W912BU-23-B-0026 Amendment 1.pdf

PDF 497 KB Posted

Attached to
Two (2) 2400 HP Towboats for USACE New Orleans
Solicitation number
W912BU-23-B-0026
Issued by

About this file

This document is an amendment to a solicitation for two 2400 HP towboats for the U.S. Army Corps of Engineers New Orleans District. The amendment modifies the delivery address and changes the performance and payment bond requirements. Offerors must acknowledge receipt of the amendment prior to the stated deadline. The required delivery schedule specifies phases for planning, scheduling, engineering, construction, testing, and delivery totaling 985 calendar days from notice to proceed. Liquidated damages of $1,274.29 per day will be assessed for delays. The performance and payment bonds are revised to 20% of the original contract price each. The towboats must be delivered afloat and ready for service at the specified New Orleans address.

View the file

Other files

File Type Posted
W912BU-23-B-0026 Amendment 4.pdf PDF
Compiled Drawings Revised 07SEP23 Amend 0003.pdf PDF
W912BU-23-B-0026 Amendment 3.pdf PDF
W912BU-23-B-0026 Amendment 2.pdf PDF
884-B715-04 R0 Electrical Equipment Hazardous Area Plan_138543998.pdf PDF
884-B410-03 R3 Fendering.pdf PDF
884-B601-01 PIPE MARKING GUIDE.pdf PDF
884-B105-02 R2 Deckhouse Lines_139580493.pdf PDF
884-B425-01 R3 Walkways Handrails Gratings and Floor Plates.pdf PDF
884-B637-01 R2 Waste Oil System.pdf PDF
884-B410-04 R1 H-Bitts_135405910.pdf PDF
884-B667-01 R3 Sanitary Sewage and Greywater System.pdf PDF
884-B315-01 R2 Deckhouse Structure.pdf PDF
884-B730-04 R0 Navigation Lights.pdf PDF
884-B685-01 R2 HVAC System.pdf PDF
884-B606-01 R1 Propeller Details_139114367.pdf PDF
884-B605-01 R0 Propulsion System Arrangement.pdf PDF
884-B455-02 R2 Skiff Cradle and Lifting Bridle.pdf PDF
884-B311-01 R1 Longitudinal Structure.pdf PDF
884-B427-01 R2 Vertical and Inclined Ladders.pdf PDF
884-B415-01 R1 Doors Windows Hatches and Manholes.pdf PDF
884-B715-03 R1 Electrical Equipment Arrangement.pdf PDF
884-B330-02 R1 Generator Foundations.pdf PDF
884-B170-01 R2 Dry Dock Plan_138907847.pdf PDF
884-B710-02_R0 Electrical Load Analysis -DC-137024054.pdf PDF
884-B456-01 R1 Barge Winches and Capstan.pdf PDF
884-B430-01 R2 Deck Coverings.pdf PDF
884-B677-01 R3 CO2 Fire Suppression System.pdf PDF
884-B317-01 R3 Masts_136343593.pdf PDF
884-B406-01 MDC STANDARD FLOATING PLANT PAINT SCHEDULE.pdf PDF
884-B309-01 R1 Transverse Structure.pdf PDF
884-B615-02 R1 Steering System Control Details.pdf PDF
884-B420-01 R3 Deck Fittings.pdf PDF
884-B610-02 R1 Strut Details_136304074.pdf PDF
884-B405-01 R3 Anode Arrangement.pdf PDF
884-B307-01 R1 Deck and Bottom Structure.pdf PDF
884-B410-02 R2 Towknees_136337164.pdf PDF
W912BU-23-B-0026.pdf PDF
884-B330-01 R3 Propulsion Engine Foundations.pdf PDF
884-B710-01_R1 Electrical Load Analysis -AC-.pdf PDF
884-B720-02 R1 Electrical System One-Line Diagram -DC-_137018346.pdf PDF
884-B326-01 R2 Transducer Well Conduit and Chase.pdf PDF
884-B730-03 R2 Receptacle Plan.pdf PDF
884-B130-01R1 TANK CAPACITY_135409890.pdf PDF
884-B615-01 R1 Steering System Arrangement and Details.pdf PDF
884-B436-01 R2 Insulation Sheathing Joinery and Ceilings.pdf PDF
884-B301-02 R1 Welding Schedule.pdf PDF
884-B205-01 R1 Outboard Profile.pdf PDF
884-B105-01 R1 Hull Lines_135027021.pdf PDF
884-B210-01 R1 Inboard Profile_139585544.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to correct the delivery address, and to change the payment and performance bond requirements.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Aug-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU23B0026

X 9B. DATED (SEE ITEM 11)

02-Aug-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2023

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: AMANDA BELLNIER, CONTRACTING DIVISION, 1

TREET, 4TH FLOOR

PHILADELPHIA PA 19103-2004

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU23B0026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

SECTION F

Section F - Deliveries or Performance

F01 CLAUSES INCORPORATED BY REFERENCE

CLAUSES INCORPORATED BY REFERENCE

52.211-8 Time of Delivery JUN 1997 52.211-11 Liquidated Damages -- Supplies, Services, or Research and

Development

SEP 2000

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991

F02 PERFORMANCE

FAR 52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires completion of ALL work and delivery under this contract to be made within 985 calendar days after receipt of the Notice to Proceed for CLIN 0001 TWO

(2) TOWBOATS issued by the Contracting Officer (KO). This includes the 15 calendar days between each Phase of Work for MDC review of submittals as outlined in Section H). All work shall be completed in accordance to the following schedule:

REQUIRED DELIVERY SCHEDULE

WITHIN DAYS AFTER

ITEM DATE OF NOTICE

NUMBER DESCRIPTION QUANTITY TO PROCEED

0001AA PLANNING, 1 job 180 calendar days

SCHEDULING & ENGINEERING

0001AB CONSTRUCT AND 1 job 730 calendar days

TEST

0001AC DELIVER 1 job 45 calendar days

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered non-responsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR’S PROPOSED DELIVERY SCHEDULE

WITHIN DAYS AFTER

ITEM DATE OF NOTICE

NUMBER DESCRIPTION QUANTITY TO PROCEED

0001AA PLANNING, 1 job _____ calendar days

SCHEDULING AND ENGINEERING

0001AB CONSTRUCT AND 1 job _____ calendar days

TEST

0001AC DELIVER 1 job _____ calendar days

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract.

The Government will mail or otherwise furnish to the offeror an award or notice of award not later than one day after the award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of Notice To Proceed rather than the date the written notice is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor’s date of receipt of the contract or notice of award by adding five days for delivery of the award through the ordinary mails. If, as so computed, the offered delivery date is later than the required date, the offer will be considered non-responsive and rejected.

(End of Clause)

F03 PLACE OF DELIVERY

For CLIN0001:

The Contractor shall deliver the vessel afloat and ready for service at the following location:

U.S. Army Corps of Engineers U.S. Army Engineer District, New Orleans

7400 Leake Ave New Orleans, LA 70118

F04 LIQUIDATED DAMAGES

FAR 52.211-11 LIQUIDATED DAMAGES – SUPPLIES, SERVICES OR RESEARCH AND

DEVELOPMENT (SEPT 2000)

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, or any extension, the Contractor shall, in place of actual damages, pay to the Government as fixed, agreed, and liquidated damages, for each calendar day of delay the sum of:

For Line Item 0001 ................................................................................................. $1274.29

(b) Alternatively, if delivery or performance is so delayed, the Government may terminate this contract in whole or in part under the Termination for Default - Fixed Price, Supply and Services clause in this contract and in that event, the Contractor shall be liable for fixed, agreed, and liquidated damages accruing until the time the Government may reasonably obtain delivery or performance of similar supplies or services. The liquidated damages shall be in addition to excess costs under the Termination clause.

(c) The Contractor shall not be charged with liquidated damages when the delay in delivery or performance arises out of causes beyond the control and without the fault or negligence of the Contractor as defined in the Termination for Default - Fixed Price, Supply and Services clause of this contract.

(End of Clause FAR 52.211-11)

52.228-16 PERFORMANCE AND PAYMENT BONDS-OTHER THAN CONSTRUCTION (APR 2020)

(DEVIATION 2020-O0016)

(a) Definitions. As used in this clause—

Original contract price means the award price of the contract or, for requirements contracts, the price payable for the estimated quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity.

Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) The Contractor shall furnish a performance bond (Standard Form 1418), except that a seal is not required) for the protection of the Government in an amount equal to 20 percent of the original contract price and a payment bond Standard Form 1416, except that a seal is not required) in an amount equal to 20 percent of the original contract price.

(c) The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within 10 days, but in any event, before starting work.

(d) The Government may require additional performance and payment bond protection if the contract price is increased. The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bonds or to obtain additional bonds.

(e) The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register, or may be obtained from the U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/.

(End of clause)

(End of Summary of Changes)