payment will only be made for completed and approved work. The Contractor shall provide the Project Office with an invoice, after performance of the services ordered, requesting payment for ordered services. Payment shall be made in accordance with the Prompt Payment Act via Electronic Funds Transfer (EFT) into the Contractor’s banking account. For EFT, the Contractor will be provided a blank ‘direct deposit’ form at the Pre-Work meeting. This form shall be completed by the Contractor to enable EFT.

PART 2

DEFINITIONS AND ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. Definitions:

2.1.1. Contractor. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. Contracting Officer. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. Contracting Officers Representative. An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. Deliverable. Anything that can be physically delivered but may include non-physical things such as meeting minutes.

2.1.6. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. Physical Security. Actions that prevent the loss or damage of Government property.

2.1.8. Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. Quality Assurance Surveillance Plan. An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13. Work Week. Is defined as Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial Off the Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of

KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program QDR Quality Deficiency Report TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES

3.1.Services: The Government will supply the contractor with maps of the areas where work will be performed.

3.2.Facilities: N/A

3.3.Utilities: Water sources will be available to the Contractor. The Contractor must supply their own hoses and backflow preventative devices when using Government water sources. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4.Equipment: N/A

3.5.Materials: N/A

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES

4.1. General: The contractor will furnish all necessary labor, equipment, supplies, materials, supervision, transportation and fuel required to perform work under this contract that are not listed under Section 3 of this PWS.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. Basic Services: The Contractor shall apply herbicide to all areas listed under Herbicide Application sites. In most cases, the result should be a clean, vegetation free area. Some areas involve the control of certain species (i.e. woody vegetation). In those areas, it will be the Contractor’s responsibility to insure that the target species are all that are killed.

5.2. The Contractor will be responsible for selecting the appropriate chemical to be used based on site location, proximity to the public, environmental concerns, target species and best commercial practices. Information will be provided to the government regarding the chemical(s) to be used prior to application. The COR must approve all chemicals that will be used during this contract. The contractor will provide SDS sheets (Safety Data Sheets) and product labels for all chemicals used on government property.

Biodegradable dye will be used as a marker to insure even applications.

5.3. The Contractor will guarantee at least a 99% vegetation free control in all areas where herbicide application is performed, as evidenced by dead and dying plants, by stem count. Should the level of control fall below 99%, the contractor will be responsible for the re-treatment of the subject area(s) to achieve the desired result at no additional cost to the government. In order to maintain this level of vegetation control, the contractor will be required to make at least one Quality Control visit after each application to insure that the desired results are being achieved. Payment will not be made until this level of control is accomplished.

5.4. Herbicide Application: The contractor will apply herbicides in all areas listed in

Attachment 4/Technical Exhibit 4 Herbicide Application Sites. One round of application must include all of the sites listed in this attachment excluding the rip rap only areas at the Dam and the Sewage Lagoons. Rip rap only areas and Sewage Lagoons are included under separate line items. There will be a minimum guarantee of 3 rounds of herbicide application in these areas and a maximum of 5 rounds.

5.5. Sewage Lagoons: The contractor shall treat sewage lagoons once per year to control aquatic vegetation growing in the lagoon. There are thirteen sewage lagoons that will be treated for unwanted vegetation as follows: Stockton 1 lagoon, Orleans Trail 1 lagoon, Orleans Trail South 1 lagoon, Hawker Point 2 lagoons, Ruark Bluff West 1 lagoon, Ruark Bluff East 2 lagoons, Mutton Creek 3 lagoons, Cedar Ridge 1 lagoon, and Crabtree Cove 1 lagoon. See attached area maps and reference lagoon fence locations for sewage lagoon locations. Note: One round of herbicide application for sewage lagoons must include all of the areas listed above.

5.6. Dam Rip Rap Only Areas: The contractor shall apply herbicides to control unwanted vegetation growing in all rip rap areas along both the upstream and downstream sides of the embankment along Stockton Lake Drive at Stockton Dam. Rip Rap extends from the concrete structure of the dam past eastern end the overlook parking lot on the upstream side of the dam and from the eastern end of the concrete structure of the dam and ends just before entrance of the Old Mill area on the downstream side of the dam.

5.7. The contractors monthly herbicide treatment will be conducted between the 1st and 15th of each month when herbicide application is ordered. The monthly Quality Control visit will be conducted between the 15th and 30th of each month. The monthly Quality Control visit can occur no less than 7 days from the date of the initial monthly treatment.

The government will begin inspecting areas 7 days after the initial treatment for quality assurance purposes. The goal of these inspections is to observe the effectiveness of the Contractor’s quality control program and see that contract requirements are being met.

5.8. All contractor personnel applying herbicide shall be appropriately trained and licensed.

Copies of all licenses and certifications will be provided to the government prior to the start of work. Appropriate insurance will also be in place and documentation provided prior to the start of work. At least one employee must possess a Commercial Applicator License in the State of Missouri with both a Category 3 and Category 5 certification and must be onsite at all times while work is being performed.

5.9. The serviced areas will present a neat, even kill of all target species. Spray patterns will provide an even border between treated and untreated areas. A 1 foot (approx.)

vegetation free border will be left around all hard-surfaced or rocked facilities (i.e.

campsites, parking lots, riprap, curbing etc.).

5.10. Work will not be performed on days when the wind exceeds 10 mph in developed areas (15 mph in undeveloped areas) or when wet weather could affect the application.

5.11. The government will provide water for tank filling. The Contractor will provide hoses and backflow-preventers. Clean-out of chemical tanks and disposal of chemical containers will not be done on government property. The Contractor will have spill kits available on all vehicles used on government property adequate to the type and quantity of chemical on the vehicle. Contractor employees will be trained in the use of these kits and are expected to aggressively implement their use in the event of a spill.

5.12. The Contractor will be responsible for any damage to non-target species.

5.13. The Contractor will complete a herbicide application report form (furnished by the government) after each chemical application whether initial or follow-up. Payment will not be made until the completed forms are provided.

5.14. The use of aerial spraying will not be permitted in any of the areas serviced under this contract.

PART 6

APPLICABLE PUBLICATIONS

6. Applicable Publications (Current Editions): The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures including but not limited to EM-385-1-1.

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1.Attachment 1/ Technical Exhibit 1 – Performance Requirements Summary

7.2.Attachment 2/Technical Exhibit 2 – Deliverables Schedule

7.3.Attachment 3/Technical Exhibit 3 – Quality Assurance Surveillance Plan.

7.4.Attachment 4/Technical Exhibits – Herbicide Locations and Corresponding Maps

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

(The Service required—usually a shall statement)

Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)

% of Deduction from the

CLIN Price if not

Corrected

Method of Surveillance

PRS # 1.

The contractor shall provide herbicide application services in all areas shown on the attached area maps in accordance with this PWS

5.3, 5.4 Zero Deviation from Standard

30% Periodic Inspection Monthly

PRS # 2

Contractor shall treat sewage lagoons for unwanted aquatic vegetation

5.3 5.5 Zero Deviation from Standard

25% 100% Inspection

PRS # 3

Contractor apply herbicide to treat unwanted vegetation growing in rip rap on both sides of the Highway at Stockton Dam.

5.3, 5.6 Zero Deviation from Standard

25% 100% Inspection

PRS # 4

Timeliness

5.7 Zero Deviation

from Standard

10% 100% Inspection

PRS # 5

Quality Control

5.7 Zero Deviation

from Standard

10% Periodic Inspection Monthly

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To Proof of Insurance

Once prior to the start of work

One Electronic is preferred but hardcopy will also be accepted.

Attn: Caleb Young Email:caleb.j.you ng@usace.army.

mil Address: 16435 E. Stockton Lake Dr. Stockton, MO 65785

Quality Control Plan

Once prior to the start of work

One Same as above Same as above

Herbicide Application Report

Daily when work is performed

One copy for each day

Same as above Same as above

Security Requirements Documentation

As needed As needed Same as above Same as above

Accident Prevention Plan and AHA

Once prior to the start of work

One Same as above Same as above

Herbicide Applicators License (Category 3 and 5)

Once prior to the start of work

One Same as above Same as above

SDS and Product Information

For any new chemical used on the project

One Same as above Same as above

Exposure Hours Report (Man Hours)

Once per month on the 1st of the month the previous month’s man hours will be reported.

One Same as above Same as above mailto:ng@usace.army mailto:ng@usace.army

ATTACHMENT 4 TECHNICAL EXHIBIT4

HERBICIDE APPLICATION SITES

*Highlighted areas are considered Aquatic/Sensitive areas and may require special treatment/chemicals due to their proximity to water or potential for public contact.

AREA SITE TO BE SERVICED

Administration Area Spraying

1. Office Parking Lot

2. Kit Bond Visitor Center Sign

3. Maintenance Compound parking areas, graveled areas, weather station, perimeter fence

4. Overlook Parking Lots(east)

5. Old Office and Turbine display parking area

6. Old Warehouse graveled stockpile area

7. Powerhouse parking lot and concrete drainage ditch(includes inside the fence)

8. Powerhouse Roadway(west side of dam)

9. Chain link fences on or below the dam

10. Switchyard (must be accompanied by Corps Employee)

Old Mill

1. Old Mill Roadways

2. Overlook Parking Lot (west)

3. Spill way parking lot(including the drainage ditch)

4. Spill way overlook parking lot

5. Fencing along spillway and parking lots

6. Graveled parking lots

7. Ball field infield and fences

8. NEAT fish display rocks/gravel

Dam

1. Rip Rap – Dam Only Application, includes all rip rap on both sides of the highway

2. Roadway across dam from 32 west side to 32 east side

3. Guardrail

4. Rip Rap stockpile- Dam Only Application

Crabtree Cove Park

1. Crabtree Cove Trail head parking lot

2. Boat ramp, parking lot and rip rap rock on both sides of boat ramp

3. Fishing dock, sidewalk and rip rap rock on both sides of dock and sidewalk

4. Crabtree Cove Park Attendant booth, campsite and Parking area

5. Crabtree Cove Park A Loop Campsites (42 campsites and 4 tent camping sites)

6. Crabtree Cove Park B Loop Campsites ( 13 campsites)

7. Campsite identification posts (6” perimeter)

6. Shower house parking lot (1) Vault Toilet Parking Lots (3) and sidewalk in front of playground

7. Dumpster pad

8. Dump Station

9. Rip rap on west side of road on B loop point and west side of A loop road

10. All vegetation growing through cracks in asphalt roads in park will be sprayed. Approximately 3 miles.

11. Lagoon fence

Masters Park

1. Boat ramp, parking lot, dumpster pad, CXT and rip rap rock on both sides of boat ramp

2. Swim beach, swim beach parking lot, shelters (2) and CXT (1)

3. Fishing dock parking lot, sidewalk and rip rap rock on both sides of dock

4. All vegetation growing through cracks in asphalt roads in park will be sprayed. Approximately 5miles.

5. Base rock parking lot at entrance to A Loop.

Cedar Ridge Park

1. Beach parking lot, sidewalks, day use vaults, beach and CXT

2. Beach playground

3. South boat ramp, parking lot and self-pay station

4. Rip rap rock at South boat ramp

5. Fishing dock parking lot, sidewalk and rip rap rock at dock and along sidewalk

6. Park attendant booth, campsite, parking area and storage shed

7. Campsite identification posts (6” perimeter)

8. A- loop campsites, 36 Sites

9. B-loop campsites, 12 Sites

10. North boat ramp, parking lot, CXT, life jacket loaner board and self pay station 11.Rip rap rock around the North boat ramp

12. Lagoon access road and fence

13. All vegetation growing through asphalt cracks in roads (approximately 3 miles

14. Dump station and curbing (1 dump station)

15. Shower house parking lot, sidewalks and curbing

16. Dumpster pads (4)

High Point

1. Boat ramp, Boat ramp Parking Lot, CXT and dumpster pad

2. Rip rap rock at boat ramp and courtesy dock

3. All vegetation growing through asphalt cracks in roads (approximately 1 mile)

Mutton Creek Boat Ramp and Group Camp

1. Group Camp campsite pads, 17 sites

2. Group Camp showerhouse/restroom sidewalks

3. Campsite identification posts (6” perimeter)

4. Lagoon fence

5. Boat ramp, Boat ramp parking lot, CXT, AND rip rap rock around the boat ramp

6. All vegetation growing through asphalt cracks in roads (approximately 5 miles)

7. Lagoon fence

8. Marina lagoon fences

Ruark Bluff West

1. Boat ramp, Boat ramp parking lot, life jacket loaner board, CXT, dumpster pad and self pay station

2.Rip rap rock at boat ramp

3. Park attendant booth, campsite, parking area and storage shed

4. Group Camp campsite pads, 22 sites

5. Group Camp Shelter and restroom sidewalks

6. Campsite identification posts (6” perimeter)

7. Campsites, 74 Sites

8. Vault toilet and parking lot (2)

9. Lagoon fence

10. Shower houses (2), sidewalks, dump station, and dumpster pads (2)

11. All vegetation growing through asphalt cracks in roads (approximately 3 miles)

Ruark Bluff East

1. Beach shelter parking lots

2. Beach playground and basketball court

3. Beach parking lot, self-pay stations, life jacket loaner board, sidewalks and beach

4. Fishing dock parking lot, sidewalk, and rip rap rock at dock

5. Park attendant booth, campsite, storage shed and parking area

6. Park custodial site, storage shed and parking area

7. Park Volunteer sites , storage sheds and parking area s (4)

8. Campsite identification posts (6” perimeter)

9. A- loop campsites, 37 Sites

10. A-loop vault toilet parking lots (2)

11. A-loop tent camping parking lot

12. B-loop campsites, 46 Sites

13. B-loop vault toilet and parking lot

14. Playground

15. Shower house parking lot (2), dumpster pads and dump station

16. Lagoon fence at 2 Lagoons 16-1 and 16-2.

17. All vegetation growing through asphalt cracks in roads (approximately 3

Hawker Point Park

1. Park attendant booth, campsite, storage shed and parking area

2. Shower house, Dump station, Dumpster pad and parking lot

3. Boat ramp, Boat ramp parking lot, CXT, dumpster pad and self pay station

4. Rip rap rock at boat ramp

5. Campsite identification posts (6” perimeter)

6. A-loop campsites, 14 Sites

7. Playground , CXT and parking lot

8. B-loop campsites, 23 Sites

9. B-loop CXT parking lot and Flush toilet

10. C-loop campsites, 19 Sites

11. C-loop CXT parking lot

12. Lagoon fences (2)

13. Rip rap rock along roadsides at A, B and C Loops.

14. All vegetation growing through asphalt cracks in roads (approximately 3

Stockton Park

1. Beach playground

2. Beach parking lot, sidewalks and beach

3. Volunteer campsite, storage shed and parking area

4. Dump station

5. Comfort station

6. Boat ramp, Boat ramp parking lot, CXT and self pay station

7. Rip rap rock at boat ramps

8. Day Use Shelter, sidewalk and entrance gate

9. Lagoon access road and fence

10. All vegetation growing through asphalt cracks in roads (approximately 2

11. Trail - .25 miles of vegetation growing through asphalt cracks in trail

Orleans Trail Park

1. Beach parking lot, sidewalks and beach

2. South boat ramp parking lot, CXT and self-pay station

3. Rip rap rock at boat ramp

4. Shower house and sidewalks

5. Dumpster pads

6. Park attendant booth, campsite, storage shed and parking area

7. Group Camp campsite pads, 14 sites

8. Campsite identification posts (6” perimeter)

9. D- loop campsites, 13 Sites

10. D-loop vault toilet and parking lot

11. C-loop campsites, 10 Sites

12. C-loop vault toilet and parking lot

13. B-loop campsites, 18 Sites

14. B-loop shower house and sidewalk

15. A-loop campsites, 20 Sites

16. A-loop vault toilets and parking lots (2)

17. Shower house, sidewalks, dump station and dumpster pad

18. Lagoon fences (2) 18-1 and 18-2.

19. All vegetation growing through asphalt cracks in roads (approximately 4 miles)

Greenfield Boat Ramp

1. Upper and lower parking lots

2. Boat ramp

3. CXT

4. Rip rap rock at boat ramp

5. Courtesy Dock and rip rap along walkway

"C

Q) -0 Ti £i Q;

I

SITE VISIT

VEGETATION AND HERBICID MANAGEMETN SERVICES

STOCKTON LAKE PROJECT

KANSAS CITY DISTRICT

U.S. ARMY CORPS OF ENGINEERS

Site visits may be arranged during normal duty hours by contacting:

POC:

Name: Caleb Young

Email Address: caleb.j.young@usace.army.mil

Telephone: (816) 389-3006

Address: Stockton Lake Project Office

U.S. Army Corps of Engineers 16435 E. Stockton Lake Dr.

Stockton, MO 65785 mailto:caleb.j.young@usace.army.mil

WD 15-5103 (Rev.-5) was first posted on www.wdol.gov on 01/16/2018

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

|…