W912BU21B0011 0004.pdf

PDF 299 KB Posted

Attached to
Dredge McFarland Overhaul W912BU21B0011
Solicitation number
W912BU21B0011
Issued by

About this file

This amendment modifies a solicitation for drydocking and repair services for the dredge McFarland. Key details include extending the bid due date to September 9, 2021 at 1:00 PM EST and revising Section H and item H-208 of the statement of work. Changes to the drydocking and repair scope include house steel replacement. The period of performance remains 150 calendar days and the solicitation is designated as a small business set-aside for North American Industry Classification System code 336611 for ship building and repair. Offerors must have capabilities for a master ship repair agreement with the U.S. Army Corps of Engineers and drydock facilities meeting Military Standard MIL-STD-1625C(SH) standards.

View the file

Other files

File Type Posted
Abstract 21B0011.pdf PDF
SOW Section C Rev3.pdf PDF
W912BU21B0011 0003.pdf PDF
30-002806 US McFarland Field Service Report.pdf PDF
SOW Section C Rev2.pdf PDF
W912BU21B0011 Final.pdf PDF
SOW Section C Rev1.pdf PDF
W912BU21B0011 0002.pdf PDF
W912BU21B0011 Amendment 0001.pdf PDF
Drawing Package 2.zip ZIP file
W912BU21B0011.pdf PDF
Drawings.zip ZIP file
SOW Section C.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Implement changes to section "H".

2. Implement changes to item H-208

3. Extend the due date to 9 Sep 2021. See changes in section "L"

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU21B0011

X 9B. DATED (SEE ITEM 11)

23-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Aug-2021

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU21B0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0004

SECTION C

TECHNICAL SPECIFICATIONS

PART II – HULL AND MACHINERY REPAIR LINE ITEMS

H-208 HOUSE STEEL REPLACEMENT

See attachment: SOW Section C Rev3

SECTION H

SPECIAL CONTRACT REQUIREMENTS

H-1 MANDATORY ITEMS

All mandatory items, those not specifically identified as "Information", “Unit Price” or “Title”, shall be accomplished and completed within the specified performance period.

H-2 UNIT PRICE ITEMS

Certain items are identified as "(Unit Price)" items in the bidding schedule and in the technical specifications. The total price for these items will be determined by multiplying the unit price by the quantity specified in the item. If work is done on less than the specified quantity, the contract price for such items will be determined by multiplying the unit price by the quantity actually used. The locations and quantities for all unit price items shall be approved by the Government's Technical Representative, in writing.

H-3 ACCIDENT PROTECTION

All work performed under this contract shall be in accordance with the requirements of the U.S. Army Corps of Engineers Safety Manual, EM 385-1-1 and other safety requirements specified herein and further identified in Technical Provision TP-4 STANDARDS.

a. Contractor Accident Prevention & Safety Program.

After award but no later than the pre-work conference, four copies of the Contractor’s Accident Prevention & Safety Program shall be submitted to the Contracting Officer for review and approval. In conjunction with this the contractor shall complete the U.S. Army Corps of Engineers Safety Inspection Checklist Accident Prevention Plan (FORM A- 02). The page number will be provided in the Remarks section for each Item indicating where the item can be found in the APP. If a “No” is selected an explanation shall also be provided in the Remarks section. The program shall meet EM-385-1-1 and AHA requirements and be prepared and at a minimum shall address the following items:

1. EMPLOYEE SAFETY PLAN

A copy of company policy statement of accident prevention and any other guidance statements normally provided new employees.

2. CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

Before personnel perform any servicing or maintenance on a system where the unexpected energizing, start up, or release of kinetic or stored energy could occur and cause injury or damage, the system shall be isolated in accordance with the procedures contained in EM-385-1-1, and Engineer Regulation ER 385-1-31. After award of contract but not later than the pre-work conference, the Contractor shall submit his hazardous energy control plan to the Contracting Officer for acceptance. Locks and tags will be placed on circuit breakers, or other appropriate devices, to isolate and identify hazardous energy sources. A SAFE CLEARANCE LOG will be maintained in the Engine Control Room by the Contractor and the Engineer-on-Watch. Two logbooks shall be maintained – one (1) by the Contractor, “the primary” and one (1) by the engineer on watch “the secondary”.

Each logbook will have a lock/tag issue sheet and SAFE CLEARANCE REQUEST FORMS. Corps and Contractor designated authorities shall fully coordinate their control activities for the life of the Contract. Each shall inform the other of their energy control procedures, ensure that their own personnel understand and comply with rules and restrictions of the procedures, and ensure that all employees affected by the hazardous energy control activity are notified. All Contractor lockout/tagout shall have the engineer on watch accompanying Contracting personnel.

During each daily walk-through, safety inspection the logs will be checked for congruence. During this inspection the Contractor shall itemize all existing lockouts, all new lockouts, and all removed tags that morning or the previous day. The Government Safety Inspector or the Engineer of Watch will initial this itemized list. Submit a CONDITION REPORT to the Government’s Technical Representative on a weekly basis, the lists from the week’s inspections.

Prior to a change in the status or location of the vessel (such as undocking), the Corps and the Contractor shall meet to review the status of hazardous energy control measures. Hazardous energy control procedures have been incorporated into the Check List for Undocking, Section J, Attachment J-1.

3. ACCIDENT INVESTIGATIONS AND REPORTING

Refer to EM 385-1-1, Para. 01.D.01. Accidents shall be investigated by the immediate supervisor of the employee(s) involved and reported to the Government's Technical Representative within one working day after accident occurs. A report of all mishaps occurring on the project shall be submitted to the Contracting Officer within four calendar days following the incident, on ENG Form 3394. All data reported must be complete, timely and accurate. A follow up report shall be submitted when the estimated lost time days differs from actual lost time days.

All accidents shall be reported on Engineering Form 3394.

4. DAILY INSPECTIONS

The Contractor shall institute a daily inspection program to assure safety requirements are being fulfilled. Reports of daily inspections shall be maintained at the job site. The reports shall be records of the daily inspections and resulting actions. Each report will include, as a minimum, the following:

a. Items of work underway during the inspection.

b. Locations of areas where inspections were made.

c. Results of inspections, including nature of deficiencies observed and corrective action taken, or to be taken, date, and signature of the person responsible for its contents.

d. Status of Lockout/Tagout items.

The daily inspection findings and statuses shall be discussed during the daily progress meeting.

5. HATCHES AND OPENINGS

Hatches and openings of all kinds that present a hazard will be provided with safe and suitable guard rails and toe boards. Hatches will be closed and secured when work is complete.

6. FIRE PREVENTION PLAN

The Contractor is required to exercise reasonable care to protect the ship from fire during overhaul. However, this does not relieve Government personnel of their normal responsibility for the ship's safety. The Contractor, with the concurrence of the government’s Technical Representative, shall conduct a fire fighting and fire prevention conference aboard ship within five days after arrival of the ship in the Contractor's plant. The municipal fire department whose jurisdiction includes the Contractor's facility shall be notified in writing of the projected date for ship arrival in the Contractor's facility. Notification shall include name of ship, size of crew, and planned ship's berthing at the time of entry into the Contractor's facility. Representatives of the municipal fire department shall be invited to attend this conference and to meet with representatives of the Contractor, and the Government’s Technical Representative to establish liaison and to review the firefighting plan. The purpose of the conference is to familiarize (a) the ship's force with the Contractors procedures for firefighting and fire prevention, (b) the ship's force with procedures that will be in use by municipal firefighting organizations, (c) the Contractor and municipal firefighting organizations with the ship arrangement, shipboard fire prevention and firefighting systems, equipment and organization, and (d) all parties with the scope of work and ship conditions that have significance in fire prevention and firefighting. With the concurrence of the municipal fire department, tours for their benefit shall be conducted on the ship in order to provide familiarity with conditions of a ship in overhaul. Tours shall be conducted by ship's force. The schedule for these tours shall be established to minimize interference with production. The fire fighting and fire prevention plan shall be as required by the contract and conference and shall cover:

a. Name, type and location of ship and shipyard.

b. Duration of time for which the ship will be at drydock and/or wetberth location.

c. Response procedures.

d. Manning practice including size and location of duty watch and proximity of firefighting crew’s berthing quarters to the ship.

e. Designation of senior fire party personnel.

f. Method of transmitting fire alarm from ship to fire department.

g. Nature of work to be accomplished.

h. Expected status of ship including equipment access cuts, type and location of temporary services;

status, location and means of operating ship's communication and firemain systems.

i. Water supply to the ship including type and location of fire pumps, location of saltwater and freshwater hydrants, pumper suction hydrant connections and where installed fireboat connections.

j. Pumper drafting location.

k. Communication between command post, quarterdeck, shipyard fire pumps and fire fighting forces.

l. Ship arrangement including frame and deck numbering systems, and access routes.

m. Designation and availability of shipyard personnel to meet fire department personnel and lead them to the ship, to stand by fire pumps if needed, and to rig temporary services such as lighting, ventilation, cutting torches and dewatering equipment.

n. Designation of shipyard and/or ship's force personnel to secure temporary services from the pier or on the ship.

o. Designation of ship's force personnel to advise the municipal fire department regarding changes in stability and buoyancy due to the accumulation of firefighting water.

p. The Contractor shall demonstrate (test) fire pumps and hydrants flow and pressure at the designated wet and drydock.

q. The Master or Senior Officer aboard the vessel must be notified whenever firefighting/damage control capabilities are reduced significantly, such as when the CO2 system is taken off-line. The Contractor shall also inform the Master when these services are returned.

7. LIGHTING

The Contractor shall ensure that all work areas and walkways are adequately lit, particularly during hours of darkness.

Portable lighting shall be properly secured as to prevent damage to the light system or injury to personnel.

Lamps and fixtures will be guarded and secured to preclude injury to personnel.

Temporary lighting circuits shall be separate from electric tool circuits. Receptacle circuits shall be dedicated to either temporary lighting or electric tools and shall be labeled "LIGHTS ONLY" or "TOOLS ONLY," as applicable.

8. SCAFFOLDING

The Contractor shall provide adequate scaffolding when required to safely accomplish work under this contract. (See

EM 385-1-1).

Scaffolding and work platforms shall be erected, used, inspected, tested, maintained, and repaired in accordance with EM 385-1-1, SECTION 22, ANSI A10.8, scaffolding safety requirements, or the scaffolding, shoring, and forming institute’s code of safe practices, and the manufacturer’s operating manual.

9. OIL BOOM

The Contractor shall install and maintain an oil boom around the vessel while it is at the wet dock or pierside.

10. NOTIFICATION

The Contracting Officer will notify the Contractor immediately of any noncompliance with the foregoing paragraphs a thru k and the action to be taken. The Contractor shall, after receipt of such notice, immediately take corrective action. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such "stop work" orders shall be made the subject of claim against the Government for extension of time or for excess costs or damages by the Contractor.

H-4 REVIEW OF CONTRACTOR SUBMITTALS

The Physical Support Branch (PSB) of Operations Division, Philadelphia District, USACE will review the drawings, data and other material submitted by the Contractor in the various contract phases.

Submittals from the contractor must be clear as to what the submittal represents and the action the contractor requires performed.

The Government’s review is intended to be limited to the functional aspects of the submittals with limited technical review of general cursory nature only.

The Contractor shall comply with the requirements of the design embodied in the contract. Where review, approval, classification or certification by ABS, USCG or other regulatory agency is a provision of the contract, Government review of Contractor submittals may not address the requirements of those agencies. The contractor shall take into account that the Government approval of submittals will be contingent upon satisfactory fulfillment of those requirements.

Submittals found to be completely acceptable to the COR without comment will be marked “ACCEPTED - Resubmittal Not Required”.

Submittals found to be generally acceptable to the COR with qualifying comments will be marked “ACCEPTED” but may or may not require resubmission depending on the COR’s assessment of the criticality of the comments.

“ACCEPTED” submittals being resubmitted will be reviewed only to ensure that the previous comments have been adequately incorporated. Resubmission requirements will be clearly listed in the reply letter.

Submittals unacceptable to the COR will be marked “NOT ACCEPTED”. Submittals not accepted will always require full and complete resubmittal. Such resubmittal will result in a full and thorough review as though it was a first submittal.

The Contractor shall insure that all review comments are incorporated in corrected submittal documents or are rebutted in separate correspondence. The contractor is encouraged to completely discuss all submittal comments with the author in order to insure complete and effective communication.

The Contractor will not use the drawing review or submittal process for contract deviations. Changes in equipment, materials, construction techniques or details must be the subject of separate, specific correspondence.

All requests made by the Contractor for deviations, variations or substitutions must be specific and clear as to what is contractually required, the proposed change, location and/or extent, benefits resulting from the change and effect on contract cost and delivery. Refer to Section H-7.

Submittals for review by the Government after award of the contract will generally be return mailed within 14 calendar days after receipt.

Submittals for review by the Government prior to Notice to Proceed will be reviewed with 72 hours of receipt.

Contractors shall plan their submittal schedules so as not to affect contract performance.

H-5 SUBCONTRACTING PLAN

A. SUBCONTRACTING

After receiving the Notice To Proceed, the contractor shall submit a Subcontracting Plan for the contract. This should not be confused with the SUBCONTRACTING PLAN required of Large Business as a part of their affirmative action responsibilities.

The Subcontracting Plan shall identify the areas or features of the contract or vessel which will be performed, all or in part by subcontractors. The plan shall identify the scope of work; subcontractor firm’s name, telephone number and point of contact; and reference to the subcontractor’s proposal or letter of intent.

The Subcontracting Plan shall specifically address the contractor’s plan for design and engineering.

Subletting by subcontractors is subject to these same requirements.

B. ENGINEERING

If any part of the contractor’s engineering is to be subcontracted, the contractor shall also submit the subcontractor’s qualifications, the scope of work and the contract, purchase order or letter of intent.

If the engineering is to be performed by the contractor’s hired labor, the plan shall make that specifically clear. The contractor shall provide a statement of qualification for any ‘in-house’ engineering activities.

All persons employed as naval architects or marine engineers either by the contractor or by any subcontractor shall be professionally competent by virtue of education, training, experience or licensing.

The Subcontracting Plan shall be in ‘spread sheet’ format and will be incorporated into the Material and Equipment Schedule of Section H-9.

Upon written approval of the Subcontracting Plan by the Authorized Representative of the Contracting Officer, the contractor is authorized to proceed to place the subcontracts on the plan.

H-6 ENGINEERING

A. ENGINEERING AND DESIGN

The contractor will perform engineering and prepare designs where required in Section C in order to:

Correct the drawings to ‘As – Built’ condition Obtain regulatory body approval Develop shop drawings

Develop construction details Prepare complete bills of materials Obtain COR approval for NTP with Drydocking & Repairs

All drawings and documents prepared by the contractor or substantively modified by the contractor shall be forwarded to Physical Support Branch for review, comment and approval.

3 copies of each drawing/document shall be furnished, 1 on Mylar reproducible paper and 2 black line prints on bond paper. One bond paper copy will be returned to the contractor showing the Government review action.

It is the responsibility of the contractor to schedule submission of the listed drawings/documents to allow for review by PSBr, without adversely affecting the construction schedule or submittals to ABS (refer to Section H-2).

All drawings shall conform to the American National Standards Institute (ANSI) Standard Y14.

Drawings shall be in flat size, format A (horizontal or vertical) B, C, D or F as required by ANSI Y14.1. In no case will drawings in any other size or format be accepted.

Title blocks shall conform to ANSI dimensions and shall be submitted to PSBr for approval.

The Government will be the sole owner of the design and shall have ‘Unlimited Rights’ in the duplication, use for reprocurement and disclosure of all drawings used in the development, construction, repair and modification of this vessel.

B. STANDARD DETAILS

It is not the intention of the Government to unnecessarily restrict the normal manufacturing and construction practices of the contractor.

Prior to issuance of a NTP, the Contractor may provide to the COR, for approval, a list of the standard details (brackets, gussets, small foundations, site fabricated fittings etc.) that the contractor proposes to incorporate into the design. Such list shall be accompanied by the contractor’s standard detail drawings.

If approved, the contractor’s Standard Details can be integrated into the Design drawings by reference and need not be resubmitted for review.

After issuance of a NTP, requests for incorporation of standard details will be considered only in cases where contract performance or design features are improved.

H-7 REPAIR DRAWINGS

In order to provide a record of the as-repaired condition of the vessel, the contractor shall update the vessel drawings and documents to clearly show any modifications performed by the contractor to the construction, details and systems of the vessel between the time of receipt and the time of delivery. The cost of this shall be included in the cost of the respective Clause.

All of the drawings and documents included in the Section C shall be updated and corrected to form a repair record of the vessel.

The drawing materials shall be delivered as follows:

Prior to FINAL INSPECTION, the contractor shall submit one set of prints of the updated repair drawings for review and approval.

Prior to PROVISIONAL ACCEPTANCE, the contractor shall provide the following

Two sets of black or blue line prints of all updated repair drawings.

One set of high quality (original) Mylar reproducibles of all updated repair drawings.

H-8 SUBSTITUTIONS

‘Substitution’ as used in this clause, is an administrative action, not resulting in a contract change of cost or time.

Prior to issuance of a NTP, the contractor shall prepare and submit a comprehensive list and analysis of any contractor proposed substitutions of the equipment and materials required in the contract.

The Substitution List shall be limited to equipment and materials specifically required by the contract. Equipment and Materials where the contractor has selection responsibility (i.e. ‘similar to’) need not be included in the list.

Each proposed substitution shall be accompanied with a detailed analysis and comparison of the equipment or materials specified and the equipment or materials proposed, including features, dimensions, performance characteristics, benefit to the Government, and the compelling reason why the substitution should be made.

In the absence of compelling reasons for making the substitution, the contractor’s proposal may be denied.

Should the substitution be accepted, the contractor shall be responsible for integrating the substitution into the design.

Such modifications to the design must be completed, submitted for approval, revised as necessary and approved by the COR prior to issuing a NTP.

The Contractor bears ultimate responsibility for satisfactory performance of all systems impacted or affected by an approved substitution as well as the operation of the completed vessel, as affected by the substitution.

Once a NTP has been issued, substitutions will not be considered.

H-9 MANUFACTURER OR SUBCONTRACTOR DRAWINGS AND MANUALS

For each vessel, the contractor shall provide three complete sets of drawings and manuals for each piece of machinery and equipment provided by the contractor; that clearly describe the operation, construction, maintenance, repair, adjustment, lubrication, parts lists and ‘trouble shooting’ of every item of machinery and equipment. This shall include Detailed Fabrication Drawings where they exist.

Manuals shall be in the English language with all dimensions in the foot-pound-second systems of units. Manuals shall be no larger than 8-1/2” x 11” and bound in hard covers of durable materials.

Manufacturer’s or subcontractor’s drawings may be included in the manual but must be folded to page size.

Manufacturer’s or sub-contractor’s drawings not suitable for inclusion in the manuals must be considered as engineering and design drawings and shall be prepared and submitted in accordance with the requirements of Section

H-5, ENGINEERING.

At least 5 days prior to FINAL INSPECTION, one set of the manuals shall be submitted to the COR for review, comment and/or approval. This set of manuals will be returned to the contractor with approval or comments.

Final submittal of the manuals shall consist of three sets of the manuals and must be completed prior to

PROVISIONAL ACCEPTANCE.

If photocopies (Xerox or similar) of parts lists, text, diagrams, etc., are furnished, one of the sets shall be a “Master” and must be made up of all ‘original’ sheets and be clearly identified as the “Master” copy. Photocopies will be clear with high black/white contrast, sharp lines, full sheet reproduction, and no background shadow or clutter.

Where catalog ‘cut-sheets’ are provided, all information not pertinent to the equipment or machinery provided shall be obliterated.

The contractor and his subcontractors shall grant Unlimited Rights to the Government for all the information and materials contained in the Manuals.

H-10 SERVICES TO BE FURNISHED BY CONTRACTOR

While the vessel is in the custody of the Contractor, the contractor shall furnish the following:

a. Storage: Furnish approximately 5000 square feet of secured, protected and easily accessible fully-enclosed warehouse space for the Government-furnished parts and supplies provided for this contract, and for parts, equipment and supplies for the vessel delivered during the contract period. Ensure the containers and crates are adequately housed and protected from damage at the Contractor’s facility and returned to the Government upon completion of the Contract.

b. Facilities for Government Personnel: A Port Engineers Office will be established and maintained at the shipyard for the U.S. Army Corps of Engineers staff throughout the life of the contract. This staff will consist of CORs, Crew or other personnel as best suits the Government’s needs. The cost of providing this facility, and all the requirements listed herein, shall be included in the bid price for Line Item H-103, Utilities and Services.

The contractor shall provide an office and other facilities as described in this clause.

Ten private offices, each with key-lockable door (8 keys to be provided), convenient to the work, shall be made available to the Government staff. The office and facilities shall be suitable for both male and female staff.

These offices shall be accessible 24/7.

Each office shall be furnished with the following:

• One kneehole standard office desks complete with lockable drawers, each with an arm chair and two side chairs. Each desk to be fitted with plexiglass screens along the front and the sides.

• 2 four-drawer lockable filing cabinets.

• One clothes tree for hanging jackets and rain gear.

• Shelves and/or racks for storage of up to 8 safety hardhats.

• Three duplex 120 volt AC, 60 Hertz convenience receptacles.

Furthermore, the building in which the private offices are located shall have the following, for sole use by the GTR/COR, Crew and Government Personnel:

• Microwave

• Two 6’ x 2’ (minimum) tables for supplies and drawings.

• Two 72” x 36” x 18” lockable storage cabinets for supplies.

• New First-Aid Kit (16-Man Capacity)

• Bottled Water Cooler with Bottled Water Service and Cups.

• Refrigerator w/ Freezer, minimum 18 cubic foot capacity.

• Two separate Bathrooms, complete with Toilet and Handwashing Facilities, soap, disposable towels and toilet paper.

• A shower facility, complete with soap and disposable towels, shall be available, convenient to the office, within the same structure and on the same floor.

• A conference room, with table space and seating for up to 12 people, that allows for a minimum of 6’ of separation per person. This conference room shall have a conference call/speakerphone connected to a landline.

• Networked color laser printer with scanning and scan to email capabilities.

• Ink and Paper (Standard and Legal Size) for both the printer and facsimile machine with spare paper and ink cartridges.

• Facsimile machine with automatic and unattended capabilities connected to a separate landline.

• Color Photocopier with reduction/enlargement and sorting capability. The photocopier shall be provided with paper, fluids, toner, and service.

• One tape-printing calculator. Calculator shall be provided with spare ribbons and extra tape.

• Cross-cut paper shredder.

• 24-hour wireless high-speed internet access (minimum download speed 600 MB/second) shall also be provided with encryption protocols WEP or WPA security formats.

• Hand sanitizing stations at each entrance, the conference room and any other public areas.

• 4’ x 6’ white board with dry erase markers and eraser.

• 50-gallon trash cans by each entrance, complete with liners, to be emptied twice a week.

• Industrial boot brush at each entrance.

A color monitor (minimum 40”), HD webcam and equipment shall be furnished and installed in the conference room, fully capable of being used to perform virtual training, live teleconferences, WebEx meetings and as a platform for displaying drawings. This kit shall remain the property of the contractor upon completion of the shipyard overhaul. The monitor shall be wall mounted. This system shall be connected to the Internet and shall be fully ready to use.

One 20’ lockable watertight shipping container shall be furnished by the contractor and installed adjacent to the Port Engineers Office for use by the Port Engineers.

Light, heat, air conditioning and ventilation shall be furnished together with daily janitor and cleaning services.

The contractor shall provide a restroom facility (toilet and handwashing facilities, complete with soap, disposable towels and toilet paper) within 100’ of each gangway for sole use by the crew of the McFARLAND. These facilities shall be cleaned and maintained daily throughout the period of performance.

The contractor shall also provide weekly COVID-19 disinfectant and sanitizing service to all offices and facilities occupied or used by Government personnel as detailed herein. This disinfectant and sanitizing service shall be applied to the floors, walls and all furniture and furnishings, including desks, cabinets, doors and chairs, at a minimum.

Bi-weekly laundry service shall be provided for laundering of government provided coveralls and work clothes.

Coveralls shall be returned laundered, dried and folded within 24 hours of pickup. This service shall be provided twice a week for the duration of the overhaul.

Government Representatives attending the repair period will bring with them walkie-talkie radios for intra-agency communication, cameras, and various items of test equipment. The Contractor shall permit unencumbered ingress and egress to and from the shipyard and the vessel with such equipment.

In addition, the Contractor shall furnish a minimum of parking spaces within the shipyard in safe locations and accessible to the assigned offices. Five of these spaces shall be for the CORs, one for the ship’s van, one each for the Master, Assistant Master, Chief Engineer and Assistant Chief Engineer. All parking spaces shall be next to the Port Engineers Office. If these parking spaces are located behind a gate that is locked after the 1st shift, provide 24-hour means of access (key card, code, keys, etc.)

If the Port Engineers Office is more than ¼ mile from the location of the vessel and/or the main shops and offices of the shipyard, the contractor shall provide two golf carts for transportation to and from the vessel. These golf carts shall be available at all times and shall be maintained by the contractor for the duration of the repair period.

One shipyard radio with battery charger which will provide communication between the COR and the Contractor's Ship Superintendent, Shop Foremen, and Leadermen.

H-11 WORK PERFORMED BY THE GOVERNMENT

The Government reserves the right to perform work on board the vessel while it is in the possession of the Contractor.

The Government may also employ men, materials and tools as may be necessary to perform this work. Any work done will be performed so as not to delay or interfere in any way with the duties of the Contractor.

The Government also reserves the right to bring contractors onboard the vessel to perform work not associated with this contract. All contractors shall have to meet the insurance and entry/security requirements of the shipyard prior to entry. The shipyard shall provide these requirements and all associated documentation to the COR immediately after NTP so that it can be sent in advance to these contractors.

It is anticipated that the Government will contract the services of MCR Engineering, EMI, EMS Marcon, Enterline Marine Solutions, ADISS, amongst others, during the shipyard repair period, H-12 CHANGES TO CONTRACT

No changes will be made to this contract unless it is made, in writing, by the Contracting Officer. Changes made to this contract by any other direction will be at the Contractor's own risk and will not be cause for the Contractor to make claim against the Government for extension of contract time, delays and disruption or for excess costs or damages incurred by the Contractor.

H-13 ACCESS TO VESSEL

The Contractor will be permitted access to the dredge from the time of award until delivery of the vessel for the purpose of taking necessary measurements for the preparation of working drawings and to permit, to the maximum practicable extent, procurement, prefabrication and assembly of materials and equipment.

H-14 INSURANCE

Insurance shall be carried in the amount required by the Master Ship Repair Agreement.

The contractor shall file with the Contracting Officer an affidavit showing that he/she has such insurance. The Contractor shall submit evidence of the insurance level requirements by no later than seven calendar days after receipt of Notice of Award.

H-15 INDEMNIFICATION FOR ACCESS TO VESSELS

Notwithstanding any provision or any other clause of the contract, the Contractor agrees to allow officers, employees, and associates of the Government, or other prime Contractors with the Government and their Subcontractors, and officers, employees, and associates of offerers on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not been previously included in the contract price.

H-16 NON-SMOKING AREAS

Smoking will not be allowed onboard the vessel by contractor personnel.

H-17 FUELING AND POTABLE WATER

During the repair period, the contractor shall provide unencumbered access to permit fueling of McFARLAND by tanker barge, whether self-propelled or towed, or by truck.

The same applies to delivery of lubricating oil and potable water.

The time and date for fueling shall be mutually agreeable to the COR and the contractor. It is estimated that the refueling and delivery of lubricating oil will take a minimum of 16 hours to complete; this total estimate may be split into two separate intervals dependent on delivery schedule. The contractor shall schedule a ‘window’ of sufficient duration to allow the refueling and delivery of lubricating oil to occur. The contractor is also expected to schedule their work accordingly so any hot work is not delayed or disrupted by the fueling; any delays or disruptions to the schedule will be the sole responsibility of the contractor.

All safety rules and requirements regarding cessation of hot work, open lights, etc., by the contractor, fuel supplier and ship’s crew, shall be strictly adhered to.

H-18 SHIPYARD PERSONNEL

Shipyard personnel, outside of Lead Foremen and Shipyard Management, are not permitted in spaces where work is not being performed. The shipyard, during the morning progress meetings, shall inform the Government of all the spaces where shipyard workers will be located. Any workers found outside of the work areas will be required to leave the vessel immediately.

The contractor shall provide bathroom facilities (portable toilets) near each gangway onto the Dredge McFARLAND for use by shipyard personnel. The use of the heads and sinks onboard the vessel by shipyard personnel is prohibited.

The contractor shall also provide a suitable area or facilities off the vessel for shipyard personnel to eat their lunch and dinner meals. Eating anywhere onboard the vessel by shipyard personnel is prohibited.

H-19 SHIP’S CREW

The contractor shall note that the entire ship’s crew will remain aboard the vessel throughout the contract period, sleeping aboard and receiving 3 meals similar to normal dredging operations. The Government will provide all meals to the ship’s crew.

The majority of the crew will be on duty from 0800 to 1630 daily including Saturday and Sunday engaged in various repair and maintenance work on the dredge, with only a nominal ‘security watch’ from 1630 to 0800.

Work producing high levels of noise should be scheduled between the hours of 0700 and 1900, whenever possible.

The crew shall have access to a lit, secure parking facility within the contractor’s facility at all times. The crew shall also have access to pay telephones within the contractor’s facility at all times.

END OF SECTION H

Section L – Instructions, Conditions and Notices to Bidders

INSTRUCTION TO BIDDERS

L-1 PROJECT DESCRIPTION

This requirement is for a Job Order under a Mastership Agreement for Drydocking and Repairs to the Dredge McFARLAND. General Vessel Information: The McFARLAND is an all-steel, sea-going, hopper dredge. The Dredge McFARLAND is currently stationed at Ft. Mifflin, Philadelphia, PA. The hull dimensions are:

Length without Boom Overhang 300 feet – 0 inches Length with Boom Overhang 319 feet – 8 inches Length Between Perpendiculars 384 feet – 0 inches Beam Molded 72 feet – 0 inches Depth Amidships, molded 33 feet – 0 inches Normal Draft Aft 16 feet – 6 inches Normal Draft Forward 15 feet – 3 inches Registered Gross Tonnage 6,036 long tons Displacement Tonnage 9,720 long tons Lightship Displacement 4,007 long tons Ballast, Fuel and Water 400 long tons (approx.)

NOTE – “Normal” being light on fuel and ballast. Actual draft must be taken prior to drydocking, and weight calculated.

The Government will deliver the vessel to the contractor’s facility.

The general elements of work include, but are not limited to: Drydocking, utilities and services; painting of vessel from keel to waterline, dredging valve repairs, hopper door repairs, controllable pitch propulsion (CPP) system repairs and steel replacement. If-Directed items will include cleaning and gas-freeing of tanks and spaces, piping replacement, and miscellaneous maintenance, as required.

It is the intent of the Government to perform and complete all inspections and testing necessary for renewal of the vessel’s U.S. Coast Guard Certificate of Inspection, including the Drydock Examination and Internal Structural Review.

It is also the intent of the Government to perform and complete all inspections and testing necessary for renewal of the vessel’s American Bureau of Shipping International Load Line Certificate.

The total performance period for this procurement will be one hundred and fifty (150) calendar days.

The Government will award a Firm Fixed-Priced Job Order resulting from this solicitation to the offeror whose offer, conforming to the solicitation, is the lowest price

L-2 SITE VISIT

A site visit will be held on Tuesday 3 August 2021 at 0900 at:

Fort Mifflin 6400 Hog Island Rd Philadelphia, PA 19153

Contractors who wish to visit the ship are required to contact Mr. Mark Saylor at 215.964.4202 or by email to

Mark.A.Saylor@usace.army.mil .

L-3 PREAWARD SURVEY

The Government reserves the right to conduct a pre-award survey of any firm under consideration to confirm any part of the information furnished by the offeror, or to require other evidence of managerial, financial, technical, and other capabilities, the positive establishment of which is determined by the Government to be necessary for the successful performance of the contract.

L-4 BID OPENING

INSTRUCTION TO OFFERORS

The Bid Opening will be held on 9 September 2021 at 01:00 PM EST at the Wanamaker Building, on the 6th Floor. If you plan on attending, please give notice to contracting ahead of time so that the security office can be made aware of your visit. Please remember to bring a valid form of ID with you.

aware of your visit. Please remember to bring a valid form of ID with you.

Entry can be made on the West Side of the Building on Juniper Street just south of Market. Visitors will proceed to the security desk on the mezzanine level. From there security will check for your name and notify contracting of your visit. Guests will then be allowed up to the 6th floor lobby where a contracting official will receive you.

Where:

The Wanamaker Building Corps of Engineers, 6th Floor 100 Penn Square East Philadelphia, PA 19107

Mailing Address:

US Army Corps of Engineers, Philadelphia District ATTN: Michael Hunter 7th Floor, Wanamaker Building 100 Penn Square East Philadelphia PA 19107-3390

Date and Time:

9 September 2021

01:00 PM EST

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 24-Aug-2021 01:00 PM to 09-Sep-2021 01:00 PM.

(End of Summary of Changes)

SECTION H
Section L – Instructions, Conditions and Notices to Bidders
INSTRUCTION TO BIDDERS