Solicitation W912D025R00100003 Amended MOD copy.pdf

PDF 536 KB Posted

Attached to
ISP Network Cable Installation for B600 JBER Alaska Federal contract opportunity
Solicitation number
W912D025R0010
Issued by
Department of the Army Materiel Command Army Contracting Command

About this file

This document is an Amendment of Solicitation/Modification of Contract for the U.S. Army 311th Military Intelligence Battalion at Joint Base Elmendorf Richardson (JBER), Alaska. The amendment extends the solicitation due date to 28 August 2025 at 10:00 a.m. AKST and highlights credential requirements for a network infrastructure and security systems installation project.

The contract scope involves installing and integrating network cable infrastructure (NIPRNET and SIPRNET), Integrated Commercial Intrusion Detection System (ICIDS), and Access Control System (ACS) in Building 600. The contractor must provide Honeywell Vindicator IDS and ACS systems, repair and install CAT6 and fiber optic cabling, and ensure full integration with JBER standards. Specific requirements include installing network patch panels, fiber optic connectors, control panels, readers, and completing comprehensive system testing. The period of performance is 60-90 days from contract award, with material lead times estimated at 6-8 weeks. Contractors must have specific telecommunications certifications and comply with multiple DoD, Army, and industry standards.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the due date of the solicitation to 28 August 2025 at 10.00a.m. AKST as w ell as highlight the section 12 of the Statement of Work credential requirement for this contract w hich w ill be looked/review ed for evaluation purposes.

See sam.gov for anw ers to the RFI questions.

All other terms and conditions remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Aug-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912D025R0010

X 9B. DATED (SEE ITEM 11)

05-Aug-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Aug-2025

CODE

REGIONAL CONTRACTING OFFICE - ALASKA

1064 APPLE STREET

FORT WAINWRIGHT AK 99703

W912D0 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Page 2 of

W912D025R0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 25-Aug-2025 10:00 AM to 28-Aug-2025 10:00 AM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SOW

STATEMENT OF WORK (SOW)

As of 14 July 2025

Award/Mod Effective Version Date

Award TBD

Contract Number: (completed by the KO at time of contract or TO award)

Task Order Number: (completed by the KO at time of TO award or N/A) Contractor Name (completed by the KO at time of contract or TO award)

Tracking Number: (completed by the KO when complete package is received)

Follow-on to Previous Contract and Task Order Number:

N/A

1. Contracting Officer’s Representative (COR) & Technical Representative (TR).

a. Primary COR: N/A (due to small size of contract)

b. Primary TR.

Name: Mr. Oo, Ye N.

Organization: U.S. Army, 311th MI BN

DODAAC: WKCQT0

Address: 311th MI BN, Unit 45009, PSC 704, APO AP 96338-5009

Phone Number: DSN:315-263-3786, Cml: 046-407-3786, Intl: +81-46-407-3786

Fax Number: N/A E-Mail Address: ye.n.oo.civ@army.mil

c. Alternate TR.

Name: CPT Thomas, Kendrick L.

Organization: U.S. Army, 311th MI BN

DODAAC: WKCQT0

Address: 311th MI BN, Unit 45009, PSC 704, APO AP 96338-5009

Page 3 of

Phone Number: DSN:315-263-4416, Cml: 046-407-4416, Intl: +81-46-407-4416 Fax Number: N/A E-Mail Address: kendrick.l.thomas4.mil@army.mil

2. Contract or Task Order Title. “311th MI BN ARO building 600, JBER, Alaska” network cable layer 1 ISP (Inside Plant), ICIDS (Integrated Commercial Intrusion Detection System), and ACS (Access Control System) ISO (in support of) open storage accreditation.

3. Background. U.S. Army 311th Military Intelligence Battalion, ARO (Alaska Resident Office), is responsible for Intelligence Support, Force Protection, Counterintelligence (CI), and Human Intelligence (HUMINT) operations across U.S. Army Alaska. ARO recently acquired building 600 (basement office) in Joint Base Elmendorf Richardson (JBER), Alaska. Hence, the building 600’s ISP network cable infrastructure, ICIDS, and ACS must be fully mission capable of supporting ARO assigned operations and missions. The installation must be compliance with the DoD, Army, and other applicable regulations, policies, and standards that are annotated in Appendix A. Integrated Commercial Intrusion Detection System (ICIDS) is the Army standard for Department of Defense (DoD) intrusion detection. An Intrusion Detection System provides early warning of an intruder; precludes unauthorized entry; and prevents the introduction of harmful devices, materiel, and components. If vulnerable activities are not protected by an Intrusion Detection System (IDS), Arms Rooms and SCIFs would have to provide armed guards for their areas, Mission Essential Vulnerable Areas (MEVAs) would be unprotected, and money handling activities would see an increase in theft and vandalism. ACS will be directly support ARO’s physical security program IAW AR 190-13 which aspects include verifying identification conducting background checks and establishing Access Control Points (ACPs). ISP Network Copper and Fiber Optic cables installation will be in support of NIPRNET and SIPRNET connections.

4. Objectives: The contractor shall provide the required materials, labors, and perform identified tasks within SOW for ISP Network cables ISO NIPRNET and SIPRNET connectivity. All repair and installation efforts shall be in accordance with DoD, Army, and the industry standards mandated by public-law 104- 113, section 12 “Standards Conformity” (ANSI TIA/EIA telecommunications standards) as listed below.

For ICIDS and ACS, the contractor shall procure, provide the required materials, install, and test Honeywell Vindicator ICIDS and ACS designed to meet or exceed AR 380-5 and JBER – Air force standards within BLDG 600, JBER, Alaska. Systems must be fully integrated into JBER – Air Force control IDS and ACS infrastructure and tested system performance verification in order to provide early warning of an intruder to active monitoring station, as well as all programming and integration of the receiver system per JBER base requirements for a fully functional and operational system.

5. Scope: The Contractor shall provide, install, program, integrate, commission, and test Honeywell Vindicator IDS, and ACS designed to meet or exceed AR 380-5 within building 600, JBER. In addition, the Contract shall provide the required material for repair, install, and test the 311th MI BN, ARO telecommunications infrastructure installation – ISP layer 1 network cables implementation as described in this SOW. All work shall meet or exceed Army regulations, and Unified Facility Criteria (UFCs). The contractor shall comply with all applicable codes for DoD facilities as stated in UFC 1- 200-01 and unified facilities guide specification (UFGS) 28 20 01.00 10. In general, Telecommunications Industry Association standards and best industry standard installation practices will be used to meet requirements set forth in this SOW. This effort will include both Inside Plant / distribution cabling and premise cables install IAW the standards, codes and instructions listed below. Below is a list of required tasks:

6. Performance Requirements:

The items listed below apply to task 6.1.

1. Maximum compliance with the most current version of ANSI/EIA/TIA Standards as well as all other directives (i.e JBER – Air Force) standards listed in below Appendix A will be followed on all work performed under this effort.

Page 4 of

2. Timelines & schedules are directed via the Technical Representative (TR) or contracting officer (KO).

3. Adhere to all federal and local safety standards and regulations.

4. Provide post-install “redlined” Installation Design Plans for installed work associated with this installation effort.

5. Provide completed, legible deliverable documents to include copper/fiber test results of all installed infrastructure. Provide digital “soft copy” test results in accordance with of the standards, codes and instructions listed in below.

6. Documentation and Performance. 311th MI BN, ARO shall have unlimited rights to, and ownership of all deliverables provided under this Task Order, including reports, recommendations, briefings, work plans and all other deliverables. The definition of “unlimited rights” is contained in Federal Acquisition Regulation (FAR) 27.401, Definitions.

7. Formal Acceptance or Rejection of Deliverables: The Government will have five (5) business days to review each document and provide feedback/comments. The contractor shall have five (5) business days to incorporate comments. Delivery of final document with incorporated comments shall constitute acceptance by the Government.

6.1 ISP Layer 1 Network Cable, IDS, and ACS:

Task 1: Telecommunication Infrastructure Installation:

In building 600, the contractor shall perform the following tasks in according with (IAW) enclosure#1:

NIPR Cabling

a) Test, repair, and/or re-terminate already installed (36) CAT6 unshielded plenum rated cable with green jacket the ARO work area outlets in Bldg. 600.

I. When the already installed cables are unrepairable, provide and install the required CAT6 cable.

b) Verify and validate (1) 48 port Unshielded patch panel loaded with unshielded jacks.

I. Repair and/or replace broken materials.

c) Test, and validate already installed (36) Unshielded CAT6 RJ45 jacks with green trim.

I. Repair and/or replace broken materials.

d) Verify and validate already installed (18) 2 Port faceplates.

I. Repair and/or replace broken materials.

e) Test, repair, and/or re-terminate already installed CAT6 cables on the patch panels in the NIPR cabinets.

I. Repair and/or replace broken materials.

SIPR Cabling

a) Verify and validate already installed (1) CCH-04U inside Secure Cabinet.

I. Repair and/or replace broken material.

b) Test, repair, and re-terminate already installed (22) 2-Stand OM4 multimode Fiber Optic red cables.

I. When the already installed cables are unrepairable, provide and install the required CAT6 cable.

c) Test, repair, and/or re-terminate already installed (24) 12 Fiber Panduit OptiCam duplex LC MM connector panels.

I. Repair and/or replace broken materials.

d) Verify and validate already installed (176) LC Panduit OptiCam LC Fiber Optic Connectors.

I. Repair and/or replace broken materials.

e) Verify and validate already installed (11) 2 port faceplates.

I. Repair and/or replace broken materials.

f) Verify and validate already installed/terminated fiber cables with LC type fiber connectors.

I. Repair and/or replace broken materials.

Network Cabinets

Page 5 of

a) Verify and validate already installed (2) 4x4 3/4-inch fire rate - A/C grade plywood.

I. Repair and/or replace broken materials.

b) Verify and validate already installed (2) CPI Cube-it 24x30 (CPI# 11996-724) 12U lockable wall mount cabinet with low-decibel (31 dB), dual-fan Kit for 1 for SIPR and 1 for NIPR.

I. Repair and/or replace broken materials.

c) Verify and validate already installed (2) 19” Rack busbar (EBB).

I. Repair and/or replace broken materials.

d) Verify and validate already installed (1) 12x4 TGB buss bar with #6 AWG to each rack.

I. Repair and/or replace broken materials.

e) Verify and validate already installed (1) #2 AWG from the TGB to the TMGB COMM room busbar.

I. Repair and/or replace broken materials.

Pathway

a) Verify and validate already installed (1) 1” conduit pathway from the new NIPR cabinet to the

Bldg. 600 telecommunication room outside the ARO suite.

I. Repair and/or replace broken materials.

b) Provide and install J-hooks where necessary and where dictated by standard.

c) Verify and validate that already installed pathways are separated by at least 3ft IAW AR 380-5, 25-2, & TEMPEST requirements. The pathways will allow NIPR and SIPR cables to cross the hallway from the far side of the hallway to the new ARO COMM room (Room B53).

I. If there is no 3ft of separation between NIPR and SIPR cables pathway, repair and/or replace the required cables.

d) Provide and install surface mount raceway where cabling cannot be run down the wall

e) Where cables can be run down the wall provide and install LV1 cut in rings.

Backbone fiber

a) Test, repair, and re-terminate already installed (1) 12f SM Fiber optic cables from the ARO NIPR cabinet (in Room B53) to the cabinet in the Bldg. 600, telecommunication room (Room B43) outside the ARO suite.

I. When the already installed cables are unrepairable, provide and install the required fiber optic cable.

b) Test, repair, and re-terminate already installed (1) 12f SM Fiber optic cables from the ARO NIPR cabinet to the Bldg. 600, 2nd floor telecommunication room and place in existing fiber patch panel. The cables must be routed through the Bldg. 600, telecommunication room (Room B43) outside the ARO suite.

I. When the already installed cables are unrepairable, provide and install the required fiber optic cable.

c) Verify and validate already installed (1) CCH-02U fiber optic patch panel in the NIPR cabinet.

I. Repair and/or replace broken materials.

d) Verify and validate already installed (1) CCH-01U fiber optic patch panel in the Bldg. 600 telecommunication room (Room B43) outside the ARO suite.

I. Repair and/or replace broken materials.

e) Verify and validate already installed (48) 3m SC Hotmelts - terminate all backbone fiber cables with SC/ST (industry standard) connectors.

I. Repair and/or replace broken materials.

f) Verify and validate already installed (6) ST 6f Simplex bulkheads.

I. Repair and/or replace broken materials.

g) Verify and validate already installed (12) strands fiber MM OM3 from NIPR cabinet to SIPR cabinet, terminate all fibers with LC connectors.

I. When the already installed cables are unrepairable, provide and install the required fiber optic cable.

h) Verify and validate that all fiber cables are terminated with LC type fiber connectors.

i) Test and Label accordingly.

Task 2: ICDS and ACS Installation:

Page 6 of

In building 600, the contractor shall perform the following tasks in according with (IAW) enclosure#2 & 3:

ICDS

a) Procure, Install, and Configure Honeywell Vindicator Intrusion Detection System (IDS) designed to meet or exceed AR 380-5, UFC, USGS, and JBER standards shall be used for all wiring within BLDG 600, JBER, Alaska.

b) Provide a complete system which is fully integrated into the existing Joint Base Elmendorf Richardson (JBER) ICDS, located JBER Air Force PMO.

c) Provide all materials, installation, integration, and testing of all equipment and cables to ensure ARO’s IDS is fully mission capable.

d) Contractor shall.

I. Install the ¾” rigid conduit to protect the network copper cable from ARO’s IDS control panel located near main entry/exit door to JBER IDS PoP (Point of Presence) in Room B43 (Basement Telecommunication Room).

II. Install and run two - 2x CAT6 STP (Shielded) network cables inside the conduit from ARO’s IDS control panel to Room B43.

III. Install and mount one – (1) Cisco C9200CX-8P-2X2G (TAA Compliant) with 19” rack rail kit for Cisco switch in the exiting network rack inside Room B43.

IV. Install and mount one – (1) UPS (Uninterruptible Power Supply) that shall last minimum of 4 hours. APC SMX750CNC (qty. 1) or SMX48RMBP2U (qty. 1) meets the power specific requirement.

V. Install a control alarm panel for Arm/Disarm w/Duress, 360-degree motion sensors, HSS (High Security Sensor/Switches), BMS (Balanced Magnetic Sensor/Switch), Curtain, and other required items at annotated/identified location in the enclosure# 3.

VI. Verify and validate the entire ARO’s IDS integration with JBER ICIDS and ensure ARO’s IDS is fully mission capable.

e) Label all devices and materials accordingly.

f) Provide one copy of the Performance Verification Test result and documentation ensuring ARO’s

IDS is fully operational.

I. All sensors shall be installed and compliance with DoD/Army/JBER regulations, policies, and standards.

II. All sensors shall be able to communicate ARO’s IDS control panel.

III. ARO’s IDS shall successfully be able to arm/disarm.

IV. ARO’s IDS shall successfully be able communicate with JBER overall ICDS controller and receive the required notifications, alarms, and other reporting requirements.

ACS

In building 600, the contractor shall perform the following tasks in accordance with (IAW) enclosure#

3:

a) Procure, Install and Configure Honeywell Vindicator Access Control System (ACS) designed to meet or exceed AR 380-5, UFC, USGS, and JBER standards shall be used for all wiring within BLDG 600, BER, Alaska.

b) Provide all materials, installation, integration, and testing of all equipment and cables to ensure ARO’s IDS is fully mission capable.

c) Provide a complete standalone ACS that is not tied to the existing JBER. The system shall consist of the following items.

I. (1) Honeywell Vindicator AE V3 ACS AES Encryption, Wire II. (1) Access Control Enclosure Assembly with power Supply and Power Distribution for V3

ACS.

III. (1) Honeywell Vindicator MR-52 Dual Reader Interface w/ Enclosure, Power Supply and

Power Distribution IV. (1) PIVClass RP40 Single Gang Reader V. (1) AE VBM 3 Badge Manager

VI. (1) VBM Badging Camera Package

Page 7 of

VII. (1) CAC Enrollment Station

d) Install “the reader” on both side of the wall near Entry/Exit Door and enrollment station in Room

B53 (ARO’s COMM Room).

e) Label all devices and materials accordingly.

f) Provide one copy of the Performance Verification Test result and documentation ensuring ARO’s

ACS is fully operational.

I. All readers shall be installed and compliance with DoD/Army/JBER regulations, policies, and standards.

II. All readers shall be able to communicate ARO’s ACS.

III. ARO shall successfully be able enroll/de-enroll Access Card.

IV. ARO shall successfully be able manage CAC enrollment station for personnel access requirement.

7. Performance Standards

Performance Standard Acceptable Quality Level (AQL) Methods of Calculation Task 6.1 100% in compliance with

ANSI EIA/TIA, AR 380-5,

UFC, USGS, and JBER standards standards listed in appendix A.

On-site surveillance and inspection of as- built drawings.

Performance measures for satisfactory completion of this task order shall be measured by completion of deliverables and tasks identified in the PWS. Completion of deliverables and tasks shall remain within the scope of this PWS. At a minimum, the following metrics shall be applied:

I. There are no oversights in the review and analysis performed by the contractor that result in incorrect or inadequate assumptions, which, in turn, result in unacceptable recommendations.

II. There are no oversights in the development of reports, documents or functional requirements, which could result in delays in meeting established timelines.

III. All written documentation is written in a skilled business style.

The documentation conforms to standards for documentation established by the Contracting Officer and the COR.

IV. All work is completed within the established and agreed upon time frames.

V. The quality of the work and the content of deliverables (and their exposition) shall be highly professional

8. Incentives. Not Applicable

9. Place of Performance. Building 600 is located at Joint Base Elmendorf Richardson (JBER), Alaska.

10. Period of Performance. 60-90 Days from Contract award date.

Material lead times and shipping are anticipated to be 6-8 weeks (Long lead times from CONUS based materials). Estimated installation will be 30-60 days.

As directed by the COR/TR, the contractor shall continue performance in emergency or mission essential conditions. Additionally, the contractor may be required to account for the where abouts of their personnel should this information be requested by the COR/TR.

Page 8 of

11. Delivery Schedule.

PWS

Task#

Deliverabl e Title

Format Due Date Distribution/Copies Frequency and Remarks

6.1 As Built

Drawings

Soft and Hard copies as required

10 days after project completion

Standard Distribution*

Project completion

6.1 Test Results Softcopy IAW

standards in Appendix A

10 days after installation.

Two Copies to COR; Letter Only to

KO

Project completion

*Standard Distribution: 1 copy of the transmittal letter without the deliverable to the Contracting Officer (COR) or Technical Representative (TR); 1 copy of the transmittal letter with the deliverable to the Primary COR/TR.

12. Credential Requirements. The contractor shall be fully certified and shall provide the Honeywell Vindicator certification for IDS and ACS installation. In addition, the contractor must have extensive knowledge of Fiber Optic Cable (FOC) and Copper Cables (CAT6 etc.) installation experience and knowledge IAW Fiber Optic Association (FOA) and ETA International (ETA), and shall provide certifications that are equal or equivalent to Certified Fiber Optic Technician (CFOT), Fiber Optics Installer (FOI), Certified Network Cable Installer (CNCI) or other industry leading acceptable certification.

13. Training Requirements.

a) All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete:

AT Level I awareness training within five (5) calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or TR, if a COR is not assigned, within five (5) calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil.

b) 5.2 Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within five (5) calendar days of their reporting for duty and annually thereafter. OPSEC Awareness training is available at the following website: http://jko.jten.mil.

14. Security Requirements.

Contractor Identification. Contractor employees shall be clearly identifiable while on Government property by wearing a badge as required. Contractor employees shall clearly identify themselves and the company they work for whenever making contact with Government personnel by telephone, electronic, or by other means.

Contractor shall comply with all Army and Federal Government security laws and established policies and procedures. Contractor shall follow procedures for security compromises that conform to Army and Government procedures.

14.1 Facility Security Clearance. N/A

14.2 Visit Authorization Letters (VAL). N/A

14.3 Information Security and other miscellaneous requirements.

14.3.1 Contractor personnel shall comply with all local security requirements including entry and exit control for personnel and property at the government facility.

14.3.2 Contractor employees shall be required to comply with all Government security regulations and requirements. Initial and periodic safety and security training and briefings will be provided by Government security personnel. Failure to comply with Government security regulations and requirements shall require the company to provide the Government with a written

Page 9 of remediation/corrective action plan; furthermore, failure to comply with such requirements can be cause for removal and the contractor will not be able to provide service on this contract/order.

14.3.3 The Contractor shall not divulge any information, classified or unclassified, about DoD files, data processing activities or functions, user identifications, passwords, or any other knowledge that may be gained, to anyone who is not authorized to have access to such information. The Contractor shall observe and comply with the security provisions in effect at the DoD facility. Identification shall be worn and displayed as required.

14.3.4 Contractor personnel will generate or handle documents that contain Controlled Unclassified Information (CUI) at the Government facility. All contractor deliverables shall be marked in accordance with DoDM 5200.1, Vol. 3, Vol. 4, Information Security, DoD 5400.7-R, Freedom of Information Act Program, unless otherwise directed by the Government. The contractor shall comply with the provisions of the DoD Industrial Security Manual for handling classified material and producing deliverables. The contractor shall comply with DISA Instruction 630-230-19.

14.3.5 The Contractor shall afford the Government access to the contractor’s facilities, installations, operations, documentation, databases and personnel used in performance of the contract/order.

Access shall be provided to the extent required to carry out a program of IT inspection (to include vulnerability testing), investigation and audit to safeguard against threats and hazards to the integrity, availability and confidentiality of data or to the function of information technology systems operated on behalf of DISA or DoD, and to preserve evidence of computer crime.

15. Government Furnished Resources.

Facilities: The Government will make available to the Contractor, located BLDG 600, Joint Base

Elmendorf Richardson (JBER), Alaska to perform the work outlined in this SOW.

Utilities: The Government will provide all standard utilities at no cost to the Contractor. Such standard services at a minimum will include electricity, water, sewage, heating and cooling. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, such as turning off the water faucets or valves after using the required amount.

Information: The Government will provide the installation plan, building, and other pertinent information (see enclosures).

16. Other Pertinent Information or Special Considerations. N/A Identification of Possible Follow-on Work: N/A Identification of Potential Conflicts of Interest (COI): N/A Identification of Non-Disclosure Requirements: N/A Packaging, Packing and Shipping Instructions: N/A

16.1. Inspection and Acceptance Criteria Formal Acceptance or Rejection of Deliverables: The Government will have five (5) business days to review each document and provide feedback/comments.

The contractor shall have five (5) business days to incorporate comments. Delivery of final document with incorporated comments shall constitute acceptance by the Government.

16.2. Normal Work Hours: The Contractor shall report to work Monday through Friday, work a minimum of eight hours a day, between the hours of 8:00 a.m. to 17:00 p.m. Specific work schedules will be provided on contract start date, other hours may be worked as requested and authorized by the COR/TR.

16.3. Business Dress: All Contractor personnel shall dress professionally when at the work site. Business attire EXCLUDES short pants, tee shirts, sneakers, and other dress considered not to be appropriate.

Notwithstanding any other terms or conditions of the contract, Contractor wearing inappropriate dress to the work site may be immediately removed from the project, or at the discretion of the COR/TR, may be requested to leave the work site and return with appropriate dress.

16.4. Contractor personnel shall be courteous and respectful to the customer and all other onsite personnel at all times. The Contractor shall follow the direction provided by COR/TR, regarding the level of communication with the naval base personnel and conflict resolution/escalation procedures.

Enclosures

1) Alaska resident Office (ARO), Bldg. 600 ISP layout

2) ARO Bldg 600 location and conduit installation requirement

3) ARO IDS and IDS installation requirement

Appendix A

The publications listed below form a part of this specification to the extent referenced.

The publications are referred to within the text by the basic designation only. In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears.

UNITED STATES CODE

41 U.S.C 23 “Project Order Law” ASTM

INTERNATIO

NAL (ASTM)

ASTM B 1 (2001) Standard Specification for Hard-Drawn Copper Wire

ASTM B 8 (2004) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft

ASTM D 1557 (2002e1) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D 709 (2001) Laminated Thermosetting Materials CONSUMER

ELECTRONICS ASSOCIATION (CEA)

CEA-310-E (2005) Racks, Panels, and Associated Equipment 31 U.S.C 1535 “Economy Act”

CHAIRMAN JOINT CHIEFS OF STAFF INSTRUCTIONS

CJCSI 6211.01C Defense Information System Network (Disn): Policy And Responsibilities

CJCSI 6212.01E Interoperability And Supportability Of Information Technology And National Security Systems CJCSI 6215.01C Policy For Department Of Defense (Dod) Voice Network With Real Time Services (Rds) DEPARTMENT OF DEFENSE

DOCTRINE

DoDI 8100.04 DoD Unified Capabilities (UC)

DoD FMR Vol.11 A – Chapter 1 General Reimbursement Procedures And Supporting Documentation DODINST 4000.19 Interservice And Intragovernmental Support DODINST 4630.09 Wireless Communications Waveform Development And Management

DODINST 4630.8 Procedures For Interoperability And Supportability Of Information

Technology (It) And National Security Systems (NSS)

DODM 5200.22 National Industrial Security Program: Industrial Security Procedures for Government Activities

DODINST 8100.3 Department Of Defense (Dod) Voice Networks

CNSSAM TEMPEST 1-13 Red/Black Installation Guidance

AR 25-13 Army Telecommunication and Unified Capabilities

AR 25-2 Army Cybersecurity

AR 190-13 Army Physical Security Policy

AR 380-67 Army Personnel Security Program

AR 380-5 Army Information Security Program

ELECTRONIC INDUSTRIES ALLIANCE (EIA)

EIA TIA/EIA-455-204 (2000) FOTP-204 Measurement of Bandwidth on Multimode Fiber INSTITUTE OF ELECTRICAL AND ELECTRONICS

ENGINEERS (IEEE)

IEEE C2 (2005) National Electrical Safety Code

IEEE Std 100 (2000) The Authoritave Dictionary of IEEE Standards Terms INSULATED CABLE ENGINEERS

ASSOCIATION (ICEA)

ICEA S-83-596 (2001) Fiber Optic Premises Distribution Cable

ICEA S-87-640 (1999) Fiber Optic Outside Plant Communications Cable

ICEA S-90-661 (2002) Category 3, 5, & 5e Individually Unshielded Twisted Pair Indoor Cable for Use in General Purpose and LAN Communications Wiring Systems

ICEA S-98-688 (1997) Broadband Twisted Pair, Telecommunications Cable Aircore, Polyolefin Insulated Copper Conductors

ICEA S-99-689 (1997) Broadband Twisted Pair Telecommunications Cable Filled, Polyolefin Insulated Copper Conductors

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA C62.61 (1993) Gas Tube Surge Arresters on Wire Line Telephone Circuits NEMA WC 63.1 (2005) Twisted Pair Premise Voice and Data Communications Cables NEMA WC 66 (2001; Errata 2003) Category 6 and Category 7 100 Ohm Shielded and Unshielded Twisted Pairs NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70

National

Electrical Code

OFSTP-7

RUS 1755 Telecommunications Standards and Specifications for Materials, Equipment and Construction RUS Bull 1751F-630 (2002) Underground Plant Design RUS Bull 1751F-640 (1995) Design of Buried Plant, Physical Considerations RUS Bull 1751F-643 (1996) Design of Aerial Plant RUS Bull 1751F-815 (1979) Electrical Protection of Outside Plant

RUS Bull 1753F-201 (1997) Acceptance Tests of Telecommunications Plant (PC-4) RUS Bull 1753F-401 (1995) Splicing Copper and Fiber Optic Cables (PC-2)

RUS Bull 345-50 (1979) Trunk Carrier Systems (PE-60) RUS Bull 345-65 (1985) Shield Bonding Connectors (PE-65) RUS Bull 345- 72 (1985) Filled Splice Closures

(PE-74)

RUS Bull 345-83 (1979; Rev Oct 1982) Gas Tube Surge Arrestors (PE-80) SSPC SP 6 (2000; E 2004) Commercial Blast Cleaning

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)

(Reqired by Public Law 104-113, Section 12, Standards Conformity)

TIA J-STD-607-C (2015) Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications

TIA-455-107A (1999) Component Reflectance or Link/System Return Loss using a Loss Test Set

TIA-455-46A (1990) FOTP-46 Spectral Attenuation Measurement for Long-Length, Graded-Index Optical Fibers

TIA-455-78-B (2002) FOTP-78 Optical Fibers - Part 1-40: Measurement Methods and Test Procedures - Attenuation

TIA-472D000-A (1993) Fiber Optic Communications Cable for Outside Plant Use

TIA-492AAAA-A (1998; R 2002) 62.5-um Core Diameter/125-um Cladding Diameter Class 1a Graded-Index Multimode Optical Fibers

TIA-492AAAB (1998; R 2002) 50-Um Core Diameter/125-Um Cladding Diameter Class IA Graded-Index Multimode Optical Fibers

TIA-492CAAA (1998; R 2002) Class IVA Dispersion-Unshifted Single-Mode Optical Fibers

TIA-492E000 (1996; R 2002) Class IVd Nonzero-Dispersion Single-Mode Optical Fibers for the 1550 nm Window (ANSI/TIA/EIA-492E000)

TIA-526-14-C (2015) OFSTP-14A Optical Power Loss Measurements of Installed Multimode Fiber Cable Plant

TIA-526-7-A (2015) Measurement of Optical Power Loss of Installed Single-Mode

Fiber Cable Plant OFSTP-7 TIA-590-A (1997) Standard for Physical Location and Protection of Below Ground Fiber Optic Cable Plant TIA-758-B (2012) Customer- Owned Outside Plant Telecommunications Cabling Standard TIA/EIA-455-B (1998) Standard Test Procedure for Fiber Optic Fibers, Cables, Transducers, Sensors, Connecting and Terminating Devices, and other Fiber Optic Components

TIA-455-21-A (1988) FOTP-21 - Mating Durability of Fiber Optic Interconnecting Devices

TIA-492AAAA-A (1998; R 2002) 62.5-um Core Diameter/125-um Cladding Diameter Class 1a Graded-Index Multimode Optical Fibers

TIA-492AAAB (1998; R 2002) 50-Um Core Diameter/125-Um Cladding Diameter Class IA Graded-Index Multimode Optical Fibers

TIA-492CAAA (1998; R 2002) Class IVA Dispersion-Unshifted Single-Mode Optical Fibers

TIA-526-7-A (2015) Measurement of Optical Power Loss

TIA-570-C (2012) Residential Telecommunications Infrastructure Standard

TIA/EIA-604-12 (2000) FOCIS 12 Fiber Optic Connector Intermateability Standard Type LC TIA/EIA-604-2 (2004) FOCIS 2 Fiber Optic Connector Intermateability Standard, Type ST TIA/EIA- 604-3A (2000) FOCUS 3 Fiber Optic Connector Intermateability Standard TIA/EIA-606-A (2002) Administration Standard for the Telecommunications Infrastructure TIA/EIA-568-C.0 (2009) Generic Telecommunications Cabling for Customer Premises TIA/EIA-568- C.1 (2009) Commercial Building Telecommunications Cabling Standard TIA/EIA-568-C.2 (2009) Balanced Twisted-Pair Telecommunications Cabling and Components Standards TIA/EIA-568-C.3 (2008) Optical Fiber Cabling Components Standard TIA/EIA-568-C.x (2010) Commercial Building Telecommunications Cabling Standard

TIA/EIA-569-D (2015) Commercial Building Standards for Telecommunications Pathways and Spaces TIA/EIA-598-D (2014) Optical Fiber Cable Color Coding TIA/EIA-568-B.1 (2001 Addendums 2001, 2003, 2003, 2003, 2004, 2007) Commercial Building Telecommunications Cabling Standard – Part 1: General Requirements

TIA/EIA-568-B.2 (2001) Commercial Building Telecommunications Cabling Standard – Part 2: Balanced Twisted Pair Cabling Components

TIA/EIA-568-B.3 (2000; Addendum 2002) Optical Fiber Cabling Components Standard

TIA/EIA-569-D (2015) Commercial Building Standards for Telecommunications Pathways and Spaces TIA/EIA-598-D (2014) Optical Fiber Cable Color Coding TIA/EIA-606-B-1 (2015) Administration Standard for the Telecommunications Infrastructure

U.S. FEDERAL COMMUNICATIONS COMMISSION (FCC)

FCC Part 68 Connection of Terminal Equipment to the Telephone Network

(47 CFR 68) UNDERWRITERS LABORATORIES (UL)

UL 1286 (1999; Rev thru Jul 2004) Office Furnishings

UL 1666 (2000; Rev thru Jul 2002) Test for Flame Propagation Height of Electrical and Optical-Fiber Cables Installed Vertically in Shafts

UL 1863 (2004) Communication Circuit Accessories

UL 444 (2002; Rev thru Sep 2006) Communications Cables

UL 467 (2004) Standard for Grounding and Bonding Equipment

UL 497 (2001; Rev thru Jun 2004) Protectors for Paired Conductor Communication Circuits UL 50 (2003; R 2005) Standard for Enclosures for Electrical Equipment UL 510 (2005; Rev thru Aug 2005) Polyvinyl Chloride, Polyethylene, and Rubber Insulating Tape UL 514C (1996; Rev thru Dec 2006) Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers UL 83 (2003; Rev thru Apr 2006) Standard for Thermoplastic-Insulated Wires and Cables UL 910 (1998) Test for Flame-Propagation and Smoke-Density Values for Electrical and Optical-Fiber Cables Used in Spaces Transporting Environmental Air

UL 969 (1995; Rev thru Dec 2006) Marking and Labeling Systems.

UFC-3-580-01 Telecommunications Interior Infrastructure Planning And Design UFC 4-021-02NF (Change 1) Security Engineering – Electronic Security Systems UFC 4-020-04FA Security Engineering - Electronic Security Systems UFGS 28 23 23.00 10 Closed Circuit TV systems

UFGS 01 33 00 Submittal Procedures

UFGS 01 78 23, Operation And Maintenance Data

UFGS 01 78 23, Operation and Maintenance Data

UFGS 07 84 00, Firestopping

UFGS 09 90 00 Paints and Coatings

UFGS 26 20 00 Interior Distribution System

UFGS 27 10 00 Installed Single-Mode Fiber Cable Plant

UFGS 31 00 00, Earthwork

UFGS 33 71 01, Overhead Transmission And Distribution

UFGS 33 71 02.00 20, Underground Transmission And Distribution

UFGS 33 70 02.00 10, Electrical Distribution System, Underground

UFGS 33 82 00 Telecommunications, Outside Plant

(End of Summary of Changes)