RFQ_Attachments_-_Perry_Lake_20180127.pdf
PDF 1 MB Posted
- Solicitation number
- W912DQ18R1007
About this file
RFQ Attachments - Perry Lake
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8 R 07
Building Strong
Vegetation and Herbicide Management
Perry Jefferson County, Kansas
Request for Quote Attachments
January 8
Supplemental Bid Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Season
Herbicide Application – Base Year
The contractor shall furnish all herbicide applications services at Perry Lake as defined in the Performance Work Statement (PWS). The period of performance
(POP) for the work to be performed is 1 April 2018 through 30 September 2018.
FFP
NET AMT
0002 1 Season
OPTION Herbicide Application – Option Year One
0003 1 Season
OPTION Herbicide Application - Option Year Two
GRAND TOTAL BASE YEAR PLUS ALL OPTION YEARS
HERBICIDE APPLICATION SERVICES
PERRY LAKE PROJECT, PERRY, KANSAS
Performance Work Statement
01 January 2018
C.1.1 General Information: Perry Dam is located three (3) miles north of Perry, Kansas in Jefferson County, at mile 5.3 of the Delaware River in the northeast portion of the state. It is situated within 50 miles of one-third of the state’s population. Three of the state’s four metropolitan areas are in close proximity to the lake: Topeka, Kansas City, and Lawrence. Due to the lake’s proximity to these population areas, the lake will continue to receive high use.
C.1.2 Scope of Work
The Contractor shall provide all labor, equipment, fuel, materials and supplies, and supervision necessary to accomplish vegetative management services at the Administration Area, Dam Area, Outlet Park, Thompsonville Park, Rock Creek Park, Old Town Park, Old Military Trail Park, Longview Park, Slough Creek Park, Perry Park, and the Perry ATV Riding Area of the Perry Lake in Jefferson County, Kansas. Services shall be completed as described in this Performance Work Statement (PWS) and elsewhere in the contract. The Contractor shall perform tasks listed in Section C-10.
Acceptable performance standards and current regulations are provided for each task.
The Contractor shall monitor performance and ensure compliance in accordance with the terms and conditions.
C.1.2.1 Dates and Hours of Performance: April 1 through 30 September of each year during this contract. All work shall be performed Monday through Thursday between the hours of 7:00 a.m. and 7:00 p.m. and Friday between the hours of 7:00 a.m. and 12:00 p.m. No work will be performed on weekends or holidays. Each individual work item shall be performed pursuant to the schedule for that work item set forth in Section C-5. Services rendered outside the time periods specified shall not be compensated unless specifically approved in writing by the Contracting Officer or his authorized representative.
C.1.2.2 Pre-Award Site Visit: During open period for proposals, it is highly recommended contractor representative schedule site visit to better understand scale of work to be accomplished.
C.1.3 Post-Award Conference
After award, but prior to commencement of work, the Contractor shall contact the Contracting Officer’s Representative, to arrange a mutually agreeable time to meet at the Perry Project Office to review the contract requirements and details of the work.
C.1.4 Quality Control
C.1.4.1 The Contractor will develop a Quality Control Plan designed to demonstrate how the Contractor will meet the needs of the project. The Quality Control Plan will document how well the Contractor is meeting these needs and will be submitted for approval prior to work on this contract.
C.1.4.2 An inspection system covering all work tasks stated in the contract to include supplies. Said inspection system shall include a check-off sheet for personnel to fill out each time an area is sprayed. It shall specify areas to be sprayed and inspected on a per-spraying basis and satisfaction of compliance by Corps quality assurance personnel.
C.1.4.3 A method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable. The contractor shall use process control procedures and quality data analysis techniques.
C.1.4.4 Corrective action procedures for deficiencies and measures to prevent recurrence: The corrective actions will address the deficiency and an action to prevent future deficiencies. Additional inspection(s) is/are not considered a corrective action.
The Quality Control Plan shall be evaluated for adequacy and changed or updated by the contractor as a part of all corrective actions by the contractor.
C.1.5 QUALITY ASSURANCE
C.1.5.1 Quality Assurance Surveillance Plan: A Quality Assurance Surveillance Plan (QASP) will be used during the life of the contract to ensure that the Service Provider is performing the services required by this PWS in an acceptable manner. The Government develops the QASP and the Project Office administers the Plan through Quality Assurance Evaluators (QAEs).
C.1.5.2 The government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract.
The government will perform inspections and tests in a manner that will not unduly delay the work.
C.1.5.3 Contractor understands that the QASP is solely for the benefit of the Government in ensuring the contractor completes its required work in accordance with this contract. Government officers shall never exercise supervision over the contractor’s employees and any defects noted shall be brought to the attention of contractor’s designated representative. Failure of the Government to identify a defect shall not constitute waiver of the Government’s rights concerning that defect.
C.1.5.4 In the event of unsatisfactory performance of specified work, the Contractor may be directed to re-perform the unsatisfactory services at no additional cost to the Government. Re-performance as directed by the Government shall be completed within two (2) days. Failure of the Contractor to perform the work as specified, or to re-perform work as directed within the allotted time, may result in reduction of the contract price in proportion to the portion(s) of the work not accomplished. Amounts to be withheld will be determined by prorating the amount of services satisfactorily performed against the amount of services required. When the defects in services cannot be corrected by re-performance, the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements;
and (2) reduce the contract price to reflect the reduced value of the services performed.
Payment will not be made for work not performed or not performed to standard.
Payment will be made when spraying(s) and inspection(s) is/are completed. It will be the Contractor’s responsibility to ensure that the 96% control level is achieved prior to the submission of the invoice to the Perry Project Office. Payment will not be made until it is mutually agreed that the control level has been met. If the contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the government may: (1) by contract, or otherwise, perform the services and charge to the Contractor any cost incurred by the government that is directly related to the performance of such service or
(2) terminate the contract in whole or in part.
C.1.5.5 Performance by Third Party or Government Personnel: In addition to the above remedies for nonperformance, the Government reserves the right to cause the specified work to be performed by a third party or Government personnel and the cost incurred thereby will be levied against the Contractor. Any time Government personnel are used because of Contractor’s nonperformance, the cost levied against the Contractor will include all direct costs associated with the performance of the specified work. Government personnel will be used only when time is of the essence and the interests of the Government would not be served by securing a third party to perform the specified work.
C.1.6 Coordination with the Project Office
C.1.6.1 As each item of work is completed, the Contractor’s representative at the job shall enter the time that the item of work was completed on a Contractor’s Daily Worksheet (See example, Section C.11.2). Completed and signed worksheets shall be delivered to the Contracting Officer’s Representative (or his/her designee) each day services are performed.
C.1.6.2 Day-to-day contact with Government personnel and telephone communication shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the Project Office as necessary to insure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notice, the Contractor shall attend meetings regarding matters affecting this contract and the time spent in such meetings shall be at no additional charge to the Government.
C.1.6.3 To assist the visiting public in reclaiming lost articles, all property left by visitors and found during spraying operations shall be turned in to the Project Office.
C.1.6.4 Any evidence of vandalism, instances of facilities not operating properly, or are in need of repair, shall be promptly reported to project personnel.
C.1.7 Insurance: In accordance with FAR 52.228-5, Insurance-Work on a Government Installation, the contractor shall obtain and maintain the following insurance policies during the period of performance under this contract and shall provide proof of insurance to the Contracting Officer’s Representative prior to commencement of duties:
Worker’s Compensation Coverage complying with applicable State Statute Employer’s Liability Minimum amount of $100,000 per occurrence Commercial General Liability Minimum amount of $100,000 per person, $300,000 per occurrence for bodily injury, & $20,000 per accident for property damage.
Motor Vehicle Liability Minimum amount of $100,000 per person, $300,000 per occurrence for bodily injury, & $20,000 per accident for property damage.
NOTE: Coverage required (above) are minimums. If higher limits of coverage are required by state statute, the contractor shall be responsible for obtaining such additional coverage.
C.1.8 Licensing: It shall be the responsibility of the Contractor to comply with all Federal, state, and local laws governing health, training, operational, and licensing requirements as may be applicable and required for application of commercial pesticide (including OSHA Hazard Communication Standard 29 CFR 1910.1200).
The Contractor's employee applying chemicals under this contract shall possess an appropriate COMMERCIAL APPLICATOR'S LICENSE acceptable to the state in which work is to be accomplished. However, an applicator may be unlicensed if allowed by law and if closely supervised by an immediate, onsite supervisor who is licensed in accordance with the above requirement.
C.1.9 Contractor Personnel
C.1.9.1 All Contractor personnel shall be fully clothed, at all times, while performing these services. “Fully clothed” shall be deemed to mean that a shirt (or T-shirt), trousers and shoes shall be worn at all times, except that this requirement shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required for the application of various chemicals.
Clothing shall be clean and neat in appearance.
C.1.9.2 Contractor personnel shall utilize tact, diplomacy, and courtesy at all times during contact with the public. The contractor or any of his or her employees shall not consume any alcohol or drugs (except prescription drugs) during duty hours or within the eight (8) hour period next preceding duty hours.
C.1.9.3 The Contractor shall designate, in writing, a responsible member of each work crew who shall serve as the contact for matters involving quality and performance of the required work assigned to that crew. The employee(s) designated in accordance with the above requirement shall be qualified and fully competent and shall insure that the work described herein is performed in accordance with these specifications. The Contractor shall furnish the above written designation to the Contracting Officer’s Representative at the project the first day that an individual is a “responsible party.” The designation shall include the name(s), address(es), and telephone number(s) of the responsible individual(s).
C.1.9.4 Employee Qualifications; Background Checks: Only U.S. Citizens, lawful resident aliens, and persons holding a valid work visa are permitted to work on this contract. The contractor shall submit to the Corps the names of each foreign national proposed for performance under this contract/task order, along with documentation to verify that he/she was legally admitted into the United States and has authority to work in the U.S. All contractor employees and subcontractors will also submit to the Contracting Officer’s Representative a background check investigation prior to beginning work.
C.1.10. Safety Requirements Prior to beginning work on the Contract, the Contractor shall have an approved Accident Prevention Plan. This plan shall be in accordance with the most recent EM 385-1-1 (See Section C.11 Applicable Forms and Publications). The plan is intended to be a viable document and enhance the safety of Project staff and visitors. The Contractor will be expected to take a vital interest in safety, hazard, and educate their employees to work and plan their work safely. Proper driving techniques and defensive driving will be practiced to prevent vehicle accidents and property damage. All vehicles will comply with all local, state and federal laws and be operated on roadways at all times.
C.1.11 Required Submissions: The Contractor shall submit the following documents to the Contracting Officer's Representative at the Project Office:
(1) Insurance: Proof of requirement insurance in the form of a copy of the insurance policy or a binder issued by the insurer, to be delivered no later than the pre-work conference or prior to the start of the contract period.
(2) Licensing: Proof of proper licensing, to be delivered no later than the start of the contract period.
(3) Chemical Labels: A label for each chemical being utilized under this contract, to be delivered no later than the pre-work conference.
(4) OSHA Compliance: Evidence of compliance with OSHA Hazard Communication Standard 29 CFR 1910.1200, to be delivered not later than the pre-work conference, as follows:
(a) A hazardous material inventory of all materials used on the contract.
(b) Material Safety Data Sheets (MSDS's) for all materials listed in the inventory.
(c) A procedure to ensure that all containers are properly labeled.
(d) A written hazard communication program which includes employee training and methods of communicating hazards and protective measures to employees and others.
(5) Designation of "responsible party" in accordance with C.1.9.3.
(6) Background checks and proof of authority to work in the U.S. for all proposed employees in accordance with C.1.9.4.
The Contractor will NOT be allowed to proceed on this contract until all the above-required submissions have been furnished.
C.2.0 Identification of Contractor Personnel: Two types of identification are required for each employee and subcontractor who will provide services on the contract: (a) a tamper-proof laminated identification card that identifies the name of the contractor’s company, a clear employee photograph at least 1 by 1 ¼ inches, the employee’s typed name, signature, date of birth, eye color, sex, height, and weight, and the signature, date and phone number of the company representative issuing the card, and (b) a valid U.S. Photo ID that shows the individual’s name, photograph, and signature; acceptable photo IDs include American driver’s license, State identification cards, passports, and resident alien cards (green cards). The company ID shall be worn in a conspicuous place and both types of ID shall be carried on the person of the employee and made available for inspection, upon request by any Government representative or member of the public.
C.2.1 Other Contractors The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees. All work must be carefully planned and fitted not to interfere with such other work. The Contractor shall not commit or permit any act that will interfere with the performance of work by other contractors or by Government employees.
C.2.2 ANTITERRORISM/OPERATION SECURITY REQUIREMENTS
All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
All contractor and all associated sub‐contractors employees will receive a CORPS Watch information paper (provided by the authorized government representative) and provide a written acknowledgement to the COR, no later than 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract.
The Contractor must pre‐screen candidates using the E‐verify Program
(http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The vendor must ensure that the candidate has two valid forms of government issued identification to ensure the correct information is entered into the E‐ verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after the initial contract award.
Per the E-Verify Website the following exemptions apply:
Employers whose contracts are exempt from the E-Verify federal contractor rule are not required to enroll in E-Verify. A contract is considered exempt if any one of the following applies: (1) It is for fewer than 120 days. (2) It is valued at less than $150,000, the simplified acquisition threshold (Source: http://www.uscis.gov/e-verify/federal-contractors/exemptions-and-exceptions).
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
C.3 Definitions
ALP: Acceptable Level of Performance http://www.dhs.gov/E‐Verify http://www.uscis.gov/e-verify/federal-contractors/exemptions-and-exceptions http://www.uscis.gov/e-verify/federal-contractors/exemptions-and-exceptions
Contracting Officer’s Representative means an individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.
Fully-Clothed: Deemed to mean that a sleeved shirt (or T-shirt), trousers, and shoes shall be worn at all times. Clothing shall present a professional appearance and shall not be ripped, torn, or dirty. Clothing shall also contain logos or badges that clearly identify the wearer as a contractor employee. These requirements shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required for the application of various chemicals.
PWS: Performance Work Statement
Quality Assurance (QA): A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Quality Control (QC): A method used by the Contractor to control the quality of goods and services provided.
Vegetative Free: An area is considered vegetative free if 95% of all plants within a treated area die within 5 days after application of herbicide.
C.4 Government-Furnished Materials and Supplies: The Government will furnish the following consumable items to the Contractor. The Government will retain control of expendables, to be dispensed on an as-needed basis for use in performance of the contract.
1. Water
2. Contractor Daily Worksheets
3. Herbicide Application Report Form
C.5 Contractor-Furnished Equipment and Supplies The Contractor shall furnish all equipment and supplies to execute this contract that are not specifically identified in Section C.3 of this PWS as Government-Furnished supplies and equipment or specifically identified in the section. Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. It shall be the responsibility of the Contractor to assure that he/she has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of his primary equipment.
C.6 Specific Tasks
C.6.1 General Information The Contractor shall provide all manpower, equipment, fuel, tools, materials and supplies, and supervision and other items and service necessary to perform all tasks and functions identified in the section except as specified in Section C.4 as Government Furnished equipment and supplies.
C.6.1.2 The Contractor shall establish a work schedule indicating the days and hours during which services will be performed on a regular basis. The schedule shall be submitted in writing to the Contracting Officer or his authorized representative for approval no later than the first week of work. Changes in the approved schedule shall be submitted for approval prior to implementing the change.
C.6.1.3 Apply herbicide to all areas listed under the Herbicide Application sites. In most cases, the end result should be a clean, vegetative free area.
C.6.1.4 The Contractor will be responsible for selecting the appropriate herbicide to be used based on site location, proximity to the public, environmental concerns, target species, and best commercial practices. All herbicides shall be approved by USEPA and the State of Kansas, and shall be approved by the COR prior to application.
Information in the form of labels and brochures will be provided to the government regarding the chemical(s) to be used prior to application. Biodegradable blue dye will be used as a marker.
C.6.1.5 The Contractor shall provide and maintain at least a 96% vegetative free control of all serviced areas during the growing season (April through September). Should the level of control fall below 96%, the Contractor will be responsible for the retreatment of the subject area(s) to achieve the desired result at no additional cost to the Government. It is the obligation of the Contractor to make sufficient site visits to verify results throughout the growing season and performance periods.
C.6.1.6 The serviced areas will present a neat, even kill of all target species. Spray patterns will provide an even border between treated and untreated areas. A 1-foot (approx.) vegetative free border will be left around all hard-surfaced or rocked facilities (i.e. pads, parking lots, etc.).
C.6.1.7 There will be no work on days when the wind exceeds 15 mph in developed areas or when wet weather could affect the application. It will be the Contractor’s responsibility to check with the project office regarding weather conditions prior to application. The Government reserves the right to halt spraying operations should weather conditions, in the opinion of the COR, warrant.
C.6.1.8 The Government will provide water, at specified locations, for tank filling. The Contractor will provide hoses and backflow-preventers. Clean out of chemical tanks and disposal of chemical containers will not be permitted on Government property. The Contractor will have spill kits available on all vehicles used on Government property that will insure adequate coverage of the type and quantity of chemical(s) used. Contractor employees will be trained in the use of these kits and are expected to aggressively implement their use in the event of a spill.
C.6.1.9 The Contractor will be responsible for any damage to non-target species. The Contractor shall replace any non-target species accidentally killed with an equivalent plant or tree as approved by the Contracting Officer, and shall plant the replacement and provide a one-year guarantee of survival of the replacement.
C.6.1.10 The Contractor will complete a herbicide application report form (furnished by the Government) after all chemical applications whether initial or follow-up. Payment will not be made until the completed forms are provided.
C.6.1.11 In the event that an area is missed or is not serviced, the Contractor agrees to return and re-perform the unsatisfactory or missed services immediately upon receipt of notice from the Contracting Officer or his representative.
C.6.1.12 Services shall be performed so as to provide the desired vegetation-free appearance during the growing season (1 March through 30 September). Application of pre-emergent may begin as early in the year as weather conditions allow.
C.7 Inspection and Sampling Prior to beginning each item involving chemical application, the Contractor (or his authorized representative) shall notify the Contracting Officer Representative of the times he will begin mixing and applying chemicals (in order to permit inspection by Government personnel of the mixing and application methods).
C.8 Alternate Chemicals, Rates of Application or Mix Ratios Application of chemicals shall be in accordance with label direction for the material used. When other than anticipated pests or disease is encountered, or when it is the professional opinion of the Contractor that the use of different mix ratios, rates of application, or chemicals other than those specified will produce better results, the Contractor may request permission for their use. Any such request shall be in writing and shall specify the chemical, its uses, rates of application and cost. A label for the requested chemical shall be furnished with the Contractor’s request. Requests shall be submitted to the Project Manager at least 30 days prior to intended use. If granted, permission for the use of an alternate mix ratio, rate of application, or chemical will be in writing from the Contracting Officer or his authorized representative. Chemicals, rates, or mixture ratios other than those specified will not be used in the absence of the above-specified request and approval. When the use results in an increase or decrease in Contractor cost or time, an equitable adjustment will be made to the contract price, through the issuance of a contract modification.
C.9 Measurement Exact limits of chemical application shall be as directed by the Contracting Officer or his designated representative at the Project. All acreages and quantities are approximate.
It shall be the responsibility of the Contractor to determine exact quantities and conditions affecting performance of this work.
C.10 Coverage Bid items indicating “full coverage” shall receive chemical treatment of the entire area.
Bid items indicating “spot treatment” shall receive chemical treatment of targeted vegetation only.
C.11 Performance Requirements Summary
C.12 Service Facilities/Areas
Dam and Outlet Area:
1. Spot treatment of vegetation on face of dam, from water line to guardrail and grass line to guardrail.
2. All wicks, extensions, collector ditches, and rock areas on both sides of the outlet structure
3. Guard rail along upper dam road
4. West dam parking lot and guardrail
5. Lower dam road guardrail
6. Relief well drainage ditch
7. Outlet stilling basin riprap and outlet channel riprap running from spillway road and downstream
8. Outlet east parking lots (including curb stops and fencing) and trash containment area
9. Outlet east day use shelter, shelter parking lot, and shelter sidewalk
Required Service Standard Performance Requirements
(Acceptable Level of Performance)
Method of Surveillance
Quality Control Refer to C.1.4 96% Compliance
(4% maximum defective allowed)
-Periodic Inspection by Government
–Public Visitor
Complaint
Specific Tasks Refer to C.6 99% Compliance
Safety Refer to C.1.10 96% Compliance
10. Outlet east vault toilet sidewalk
11. Outlet west vault toilet sidewalk, parking lots (including curb stops and fencing) and trash containment area
12. Gravel parking lots running parallel of Delaware River in outlet west day use area
13. Delaware Marsh Cul-de-sac
14. ATV Area Parking lot/curbing/trash containment area
15. ATV Area shelter/shelter sidewalk
16. ATV Area bathroom sidewalk
17. Base of all sign posts (12 inch diameter at base of all posts)
Administration Area:
1. Levee rip rap (all rocked areas)
2. Volunteer camp sites
3. Administration area perimeter fencing, parking lots and sidewalks
4. Weather Station
5. Dedication Point parking lots/playground border where composite edging is present/shelter/sidewalk/any sand areas
6. Administration vault toilet parking lot and sidewalk
7. Rip rap between dedication point parking lot and the lake
8. Base of all sign posts (12 inch diameter at base of all posts)
Perry Park:
1. Beach shelter, parking lot, curbing, and trash containment area
2. Beach restroom sidewalks
3. Sidewalk leading to beach
4. All sidewalks/splash pad areas around outdoor showers
5. Beach perimeter, clear delineation between sand and grass
6. Beach volleyball court and swings, and all sand area
7. Vegetation between lakeshore and beach parking lot
8. All areas with rip rap rock
9. Radio Tower – spray all gravel areas and along fence perimeter
10. Base perimeter of water tower
11. Base of all sign posts (12 inch diameter at base of all posts)
Slough Creek Park:
1. Fee Booth, Entrance Dump Station, and trash containment area
2. Bur Oak Camp Loop (sites 1 – 39)
- Bur Oak Camp Restroom parking lot and sidewalk
- Trash containment area
3. Locust Camp Loop (sites 1 – 24)
- Locust Camp restroom parking lot and sidewalk
- Trash containment area
4. Lagoon Fence (lagoon located between Locust loop and Worthington loop)
5. Worthington Camp Loop (sites 1 – 86)
- Worthington Camp restrooms parking lots and sidewalks (x4)
- Worthington Camp Shower House parking lot and sidewalk
- Worthington Dump Station and trash containment area
- Worthington Boat Ramp and boat ramp parking lot and all rip-rap around boat ramp (minimum 15 feet from edge of boat ramp lanes from the start of the launch lanes to the water’s edge)
- Trash containment area
- Playground parking lot
- Playground border where composite edging is present
6. Lagoon Fence (lagoon located between Worthington loop and South Point loop)
7. South Point Camp Loop (sites 1 – 90)
- South Point Camp restrooms and sidewalks (x5)
- Trash containment area
8. Limestone Cove Camp Loop (sites 1 – 16)
- Limestone Cove bathroom parking lots and sidewalks (x1)
9. Slough Creek Park Group Camp West parking sites/curbing/shelter/trash containment area and restroom
10. Slough Creek group camp shower house sidewalk and parking lot
11. Lagoon fence (lagoon located between group camps)
12. Slough Creek Thunder Ridge Trail head parking lot
13. Slough Creek Devil’s Gap Boat Ramp and parking lot, curbing, all rip-rap around boat ramp (minimum 15 feet from edge of boat ramp lanes from the start of the launch lanes to the water’s edge), and trash containment area
14. Slough Creek Perry lake trail trailhead parking lot
15. Base of all sign posts and campsite marker posts (12 inch diameter at base of all posts)
Longview Park:
1. Volunteer camp site
2. Electric Group Camp area gravel roadway
3. Electric Group Camp area campsites (26 individual sites)
4. Primitive ground camp area parking sites
5. Primitive Group Camp area bathroom parking sites and sidewalks.
6. Primitive group camp area roads
6. Lagoon Fence
7. Longview shower house parking lot and sidewalk
8. Longview dump station and trash containment area
9. Disc Golf Course parking lot
10. Longview Boat Ramp/boat ramp parking lot/and boat ramp sidewalk, rip rap along shore between parking lot, all rip-rap around boat ramp (minimum 15 feet from edge of boat ramp lanes from the start of the launch lanes to the water’s edge) curbing, and trash containment area
11. Guardrails leading into the park
12. Base of all sign posts and campsite marker posts (12 inch diameter at base of all posts)
13. Access road into campground
Slough Creek Bridge Boat Ramp
1. Boat ramp parking lot, curbing, self-pay station, vault toilet sidewalk, trash containment area, and all rip-rap around boat ramp (minimum 15 feet from edge of boat ramp lanes from the start of the launch lanes to the water’s edge)
2. Base of all sign posts and campsite marker posts (12 inch diameter at base of all posts)
Old Military Trail
1. Trailhead parking lot and guardrails
2. Base of all sign posts (12 inch diameter minimum at base of all posts)
Old Town Park:
1. Old Town Boat Ramp/boat ramp parking lot/rip rap surrounding boat ramp/upper parking lot, curbing, and trash containment area
2. Old Town Boat Ramp bathroom sidewalk
3. Old Town Campground A loop (sites 1 – 18)
4. Old Town Campground B loop (sites 1 – 19)
5. Old Town Campground C loop (sites 1 – 10)
6. Old Town Campground D loop (sites 1 – 11)
7. Old Town Campground E loop (sited 1-15)
8. Old Town gravel parking lot in “C” loop
9. Old Town bathroom sidewalk near “D” loop
10. Old Town shower house parking lot and sidewalks
11. Lagoon, Ball Field, ball field fence
12. Spray all sand areas in the playground
13. Gravel parking lot in “E” loop
14. Gravel parking lot in A loop
15. Gravel parking lot in B Loop
16. Gravel parking lot at baseball field
17. Base of all sign posts and campsite marker posts (12 inch diameter at base of all posts)
Rock Creek Park:
1. Big Rock camping loop and parking spots
2. Edwardsville Tent Camping parking lot
3. Edwardsville bathroom and bathroom sidewalks
4. Edwardsville trash containment area5. Peninsula Campground shower house, shower house parking lot and sidewalks
6. Rock Creek Fee Booth, dump station, and trash containment area
7. Peninsula Loop A (sites 1 – 26)
8. Peninsula Loop B (sites 27 – 62)
9. Peninsula Loop C (sites 63 – 78)
10. Peninsula bathroom sidewalk located in Loop C
11. Parking lots in Peninsula loop and main access road in park
12. Whippoorwill Campground (sites 1 -14)
13. Whippoorwill bathroom sidewalk15. Walnut Grove Cove drive and parking lot
16. Walnut Grove Cove bathroom and bathroom sidewalk
18. Guard rails throughout campground
19. Playground parking lot and playground border where composite edgings if present
20. Base of all sign posts and campsite marker posts (12 inch diameter at base of all posts)
Rock Creek Day Use Area:
1. Rock creek day use shelter/shelter sidewalk/shelter parking lot on lower road
2. Rock Creek Boat Ramp, boat ramp parking lot, self-pay station, curbing, shelter, shelter parking, trash containment area, and all rip-rap around boat ramp (minimum 15 feet from edge of boat ramp lanes from the start of the launch lanes to the water’s edge)
3. Rock Creek Vault Toilet sidewalk at boat ramp
4. Base of all sign posts (12 inch diameter at base of all posts)
Thompsonville Park:
1. Dump Station
2. Restroom, parking lot, and sidewalk
3. Lagoon Fence
4. Shelter, shelter parking lot
5. Gazebo
6. Vault toilet, parking lot, and sidewalk
7. Trash containment area
8. Base of all sign posts (12 inch diameter at base of all posts)
C.12 Applicable Publications and Forms
C.12.1 Information on Perry Lake can be found on the Internet at:
http://www.nwk.usace.army.mil/pe/
C.12.2 Contractor’s Daily Worksheet:
Pesticide Use Report
Date:
Applicator:
Applicator Certification #:
Type of Chemical Sprayed:
Amount of Chemical Sprayed:
http://www.nwk.usace.army.mil/pe/
Location of Area Sprayed:
Target of Spraying:
C.12.3 OSHA Hazard Communication Standard 29 CFR 1910.1200
C.12.4 Engineer Manual (EM) 385-1-1 (Safety)
The above referenced manuals are hereby incorporated by reference and the contractor is required to perform this contract in accordance with the standards set forth therein.
(End of Performance Work Statement)
SITE VISIT
VEGETATION AND HERBICID MANAGEMETN SERVICES
PERRY LAKE PROJECT
KANSAS CITY DISTRICT
U.S. ARMY CORPS OF ENGINEERS
Site visits may be arranged during normal duty hours by contacting:
POC:
Name: Jason Hurley
Email Address: Jason.L.Hurley@usace.army.mil
Telephone: (816) 389-3035
Address: Perry Lake Project Office
U.S. Army Corps of Engineers
10419 Perry Park Drive
Perry, Kan. 66073
WD 15-5339 (Rev.-5) was first posted on www.wdol.gov on 01/16/2018
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-5339
Daniel W. Simms Division of | Revision No.: 5
Director Wage Determinations| Date Of Revision: 01/10/2018
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Service Contract
Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts
State: Kansas
Area: Kansas Counties of Jackson, Jefferson, Osage, Shawnee, Wabaunsee
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations
01011 - Accounting Clerk I 12.69
01012 - Accounting Clerk II 14.24
01013 - Accounting Clerk III 15.93
01020 - Administrative Assistant 19.09
01035 - Court Reporter 16.76
01041 - Customer Service Representative I 12.10
01042 - Customer Service Representative II 13.61
01043 - Customer Service Representative III 14.85
01051 - Data Entry Operator I 12.05
01052 - Data Entry Operator II 13.15
01060 - Dispatcher, Motor Vehicle 16.42
01070 - Document Preparation Clerk 13.77
01090 - Duplicating Machine Operator 13.77
01111 - General Clerk I 12.56
01112 - General Clerk II 13.70
01113 - General Clerk III 15.38
01120 - Housing Referral Assistant 18.36
01141 - Messenger Courier 11.98
01191 - Order Clerk I 14.19
01192 - Order Clerk II 15.64
01261 - Personnel Assistant (Employment) I 15.46
01262 - Personnel Assistant (Employment) II 17.30
01263 - Personnel Assistant (Employment) III 19.28
01270 - Production Control Clerk 25.62
01290 - Rental Clerk 13.12
01300 - Scheduler, Maintenance 14.72
01311 - Secretary I 14.72
01312 - Secretary II 16.47
01313 - Secretary III 18.36
01320 - Service Order Dispatcher 13.40
01410 - Supply Technician 19.09
01420 - Survey Worker 15.29
01460 - Switchboard Operator/Receptionist 12.85
01531 - Travel Clerk I 12.96
01532 - Travel Clerk II 14.00
01533 - Travel Clerk III 15.03
01611 - Word Processor I 13.35
01612 - Word Processor II 14.98
01613 - Word Processor III 16.76
05000 - Automotive Service Occupations
05005 - Automobile Body Repairer, Fiberglass 22.68
05010 - Automotive Electrician 17.36
05040 - Automotive Glass Installer 16.62
05070 - Automotive Worker 16.62
05110 - Mobile Equipment Servicer 15.23
05130 - Motor Equipment Metal Mechanic 18.03
05160 - Motor Equipment Metal Worker 16.62
05190 - Motor Vehicle Mechanic 18.03
05220 - Motor Vehicle Mechanic Helper 14.59
05250 - Motor Vehicle Upholstery Worker 15.96
05280 - Motor Vehicle Wrecker 16.62
05310 - Painter, Automotive 17.36
05340 - Radiator Repair Specialist 16.62
05370 - Tire Repairer 12.95
05400 - Transmission Repair Specialist 18.03
07000 - Food Preparation And Service Occupations
07010 - Baker 12.42
07041 - Cook I 11.33
07042 - Cook II 12.90
07070 - Dishwasher 8.92
07130 - Food Service Worker 9.16
07210 - Meat Cutter 15.20
07260 - Waiter/Waitress 9.07
09000 - Furniture Maintenance And Repair Occupations
09010 - Electrostatic Spray Painter 18.00
09040 - Furniture Handler 12.56
09080 - Furniture Refinisher 18.00
09090 - Furniture Refinisher Helper 13.93
09110 - Furniture Repairer, Minor 16.07
09130 - Upholsterer 18.00
11000 - General Services And Support Occupations
11030 - Cleaner, Vehicles 11.45
11060 - Elevator Operator 11.29
11090 - Gardener 14.89
11122 - Housekeeping Aide 11.29
11150 - Janitor 11.29
11210 - Laborer, Grounds Maintenance 11.67
11240 - Maid or Houseman 9.11
11260 - Pruner 10.60
11270 - Tractor Operator 13.87
11330 - Trail Maintenance Worker 11.67
11360 - Window Cleaner 12.43
12000 - Health Occupations
12010 - Ambulance Driver 14.82
12011 - Breath Alcohol Technician 17.93
12012 - Certified Occupational Therapist Assistant 26.52
12015 - Certified Physical Therapist Assistant 25.38
12020 - Dental Assistant 15.59
12025 - Dental Hygienist 34.41
12030 - EKG Technician 28.05
12035 - Electroneurodiagnostic Technologist 28.05
12040 - Emergency Medical Technician 14.82
12071 - Licensed Practical Nurse I 16.56
12072 - Licensed Practical Nurse II 18.53
12073 - Licensed Practical Nurse III 20.65
12100 - Medical Assistant 13.76
12130 - Medical Laboratory Technician 16.71
12160 - Medical Record Clerk 15.74
12190 - Medical Record Technician 17.61
12195 - Medical Transcriptionist 16.56
12210 - Nuclear Medicine Technologist 40.71
12221 - Nursing Assistant I 10.67
12222 - Nursing Assistant II 12.00
12223 - Nursing Assistant III 13.09
12224 - Nursing Assistant IV 14.69
12235 - Optical Dispenser 14.27
12236 - Optical Technician 14.24
12250 - Pharmacy Technician 14.75
12280 - Phlebotomist 14.41
12305 - Radiologic Technologist 25.56
12311 - Registered Nurse I 23.49
12312 - Registered Nurse II 28.73
12313 - Registered Nurse II, Specialist 28.73
12314 - Registered Nurse III 34.76
12315 - Registered Nurse III, Anesthetist 34.76
12316 - Registered Nurse IV 41.67
12317 - Scheduler (Drug and Alcohol Testing) 22.28
12320 - Substance Abuse Treatment Counselor 19.05
13000 - Information And Arts Occupations
13011 - Exhibits Specialist I 18.03
13012 - Exhibits Specialist II 22.33
13013 - Exhibits Specialist III 27.34
13041 - Illustrator I 18.03
13042 - Illustrator II 22.33
13043 - Illustrator III 27.34
13047 - Librarian 24.76
13050 - Library Aide/Clerk 11.99
13054 - Library Information Technology Systems 22.33
Administrator
13058 - Library Technician 17.89
13061 - Media Specialist I 16.12
13062 - Media Specialist II 18.03
13063 - Media Specialist III 20.11
13071 - Photographer I 15.91
13072 - Photographer II 17.80
13073 - Photographer III 22.04
13074 - Photographer IV 26.96
13075 - Photographer V 32.63
13090 - Technical Order Library Clerk 15.81
13110 - Video Teleconference Technician 15.91
14000 - Information Technology Occupations
14041 - Computer Operator I 15.01
14042 - Computer Operator II 16.86
14043 - Computer Operator III 18.71
14044 - Computer Operator IV 20.79
14045 - Computer Operator V 23.03
14071 - Computer Programmer I (see 1) 22.89
14072 - Computer Programmer II (see 1)
14073 - Computer Programmer III (see 1)
14074 - Computer Programmer IV (see 1)
14101 - Computer Systems Analyst I (see 1)
14102 - Computer Systems Analyst II (see 1)
14103 - Computer Systems Analyst III (see 1)
14150 - Peripheral Equipment Operator 15.01
14160 - Personal Computer Support Technician 20.79
14170 - System Support Specialist 23.15
15000 - Instructional Occupations
15010 - Aircrew Training Devices Instructor (Non-Rated) 27.18
15020 - Aircrew Training Devices Instructor (Rated) 32.87
15030 - Air Crew Training Devices Instructor (Pilot) 39.03
15050 - Computer Based Training Specialist / Instructor 27.18
15060 - Educational Technologist 26.40
15070 - Flight Instructor (Pilot) 39.03
15080 - Graphic Artist 21.89
15085 - Maintenance Test Pilot, Fixed, Jet/Prop 38.16
15086 - Maintenance Test Pilot, Rotary Wing 38.16
15088 - Non-Maintenance Test/Co-Pilot 38.16
15090 - Technical Instructor 19.59
15095 - Technical Instructor/Course Developer 23.98
15110 - Test Proctor 15.80
15120 - Tutor 15.80
16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations
16010 - Assembler 9.72
16030 - Counter Attendant 9.72
16040 - Dry Cleaner 12.51
16070 - Finisher, Flatwork, Machine 9.72
16090 - Presser, Hand 9.72
16110 - Presser, Machine, Drycleaning 9.72
16130 - Presser, Machine, Shirts 9.72
16160 - Presser, Machine, Wearing Apparel, Laundry 9.72
16190 - Sewing Machine Operator 13.44
16220 - Tailor 14.37
16250 - Washer, Machine 10.69
19000 - Machine Tool Operation And Repair Occupations
19010 - Machine-Tool Operator (Tool Room) 24.05
19040 - Tool And Die Maker 28.29
21000 - Materials Handling And Packing Occupations
21020 - Forklift Operator 16.28
21030 - Material Coordinator 25.62
21040 - Material Expediter 25.62
21050 - Material Handling Laborer 14.51
21071 - Order Filler 13.16
21080 - Production Line Worker (Food Processing) 16.28
21110 - Shipping Packer 18.36
21130 - Shipping/Receiving Clerk 18.36
21140 - Store Worker I 12.79
21150 - Stock Clerk 17.10
21210 - Tools And Parts Attendant 16.28
21410 - Warehouse Specialist 16.28
23000 - Mechanics And Maintenance And Repair Occupations
23010 - Aerospace Structural Welder 28.93
23019 - Aircraft Logs and Records Technician 23.56
23021 - Aircraft Mechanic I 27.69
23022 - Aircraft Mechanic II 28.93
23023 - Aircraft Mechanic III 29.90
23040 - Aircraft Mechanic Helper 20.42
23050 - Aircraft, Painter 26.41
23060 - Aircraft Servicer 23.56
23070 - Aircraft Survival Flight Equipment Technician 26.41
23080 - Aircraft Worker 24.96
23091 - Aircrew Life Support Equipment (ALSE) Mechanic 24.96
I
23092 - Aircrew Life Support Equipment (ALSE) Mechanic 27.69
II
23110 - Appliance Mechanic 24.05
23120 - Bicycle Repairer 15.68
23125 - Cable Splicer 32.09
23130 - Carpenter, Maintenance 19.62
23140 - Carpet Layer 22.29
23160 - Electrician, Maintenance 26.30
23181 - Electronics Technician Maintenance I 22.91
23182 - Electronics Technician Maintenance II 24.24
23183 - Electronics Technician Maintenance III 25.42
23260 - Fabric Worker 21.45
23290 - Fire Alarm System Mechanic 22.49
23310 - Fire Extinguisher Repairer 19.97
23311 - Fuel Distribution System Mechanic 25.42
23312 - Fuel Distribution System Operator 20.13
23370 - General Maintenance Worker 17.73
23380 - Ground Support Equipment Mechanic 27.69
23381 - Ground Support Equipment Servicer 23.56
23382 - Ground Support Equipment Worker 24.96
23391 - Gunsmith I 19.97
23392 - Gunsmith II 22.73
23393 - Gunsmith III 25.42
23410 - Heating, Ventilation And Air-Conditioning 26.17
Mechanic
23411 - Heating, Ventilation And Air Contidioning 27.09
Mechanic (Research Facility)
23430 - Heavy Equipment Mechanic 23.91
23440 - Heavy Equipment Operator 18.63
23460 - Instrument Mechanic 27.83
23465 - Laboratory/Shelter Mechanic 24.05
23470 - Laborer 13.56
23510 - Locksmith 24.05
23530 - Machinery Maintenance Mechanic 25.94
23550 - Machinist, Maintenance 21.98
23580 - Maintenance Trades Helper 16.09
23591 - Metrology Technician I 27.83
23592 - Metrology Technician II 27.29
23593 - Metrology Technician III 28.38
23640 - Millwright 26.53
23710 - Office Appliance Repairer 19.78
23760 - Painter, Maintenance 20.49
23790 - Pipefitter, Maintenance 25.50
23810 - Plumber, Maintenance 24.55
23820 - Pneudraulic Systems Mechanic 25.42
23850 - Rigger 25.42
23870 - Scale Mechanic 22.73
23890 - Sheet-Metal Worker, Maintenance 24.14
23910 - Small Engine Mechanic 22.73
23931 - Telecommunications Mechanic I 24.06
23932 - Telecommunications Mechanic II 27.20
23950 - Telephone Lineman 26.02
23960 - Welder, Combination, Maintenance 19.18
23965 - Well Driller 25.42
23970 - Woodcraft Worker 25.42
23980 - Woodworker 19.97
24000 - Personal Needs Occupations
24550 - Case Manager 15.94
24570 - Child Care Attendant 10.42
24580 - Child Care Center Clerk 15.05
24610 - Chore Aide 12.03
24620 - Family Readiness And Support Services 15.94
Coordinator
24630 - Homemaker 17.66
25000 - Plant And System Operations Occupations
25010 - Boiler Tender 25.42
25040 - Sewage Plant Operator 19.87
25070 - Stationary Engineer 25.42
25190 - Ventilation Equipment Tender 18.60
25210 - Water Treatment Plant Operator 19.87
27000 - Protective Service Occupations
27004 - Alarm Monitor 16.17
27007 - Baggage Inspector 12.40
27008 - Corrections Officer 15.26
27010 - Court Security Officer 17.84
27030 - Detection Dog Handler 13.87
27040 - Detention Officer 15.26
27070 - Firefighter 17.84
27101 - Guard I 12.40
27102 - Guard II 13.87
27131 - Police Officer I 19.05
27132 - Police Officer II 21.18
28000 - Recreation Occupations
28041 - Carnival Equipment Operator 12.17
28042 - Carnival Equipment Repairer 12.72
28043 - Carnival Worker 9.72
28210 - Gate Attendant/Gate Tender 16.94
28310 - Lifeguard 13.72
28350 - Park Attendant (Aide) 18.95
28510 - Recreation Aide/Health Facility Attendant 14.48
28515 - Recreation Specialist 18.35
28630 - Sports Official 15.80
28690 - Swimming Pool Operator 16.85
29000 - Stevedoring/Longshoremen Occupational Services
29010 - Blocker And Bracer 22.91
29020 - Hatch Tender 22.91
29030 - Line Handler 22.91
29041 - Stevedore I 21.63
29042 - Stevedore II 24.24
30000 - Technical Occupations
30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 37.70
30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 25.99
30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 28.62
30021 - Archeological Technician I 17.12
30022 - Archeological Technician II 19.48
30023 - Archeological Technician III 22.96
30030 - Cartographic Technician 23.01
30040 - Civil Engineering Technician 21.90
30051 - Cryogenic Technician I 25.34
30052 - Cryogenic Technician II 27.98
30061 - Drafter/CAD Operator I 16.60
30062 - Drafter/CAD Operator II 18.57
30063 - Drafter/CAD Operator III 20.73
30064 - Drafter/CAD Operator IV 25.50
30081 - Engineering Technician I 16.89
30082 - Engineering…
This is the start of the file's text. The full file is on GovTribe.