3289 Section F - AMENDMENT 1.docx

DOCX document 25 KB Posted

Attached to
MDC 3289 Revetment Barges FY25
Solicitation number
w912bu25ba004
Issued by

About this file

Section F of the solicitation details delivery and performance requirements for four new welded steel revetment barges for the U.S. Army Corps of Engineers Marine Design Center. The contract (Solicitation Number w912bu25ba004) requires complete delivery of all four barges within 580 calendar days after the Notice to Proceed, with a phased approach including 90 days for planning and engineering, 430 days for construction and testing, and 30 days for final delivery. Each barge will be delivered to the Vicksburg Supply Base Port at Lower Mississippi River Mile Marker 437.2, with specific dimensional requirements of 160' length, 36' beam, and 11' depth, designed to accommodate two rows of mat stacks (23 on bottom, 22 on top) with each stack comprising 14 squares weighing approximately 3,400 lbs per square.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I – THE SCHEDULE – SECTION F

DELIVERIES OR PERFORMANCE

F01 CLAUSES INCORPORATED BY REFERENCE

F02 PERFORMANCE

FAR 52.211-8 TIME OF DELIVERY

(a) The Government requires completion and delivery of the BASE WORK (CLINs 0001-0004) under this contract to be made within 580 calendar days after receipt of the Notice to Proceed of CLINs 0001-0004 by the Contracting Officer. This includes the 15 calendar days between each Phase of Work for MDC review of Submittals as outlined in Section H). All work shall be completed in accordance with the following schedule:

DELIVERY SCHEDULE

ITEM

NUMBER

ITEM

QTY

UNIT

WITHIN DAYS AFTER DATE OF NOTICE TO PROCEED

REVETMENT BARGE A

580 Calendar Days

REVETMENT BARGE B

580 Calendar Days

REVETMENT BARGE C

580 Calendar Days

REVETMENT BARGE D

580 Calendar Days

Phase I

PLANNING, ENGINEERING & SCHEDULING

90 Calendar Days

Phase II

CONSTRUCTION & TESTING

430 Calendar Days

Phase III

DELIVERY

30 Calendar Days

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered non-responsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

(End of Clause)

F03 PLACE OF DELIVERY

For CLIN 0001 – CLIN 0004

The Contractor shall deliver each vessel afloat and ready for service at the following location:

US Army Corps of Engineers Vicksburg Supply Base Port of Vicksburg / Vicksburg Harbor Lower Mississippi River Mile Marker 437.2

Vicksburg Supply Base Fleet is located 4.5 nautical miles up the Yazoo River from the confluence of the Yazoo and Mississippi River, in the slack water Vicksburg Harbor.

File details come from the government source that posted it. Updated .