Attachment 1_Photos and Images.pdf
PDF 962 KB Posted
- Attached to
- Intrusion Detection System (IDS) Conduit Installation Federal contract opportunity
- Solicitation number
- W912CH-24-R-L002
- Issued by
- Department of the Army
About this file
This document appears to be an attachment related to a federal contract solicitation for an Intrusion Detection System (IDS) Conduit Installation project at the United States Army Aviation Museum. The solicitation, issued by the Army Contracting Command - Detroit Arsenal (ACC-DTA), is seeking a contractor to install necessary metal conduit and hardware to complete runs for the Integrated Commercial Intrusion Detection System (ICIDS) in various rooms and entrances of the Training Support Facility (TSF).
The key requirements include installing conduit from room 114 along the north wall, with a 90-degree turn south over a roll-up door and into room 102, terminating near the double doors leading into the main gallery. Additional conduit needs to be run from the alarm control panel to the roll-up door for a sensor, as well as for CCTV and door alarms at the five entry doors. All conduit for the building, excluding the arms room, will terminate at the alarm control panel. The contract will be a Firm-Fixed-Price award, and the successful offeror must be registered in the System for Award Management (SAM).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IDS Conduit SOL_Amendment 0003.pdf | ||
| IDS Conduit SOL QA log_14 May.pdf | ||
| TSF Building Dimensioned Drawings and Reflected Ceilings.pdf | ||
| IDS Conduit SOL_Amendment 0002.pdf | ||
| IDS Conduit SOL_Amendment 0001.pdf | ||
| IDS Conduit SOL QA log_30 April.docx | DOCX document | |
| Final_SOW TSF IDS Conduit_revised 24 April.docx | DOCX document | |
| Technical Exhibit 15 - Delivery Schedule.docx | DOCX document | |
| Technical Exhibit 14_Architectural Square Footage.pdf | ||
| Final_CDRL A001 TSF IDS Conduit Install.pdf | ||
| Security 2000 Drawings.pdf | ||
| FINAL_SOL_IDS Conduit.pdf | ||
| Final_CDRL A002 TSF IDS Conduit Install.pdf | ||
| Technical Exhibit 14 - Delivery Schedule.docx | DOCX document | |
| Governement Drawings.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
a
1” Conduit will be run (in Yellow) from room 114 along north wall with a
90 degree turn south over the roll up door and into room 102 terminating near the doubled doors leading into room 103, the main gallery where the alarm control panel is located. Also conduit will need to run back from the alarm panel to the roll-up door for the sensor. Additionally, conduit for the CCTV will be used for door alarms and needs to be completed to the center of the five entry doors. (See attached photos). All conduit for the building (not including the arms room) will terminate at the alarm control panel (in red)
Northeast entrance- conduit run from wall box to a four inch box above door center main entrance- conduit from junction box to four-inch box above center of doors
Southeast entrance- Conduit from stub to four-inch box above center of doors
Southwest entrance-Conduit from stub to four-inch box above center of doors
Northwest entrance-Conduit from stub to four-inch bow above center of doors
Room 116 Mechanical room interior door
Roll-up Door
Roll-up Hanger Door
File details come from the government source that posted it. Updated .