W912BU21B0011 0002.pdf

PDF 4 MB Posted

Attached to
Dredge McFarland Overhaul W912BU21B0011
Solicitation number
W912BU21B0011
Issued by

About this file

This document contains a federal contract solicitation and related opportunity details. The U.S. Army Corps of Engineers, Philadelphia District, is seeking bids for the drydocking and repairs of the dredge McFarland. Work includes drydocking, utilities and services, hopper door repairs, hull painting, controllable pitch propulsion system repairs, steel replacement, and sea valve repairs. The drydock examination and inspection for vessel certification will also be conducted. The McFarland is a 300-foot steel hopper dredge. The performance period is 120 calendar days. Bidders must have a NAVSEA-approved drydock facility and be capable of a Master Ship Agreement with the Corps of Engineers. The solicitation is for contractors on the East and Gulf Coasts of the U.S., and is a 100% small business set-aside. The NAICS code is 336611 and size standard is 1,250 employees. Liquidated damages may apply for delays in completion. Payment and performance bonds are required.

View the file

Other files

File Type Posted
Abstract 21B0011.pdf PDF
W912BU21B0011 0004.pdf PDF
SOW Section C Rev3.pdf PDF
W912BU21B0011 0003.pdf PDF
30-002806 US McFarland Field Service Report.pdf PDF
SOW Section C Rev2.pdf PDF
W912BU21B0011 Final.pdf PDF
SOW Section C Rev1.pdf PDF
W912BU21B0011 Amendment 0001.pdf PDF
Drawing Package 2.zip ZIP file
W912BU21B0011.pdf PDF
Drawings.zip ZIP file
SOW Section C.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Add line item M-941 specif ication to section C.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU21B0011

X 9B. DATED (SEE ITEM 11)

23-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Aug-2021

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU21B0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

M-941 SWELL COMPENSATOR REPAIRS (IF-DIRECTED)

See attached specs.

(End of Summary of Changes)

M-941 SWELL COMPENSATOR REPAIRS (IF-DIRECTED)

1. Intent

The intent of this Line Item is to replace sections of Swell Compensator hydraulic piping in the Port and/or Starboard Swell Compensator Compartments.

2. Reference Drawings/Pictures

MF-H9-10, Arrangement of Swell Compensator MF-H9-11, Detail of Swell Compensator (Sheet 1) MF-H9-11-1, Detail of Swell Compensator (Sheet 2) MF-M9-16, Hydraulic System for Dredging System: Valves, Hopper Area Valves & Drag Winch Controls: Plans, Section & Control Details MF-M9-17, Hydraulic System for Dredging System: Valves & Drag Pipe Winch Control - Elevations MF-M9-18, Hydraulic System for Dredging System: Valves; Hopper Area; Valves & Drag Pipe Winch Control M/L Picture No. 1 Picture No. 2 Picture No. 3 Picture No. 4

3. Government-Furnished Material

Shell EcoSafe S3 DU 100 Hydraulic Fluid Perforated Sheathing, as required Insulation, as required Rust Grip, as required Amercoat 385, as required

4. Scope of Work

The contractor shall provide all necessary labor, material, services, and equipment to perform and complete the work in accordance with the following specifications.

NOTE – Prior to beginning any work specified herein, the contractor shall ensure that the crew has secured and locked-out and tagged-out the hydraulic system for the swell compensators.

Any operation of the Swell Compensator and/or dragarms shall be done by the crew and coordinated with the Port Engineer. A minimum of 24 hours advance notice is required.

All material, unless specifically identified as Government-furnished, shall be furnished by the contractor.

The Swell Compensator Compartments are located between Frames 74 and 76, Port and Starboard. Access to the compartments is gained through an access hatch (approximately 24” x 20”) located on the Inboard Bulkhead of the respective Aft Winch Room. The hatch is bolted and located approximately 6’ above the deck in the Winch Room.

NOTE – The Swell Compensator Compartments measures 6’ x 6’ x 14’.

CHECKPOINT – Coordinate with the crew and the Port Engineer and ensure the electrical systems and hydraulic systems are disconnected, secured, and tagged-out.

The contractor shall provide the services of a Marine Chemist to inspect the compartment and provide a certificate stating the compartment is safe for entry and hot work. This certification shall remain valid for the entire duration of the repair period. The space shall be made safe for entry and hot work in accordance with all applicable Federal, State, and Local laws and regulations.

The contractor shall also provide the services of a Competent Person to check the Compartment(s) daily prior to the start of the work.

NOTE – The dragarm layshaft motors are located near the access hatches. Extra care shall be taken to protect the motor from damage, foreign matter, contact with contractor’s equipment and material, and fluids. At no time shall the motor be used as a working or step platform. The contractor shall cover the motors with plastic sheeting while any work is being performed in the winch rooms and/or swell compensator compartments.

The contractor shall provide and maintain lighting and ventilation of the Swell Compensator Compartments and the Aft Winch Room. All ventilation shall exhaust to the outside and shall be routed through the escape hatch in the respective Winch Room.

The contractor shall have appropriate Firewatch in place during all burning, gouging, and welding operations.

All welding shall be in accordance with U.S. Coast Guard and American Bureau of Shipping requirements and shall be performed by ABS-approved welders. All welding shall be inspected and tested in the presence of the Port Engineer.

The contractor shall establish and maintain the watertight integrity for the 6” diameter spool piece bulkhead penetration at the completion of the work herein. All watertight penetrations shall be water hose tested for watertight integrity in the presence of the Port Engineer. All watertight penetrations shall be welded on both sides of the bulkhead.

A. Lead Paint/Asbestos Tape Removal

The exterior surfaces of the Aft Winch Room Inboard bulkheads where the 6” piping penetrates the bulkhead were originally coated with lead-based paint. The contractor shall remove all lead paint as necessary to perform and complete all work listed herein and include all costs herein. All lead removal to be in accordance with all Federal, State, and Local laws and regulations. Any steel affected by lead paint removal shall be painted to match the surrounding.

The contractor shall remove the perforated sheathing and insulation as necessary to remove the 6” diameter spool piece (approximately 2’ x 2’ area). The perforated sheathing is attached to the framing with screws and seams with double sided asbestos tape. Removal and disposal of the asbestos tape of the sheathing shall be in accordance with all Federal, State, and Local laws and regulations.

Replace all removed perforated sheathing and insulation with Government-Furnished Material.

B. Piping Replacement

The contractor shall provide all necessary labor, material, services, and equipment to perform, coordinate, test and complete the work listed herein.

The contractor shall furnish and install new steel piping, pipe fittings, flanges, tags, valves, gaskets, reducers, O-Rings, pipe supports, and all associated hardware in accordance with the Drawings and Specifications provided by reference. The contractor shall connect the pipe sections by welding or use flanges where applicable to match original construction

NOTE – The system operating pressure is 150 PSI.

All the sections of the Swell Compensator hydraulic piping are located inside the Swell Compensator Compartments. The 6” hydraulic line from the Swell Compensator tank to the first flange outboard of the Aft Winch Room Inboard Bulkhead shall not be replaced. All the piping to be renewed is shown in the following sketch.

Disconnect the existing hydraulic piping at the 6” diameter spool piece. The spool piece is seal welded all-around to the ring plate on Inboard side of the Aft Winch Room Bulkhead. Remove the ring plate to gain access to Outboard flange.

NOTE – The contractor shall estimate on furnishing and installing 6’ of 6” diameter Schedule 80 hydraulic piping per side.

NOTE – Prior to removing the 6” diameter spool piece, the contractor shall ensure lead paint and double-sided asbestos tape has been removed. See Section A of this Scope.

Start the removal process by disconnecting the 6” piping at the first flange before the cylinder ram, 3” line at the first flange and reducer below the Boat Deck Level, and at the neck flange.

NOTE – The contractor shall estimate on replacing 16’ of 3” diameter Schedule 40 hydraulic piping and 6’ of 1-1/2” diameter Schedule 80 hydraulic piping per side.

NOTE – Extra care shall be taken to protect the Cylinder Ram Housing. Install temporary blanks over flanges where pipe has been disconnected.

CHECKPOINT – Inform Port Engineer that pipe sections have been removed so that compartment can be inspected.

The contractor shall remove all piping including the two 3” Swing Check Valves (MF-M9-18, H- 20), and two 1-1/2” Globe Needle Valves (MF-M9-18, H-21) incorporated within the Swell Compensators and replace with new contractor-furnished valves. The new valves shall have either bronze or stainless steel bodies. Install new valves with contractor-furnished stainless-steel fasteners and new contractor-furnished gaskets.

The contractor shall ensure all new gaskets are suitable for use with Shell EcoSafe S3 DU 100 hydraulic fluid.

Target and template new pipe sections from original. Weld new pipe, and fittings if required per original construction, to each other and the new flange via full penetration welding

NOTE – The contractor shall test individual pipe sections in the shop, as access into the compartment will allow.

Chemically clean and treat internal surfaces of all the pipe sections prior to reinstallation. Extra care shall be taken to protect the open pipe sections of the hydraulic system from any foreign material.

The contractor shall reinstall all new piping and valves to match the original. Once completed, the contractor shall flush the system as stated in Section C of this Scope.

Test newly installed pipe sections and valves during flushing and/or operational test. Correct any leaks at no additional cost to the Government.

Reinstall all removals and return to proper working order.

On all new piping and disturbed steel, apply one coat of Government-Furnished Rust Grip. All piping inside the compartment shall have a final topcoat of Government-Furnished Amercoat 385, Black.

The disturbed steel shall be primed with Government-Furnished Rust Grip and painted to match surrounding color.

C. System Clean and Flush

The contractor shall flush and clean each Swell Compensator accumulator and all hydraulic piping running from the accumulator to the Swell Compensator assembly.

NOTE – The last flush of the starboard Swell Compensator system was performed in March 2021 and was performed by the crew. During the last flush, the crew used two 55-gal drums to flush the system.

CHECKPOINT – Inform the Port Engineer to inspect the setup prior to beginning flushing the system.

The Swell Compensators shall be flushed with Government-Furnished Shell EcoSafe S3 DU 100 Hydraulic Fluid.

The contractor shall ensure the system is drained, including the cylinders, accumulators, and lines prior to system flush. The contractor shall fill the system with two 55-gal drums of Government-Furnished Shell EcoSafe S3 DU 100 hydraulic fluid to assure full circulation to all components. Connect the filtration pump suction to accumulator drain line. Connect the filtration pump discharge to oil fill line on the top of the accumulator. During the flush, operate the Swell Compensator up and down every 10 minutes. Flush the system for minimum of 4 hours using the 10-micron filtration unit.

NOTE - Care shall be taken during filing operation to vent the entire system to ensure the elimination of trapped air.

If the flushing fluid shows any sign of contamination, repeat the flush again until satisfactory.

Once the flushing is completed, fill the system with Government-Furnished Shell EcoSafe S3 DU 100 hydraulic fluid.

NOTE – The contractor is responsible for ensuring no fluid spills out while filling and/or flushing. Any cleanup of the Aft Winch Room(s) and/or the Swell Compensator Compartment(s) due to such spills, to and including recertification of the spaces for hot work, shall be the responsibility of the contractor.

The contractor shall dispose of the old used hydraulic fluid in accordance with all applicable Federal, State and Local requirements, and include the cost of the disposal herein.

Upon completion of the work listed herein, the contractor shall test the piping by operating the swell compensators in coordination with the crew. Correct all deficiencies noted during test, and retest.

Remove all other removals.

5. Bid Quantity

Estimate on replacing piping on Port and/or Starboard Sides in accordance with specifications. Price per side.

Reference Picture #1

Note – Standing inside the compartment looking up view. You can see the 3” Swing Check Valve, the 1- 1/2” Globe Valve, and the 3” line penetrates the deck above.

Reference Picture #2

Note – Standing inside the compartment looking at the 6” diameter spool piece. ENECON Carbon Fiber Pipe Wrap was used to repair leaks.

Reference Picture #3

Note – Standing inside the compartment looking at the 6” line connected to the cylinder ram via a flange.

Reference Picture #4

Note – Standing inside the compartment looking at the 3” Swing Check Valve and a 1-1/2” Globe Valve.