AM0002 - Section 01 11 00 - Paragraph 1.3 Redacted.pdf

PDF 183 KB Posted

Attached to
AIT Complex, Phase 2, Dining Facility, Fort Sill, Oklahoma
Solicitation number
W912BV21R0004
Issued by

About this file

This solicitation is for a construction contract to build a 1300-person dining facility at Fort Sill, Oklahoma. The selected contractor will construct a standard design dining facility to support Advanced Individual Training operations. The solicitation will use a best value tradeoff process to evaluate proposals and award a firm fixed-price contract. Offerors should visit the provided website for additional details on proposal submission and evaluation criteria. The work includes constructing the dining facility building and related incidental work. The Army Corps of Engineers District Tulsa is the contracting agency overseeing this project located at Fort Sill, Oklahoma.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AITPH2DFAC

Fort Sill, Oklahoma

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G'' designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.15 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Salvage Plan; G, RO

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes constructing a standard design 1300PN Dining Facility and incidental related work.

1.2.2 Location

The work is located at the Fort Sill, OK, approximately as indicated. The exact location will be shown by the Contracting Officer.

*AM0002

1.3 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.4 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

01 11 00 - 2