Pre-Proposal Conference QA W912CH24R0026.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Solicitation for G15 Cargo Parachute, Bag, Cargo Aerial Delivery A-24, Parachute, Cargo Extraction Assembly
Solicitation number
W912CH-24-R-0026
Issued by

About this file

This document is a set of questions and answers from a pre-proposal conference for Solicitation W912CH-24-R-0026, which is a Request for Proposal (RFP) for the procurement of G15 Cargo Parachute, Bag, Cargo Aerial Delivery A-24, and Parachute, Cargo Extraction Assembly.

The key details are: this is a 100% Small Business set-aside with approximately three 5-year Firm Fixed Price (FFP), Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award contracts. First Article Testing (FAT) is required, with the FAT report delivery timeframe extended from 180 to 210 days. The Government has agreed to change the monthly delivery quantity to 25 EA per month if the order is less than 300 EA. The solicitation close date has been extended from July 15, 2024 to July 29, 2024. Past performance will be evaluated for the initial award, and the basis for award for future delivery orders will be specified in each individual Delivery Order.

View the file

Other files

File Type Posted
W912CH24R0026-0006 AMENDMENT.pdf PDF
Questions and Answers Solicitation W912CH-24-R-0026.xlsx XLSX spreadsheet
W912CH24R0026-0003 AMENDMENT.pdf PDF
W912CH24R0026-0005 AMENDMENT.pdf PDF
Questions and Answers Solicitation W912CH-24-R-0026.xlsx XLSX spreadsheet
W912CH-24-R-0026-0004 amendment.pdf PDF
Pre Proposal Conference W912CH-24-R-0026 R1 - 7-1-2024.pptx PPTX presentation
Pre Proposal Conference W912CH-24-R-0026 R1 - 7-1-2024.pdf PDF
Attachment 0018 TDPL 11-1-9546-1 7-8-24.pdf PDF
Attachment 0017 11-1-9535S002.pdf PDF
Pre Proposal Conference W912CH-24-R-0026 R1 - 7-1-2024.pdf PDF
W912CH-24-R-0026 Pre-proposal conference meeting details.pdf PDF
Pre Proposal Conference W912CH-24-R-0026 R1 - 7-1-2024.pptx PPTX presentation
W912CH24R0026-0002 AMENDMENT.pdf PDF
Attachment 0015 Revised TDPL 11-1-9546-1.pdf PDF
Attachment 0016 11-1-9534S002.pdf PDF
W912CH24R0026-0001 Amendment.pdf PDF
Attachment 0011 Past Performance Questionnaire.docx DOCX document
Attachment 0008 QUALITY ASSURANCE PROVISIONS 58J6100 DEPLOYMENT BAG PARACHUTE-15 FT.pdf PDF
Attachment 0003 SPECIFICATION CONVERSION TABLE AND DEVIATION PACKAGE.pdf PDF
Attachment 0001 - Pricing Workbook.xlsx XLSX spreadsheet
TPP for NSN 1670-01-647-2680 PN 11-1-9548-1.zip ZIP file
Attachment 0007 QUALITY ASSURANCE PROVISIONS 11-1-9548-1 PARACHUTE CARGO EXTRACTION 110 INCH.pdf PDF
Attachment 0005 QUALITY ASSURANCE PROVISIONS 11-1-8455-1 BAG CARGO AERIAL DELIVERY A-24.pdf PDF
Attachment 0006 QUALITY ASSURANCE PROVISIONS 11-1-2801 CLEVIS ASSEMBLY.pdf PDF
Attachment 0002 First Article Waiver Worksheet.pdf PDF
Attachment 0004 QUALITY ASSURANCE PROVISIONS 11-1-9546-1 G-15 CARGO PARACHUTE.pdf PDF
Attachment 0010 SPECIAL PACKAGING INSTRUCTIONS AB16472680 110 IN PARACHUTE CARGO EXTRACTION.pdf PDF
W912CH24R0026.pdf PDF
Attachment 0009 SPECIAL PACKAGING INSTRUCTIONS AB16473116 G-15 CARGO PARACHUTE.pdf PDF
TPP for NSN 1670-01-650-5347 PN 11-1-8455-1.zip ZIP file
TPP for NSN 1670-01-647-3116 PN 11-1-9546-1.zip ZIP file
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Pre-proposal Conference Q&A
Solicitation: W912CH-24-R-0026
Question #Contractor QuestionGovernment Answer
1The solicitation is showing 180 days for FAT, 150 days after FAT approval for production, and 30 days for gov’t approval. Shouldn't the total days for delivery with FAT be 360 vs 330?Correct, however, the solicitation will be updated to reflect 390 days lead time with FAT. This is due to question 2 below, (extending FAT report delivery from 180 to 210 days). This changes the FAT + Gov't approval + Production lead time from 360 to 390. This change will be reflected in a forthcoming amendment.
2Can the FAT report requirement of 180 days be extended? Lead time for materials alone is generally 14-15 weeks, but longest is 18 weeks.The Government is willing to change the FAT report delivery to 210 days. This will change FAT+production total time to 390 days. This change will be reflected in a forthcoming amendment.
3Are subsequent delivery orders concurrent or consecutive to the previous order? Would they overlap so they would have to produce both quantities?The expectation is that the contractor will deliver at the rate indicated in the Time of Delivery clause, FAR 52.211-8. Any potential subsequent order amount in excess of this quantity is expected to deliver consecutive to the previous order.
4DoD SAFE website should NOT be used for transmission of contract proposals or other contract award documentation?The Government will revise the instructions for proposal submission. This change will be reflected in a forthcoming amendment.
5Would the Government give consideration to extend the solicitation 1-2 weeks?The Government has agreed and extended the solicitation close date from 15 July 2024 to 29 July 2024 via amendment 0004.
6Will the gov’t use the past performance for evaluating KTR, or only the first delivery order?In accordance with section H.1.3. Contracting Officer may exercise broad discretion in determining the basis upon which the selection will be made for each

Delivery order. The submission requirements and basis for award will be included in each individual Delivery Order.

tc={0F159E49-551D-433F-9CCB-A0F68B8FDD62}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

They have worded this question in a confusing way - I would maybe state a little more in our response to explain that past performance will be evaluated for purposes of award and then for future delivery orders it will be specified in the DO, something like: "Contractors will be evaluated for initial award based on past performance and price pursuant to section M.1. For future delivery orders, Contracting Officer may exercise broad discretion in determining the basis upon which the selection will be made, in accordance with section H.1.3. The submission requirements and basis for award will be included in each individual Delivery Order."

7 With minimum order quantities of 150 (CLIN 0011-0015), 147(CLIN 0021-0025), 27 (CLIN0031-0035) and delivery quantity of 50 per month would the Government consider changing the monthly delivery quantity to 25 EA per month on orders of less 300 in order for the contractor to have at least a six month manufacturing run and only need to hire, train then layoff half as many employees if deliveries are 50 per month? This would greatly reduce the burden on small business contractors. The government will change the rate to 25 EA per month if the order is less than 300 EA. This change will be reflected in a forthcoming amendment.

File details come from the government source that posted it. Updated .