This document is a solicitation amendment for a federal contract opportunity. The key details are:
The solicitation is for multiple 5-year, Firm-Fixed-Price (FFP), Indefinite Delivery/Indefinite Quantity (IDIQ) contracts to procure G-15 Cargo Parachutes, Bag Cargo Aerial Delivery A-24, and Parachute Cargo Extraction Assemblies. This is a 100% Small Business set-aside with a NAICS code of 314999. First Article Testing is required but the contractor may request a waiver. Proposals must be submitted via email by the due date. The amendment revises the delivery schedule for some contract line items, increasing the number of days to 390 with First Article Testing or 150 days without FAT. It also adds instructions for submitting proposals via email rather than using DoD SAFE.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0005 2024JUL18
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
DANIEL M. SHALLAL
EMAIL: DANIEL.M.SHALLAL.CIV@ARMY.MIL
W912CH-24-R-0026
2024MAY31
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 14
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DANIEL M. SHALLAL
Buyer Office Symbol/Telephone Number: CCTA-APS-A/(586)282-7359
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of Amendment 0005 to Solicitation W912CH-24-R-0026 is to make the following changes:
1. Revise section F, Time of Delivery clause 52.211-8 as follows:
a. Revise the delivery for CLINs 0011, 0021, 0031 from 330 days to 390 days with FAT.
b. Revise the delivery for CLINs 0016, 0026, 0036 from 180 days to 210 days.
c. Added language that for orders equal to or less than 300 EA, the rate of delivery shall be 25 EA per month until the order is fulfilled.
3. Revise section L as follows:
a. Added sections L.2.2.1 Proposal Submission Instructions through L.2.2.1.5 to change from submitting proposal via DoD SAFE to email submission instructions.
*** END OF NARRATIVE A0007 ***
2 14
W912CH-24-R-0026
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
F-1 CHANGED 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government solicits delivery to be made according to the following schedule:
GOVERNMENT SOLICITED DELIVERY SCHEDULE
ITEM NO. ESTIMATED QUANTITY WITHIN DAYS
AFTER DATE OF DELIVERY ORDER AWARD
CLIN 0011 EST QTY 750* EA 150 Days Without FAT; or 390 Days With FAT
CLIN 0012 EST QTY 750* EA 150 Days
CLIN 0013 EST QTY 750* EA 150 Days
CLIN 0014 EST QTY 750* EA 150 Days
CLIN 0015 EST QTY 750* EA 150 Days
CLIN 0016 1 EA 210 Days (FATR)
CLIN 0021 EST QTY 750** EA 150 Days Without FAT; or 390 Days With FAT
CLIN 0022 EST QTY 698** EA 150 Days
CLIN 0023 EST QTY 698** EA 150 Days
CLIN 0024 EST QTY 698** EA 150 Days
CLIN 0025 EST QTY 698** EA 150 Days
CLIN 0026 1 EA 210 Days (FATR)
CLIN 0031 EST QTY 188*** EA 150 Days Without FAT; or 390 Days With FAT
CLIN 0032 EST QTY 120*** EA 150 Days
CLIN 0033 EST QTY 120*** EA 150 Days
CLIN 0034 EST QTY 120*** EA 150 Days
CLIN 0035 EST QTY 120*** EA 150 Days
CLIN 0036 1 EA 210 Days (FATR)
* For orders more than 300 EA: Deliveries shall begin at a quantity of 50 EA within 390 calendar days after the date of delivery order award with FAT; or within 150 calendar days after the date of delivery order award without FAT; and continue at a rate of 50 EA every 30 calendar days until the order is fulfilled. For orders equal to or less than 300 EA: Deliveries shall begin at a quantity of 25 EA within 390 calendar days after the date of delivery order award with FAT; or within 150 calendar days after the date of delivery order award without FAT; and continue at a rate of 25 EA every 30 calendar days until the order is fulfilled.
** For orders more than 300 EA: Deliveries shall begin at a quantity of 50 EA within 390 calendar days after the date of delivery order award with FAT; or within 150 calendar days after the date of delivery order award without FAT; and continue at a rate of 50 EA every 30 calendar days until the order is fulfilled. For orders equal to or less than 300 EA: Deliveries shall begin at a quantity of 25 EA within 390 calendar days after the date of delivery order award with FAT; or within 150 calendar days after the date of delivery order award without FAT; and continue at a rate of 25 EA every 30 calendar days until the order is fulfilled.
*** For orders more than 300 EA: Deliveries shall begin at a quantity of 50 EA within 390 calendar days after the date of delivery order award with FAT; or within 150 calendar days after the date of delivery order award without FAT; and continue at a rate of 50 EA every 30 calendar days until the order is fulfilled. For orders equal to or less than 300 EA: Deliveries shall begin at a quantity of 25 EA within 390 calendar days after the date of delivery order award with FAT; or within 150 calendar days after the date of delivery order award without FAT; and continue at a rate of 25 EA every 30 calendar days until the order is fulfilled.
The Government reserves the right to award under either the solicited delivery schedule or the proposed delivery schedule when an offeror offers a delivery schedule other than identified above. If the offeror proposes no other delivery schedule, the identified delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO. ESTIMATED QUANTITY WITHIN DAYS
AFTER DATE OF DELIVERY ORDER AWARD
3 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CLIN 0011 EST QTY 750 EA ____ Days Without FAT; or 210 additional days with FAT
CLIN 0012 EST QTY 750 EA ____ Days
CLIN 0013 EST QTY 750 EA ____ Days
CLIN 0014 EST QTY 750 EA ____ Days
CLIN 0015 EST QTY 750 EA ____ Days
CLIN 0021 EST QTY 750 EA ____ Days Without FAT; or 210 additional days with FAT
CLIN 0022 EST QTY 698 EA ____ Days
CLIN 0023 EST QTY 698 EA ____ Days
CLIN 0024 EST QTY 698 EA _____ Days
CLIN 0025 EST QTY 698 EA ____ Days
CLIN 0031 EST QTY 188 EA ____ Days Without FAT; or 210 additional days with FAT
CLIN 0032 EST QTY 120 EA ____ Days
CLIN 0033 EST QTY 120 EA ____ Days
CLIN 0034 EST QTY 120 EA ____ Days
CLIN 0035 EST QTY 120 EA ____ Days
**CLINS 0016, 0026, 0036**: Offerors may not propose an alternative Delivery Schedule for these CLINS.
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(c) Only upon approval from the Contracting Officer, an accelerated delivery schedule may be acceptable at no additional cost to the
Government.
(End of Clause)
4 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
5 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
SPECIAL NOTICE FOR SB SET-ASIDE:
This RFP is a total small business set-aside. Offerors are strongly encouraged to ensure that the offeror is a small business based on the size standard for the NAICS Code assigned to this RFP. Reference 13 CFR Part 121, and the clauses and relevant FAR references contained within this solicitation. Ensure that your firm fits the definition including but not limited to any affiliations (domestic or foreign). The Small Business Administration determines whether an entity qualifies as a small business concern by counting its receipts, employees, or other measures including those of all its domestic and foreign affiliates, regardless of whether the affiliates are organized for profit. 13 C.F.R. 121.103(a)(6). SBA has a specific set of rules that explain when another person, business or entity is considered an affiliate for size standard purposes. SBAs rules on affiliation for its programs (except SBIR and STTR) are found at 13
C.F.R. 121.103.
L.1 General Proposal Information
Offerors are cautioned to consult the Contracting Officer IN WRITING before submitting an offer that proposes any deviations or exceptions to any of the requirements, terms, and conditions of the solicitation because it may be cause for rejection of the proposal
(See Section M.2)
L.1.1 The proposal, subject to the Submission, Modification, Revision, and Withdrawal paragraph of Instructions to Offeror(s)
Competitive Acquisitions (FAR Provision 52.215-1) contained in Section L of the solicitation, shall be submitted in the format and quantities set forth below. All information necessary for the review and evaluation of a proposal is to be contained in the proposal volumes set forth below. Section M of the solicitation sets forth the evaluation criteria and delineates the Factors to be evaluated and their relative order of importance. The offeror's proposal, as required by this section, will be evaluated as set forth in Section
M of this solicitation. The Government will not assume the offeror possesses any capability, understanding, or commitment not specified in its proposal. It is an offeror's responsibility to submit a well-written proposal, with adequately detailed information, which clearly demonstrates an understanding of and the ability to comply with the solicitation requirements to allow for a meaningful evaluation. The Government does not assume the duty to search for data to cure problems it finds in proposals.
L.1.2 Minimum Acceptance Period.
This provision supersedes any language pertaining to the acceptance period that may appear elsewhere in this solicitation (SF33 Box 12).
ACCEPTANCE PERIOD means the number of calendar days available to the Government for awarding a contract from the date specified in this solicitation for receipt of offers.
L.1.2.1. The Government specified minimum acceptance period of 180 calendar days.
L.1.2.2. The offeror shall clearly state in its proposal Administrative volume the acceptance period. Offerors may specify a longer acceptance period than the Government's minimum acceptance period stated above.
L.1.2.3. An offer allowing less than the Government's minimum acceptance period, or fails to provide a proposal acceptance period, may be rejected.
L.2 Proposal Content, Format and Instructions
L.2.1 Proposal Content
L.2.1.1 All proposals shall be in English (American Standard) and shall be in US dollars. Proposals not in English (American Standard) or in US Dollars may be rejected. The proposal shall include all information specified and shall address all requirements outlined in
Section L. The offeror's proposal shall be organized in the following volumes:
Volume Number Title Page Limit
Volume I Past Performance Factor 5*
Volume II Price Factor Unlimited
Volume III Administrative Unlimited
* The page limit only applies to the requested written narrative of the volume required in L.4.1. The PWS/SOW/Past Performance
Questionnaires and documents associated with section L.4.1.4 shall be submitted as attachments with no page limits and will not count towards the page limits for Volume 1.
6 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.2.1.2 A Proposal Executive Summary or transmittal letter is optional. It will neither be considered as part of the volumes required, nor will it be evaluated. If a Proposal Executive Summary is submitted, it should be no more than five pages in length and be submitted as part of the Administrative volume.
L.2.2.1 Proposal Method of Submission, Format, and Instructions
UNCLASSIFIED Proposal Submission Instructions
Proposals shall be submitted in accordance with the below instructions. It is not anticipated that any requested proposal information will be CLASSIFIED. The below are instructions for UNCLASSIFIED proposals only.
L.2.2.1.1 The proposal shall be electronically submitted via E-mail to the Contract Specialist, daniel.m.shallal.civ@army.mil, and cc the corresponding Contracting Officer at the following e-mail address(s) with the subject header: Proposal Submission W912CH-24-R-0026
(company name):
Contract Specialist: daniel.m.shallal.civ@army.mil
Contracting Officer: carrie.L.english.civ@army.mil
L.2.2.1.2 Maximum size of each e-mail shall be 10 megabytes. The offeror may use multiple e-mail messages for each submission; however, it should annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of
3.
L.2.2.1.3 There is no "expected" or "target" length of time for proposal submission via email; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission (reference L.2.2.1.5).
L.2.2.1.4 No alternate method of proposal submission is authorized by this solicitation. Failure to submit the proposal in accordance with these instructions will result in the proposal not being accepted or evaluated. Unauthorized submission methods include, but is not limited to, the following examples: Fax, Mail/Hand-carried (whether hardcopy or DVD/CD-ROM), or other electronic submission methods.
L.2.2.1.5 Submission Due Date
The offeror must ensure its proposal, in its entirety, reaches the required destination before the Offeror Due Date and Time established in this solicitation. The lateness rules for submitted proposals are outlined in FAR 52.212-1 "Instructions to Offerors - Commercial
Products and Commercial Services" and are incorporated into this solicitation.
L.2.2.2 Proposal Format and Instructions
L.2.2.2.1 Each submitted File shall be labeled and named so it is identifiable for which volume it pertains (example: Volume 2, Price
Factor)
L.2.2.2.2 Electronic Files. The proposal electronic file name should not exceed 50 characters in length (not including the file extension). Ensure the file name does not contain any periods.
L.2.2.2.3 Acceptable File Formats. All electronic information provided in response to the solicitation must be provided in Microsoft
(MS) Office 2013 compatible or Adobe Portable Document Format (PDF) format or except as noted in instructions for individual volumes.
For files in PDF format, scanners should be set to 200 dots per inch. The proposal shall not contain citations for, or active links to live Internet sites or pages. All linked information shall be contained within the electronic proposal. Any linked information that is not contained in the proposal will not be accepted.
L.2.2.2.4 Unless otherwise specified, it is recommended that the proposal be formatted for 8.5 inch x 11 inch paper with a minimum font size of 10 pt. and with a minimum of 0.5 margins. Schedules, drawings and other documents more appropriate to larger size should be formatted for no larger than 8.5 inch x 14 inch dimensions.
L.2.2.2.5 Provide spreadsheets that include all formulas, function, macros, computations, or equations used to compute the proposed amounts. For each workbook, all Rows, Columns, Cells, and Worksheets are to be visible. Do not include Zero height and zero width rows and columns in Worksheets. Do not format Worksheet cells with font color equal to the fill color. If Workbooks or Worksheets are password protected, then the passwords must be provided. Do not submit print image files or pictures or files containing only values are not acceptable. Failure to provide fully functional excel spreadsheets in the proposal may result in the proposal being rejected
(See Section M.2.1(a)).
L.2.2.2.6 The offeror shall make every effort to ensure that the proposal is virus-free. Proposals (or portions thereof) submitted which indicate the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as
7 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
"unreadable" as described in FAR 15.207(c).
L.2.2.3 Submission Due Date
The offeror must ensure its proposal, in its entirety, reaches the required destination before the Offeror Due Date and Time established in this solicitation.
L.2.2.3.1 Lateness
The lateness rules for submitted proposals are outlined in FAR 52.215-1 "Instructions to Offerors Competitive Acquisition," and are incorporated into this solicitation.
L.2.3 Single Proposal Submission
Offerors are limited to submitting one proposal with one approach to meeting the requirements of this solicitation. An offeror is defined as an entity competing independently that does not share a common parent with any other offeror or does not have a parent/subsidiary relationship with any other offeror, or is not affiliated with any other offeror. For the purposes of Section L.2.3
(Single Proposal Submission), the Government will consider affiliation to exist if associated business concerns or individuals, directly or indirectly, either controls the other or can control the other (control can exist through common ownership, common management, or a contractual relationship such as a joint venture, where members have the power to control performance of the contract); or a third party controls or can control both.
L.2.4 Organizational Conflict of Interest
L.2.4.1 The provisions of FAR 9.5, Organizational Conflict of Interest (OCI), apply to any award under this Request for Proposal (RFP).
Potential offerors should review their current and planned participation in any other Government contracts, subcontracts, consulting, or teaming arrangements where they may be in a position of actual or perceived bias or unfair competitive advantage.
L.2.4.2 Offerors should disclose any potential OCI situations to the Contracting Officer as soon as identified including prior to proposal submission. The disclosure should include the facts and an analysis of the actual or perceived conflict and a recommended approach(s) to neutralize or mitigate the potential conflict. The preferred approach to potential conflicts is to negate/obviate the conflict. Mitigation is considered only if it is not practical to negate/obviate the conflict. The Contracting Officer will promptly respond to resolve any potential conflicts.
L.2.5 Restriction On Disclosure and Use of Data.
Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall:
L.2.5.1 Mark the title page with the following legend:
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed -- in whole or in part -- for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of -- or in connection with -- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Governments right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
L.2.5.2 Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
L.3 All or None
Offers in response to this solicitation must be submitted for all the requirements identified in the solicitation. Offers submitted for less than all the requirements called for by this solicitation may be rejected or ineligible for award. Proposals that contain alternative terms and conditions may be considered as taking exception to the requirements of the solicitation. See Section M.2.
L.4 Evaluation Factors and Volumes
Offeror proposals shall address the following Factors and Administrative volume:
a. Volume I Past Performance Factor
8 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
b. Volume II Price Factor
c. Volume III Administrative
L.4.1 Volume I Past Performance Factor
L.4.1 Past Performance
For the Past Performance Factor, provide information for a total of up to two recent contracts performed by the offeror as the prime contractor, that the offeror considers to have relevance. These may include federal, state, local and private industry contracts. The burden of providing thorough and complete past performance information remains with the offeror. It is the offeror's responsibility to submit detailed and complete information so the Government may evaluate its Past Performance volume. The Government does not assume the duty to search for data to cure problems it finds in proposals. While the Government may elect to consider data obtained from internal and external sources other than the proposal, the burden to provide thorough and complete past performance information rests with the offeror. The below instructions are provided to advise offerors as to the information required by the Government to assess the contractors Recent and Relevant past performance. Since this information constitutes a basis of the Government's review, it is imperative that the offeror present its past performance in a clear and complete manner. Failure to provide the information requested under paragraph L.4.1.3 and L.4.1.4 (if applicable) below may result in an assessment that the offeror does not possess a record of
Recent and Relevant past performance.
For the purpose of this Factor, a Contract is defined as a written instrument that requires the performance of a distinct effort and demonstrates the distinct effort was actually performed. Written instruments containing supplies or services that can be ordered but typically do not demonstrate actual performance, such as Indefinite Delivery Contracts (FAR 16.5), Basic Ordering Agreements (BOA), Blanket Purchase Agreements (BPA), and Federal Supply Schedules (FSS) do not meet the definition of a Contract. Written instruments considered to demonstrate actual performance may include a single task or delivery order, a single work directive, or a single definite quantity contract provided it demonstrates a distinct effort was actually performed. An offeror may submit, or the Government may require, written instruments that enhance the Governments understanding of the distinct effort actually performed if it is not identified on the Contract itself. It is incumbent upon the offeror to demonstrate that a distinct effort was actually performed.
L.4.1.1 Recent Contracts are those performed within five years of the date of issuance of this RFP.
L.4.1.2 Relevant Contracts are those comparable in scope and magnitude of effort and complexity to the following statement of work requirements:
i: Fabricate a parachute system to a Government technical data package, to include a canopy assembly and deployment bag, with a quantity of 550 units delivered at a rate of 50 per month.
L.4.1.3 Contract Information: Refer to the definition of a Contract above (L.4.1). The offerors proposal shall substantiate what distinct effort was required and actually performed under each of the proposed Contract(s). For each Contract(s) submitted, provide the following information:
(a) Prime Contractor name and address;
(b) Contract Number (and delivery/task order number if applicable);
(c) Contract Type;
(d) Total Value of the Contract (beginning & ending value);
(e) Delivery or Performance Schedule;
(f) Government or private industry contracting activity address, telephone number and e-mail;
(g) Procuring Contracting Officers (PCO) and/or Contract Specialists name, or point of contact for private industry entity responsible for signing or administering the Contract, telephone number and e-mail;
(h) Government (DCMA) or private industry administrative contracting officer (ACO), contracting officers representative (COR), performance certifier, and/or quality assurance representative (QAR), name, telephone number and email;
(i) Specify the Government or contractor point(s) of contact for which the Questionnaire was sent, and provide the date(s) it was sent.
(j) A description of the work performed by the offeror, which shall include a narrative describing the similarities between (1) the relevant work performed under the statement of work requirements of the offerors cited Contract(s) and (2) The statement of work requirements identified in L.4.1.2. In its narrative, the offeror shall specify the location in the cited Contracts statement of work
(to include paragraph and page number) that substantiates the relevant work performed;
(k) Contract period of performance;
(l) Provide a brief self-assessment of Contract performance. The self-assessment must address performance to meet Technical and
Schedule; and
(m) Copy of the complete Performance Work Statement or Scope of Work for each of the submitted Contracts. If the proposed Contract was issued under or in connection with a related written instrument (e.g. Indefinite Delivery Contracts, BOA, BPA, FSS) and the details of the distinct effort actually performed needed to establish relevancy on the proposed Contract are further defined within the terms and conditions (e.g. statement of work) of that related written instrument, provide that information and any other information necessary to establish this instruments relationship to the proposed Contract. (These documents can be submitted as stand-alone attachments within
9 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
the proposal volume).
L.4.1.4 Associated Entity, Predecessor Company, and Joint Venture. As stated above (L.4.1), only Contracts performed by the named offeror will be considered, however the Government may consider the past performance of an associated entity, a predecessor company, or joint venture as explained below.
L.4.1.4.1 Associated Entity. The Government may consider the past performance of an associated entity if the offeror successfully demonstrates meaningful involvement by the associated entity in the proposed effort.
a) An associated entity may include a parent company, separate corporate division within the same parent company, subsidiary company, a legally affiliated company, etc. The offeror shall provide to the Government a narrative that explains the offerors relationship to the associated entity. The offeror shall support the narrative with legal documentation, including but not limited to corporate papers, establishing the legal nexus between the offeror and the associated entity.
b) The offeror shall provide to the Government a narrative that explains the meaningful involvement the associated entity will provide to the proposed effort i.e. the work to be performed by the associated entity. Meaningful involvement may include a description of the associated entitys resources, such as its workforce, facilities, and/or other resources that will be provided or relied upon in the proposed effort. A Contract will not be considered unless the offeror successfully establishes meaningful involvement by the associated entity in the proposed effort.
L.4.1.4.2 Predecessor Company. The Government may consider the past performance of a predecessor company if the offeror demonstrates the experience of the predecessor company is reasonably predictive of the offerors performance under the proposed effort.
a) A predecessor company may include a company which was acquired by the offeror or merged with the offeror. It may also include other instances where the predecessor company was reorganized, restructured, or otherwise altered. A predecessor company does not include an entity which remains separate and distinct from the offeror. The offeror shall provide to the Government a narrative that explains the offerors relationship to the predecessor company. The offeror shall support the narrative with documentation evidencing the offerors status as the successor company.
b) The offeror shall provide to the Government a narrative that explains why the predecessors past performance is predictive of the offerors performance under the proposed effort. Evidence may include, but is not limited to, continuity of operations such as the continued employment of the predecessors employees and the transfer of assets including buildings, furnishings, and fixtures.
L.4.1.4.3 Individual Partners of a Joint Venture. If the offeror is a Joint Venture, the Government may consider past performance of each partner of the Joint Venture and any work performed by the Joint Venture itself previously. The offeror must successfully demonstrate meaningful involvement by the partner to the proposed effort.
a) The offeror shall provide to the Government a narrative that discloses the individual partners of the Joint Venture and shall provide documentation evidencing the Joint Venture.
b) The offeror shall provide to the Government a narrative that explains the meaningful involvement the Joint Venture partner will provide to the proposed effort. Meaningful involvement may include a description of the partners resources, such as its workforce, facilities, and/or other resources that will be provided or relied upon in the proposed effort. A Contract will not be considered unless the offeror successfully establishes meaningful involvement by the partner in the proposed effort.
L.4.1.5 Past Performance Questionnaire. A past performance questionnaire is provided in Attachment 0011. For each contract submitted by the offeror, the offeror shall send a copy of the past performance questionnaire directly to the appropriate PCO and/or COR listed in
L.4.1.3 (g) and (h). The offeror shall request that these individuals complete the questionnaire and forward it electronically directly to the Government at daniel.m.shallal.civ@army.mil and carrie.l.english.civ@army.mil as soon as possible and prior to the RFP closing date (See Block #9 of the SF33 cover page to this solicitation) with the subject heading PAST PERFORMANCE INFORMATION FOR [Offeror name].
L.4.2 Volume II: Price Factor
L.4.2 Price Volume
In accordance with FAR 15.403-5(a)(1), certified cost or pricing data is not required for initial proposal submission. However, after initial proposal submission, if only one offer is received, the Government reserves the right to request certified cost or pricing data in accordance with DFARS 252.215-7008. In the event certified cost or pricing data is required, the offeror may submit a written request for exception based on the applicable clauses contained herein.
For initial proposal submission, provide the information outlined below.
L.4.2.1 Provide all prices and costs in U.S. dollars only.
10 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.4.2.2 Attachment 0001 Pricing Workbook:
Submit your completed Attachment 0001 - Pricing Workbook with your proposal. Complete the attachment in accordance with the instructions included within the attachment. Propose ceiling Firm-Fixed-Prices for all CLINs included in the Attachment. Submit the attachment in Microsoft Excel format. Do not enter any proposed prices into Section B of the RFP.
L.4.2.3 Range Pricing:
For each CLIN with range pricing, propose a ceiling unit price for each range shown in Attachment 0001 Pricing Workbook. The offeror may enter the same ceiling unit price for all ranges if desired.
L.4.3 The Government reserves the right to request additional or more detailed cost or price information to support its evaluation.
L.5 Volume III - Administrative Volume. In addition to the proposal evaluation factor volumes above, provide the following information:
L.5.1 Signature Actions/offeror Fill-Ins. Provide a scanned image of a signed copy of the SF33 cover page, a copy of all completed fill-ins for Sections A through K, and (if applicable) a signed copy of all Amendments to the solicitation. System for Award Management
(SAM) certifications need not be separately submitted; however, all offerors must be successfully registered and valid in SAM prior to award.
L.5.1.1 Where certifications and approved systems are required for an offeror, if the proposal is being submitted by a Joint Venture, certifications and approved systems for the principals (partners) of the joint venture will be considered as valid for that offeror providing the necessary documentation from all principals (partners) is provided with the proposal.
L.5.1.2 Joint Venture (JV): To be recognized as a JV and eligible for award, the membership arrangements of the JV must be identified and the company relationships fully disclosed in the offeror's proposal IAW FAR 9.603. A copy of the agreement establishing the JV must contain the signatures of all of the members comprising the JV.
L.5.2 The offerors proposal acceptance period in terms of calendar days from the date for receipt of offers specified in the RFP. (See
Section L.1.2)
L.5.3 Statement of Acknowledgement. A statement specifying the extent of agreement with all terms, conditions, and provisions of the
RFP, and a statement of agreement to furnish and deliver the items or perform services set forth in the RFP in consideration for offerors proposed price(s) set opposite each item. Any exceptions taken to the attachments, exhibits, enclosures, or other solicitation terms, conditions, or documents may be determined to be a Deficiency or grounds for the Government to reject the proposal from further consideration in the source selection process (Reference M.2.1).
L.5.4 Assumptions. The offeror shall consolidate and identify all offeror's generated "assumptions" contained anywhere in the proposal.
The offeror shall include a statement that none of the "assumptions" contradict or take exception to any terms, conditions, or requirements of the solicitation. Any exceptions taken to the attachments, exhibits, enclosures, or other solicitation terms, conditions, or documents may be determined to be a Deficiency or grounds for the Government to reject the proposal from further consideration in the source selection process (Reference M.2.1).
L.5.5 Organizational Conflict of Interest (OCI). The offeror shall provide an affirmative statement that the offeror does not have an
OCI as it applies to this solicitation. (Reference L.2.4)
L.5.6 Property Management Plan.
L.5.6.1 If Government Property (as defined in 52.245-1) will be utilized in the performance of this contract, the offeror is required to submit a Property Management Plan (PMP) with their proposal that is consistent with the requirements of the solicitation. If required, submit the PMP as a stand-alone Attachment to the offer in response to this solicitation and ensure the PMP addresses the following:
L.5.6.1.1 An overview description of the contractors Property Management System (PMS).
L.5.6.1.2 The purpose of the offerors PMS, specifying what laws, regulations, and/or instructions it complies with.
L.5.6.1.3 Describe the scope of the assets that are applicable to the offerors PMS.
L.5.6.1.4 The ten (10) outcomes of Government Property requirements that are required by FAR 52.245-1(f):
a) Acquisition of Property
b) Receipt of Government Property. If the contract has Item Unique Identification (IUID) requirements, the PMP must address these requirements.
c) Records of Government property
11 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
d) Physical inventory
e) Subcontractor control
f) Reporting Requirements: Please also describe intervals, format of reports, who/whom they will be reported to, how they will be delivered (Email, Hard Copies))
g) Relief of stewardship responsibility and liability
h) Utilizing Government property
i) Maintenance
j) Property closeout
L.5.6.1.5 Describe any additional standards (e.g., customary commercial practices, voluntary consensus standards, industry leading practices) that the contractor intends to use in the management of Government Property, and how they are applicable to the tasks being performed on the effort.
L.5.6.2 If the solicitation does not already include FAR 52.245-1 and the offeror proposes to utilize existing Government Property during contract performance, then FAR 52.245-1 will be included in any resulting contract.
L.5.7 Subcontractor Past Performance Consent. If applicable, the offeror shall include the written consent of its proposed subcontractor(s) to allow the Government to discuss the subcontractor's past performance with the offeror.
L.6 SOURCE NOTES ON DRAWINGS: CONFORMANCE TO MILITARY TECHNICAL DATA REQUIREMENTS
Notwithstanding the fact that ordnance drawings furnished with this solicitation may list particular manufacturer part numbers as approved sources, or as being the same as, or equivalent to, the ordnance part described on the drawing, the item to be supplied under this solicitation must conform to all specific technical requirements expressed on such drawing(s). To the extent that there may be any inconsistency between a manufacturer's part number and specific technical requirements expressed on an ordnance drawing which references the manufacturer's part number, the specific technical requirements shall control and take precedence. Bidders shall bear the responsibility of verifying that the approved part as supplied will conform to all such specific technical requirements.
L.7 PROVISION FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL (LS7304)
NOTE: For this Solicitation, Partial FAT Waivers are not being solicitated or considered.
(a) The requirement entitled FIRST ARTICLE APPROVAL (52.209-3 or 52.209-4) in Section E of this solicitation may be waived by the
Government, provided that the offeror meets the conditions outlined below.
(1) Offerors who intend to request a waiver of the First Article Test must provide sufficient information in order for the
Government to determine whether the request is to be approved. If the offeror intends to request a waiver, a First Article Waiver
Worksheet must be completed and submitted to the Government along with any supporting documentation. The worksheet can be found in
Section J Attachments of this solicitation. The offerors request will not be considered if the worksheet and any supporting documentation is not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet which do not apply, annotate with N/A (not applicable). To substantiate or clarify information provided by the offeror, the Government may request additional information. Incomplete worksheets can result in the waiver request being denied, Offerors should contact the
Contract Specialist listed on the face page of this solicitation for assistance in filling out the worksheet completely.
(2) Offerors should not assume that the FAT waiver request will be granted even if the completed worksheet and any supporting information is submitted to the Government.
(3) The worksheet and any additional supporting documentation is part of your quote/offer and must be submitted as part of the response to this solicitation on Company letterhead and signed by an agent of the Company.
(4) RESERVED.
12 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(5) RESERVED.
(6) Supporting documentation.
(i) The request for waiver must be accompanied by documentation in support of the request. The documentation may include information such as the following; (1) Copy of the Administrative Contracting Officers (ACOs) or Procuring Contracting Officers (PCO) letter approving a First Article Test report on a recent contract for the same or similar item. (2) Copy of a First Article Test report for the same or a similar item as that herein solicited. (3) Copy of an ACO or PCO letter approving a prior waiver request. (4) If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.
(ii) If a copy of a First Article Test report is submitted in support of a request for waiver under this solicitation, the test report must have been approved and signed by an authorized representative of the Government.
(iii) The FAT report and all supporting documentation should be submitted by electronic media and should accompany the offerors proposal. If the FAT report and supporting documentation cannot be transmitted by electronic media, the offeror shall contact the PCO for further instruction.
(b) Note that if a waiver is granted to the successful offeror, an accelerated delivery schedule will apply. See Section F.
(c) Note: Cost considerations shall apply for approving a waiver or a portion thereof of a First Article Test.
L.8 HQ-AMC LEVEL PROTEST PROCEDURES (LS7015)
Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/Connect/Legal-Resources/
An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.
L.9 Army Contract Writing System (ACWS) Transition Information for Offerors (LS7002)
a. The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to
Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Solicitation.
b. During this transition period, Offerors are hereby advised:
1. The Contracting Office may use any combination of contract writing systems to create and release documents related to this solicitation (e.g. solicitation amendments and awards, if any). Due to this:
i. This solicitation may contain different offer submission instructions than other solicitations released by the same
Contracting Office (e.g. requiring offer submission via the PIEE Solicitation Module vs. e-mail). Offerors should review all offer submission instructions contained in the solicitation documents and direct any questions or concerns to the Contract Specialist or
Contracting Officer.
ii. If the Contracting Office switches contract writing systems prior to award, documents you receive from the Contracting
Officer or view on SAM.gov or other forums may appear noticeably different than the initial solicitation or previous solicitations or awards from the same Contracting Office. This is normal and expected.
iii. A change between contract writing systems may cause important information concerning solicitation response
(amendments) or accepted terms (awards) to take on different formatting or appear in different parts of later documents issued. Offerors shall review all documents carefully to locate this important information and direct any questions or concerns to the Contract
Specialist or Contracting Officer.
2. The Government does not intend to use the transition between contract writing systems to effect any changes to solicitation or award terms and conditions without accompanying document narratives explicitly stating such changes are deliberate and desired. While the Contract Specialist and Contracting Officer will take care to minimize or eliminate any inadvertent changes when adapting to the new contract writing software, you, as the Offeror, may still be the first to spot such errors. Therefore, Offerors shall:
i. Notify the Contracting Officer immediately if any observed changes, removals, or additions affect your award
13 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
eligibility, violate or alter existing quote/proposal terms, or could affect Contract performance post-award.
ii. Take special care to ensure all fill-in Clauses are populated and remain populated across documents received from the
Contracting Office throughout the Solicitation and Award process.
iii. Contact the Contracting Officer listed on the first page of the solicitation or solicitation amendment for guidance if you notice or suspect any inadvertent change has occurred between document issuances.
3. The Contracting Officer will correct problems affecting award documents (if any) via bilateral modification, at no cost to the Contractor. Any such modification will reconcile the award with the latest version of this solicitation reflecting deliberate action by the Contracting Officer (e.g. the first issuance if no amendments, or the latest amendment with accompanying narratives), inclusive of any documented pre-award negotiations or accepted supplemental offer terms.
4. In the unlikely event a network disruption, contract writing system error, or financial system error threatens timely award of the requirement set forth in this solicitation, the Contracting Officer:
i. May elect to use alternative mechanisms to obligate funds and allow work or deliveries to legally begin to the benefit of, and with legal protection for, both parties.
ii. Will incorporate the latest version of this Solicitation into such mechanisms to serve as a framework for contract execution until any such system problems are resolved.
iii. Will ensure any action taken does not conflict with the stated offer evaluation and award methodology of this requirement.
iv. Will issue a complete, properly-formatted award accurately reflecting this requirement and all applicable terms and conditions once systems return to normal.
*** END OF NARRATIVE L0001 ***
14 14
| SECTION A |
| SECTION F |
| SECTION L |
File details come from the government source that posted it. Updated .