W912CH25R0176 QA Log 5.20.2026.pdf
PDF 109 KB Posted
- Attached to
- Solicitation W912CH-25-R-0176 - Collapsible Fabric Tanks (3k, 20k, 50k, 210k US gallon) - AMENDED
- Solicitation number
- W912CH-25-R-0176
- Issued by
-
Department of the Army
About this file
This is a Questions and Answers Log for federal contract solicitation W912CH-25-R-0176, last updated May 20, 2025. The document contains 16 questions submitted by potential offerors with corresponding Government answers, many marked "TBD" (To Be Determined), indicating pending clarification from the Government.
The solicitation seeks a single firm-fixed-price, five-year Indefinite Delivery Indefinite Quantity (IDIQ) Long Term Contract for procurement of collapsible fuel bladders in four sizes: 3K, 20K, 50K, and 210K gallons. Key technical requirements reference MIL-PRF-32233D performance specifications and First Article Testing procedures. Outstanding questions address critical procurement issues including: incumbent contractor identification, testing requirements and timelines for First Article qualification, acceptability of thermoset polymer bladders, fuel type specifications for testing (JP-8 vs. diesel #2), material and construction qualification across multiple vendors and equipment sources, and delivery pricing methodology given fuel cost volatility. Additional questions concern evaluation criteria (Past Performance and Price factors), acceptance of equivalent or improved performance alternatives to specified configurations, and allowance for relevant recent Government performance evidence in Past Performance evaluations. One answer confirms the correct solicitation number as W912CH-25-R-0176 per Amendment 0002 issued May 20, 2026. The Government reserves the right to conduct negotiations if necessary, though award is intended without discussions. No response deadline, award date, or specific pricing terms are identified in this Q&A log.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Last Updated: 20 May 2025
W912CH-25-R-0176 - Q & A Log
Question: Is there an incumbent contractor? If so, can you please share the contact information?
Answer: TBD
Question: As per Para 5.4.3 - Table VI in MIL PRF 32233D, please confirm Seam Dead Load
Shear Resistance conformance test (para 4.5.2.9) is required per fabric material lot, not bladder production Inspection Lot (para 4.3.1).
Answer: TBD
Question: Historically, the Government has relied on Southwest Research Institute (SwRI) for bladder test data. Due to fuel storage capacity, SWRI is unable to perform a First Article Test on
Size V – 210K Bladders. Testing outside of SWRI may require awardee to test sequentially, where the typical timeline is greater than 90 days due to fuel delivery and cycling. If a bladder supplier utilizes the same materials and construction techniques for all bladder sizes, would the
Government consider a single bladder size that is most representative of all bladders for the First
Article Test? It is recognized that a typical Size III – 20K Bladder experiences all representative stresses while providing the most efficient and cost-effective option for the Government.
Answer: TBD
Question: Are thermoset polymer bladders acceptable under this solicitation effort?
Answer: TBD
Question: To be prepared for a robust supply chain, is it necessary for a First Article bladder to be constructed to qualify multiple equipment sources and qualify various material vendors to avoid iterative First Article testing beyond Table I and Table II qualification?
Answer: TBD
Question: Per Paragraph 4.5.1.6, will road diesel #2 be appropriate/acceptable for First Article
Testing? If not, please advise on Government approval method to acquire bulk JP-8.
Answer: TBD
Question: In the solicitation, the Government states that it intends to issue an award as a single
FFP Long Term Contract. Regarding M.3.5, if the Government chooses to enter into a negotiation round and it changes its intention to a multi-source supply award, how will this be communicated to the participants?
Answer: This Solicitation, W912CH-25-R-0176, is intended to result in the award of a single firm-fixed-price, 5-year, Indefinite Delivery Indefinite Quantity Long Term Contract for the procurement of all four tank sizes, 3K, 20K, 50K, and 210K. This RFP includes FAR 52.215-1
Instructions to Offerors Competitive Acquisition in Section L, which advises offerors that the
Government intends to make award without conducting negotiations/discussions. However, under FAR 52.215-1(f)(4), the Government reserves the right to hold negotiations/discussions, if necessary.
Question: If there is a multiple award contract issued, will FAR 16.505(b)(1)(iii) - Simplified
Acquisition Threshold apply?
Answer: This Solicitation, W912CH-25-R-0176, is intended to result in the award of a single firm-fixed-price, 5-year, Indefinite Delivery Indefinite Quantity Long Term Contract for the procurement of all four tank sizes, 3K, 20K, 50K, and 210K.
Question: Will the Government reconsider delivered pricing vs First Destination Transport? As we are in a period of high fuel price volatility, which is a major driver of delivery costs, it would be prudent for vendors to estimate delivery costs based on current fuel pricing. The Government has a better view of fuel futures and buying power to ensure the most efficient delivery costs regardless of the economic situation at the time of shipment over the course of a 5-year contract.
Answer: TBD
Question: Section A and Section M state that the Government intends to award a single firm-fixed-price, 5-year IDIQ contract. Please confirm whether the Government intends to award one contract covering all four tank sizes, 3K, 20K, 50K, and 210K, or whether the Government may consider separate awards by tank size or another split-award structure among small businesses.
Answer: This Solicitation, W912CH-25-R-0176, is intended to result in the award of a single firm-fixed-price, 5-year, Indefinite Delivery Indefinite Quantity Long Term Contract for the procurement of all four tank sizes, 3K, 20K, 50K, and 210K.
Question: Section M identifies Past Performance and Price as the evaluation factors, with Past
Performance significantly more important than Price. Please confirm whether documented reliability, manufacturing controls, material performance, quality history, and relevant prior performance will be considered as part of the Past Performance confidence assessment when comparing proposals.
Answer: Please reference section M.4.1 Factor 1: Past Performance Factor for information on how Factor 1 will be evaluated and reference section L.4.1 Volume 1 Past Performance Factor for guidance on what should be submitted for Factor 1 evaluations.
Question: MIL-PRF-32233D is a performance specification. Please confirm whether an offeror may propose materials, manufacturing methods, and quality-control improvements that meet or exceed MIL-PRF-32233D and all solicitation requirements, without taking exception to the solicitation.
Answer: TBD
Question: For the 210K requirement, please confirm whether the Government requires the 210K-
IPDS exactly as identified under NSN 5430-01-546-3725 / P/N 210K-IPDS, or whether an alternate integrated configuration that provides equivalent or improved performance and total system capacity would be acceptable.
Answer: TBD
Question: If an offeror has relevant recent Government performance and test evidence for similar collapsible fuel tank systems, may that evidence be submitted as part of the Past Performance volume and/or a First Article Waiver request package for Government consideration?
Answer: TBD
Question: Section L.2.3.1 (page 93) references the proposal subject header as “Proposal
Submission W912CH-25-R-0175 (company name).” Since this solicitation is W912CH-25-R-
0176, please confirm the correct solicitation number to use in the email subject line.
Answer: The correct solicitation number is W912CH-25-R-0176. Please reference Amendment
0002 issued on 20 May 2026 for this correction.