IDS Conduit SOL QA log_14 May.pdf

PDF 76 KB Posted

Attached to
Intrusion Detection System (IDS) Conduit Installation Federal contract opportunity
Solicitation number
W912CH-24-R-L002
Issued by
Department of the Army

About this file

This document is a Question and Answer (Q&A) log related to a solicitation for the installation of Intrusion Detection System (IDS) conduit at the United States Army Aviation Museum. The solicitation, Solicitation Number W912CH-24-R-L002, is for a Firm-Fixed-Price contract to install the necessary metal conduit and hardware for an Integrated Commercial Intrusion Detection System (ICIDS) in specific rooms of the Training Support Facility. The Q&A log addresses questions about pipe chases, wall construction, conduit requirements, wiring, site visits, and inclusion of wire in the proposal. The solicitation requires offerors to complete all representations, and bids will be considered non-responsive if representations are not completed. The contract will be awarded by the Army Contracting Command - Detroit Arsenal.

View the file

Other files for this federal contract opportunity

Other files attached to Intrusion Detection System (IDS) Conduit Installation, newest first.
File Type Posted
IDS Conduit SOL_Amendment 0003.pdf PDF
TSF Building Dimensioned Drawings and Reflected Ceilings.pdf PDF
IDS Conduit SOL_Amendment 0002.pdf PDF
IDS Conduit SOL_Amendment 0001.pdf PDF
IDS Conduit SOL QA log_30 April.docx DOCX document
Technical Exhibit 15 - Delivery Schedule.docx DOCX document
Final_SOW TSF IDS Conduit_revised 24 April.docx DOCX document
Technical Exhibit 14_Architectural Square Footage.pdf PDF
Attachment 1_Photos and Images.pdf PDF
Security 2000 Drawings.pdf PDF
FINAL_SOL_IDS Conduit.pdf PDF
Final_CDRL A001 TSF IDS Conduit Install.pdf PDF
Final_CDRL A002 TSF IDS Conduit Install.pdf PDF
Technical Exhibit 14 - Delivery Schedule.docx DOCX document
Governement Drawings.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Army Aviation Museum IDS Conduit Installation

Solicitation W912CH-24-R-L002

Question & Answer Log

No. Questions Answers Date Received Date Posted

1. Are there pipe chases through the walls? There are some pipe chases where camera wire would go but we are not using them.

18 April 2024 30 April 2024

2. In the vault, will holes have to be drilled through the walls?

The holes will not have to go through the wall to mount the keyboard. The link from the

Arms room vault to the

Communications room is established.

18 April 2024 30 April 2024

3. If so, are the walls poured concrete or concrete filled cinder blocks?

The Arms room walls are poured concrete.

18 April 2024 30 April 2024

4. Please provide the total lengths for the various conduit runs.

Refer to Technical Exhibits 1 –

14.

Technical Exhibit 14 -

Architectural Square Footage was provided via Amendment

U0001 to the solicitation.

18 April 2024 30 April 2024

5. Is surface mounted conduit acceptable e.g.

wiremold?

Yes. Functionality is most important.

18 April 2024 30 April 2024

6. Room 116 - Is surface mounted conduit or wiremold acceptable on the wall?

Either is fine. 18 April 2024 30 April 2024

7. What are the heights of the roll up doors? There is one roll up door. The roll up door is 23 feet 10 inches high.

18 April 2024 30 April 2024

8. What is your input on the facility's preferred wiring requirements (e.g., 18/4, 22/4)?

18/4 will work. 24 April 2024 30 April 2024

9. Is it possible to do a site visit? Yes. Please refer to Amendment

U0001 of the solicitation for detailed information regarding the site visit.

24 April 2024 30 April 2024

10. Is the wire to be included as part of the proposal?

No, wire will not be installed, only pull string.

13 May 2024 14 May 2024

11. It is BMS/PIMS devices only? Yes, only BMS/PIMS devices. 13 May 2024 14 May 2024