Army Aviation Museum IDS Conduit Installation
Solicitation W912CH-24-R-L002 Question & Answer Log
| No. |
| Questions |
| Answers |
| Date Received |
| Date Posted |
| 1. |
| Are there pipe chases through the walls? |
| There are some pipe chases where camera wire would go but we are not using them. |
| 18 April 2024 |
| 30 April 2024 |
| 2. |
| In the vault, will holes have to be drilled through the walls? |
| The holes will not have to go through the wall to mount the keyboard. The link from the Arms room vault to the Communications room is established. |
| 18 April 2024 |
| 30 April 2024 |
| 3. |
| If so, are the walls poured concrete or concrete filled cinder blocks? |
| The Arms room walls are poured concrete. |
| 18 April 2024 |
| 30 April 2024 |
| 4. |
| Please provide the total lengths for the various conduit runs. |
| Refer to Technical Exhibits 1 – 14. |
Technical Exhibit 14 - Architectural Square Footage was provided via Amendment U0001 to the solicitation.
| 18 April 2024 |
| 30 April 2024 |
| 5. |
| Is surface mounted conduit acceptable e.g. wiremold? |
| Yes. Functionality is most important. |
| 18 April 2024 |
| 30 April 2024 |
| 6. |
| Room 116 - Is surface mounted conduit or wiremold acceptable on the wall? |
| Either is fine. |
| 18 April 2024 |
| 30 April 2024 |
| 7. |
| What are the heights of the roll up doors? |
| There is one roll up door. The roll up door is 23 feet 10 inches high. |
| 18 April 2024 |
| 30 April 2024 |
| 8. |
| What is your input on the facility's preferred wiring requirements (e.g., 18/4, 22/4)? |
| 18/4 will work. |
| 24 April 2024 |
| 30 April 2024 |
| 9. |
| Is it possible to do a site visit? |
| Yes. Please refer to Amendment U0001 of the solicitation for detailed information regarding the site visit. |
| 24 April 2024 |