This document is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract for the MDC 3289 Revetment Barges FY25 project. The amendment modifies several key aspects of the original solicitation, including: extending the contract phase II to 430 calendar days, updating the delivery location, modifying language in Section H06, and updating drawing attachments. The inspection and acceptance locations for all Contract Line Item Numbers (CLINs) have been changed to the US Army Corps of Engineers Vicksburg Supply Base, specifically located 4.5 nautical miles up the Yazoo River in the Vicksburg Harbor.
The amendment also changes the delivery timeline from 490 to 580 calendar days from the Date of Notice to Proceed for CLINs 0001-0004. Several contract documents were added, including C002 - Delivery Address, H01 Contract Phase sequencing, and 3289 Section H06 Construction Plan. Conversely, several original sections (Sections B, C, D, F, G, H, and L) were deleted. The drawing attachments were significantly expanded from 2 to 375 pages, specifically for the CEMVK 160' Revetment Barge MDC Project No. 3289 Hull No. 907 Drawings dated 23-MAY-2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912BU25BA0040003 SF 30.pdf | ||
| Solicitation Amendment W912BU25BA0040002 SF 30.pdf | ||
| Drawings Updated.pdf | ||
| C002 - Delivery Address.pdf | ||
| 3289 Section F - AMENDMENT 1.docx | DOCX document | |
| H01 Contract Phase Sequencing.docx | DOCX document | |
| 3289 Section H 06 - Amendment 1.docx | DOCX document | |
| Overall Contract Inspection-Acceptance Locations.pdf | ||
| Solicitation - W912BU25BA004 - FINAL.pdf | ||
| MDC 3289 Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
This solicitation amendment does the following:Block 14 (Description of Amendment/Modification):
1. Updated delivery location in C0001(A)
2. Changes to H01 Contract phase II to 430 calendar Days
3. Updated language in H06
4. Updates F03
5. Updated drawing attachment to reflect updated drawings
Please see changes on continuation and updated docs attached to the solicitation.
Continuation of Inspection and Acceptance
The inspection and acceptance locations for the following CLIN(s) / SLIN(s) / ELIN
(s) were modified:
Inspection and Acceptance Location - W912BU - W2SD ENDIST PHILADELPHIA
INFORMATION FROM TO
POC Name Brian Murtaugh POC Email brian.r.murtaugh@usace.army.mil
Instructions
Supplies will be accepted by the Government at the delivery destination, U.
S. Army Engineer District, Vicksburg, and inspected by the Government.
Inspection and acceptance will take place at:
U.S. Army Corps of Engineers U.S. Army Engineer District, Vicksburg 4155 Clay Street Vicksburg, MS 39180
Supplies will be accepted by the Government at the delivery destination, U.
S. Army Engineer District, Vicksburg, and inspected by the Government.
Inspection and acceptance will take place at:
US Army Corps of Engineers Vicksburg Supply Base Port of Vicksburg / Vicksburg Harbor Lower Mississippi River Mile Marker 437.2
Vicksburg Supply Base Fleet is located
4.5 nautical miles up the Yazoo River from the confluence of the Yazoo and Mississippi River, in the slack water Vicksburg Harbor.0
Inspection and Acceptance Location - W912BU - W2SD ENDIST PHILADELPHIA
INFORMATION FROM TO
POC Name Brian Murtaugh POC Email brian.r.murtaugh@usace.army.mil
Supplies will be accepted by the Government at the delivery destination, U.
S. Army Engineer District, Vicksburg, W912BU25BA0040001
Instructions
Supplies will be accepted by the Government at the delivery destination, U.
S. Army Engineer District, Vicksburg, and inspected by the Government.
Inspection and acceptance will take place at:
U.S. Army Corps of Engineers U.S. Army Engineer District, Vicksburg 4155 Clay Street Vicksburg, MS 39180 and inspected by the Government.
Inspection and acceptance will take place at:
US Army Corps of Engineers Vicksburg Supply Base Port of Vicksburg / Vicksburg Harbor Lower Mississippi River Mile Marker 437.2
Vicksburg Supply Base Fleet is located
4.5 nautical miles up the Yazoo River from the confluence of the Yazoo and Mississippi River, in the slack water Vicksburg Harbor.0
Inspection and Acceptance Location - W912BU - W2SD ENDIST PHILADELPHIA
INFORMATION FROM TO
POC Name Brian Murtaugh POC Email brian.r.murtaugh@usace.army.mil
Instructions
Supplies will be accepted by the Government at the delivery destination, U.
S. Army Engineer District, Vicksburg, and inspected by the Government.
Inspection and acceptance will take place at:
U.S. Army Corps of Engineers U.S. Army Engineer District, Vicksburg 4155 Clay Street Vicksburg, MS 39180
Supplies will be accepted by the Government at the delivery destination, U.
S. Army Engineer District, Vicksburg, and inspected by the Government.
Inspection and acceptance will take place at:
US Army Corps of Engineers Vicksburg Supply Base Port of Vicksburg / Vicksburg Harbor Lower Mississippi River Mile Marker 437.2
Vicksburg Supply Base Fleet is located
4.5 nautical miles up the Yazoo River from the confluence of the Yazoo and Mississippi River, in the slack water Vicksburg Harbor.0
Inspection and Acceptance Location - W912BU - W2SD ENDIST PHILADELPHIA
INFORMATION FROM TO
POC Name Brian Murtaugh POC Email brian.r.murtaugh@usace.army.mil
Supplies will be accepted by the Government at the delivery destination, U.
S. Army Engineer District, Vicksburg, Supplies will be accepted by the Government at the delivery destination, U.
S. Army Engineer District, Vicksburg, and inspected by the Government.
Inspection and acceptance will take place at:
Instructions and inspected by the Government.
Inspection and acceptance will take place at:
U.S. Army Corps of Engineers U.S. Army Engineer District, Vicksburg 4155 Clay Street Vicksburg, MS 39180
US Army Corps of Engineers Vicksburg Supply Base Port of Vicksburg / Vicksburg Harbor Lower Mississippi River Mile Marker 437.2
Vicksburg Supply Base Fleet is located
4.5 nautical miles up the Yazoo River from the confluence of the Yazoo and Mississippi River, in the slack water Vicksburg Harbor.0
Continuation of Deliveries or Performance
The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were modified:
Place of Performance - W912BU - W2SD ENDIST PHILADELPHIA
INFORMATION FROM TO
Delivery 490 Calendar Days, From Date of Notice to Proceed Issuance to delivery
580 Calendar Days, From Date of Notice to Proceed Issuance to delivery
Place of Performance - W912BU - W2SD ENDIST PHILADELPHIA
INFORMATION FROM TO
Delivery 490 Calendar Days, From Date of Notice to Proceed Issuance to delivery
580 Calendar Days, From Date of Notice to Proceed Issuance to delivery
Place of Performance - W912BU - W2SD ENDIST PHILADELPHIA
INFORMATION FROM TO
Delivery 490 Calendar Days, From Date of Notice to Proceed Issuance to delivery
580 Calendar Days, From Date of Notice to Proceed Issuance to delivery
Place of Performance - W912BU - W2SD ENDIST PHILADELPHIA
INFORMATION FROM TO
Delivery 490 Calendar Days, From Date of Notice to Proceed Issuance to delivery
580 Calendar Days, From Date of Notice to Proceed Issuance to delivery
List of Contract Documents, Exhibits, or Attachments
The attachments table has changed from:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
0001 3289 Section B Section B – Supplies or Services and Prices
22 Apr 2025 1 Attachment No
0002 3289 Section C
SECTION C - DESCRIPTIONS AND
SPECIFICATIONS
22 Apr 2025 30 Attachment No
0003 3289 Section D
SECTION D – PACKAGING &
MARKING
22 Apr 2025 2 Attachment No
0004 3289 Section F
PART I – THE SCHEDULE –
SECTION F
22 Apr 2025 2 Attachment No
0005 3289 Section G
PART I – THE SCHEDULE –
SECTION G
22 Apr 2025 1 Attachment No
0006 3289 Section H
SECTION H - SPECIAL CONTRACT
REQUIREMENTS
22 Apr 2025 16 Attachment No
0008 3289 Section L 3289 Section L Instruction to Offerors 23 Apr 2025 Attachment No
Drawing attachments
List of Drawing attachments 22 Apr 2025 Attachment No
To:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
C002 - Delivery Address
C002 - Delivery Address 27 May 2025 1 Attachment No
H01 Contract Phase sequencing
H01 Contract Phase sequencing 27 May 2025 1 Attachment No
3289 Section H06 Contstruction Plan
3289 Section H06 Construction Plan 27 May 2025 3 Attachment No
3289 Section F - Amendment 1
3289 Section F - Amendment 1 27 May 2025 2 Attachment No
Drawing attachments
CEMVK 160' Revetment Barge MDC Project No. 3289 Hull No. 907 Drawings (23-MAY-2025)
22 Apr 2025 375 Attachment No
The following contract documents were added:
3289 Section F - Amendment 1 3289 Section H06 Contstruction Plan C002 - Delivery Address H01 Contract Phase sequencing
The following contract documents were modified:
Drawing attachments
INFORMATION FROM TO
Other Attachment List of Drawing attachments
CEMVK 160' Revetment Barge MDC Project No. 3289 Hull No.
907 Drawings (23-MAY-2025)
The following contract documents were deleted:
3289 Section B 3289 Section C 3289 Section D 3289 Section F 3289 Section G 3289 Section H 3289 Section L
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
C002 - Delivery Address none 1
H01 Contract Phase sequencing none 1
3289 Section H06 Contstruction Plan none 3
3289 Section F - Amendment 1 none 2
Drawing attachments 2 375
| IDCode: J |
| Page: 1 |
| Pages: 6 |
| AmendNo: 0001 |
| EffDate: 27 MAY 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: W912BU |
| AdmCode: |
| IssuedBy: W2SD ENDIST PHILADELPHIA |
1650 ARCH STREET, 7TH FLOOR
PHILADELPHIA, PA 19103-0000
UNITED STATES
MATTHEW RHOADS, EMAIL: MATTHEW.T.RHOADS@USACE.ARMY.MIL TELEPHONE: 2156566786
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912BU25BA004 |
| SolDate: 06 MAY 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: SEE SCHEDULE |
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .