This is a Request for Quote (RFQ) for an Inside Plant (ISP) Network Cables Installation project for the U.S. Army's 311th Military Intelligence Battalion at Joint Base Elmendorf Richardson (JBER), Alaska. The contract requires the contractor to provide materials, equipment, and installation of telecommunications infrastructure in Building 600, including copper and fiber optic cables for NIPRNET and SIPRNET connectivity. The project also involves installing an Integrated Commercial Intrusion Detection System (ICIDS) and Access Control System (ACS) using Honeywell Vindicator equipment.
The solicitation is set aside for small businesses, with a small business size standard of $19,000,000 and NAICS code 238210. The RFQ closes on August 25, 2025, at 10:00 hrs Alaska Standard Time, with a site visit scheduled for August 19, 2025. The period of performance is 60-90 days from contract award, with material lead times estimated at 6-8 weeks. The contract will be awarded on a lowest-priced technically acceptable basis, with evaluation factors including technical capability (installation plan and infrastructure test results) and price. The total project requires comprehensive network cable installation, system integration, and documentation to meet DoD, Army, and JBER standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI Answers for W912D025R0010 311th-02.docx | DOCX document | |
| Solicitation W912D025R00100003 Amended MOD copy.pdf | ||
| Solicitation W912D025R00100003 Amended Conformed copy.pdf | ||
| RFI Answers for W912D025R0010 .docx | DOCX document | |
| Solicitation W912D025R00100002 Amended Conformed copy.pdf | ||
| Solicitation W912D025R00100002 Amendment (MOD Copy).pdf | ||
| Solicitation W912D025R00100001 Amendment (MOD Copy).pdf | ||
| ARO B600 Open Storage Enclosures.pdf | ||
| Wage Determination REV 23 June 02 2025..pdf | ||
| Solicitation W912D025R0010.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912D025R0010 05-Aug-2025
b. TELEPHONE NUMBER
907.384.3954
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 25 Aug 2025
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912D09. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ZAINAB.A.OBATAYO
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
REGIONAL CONTRACTING OFFICE - ALASKA
1064 APPLE STREET
FORT WAINWRIGHT AK 99703
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 907-353-2460 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$19,000,000
NAICS:
238210
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF55
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Page 3 of
W912D025R0010
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job ISP Network Cables Installation
FFP
The Contractor shall provide all materials, equipment, and installation associated with the telecommunications infrastructure installation at ARO, BLDG 600 in JBER, Alaska. The full effort shall include all Inside Plant Copper and Fiber Optic cables and its support equipment installation for Network connectivity. All tasking shall be performed in accordance with the attached PWS. This effort will include both Inside Plant / distribution cabling and premise cables equipment and installation IAW the standards, codes and instructions listed in Appendix A of the
PWS.
FOB: Destination
PSC CD: N061
NET AMT
Page 4 of
Section C - Descriptions and Specifications
SOW
STATEMENT OF WORK (SOW)
As of 14 July 2025
Award/Mod Effective Version Date
Award TBD
Contract Number: (completed by the KO at time of contract or TO award)
Task Order Number: (completed by the KO at time of TO award or N/A) Contractor Name (completed by the KO at time of contract or TO award)
Tracking Number: (completed by the KO when complete package is received)
Follow-on to Previous Contract and Task Order Number:
N/A
1. Contracting Officer’s Representative (COR) & Technical Representative (TR).
a. Primary COR: N/A (due to small size of contract)
b. Primary TR.
Name: Mr. Oo, Ye N.
Organization: U.S. Army, 311th MI BN
DODAAC: WKCQT0
Address: 311th MI BN, Unit 45009, PSC 704, APO AP 96338-5009
Phone Number: DSN:315-263-3786, Cml: 046-407-3786, Intl: +81-46-407-3786
Fax Number: N/A E-Mail Address: ye.n.oo.civ@army.mil
c. Alternate TR.
Name: CPT Thomas, Kendrick L.
Organization: U.S. Army, 311th MI BN
DODAAC: WKCQT0
Address: 311th MI BN, Unit 45009, PSC 704, APO AP 96338-5009
Phone Number: DSN:315-263-4416, Cml: 046-407-4416, Intl: +81-46-407-4416 Fax Number: N/A E-Mail Address: kendrick.l.thomas4.mil@army.mil
2. Contract or Task Order Title. “311th MI BN ARO building 600, JBER, Alaska” network cable layer 1 ISP (Inside Plant), ICIDS (Integrated Commercial Intrusion Detection System), and ACS (Access Control System) ISO (in support of) open storage accreditation.
3. Background. U.S. Army 311th Military Intelligence Battalion, ARO (Alaska Resident Office), is responsible for Intelligence Support, Force Protection, Counterintelligence (CI), and Human Intelligence (HUMINT) operations across U.S. Army Alaska. ARO recently acquired building 600 (basement office) in
Page 5 of
Joint Base Elmendorf Richardson (JBER), Alaska. Hence, the building 600’s ISP network cable infrastructure, ICIDS, and ACS must be fully mission capable of supporting ARO assigned operations and missions. The installation must be compliance with the DoD, Army, and other applicable regulations, policies, and standards that are annotated in Appendix A. Integrated Commercial Intrusion Detection System (ICIDS) is the Army standard for Department of Defense (DoD) intrusion detection. An Intrusion Detection System provides early warning of an intruder; precludes unauthorized entry; and prevents the introduction of harmful devices, materiel, and components. If vulnerable activities are not protected by an Intrusion Detection System (IDS), Arms Rooms and SCIFs would have to provide armed guards for their areas, Mission Essential Vulnerable Areas (MEVAs) would be unprotected, and money handling activities would see an increase in theft and vandalism. ACS will be directly support ARO’s physical security program IAW AR 190-13 which aspects include verifying identification conducting background checks and establishing Access Control Points (ACPs). ISP Network Copper and Fiber Optic cables installation will be in support of NIPRNET and SIPRNET connections.
4. Objectives: The contractor shall provide the required materials, labors, and perform identified tasks within SOW for ISP Network cables ISO NIPRNET and SIPRNET connectivity. All repair and installation efforts shall be in accordance with DoD, Army, and the industry standards mandated by public-law 104- 113, section 12 “Standards Conformity” (ANSI TIA/EIA telecommunications standards) as listed below.
For ICIDS and ACS, the contractor shall procure, provide the required materials, install, and test Honeywell Vindicator ICIDS and ACS designed to meet or exceed AR 380-5 and JBER – Air force standards within BLDG 600, JBER, Alaska. Systems must be fully integrated into JBER – Air Force control IDS and ACS infrastructure and tested system performance verification in order to provide early warning of an intruder to active monitoring station, as well as all programming and integration of the receiver system per JBER base requirements for a fully functional and operational system.
5. Scope: The Contractor shall provide, install, program, integrate, commission, and test Honeywell Vindicator IDS, and ACS designed to meet or exceed AR 380-5 within building 600, JBER. In addition, the Contract shall provide the required material for repair, install, and test the 311th MI BN, ARO telecommunications infrastructure installation – ISP layer 1 network cables implementation as described in this SOW. All work shall meet or exceed Army regulations, and Unified Facility Criteria (UFCs). The contractor shall comply with all applicable codes for DoD facilities as stated in UFC 1- 200-01 and unified facilities guide specification (UFGS) 28 20 01.00 10. In general, Telecommunications Industry Association standards and best industry standard installation practices will be used to meet requirements set forth in this SOW. This effort will include both Inside Plant / distribution cabling and premise cables install IAW the standards, codes and instructions listed below. Below is a list of required tasks:
6. Performance Requirements:
The items listed below apply to task 6.1.
1. Maximum compliance with the most current version of ANSI/EIA/TIA Standards as well as all other directives (i.e JBER – Air Force) standards listed in below Appendix A will be followed on all work performed under this effort.
2. Timelines & schedules are directed via the Technical Representative (TR) or contracting officer (KO).
3. Adhere to all federal and local safety standards and regulations.
4. Provide post-install “redlined” Installation Design Plans for installed work associated with this installation effort.
5. Provide completed, legible deliverable documents to include copper/fiber test results of all installed infrastructure. Provide digital “soft copy” test results in accordance with of the standards, codes and instructions listed in below.
6. Documentation and Performance. 311th MI BN, ARO shall have unlimited rights to, and ownership of all deliverables provided under this Task Order, including reports, recommendations, briefings, work plans and all other deliverables. The definition of “unlimited rights” is contained in Federal Acquisition Regulation (FAR) 27.401, Definitions.
Page 6 of
7. Formal Acceptance or Rejection of Deliverables: The Government will have five (5) business days to review each document and provide feedback/comments. The contractor shall have five (5) business days to incorporate comments. Delivery of final document with incorporated comments shall constitute acceptance by the Government.
6.1 ISP Layer 1 Network Cable, IDS, and ACS:
Task 1: Telecommunication Infrastructure Installation:
In building 600, the contractor shall perform the following tasks in according with (IAW) enclosure#1:
NIPR Cabling
a) Test, repair, and/or re-terminate already installed (36) CAT6 unshielded plenum rated cable with green jacket the ARO work area outlets in Bldg. 600.
I. When the already installed cables are unrepairable, provide and install the required CAT6 cable.
b) Verify and validate (1) 48 port Unshielded patch panel loaded with unshielded jacks.
I. Repair and/or replace broken materials.
c) Test, and validate already installed (36) Unshielded CAT6 RJ45 jacks with green trim.
I. Repair and/or replace broken materials.
d) Verify and validate already installed (18) 2 Port faceplates.
I. Repair and/or replace broken materials.
e) Test, repair, and/or re-terminate already installed CAT6 cables on the patch panels in the NIPR cabinets.
I. Repair and/or replace broken materials.
SIPR Cabling
a) Verify and validate already installed (1) CCH-04U inside Secure Cabinet.
I. Repair and/or replace broken material.
b) Test, repair, and re-terminate already installed (22) 2-Stand OM4 multimode Fiber Optic red cables.
I. When the already installed cables are unrepairable, provide and install the required CAT6 cable.
c) Test, repair, and/or re-terminate already installed (24) 12 Fiber Panduit OptiCam duplex LC MM connector panels.
I. Repair and/or replace broken materials.
d) Verify and validate already installed (176) LC Panduit OptiCam LC Fiber Optic Connectors.
I. Repair and/or replace broken materials.
e) Verify and validate already installed (11) 2 port faceplates.
I. Repair and/or replace broken materials.
f) Verify and validate already installed/terminated fiber cables with LC type fiber connectors.
Network Cabinets
a) Verify and validate already installed (2) 4x4 3/4-inch fire rate - A/C grade plywood.
I. Repair and/or replace broken materials.
b) Verify and validate already installed (2) CPI Cube-it 24x30 (CPI# 11996-724) 12U lockable wall mount cabinet with low-decibel (31 dB), dual-fan Kit for 1 for SIPR and 1 for NIPR.
I. Repair and/or replace broken materials.
c) Verify and validate already installed (2) 19” Rack busbar (EBB).
I. Repair and/or replace broken materials.
d) Verify and validate already installed (1) 12x4 TGB buss bar with #6 AWG to each rack.
I. Repair and/or replace broken materials.
e) Verify and validate already installed (1) #2 AWG from the TGB to the TMGB COMM room busbar.
Page 7 of
Pathway
a) Verify and validate already installed (1) 1” conduit pathway from the new NIPR cabinet to the
Bldg. 600 telecommunication room outside the ARO suite.
I. Repair and/or replace broken materials.
b) Provide and install J-hooks where necessary and where dictated by standard.
c) Verify and validate that already installed pathways are separated by at least 3ft IAW AR 380-5, 25-2, & TEMPEST requirements. The pathways will allow NIPR and SIPR cables to cross the hallway from the far side of the hallway to the new ARO COMM room (Room B53).
I. If there is no 3ft of separation between NIPR and SIPR cables pathway, repair and/or replace the required cables.
d) Provide and install surface mount raceway where cabling cannot be run down the wall
e) Where cables can be run down the wall provide and install LV1 cut in rings.
Backbone fiber
a) Test, repair, and re-terminate already installed (1) 12f SM Fiber optic cables from the ARO NIPR cabinet (in Room B53) to the cabinet in the Bldg. 600, telecommunication room (Room B43) outside the ARO suite.
I. When the already installed cables are unrepairable, provide and install the required fiber optic cable.
b) Test, repair, and re-terminate already installed (1) 12f SM Fiber optic cables from the ARO NIPR cabinet to the Bldg. 600, 2nd floor telecommunication room and place in existing fiber patch panel. The cables must be routed through the Bldg. 600, telecommunication room (Room B43) outside the ARO suite.
I. When the already installed cables are unrepairable, provide and install the required fiber optic cable.
c) Verify and validate already installed (1) CCH-02U fiber optic patch panel in the NIPR cabinet.
I. Repair and/or replace broken materials.
d) Verify and validate already installed (1) CCH-01U fiber optic patch panel in the Bldg. 600 telecommunication room (Room B43) outside the ARO suite.
I. Repair and/or replace broken materials.
e) Verify and validate already installed (48) 3m SC Hotmelts - terminate all backbone fiber cables with SC/ST (industry standard) connectors.
I. Repair and/or replace broken materials.
f) Verify and validate already installed (6) ST 6f Simplex bulkheads.
I. Repair and/or replace broken materials.
g) Verify and validate already installed (12) strands fiber MM OM3 from NIPR cabinet to SIPR cabinet, terminate all fibers with LC connectors.
I. When the already installed cables are unrepairable, provide and install the required fiber optic cable.
h) Verify and validate that all fiber cables are terminated with LC type fiber connectors.
i) Test and Label accordingly.
Task 2: ICDS and ACS Installation:
In building 600, the contractor shall perform the following tasks in according with (IAW) enclosure#2 & 3:
ICDS
a) Procure, Install, and Configure Honeywell Vindicator Intrusion Detection System (IDS) designed to meet or exceed AR 380-5, UFC, USGS, and JBER standards shall be used for all wiring within BLDG 600, JBER, Alaska.
b) Provide a complete system which is fully integrated into the existing Joint Base Elmendorf Richardson (JBER) ICDS, located JBER Air Force PMO.
c) Provide all materials, installation, integration, and testing of all equipment and cables to ensure ARO’s IDS is fully mission capable.
d) Contractor shall.
Page 8 of
I. Install the ¾” rigid conduit to protect the network copper cable from ARO’s IDS control panel located near main entry/exit door to JBER IDS PoP (Point of Presence) in Room B43 (Basement Telecommunication Room).
II. Install and run two - 2x CAT6 STP (Shielded) network cables inside the conduit from ARO’s IDS control panel to Room B43.
III. Install and mount one – (1) Cisco C9200CX-8P-2X2G (TAA Compliant) with 19” rack rail kit for Cisco switch in the exiting network rack inside Room B43.
IV. Install and mount one – (1) UPS (Uninterruptible Power Supply) that shall last minimum of 4 hours. APC SMX750CNC (qty. 1) or SMX48RMBP2U (qty. 1) meets the power specific requirement.
V. Install a control alarm panel for Arm/Disarm w/Duress, 360-degree motion sensors, HSS (High Security Sensor/Switches), BMS (Balanced Magnetic Sensor/Switch), Curtain, and other required items at annotated/identified location in the enclosure# 3.
VI. Verify and validate the entire ARO’s IDS integration with JBER ICIDS and ensure ARO’s IDS is fully mission capable.
e) Label all devices and materials accordingly.
f) Provide one copy of the Performance Verification Test result and documentation ensuring ARO’s
IDS is fully operational.
I. All sensors shall be installed and compliance with DoD/Army/JBER regulations, policies, and standards.
II. All sensors shall be able to communicate ARO’s IDS control panel.
III. ARO’s IDS shall successfully be able to arm/disarm.
IV. ARO’s IDS shall successfully be able communicate with JBER overall ICDS controller and receive the required notifications, alarms, and other reporting requirements.
ACS
In building 600, the contractor shall perform the following tasks in accordance with (IAW) enclosure#
3:
a) Procure, Install and Configure Honeywell Vindicator Access Control System (ACS) designed to meet or exceed AR 380-5, UFC, USGS, and JBER standards shall be used for all wiring within BLDG 600, BER, Alaska.
b) Provide all materials, installation, integration, and testing of all equipment and cables to ensure ARO’s IDS is fully mission capable.
c) Provide a complete standalone ACS that is not tied to the existing JBER. The system shall consist of the following items.
I. (1) Honeywell Vindicator AE V3 ACS AES Encryption, Wire II. (1) Access Control Enclosure Assembly with power Supply and Power Distribution for V3
ACS.
III. (1) Honeywell Vindicator MR-52 Dual Reader Interface w/ Enclosure, Power Supply and
Power Distribution IV. (1) PIVClass RP40 Single Gang Reader V. (1) AE VBM 3 Badge Manager
VI. (1) VBM Badging Camera Package VII. (1) CAC Enrollment Station
d) Install “the reader” on both side of the wall near Entry/Exit Door and enrollment station in Room B53 (ARO’s COMM Room).
e) Label all devices and materials accordingly.
f) Provide one copy of the Performance Verification Test result and documentation ensuring ARO’s
ACS is fully operational.
I. All readers shall be installed and compliance with DoD/Army/JBER regulations, policies, and standards.
II. All readers shall be able to communicate ARO’s ACS.
III. ARO shall successfully be able enroll/de-enroll Access Card.
IV. ARO shall successfully be able manage CAC enrollment station for personnel access requirement.
Page 9 of
7. Performance Standards
Performance Standard Acceptable Quality Level (AQL) Methods of Calculation Task 6.1 100% in compliance with
ANSI EIA/TIA, AR 380-5,
UFC, USGS, and JBER standards standards listed in appendix A.
On-site surveillance and inspection of as- built drawings.
Performance measures for satisfactory completion of this task order shall be measured by completion of deliverables and tasks identified in the PWS. Completion of deliverables and tasks shall remain within the scope of this PWS. At a minimum, the following metrics shall be applied:
I. There are no oversights in the review and analysis performed by the contractor that result in incorrect or inadequate assumptions, which, in turn, result in unacceptable recommendations.
II. There are no oversights in the development of reports, documents or functional requirements, which could result in delays in meeting established timelines.
III. All written documentation is written in a skilled business style.
The documentation conforms to standards for documentation established by the Contracting Officer and the COR.
IV. All work is completed within the established and agreed upon time frames.
V. The quality of the work and the content of deliverables (and their exposition) shall be highly professional
8. Incentives. Not Applicable
9. Place of Performance. Building 600 is located at Joint Base Elmendorf Richardson (JBER), Alaska.
10. Period of Performance. 60-90 Days from Contract award date.
Material lead times and shipping are anticipated to be 6-8 weeks (Long lead times from CONUS based materials). Estimated installation will be 30-60 days.
As directed by the COR/TR, the contractor shall continue performance in emergency or mission essential conditions. Additionally, the contractor may be required to account for the where abouts of their personnel should this information be requested by the COR/TR.
Page 10 of
11. Delivery Schedule.
PWS
Task#
Deliverabl e Title
Format Due Date Distribution/Copies Frequency and Remarks
6.1 As Built
Drawings
Soft and Hard copies as required
10 days after project completion
Standard Distribution*
Project completion
6.1 Test Results Softcopy IAW
standards in Appendix A
10 days after installation.
Two Copies to COR; Letter Only to
KO
Project completion
*Standard Distribution: 1 copy of the transmittal letter without the deliverable to the Contracting Officer (COR) or Technical Representative (TR); 1 copy of the transmittal letter with the deliverable to the Primary COR/TR.
12. Credential Requirements. The contractor shall be fully certified and shall provide the Honeywell Vindicator certification for IDS and ACS installation. In addition, the contractor must have extensive knowledge of Fiber Optic Cable (FOC) and Copper Cables (CAT6 etc.) installation experience and knowledge IAW Fiber Optic Association (FOA) and ETA International (ETA), and shall provide certifications that are equal or equivalent to Certified Fiber Optic Technician (CFOT), Fiber Optics Installer (FOI), Certified Network Cable Installer (CNCI) or other industry leading acceptable certification.
13. Training Requirements.
a) All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete:
AT Level I awareness training within five (5) calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or TR, if a COR is not assigned, within five (5) calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil.
b) 5.2 Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within five (5) calendar days of their reporting for duty and annually thereafter. OPSEC Awareness training is available at the following website: http://jko.jten.mil.
14. Security Requirements.
Contractor Identification. Contractor employees shall be clearly identifiable while on Government property by wearing a badge as required. Contractor employees shall clearly identify themselves and the company they work for whenever making contact with Government personnel by telephone, electronic, or by other means.
Contractor shall comply with all Army and Federal Government security laws and established policies and procedures. Contractor shall follow procedures for security compromises that conform to Army and Government procedures.
14.1 Facility Security Clearance. N/A
14.2 Visit Authorization Letters (VAL). N/A
14.3 Information Security and other miscellaneous requirements.
14.3.1 Contractor personnel shall comply with all local security requirements including entry and exit control for personnel and property at the government facility.
14.3.2 Contractor employees shall be required to comply with all Government security regulations and requirements. Initial and periodic safety and security training and briefings will be provided by Government security personnel. Failure to comply with Government security regulations and requirements shall require the company to provide the Government with a written
Page 11 of remediation/corrective action plan; furthermore, failure to comply with such requirements can be cause for removal and the contractor will not be able to provide service on this contract/order.
14.3.3 The Contractor shall not divulge any information, classified or unclassified, about DoD files, data processing activities or functions, user identifications, passwords, or any other knowledge that may be gained, to anyone who is not authorized to have access to such information. The Contractor shall observe and comply with the security provisions in effect at the DoD facility. Identification shall be worn and displayed as required.
14.3.4 Contractor personnel will generate or handle documents that contain Controlled Unclassified Information (CUI) at the Government facility. All contractor deliverables shall be marked in accordance with DoDM 5200.1, Vol. 3, Vol. 4, Information Security, DoD 5400.7-R, Freedom of Information Act Program, unless otherwise directed by the Government. The contractor shall comply with the provisions of the DoD Industrial Security Manual for handling classified material and producing deliverables. The contractor shall comply with DISA Instruction 630-230-19.
14.3.5 The Contractor shall afford the Government access to the contractor’s facilities, installations, operations, documentation, databases and personnel used in performance of the contract/order.
Access shall be provided to the extent required to carry out a program of IT inspection (to include vulnerability testing), investigation and audit to safeguard against threats and hazards to the integrity, availability and confidentiality of data or to the function of information technology systems operated on behalf of DISA or DoD, and to preserve evidence of computer crime.
15. Government Furnished Resources.
Facilities: The Government will make available to the Contractor, located BLDG 600, Joint Base
Elmendorf Richardson (JBER), Alaska to perform the work outlined in this SOW.
Utilities: The Government will provide all standard utilities at no cost to the Contractor. Such standard services at a minimum will include electricity, water, sewage, heating and cooling. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, such as turning off the water faucets or valves after using the required amount.
Information: The Government will provide the installation plan, building, and other pertinent information (see enclosures).
16. Other Pertinent Information or Special Considerations. N/A Identification of Possible Follow-on Work: N/A Identification of Potential Conflicts of Interest (COI): N/A Identification of Non-Disclosure Requirements: N/A Packaging, Packing and Shipping Instructions: N/A
16.1. Inspection and Acceptance Criteria Formal Acceptance or Rejection of Deliverables: The Government will have five (5) business days to review each document and provide feedback/comments.
The contractor shall have five (5) business days to incorporate comments. Delivery of final document with incorporated comments shall constitute acceptance by the Government.
16.2. Normal Work Hours: The Contractor shall report to work Monday through Friday, work a minimum of eight hours a day, between the hours of 8:00 a.m. to 17:00 p.m. Specific work schedules will be provided on contract start date, other hours may be worked as requested and authorized by the COR/TR.
16.3. Business Dress: All Contractor personnel shall dress professionally when at the work site. Business attire EXCLUDES short pants, tee shirts, sneakers, and other dress considered not to be appropriate.
Notwithstanding any other terms or conditions of the contract, Contractor wearing inappropriate dress to the work site may be immediately removed from the project, or at the discretion of the COR/TR, may be requested to leave the work site and return with appropriate dress.
16.4. Contractor personnel shall be courteous and respectful to the customer and all other onsite personnel at all times. The Contractor shall follow the direction provided by COR/TR, regarding the level of communication with the naval base personnel and conflict resolution/escalation procedures.
Enclosures
1) Alaska resident Office (ARO), Bldg. 600 ISP layout
2) ARO Bldg 600 location and conduit installation requirement
3) ARO IDS and IDS installation requirement
Appendix A
The publications listed below form a part of this specification to the extent referenced.
The publications are referred to within the text by the basic designation only. In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears.
UNITED STATES CODE
41 U.S.C 23 “Project Order Law” ASTM
INTERNATIO
NAL (ASTM)
ASTM B 1 (2001) Standard Specification for Hard-Drawn Copper Wire
ASTM B 8 (2004) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft
ASTM D 1557 (2002e1) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D 709 (2001) Laminated Thermosetting Materials CONSUMER
ELECTRONICS ASSOCIATION (CEA)
CEA-310-E (2005) Racks, Panels, and Associated Equipment 31 U.S.C 1535 “Economy Act”
CHAIRMAN JOINT CHIEFS OF STAFF INSTRUCTIONS
CJCSI 6211.01C Defense Information System Network (Disn): Policy And Responsibilities
CJCSI 6212.01E Interoperability And Supportability Of Information Technology And National Security Systems CJCSI 6215.01C Policy For Department Of Defense (Dod) Voice Network With Real Time Services (Rds) DEPARTMENT OF DEFENSE
DOCTRINE
DoDI 8100.04 DoD Unified Capabilities (UC)
DoD FMR Vol.11 A – Chapter 1 General Reimbursement Procedures And Supporting Documentation DODINST 4000.19 Interservice And Intragovernmental Support DODINST 4630.09 Wireless Communications Waveform Development And Management
DODINST 4630.8 Procedures For Interoperability And Supportability Of Information
Technology (It) And National Security Systems (NSS)
DODM 5200.22 National Industrial Security Program: Industrial Security Procedures for Government Activities
DODINST 8100.3 Department Of Defense (Dod) Voice Networks
CNSSAM TEMPEST 1-13 Red/Black Installation Guidance
AR 25-13 Army Telecommunication and Unified Capabilities
AR 25-2 Army Cybersecurity
AR 190-13 Army Physical Security Policy
AR 380-67 Army Personnel Security Program
AR 380-5 Army Information Security Program
ELECTRONIC INDUSTRIES ALLIANCE (EIA)
EIA TIA/EIA-455-204 (2000) FOTP-204 Measurement of Bandwidth on Multimode Fiber INSTITUTE OF ELECTRICAL AND ELECTRONICS
ENGINEERS (IEEE)
IEEE C2 (2005) National Electrical Safety Code
IEEE Std 100 (2000) The Authoritave Dictionary of IEEE Standards Terms INSULATED CABLE ENGINEERS
ASSOCIATION (ICEA)
ICEA S-83-596 (2001) Fiber Optic Premises Distribution Cable
ICEA S-87-640 (1999) Fiber Optic Outside Plant Communications Cable
ICEA S-90-661 (2002) Category 3, 5, & 5e Individually Unshielded Twisted Pair Indoor Cable for Use in General Purpose and LAN Communications Wiring Systems
ICEA S-98-688 (1997) Broadband Twisted Pair, Telecommunications Cable Aircore, Polyolefin Insulated Copper Conductors
ICEA S-99-689 (1997) Broadband Twisted Pair Telecommunications Cable Filled, Polyolefin Insulated Copper Conductors
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA C62.61 (1993) Gas Tube Surge Arresters on Wire Line Telephone Circuits NEMA WC 63.1 (2005) Twisted Pair Premise Voice and Data Communications Cables NEMA WC 66 (2001; Errata 2003) Category 6 and Category 7 100 Ohm Shielded and Unshielded Twisted Pairs NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70
National
Electrical Code
OFSTP-7
RUS 1755 Telecommunications Standards and Specifications for Materials, Equipment and Construction RUS Bull 1751F-630 (2002) Underground Plant Design RUS Bull 1751F-640 (1995) Design of Buried Plant, Physical Considerations RUS Bull 1751F-643 (1996) Design of Aerial Plant RUS Bull 1751F-815 (1979) Electrical Protection of Outside Plant
RUS Bull 1753F-201 (1997) Acceptance Tests of Telecommunications Plant (PC-4) RUS Bull 1753F-401 (1995) Splicing Copper and Fiber Optic Cables (PC-2)
RUS Bull 345-50 (1979) Trunk Carrier Systems (PE-60) RUS Bull 345-65 (1985) Shield Bonding Connectors (PE-65) RUS Bull 345- 72 (1985) Filled Splice Closures
(PE-74)
RUS Bull 345-83 (1979; Rev Oct 1982) Gas Tube Surge Arrestors (PE-80) SSPC SP 6 (2000; E 2004) Commercial Blast Cleaning
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
(Reqired by Public Law 104-113, Section 12, Standards Conformity)
TIA J-STD-607-C (2015) Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications
TIA-455-107A (1999) Component Reflectance or Link/System Return Loss using a Loss Test Set
TIA-455-46A (1990) FOTP-46 Spectral Attenuation Measurement for Long-Length, Graded-Index Optical Fibers
TIA-455-78-B (2002) FOTP-78 Optical Fibers - Part 1-40: Measurement Methods and Test Procedures - Attenuation
TIA-472D000-A (1993) Fiber Optic Communications Cable for Outside Plant Use
TIA-492AAAA-A (1998; R 2002) 62.5-um Core Diameter/125-um Cladding Diameter Class 1a Graded-Index Multimode Optical Fibers
TIA-492AAAB (1998; R 2002) 50-Um Core Diameter/125-Um Cladding Diameter Class IA Graded-Index Multimode Optical Fibers
TIA-492CAAA (1998; R 2002) Class IVA Dispersion-Unshifted Single-Mode Optical Fibers
TIA-492E000 (1996; R 2002) Class IVd Nonzero-Dispersion Single-Mode Optical Fibers for the 1550 nm Window (ANSI/TIA/EIA-492E000)
TIA-526-14-C (2015) OFSTP-14A Optical Power Loss Measurements of Installed Multimode Fiber Cable Plant
TIA-526-7-A (2015) Measurement of Optical Power Loss of Installed Single-Mode
Fiber Cable Plant OFSTP-7 TIA-590-A (1997) Standard for Physical Location and Protection of Below Ground Fiber Optic Cable Plant TIA-758-B (2012) Customer- Owned Outside Plant Telecommunications Cabling Standard TIA/EIA-455-B (1998) Standard Test Procedure for Fiber Optic Fibers, Cables, Transducers, Sensors, Connecting and Terminating Devices, and other Fiber Optic Components
TIA-455-21-A (1988) FOTP-21 - Mating Durability of Fiber Optic Interconnecting Devices
TIA-492AAAA-A (1998; R 2002) 62.5-um Core Diameter/125-um Cladding Diameter Class 1a Graded-Index Multimode Optical Fibers
TIA-492AAAB (1998; R 2002) 50-Um Core Diameter/125-Um Cladding Diameter Class IA Graded-Index Multimode Optical Fibers
TIA-492CAAA (1998; R 2002) Class IVA Dispersion-Unshifted Single-Mode Optical Fibers
TIA-526-7-A (2015) Measurement of Optical Power Loss
TIA-570-C (2012) Residential Telecommunications Infrastructure Standard
TIA/EIA-604-12 (2000) FOCIS 12 Fiber Optic Connector Intermateability Standard Type LC TIA/EIA-604-2 (2004) FOCIS 2 Fiber Optic Connector Intermateability Standard, Type ST TIA/EIA- 604-3A (2000) FOCUS 3 Fiber Optic Connector Intermateability Standard TIA/EIA-606-A (2002) Administration Standard for the Telecommunications Infrastructure TIA/EIA-568-C.0 (2009) Generic Telecommunications Cabling for Customer Premises TIA/EIA-568- C.1 (2009) Commercial Building Telecommunications Cabling Standard TIA/EIA-568-C.2 (2009) Balanced Twisted-Pair Telecommunications Cabling and Components Standards TIA/EIA-568-C.3 (2008) Optical Fiber Cabling Components Standard TIA/EIA-568-C.x (2010) Commercial Building Telecommunications Cabling Standard
TIA/EIA-569-D (2015) Commercial Building Standards for Telecommunications Pathways and Spaces TIA/EIA-598-D (2014) Optical Fiber Cable Color Coding TIA/EIA-568-B.1 (2001 Addendums 2001, 2003, 2003, 2003, 2004, 2007) Commercial Building Telecommunications Cabling Standard – Part 1: General Requirements
TIA/EIA-568-B.2 (2001) Commercial Building Telecommunications Cabling Standard – Part 2: Balanced Twisted Pair Cabling Components
TIA/EIA-568-B.3 (2000; Addendum 2002) Optical Fiber Cabling Components Standard
TIA/EIA-569-D (2015) Commercial Building Standards for Telecommunications Pathways and Spaces TIA/EIA-598-D (2014) Optical Fiber Cable Color Coding TIA/EIA-606-B-1 (2015) Administration Standard for the Telecommunications Infrastructure
U.S. FEDERAL COMMUNICATIONS COMMISSION (FCC)
FCC Part 68 Connection of Terminal Equipment to the Telephone Network
(47 CFR 68) UNDERWRITERS LABORATORIES (UL)
UL 1286 (1999; Rev thru Jul 2004) Office Furnishings
UL 1666 (2000; Rev thru Jul 2002) Test for Flame Propagation Height of Electrical and Optical-Fiber Cables Installed Vertically in Shafts
UL 1863 (2004) Communication Circuit Accessories
UL 444 (2002; Rev thru Sep 2006) Communications Cables
UL 467 (2004) Standard for Grounding and Bonding Equipment
UL 497 (2001; Rev thru Jun 2004) Protectors for Paired Conductor Communication Circuits UL 50 (2003; R 2005) Standard for Enclosures for Electrical Equipment UL 510 (2005; Rev thru Aug 2005) Polyvinyl Chloride, Polyethylene, and Rubber Insulating Tape UL 514C (1996; Rev thru Dec 2006) Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers UL 83 (2003; Rev thru Apr 2006) Standard for Thermoplastic-Insulated Wires and Cables UL 910 (1998) Test for Flame-Propagation and Smoke-Density Values for Electrical and Optical-Fiber Cables Used in Spaces Transporting Environmental Air
UL 969 (1995; Rev thru Dec 2006) Marking and Labeling Systems.
UFC-3-580-01 Telecommunications Interior Infrastructure Planning And Design UFC 4-021-02NF (Change 1) Security Engineering – Electronic Security Systems UFC 4-020-04FA Security Engineering - Electronic Security Systems UFGS 28 23 23.00 10 Closed Circuit TV systems
UFGS 01 33 00 Submittal Procedures
UFGS 01 78 23, Operation And Maintenance Data
UFGS 01 78 23, Operation and Maintenance Data
UFGS 07 84 00, Firestopping
UFGS 09 90 00 Paints and Coatings
UFGS 26 20 00 Interior Distribution System
UFGS 27 10 00 Installed Single-Mode Fiber Cable Plant
UFGS 31 00 00, Earthwork
UFGS 33 71 01, Overhead Transmission And Distribution
UFGS 33 71 02.00 20, Underground Transmission And Distribution
UFGS 33 70 02.00 10, Electrical Distribution System, Underground
UFGS 33 82 00 Telecommunications, Outside Plant
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-SEP-2025 TO
30-NOV-2025
N/A N/A
FOB: Destination
Section G - Contract Administration Data
CLAUSES INCORPORATED BY REFERENCE
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC ____
Issue By DoDAAC ____
Admin DoDAAC** ____
Inspect By DoDAAC ____
Ship To Code ____
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section I - Contract Clauses
52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-26 Covered Telecommunications Equipment or Services--
Representation.
OCT 2020
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services
NOV 2023
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024 52.229-11 Tax on Certain Foreign Procurements--Notice and
Representation
JUN 2020
252.203-7000 Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
MAY 2024
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.204-7022 Expediting Contract Closeout MAY 2021 252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7001 Buy American and Balance of Payments Program FEB 2024 252.225-7002 Qualifying Country Sources As Subcontractors MAR 2022 252.225-7012 Preference For Certain Domestic Commodities APR 2022 252.225-7056 Prohibition Regarding Business Operations with the Maduro
Regime
JAN 2023
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region
JUN 2023
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JAN 2023
252.244-7000 Subcontracts for Commercial Products or Commercial Services
NOV 2023
252.246-7008 Sources of Electronic Parts JAN 2023 252.247-7023 Transportation of Supplies by Sea OCT 2024
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]
X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
X (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
___ (4) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community--see FAR 3.900(a).
X (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
___ (6) [Reserved]
___ (7) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div.
C).
___ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub.
L. 111-117, section 743 of Div. C).
X (9) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub.
L. 117-328).
___ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders--Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC 2023) (Pub. L. 115-390, title II).
___ (11)(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders--Prohibition.