This is an API 653 In-Service (Visual) Inspection Report for Tank 101B (Facility 8314B) at Fort Riley, KS, conducted on December 4, 2019 by the US Army Corps of Engineers Omaha District. The tank is a 2,500 barrel above ground storage tank containing F-24 jet fuel, constructed in 1984 to API Standard 650 with a 28-foot diameter and 24-foot shell height.
The inspection found no mandatory repairs required, but identified 11 required repairs to comply with API 653 and federal/state/local codes, including deteriorated bottom-to-foundation sealing, hairline cracks in the concrete ring-wall, unsealed pipe penetrations, coating deterioration, non-functioning mechanical tape gauge, worn NFPA placard, insufficient grounding lugs, water-filled light fixtures, and thermal relief valve issues. Additionally, 21 recommended repairs were identified to fully comply with UFC 3-460-01 and AW 78-24-27 standards, such as faded facility numbers, inadequate pipe supports, missing fuel sample connectors, and various equipment upgrades. The report includes detailed engineering calculations, drawings, inspection checklists, and photographic documentation of the findings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - CLIN Schedule_Updated 22JAN25.docx | DOCX document | |
| Attachment F - API Internal Inspection Template.docx | DOCX document | |
| WD 2015-5343_Rev 26_23Dec24.pdf | ||
| Attachment A - General Installation Security Requirements.pdf | ||
| Attachment G - Return To Service Letter.docx | DOCX document | |
| Attachment 4 - 52.212-1 Addendum.pdf | ||
| Attachment C - Tank Data Sheet (1).xlsx | XLSX spreadsheet | |
| Attachment D - Monthly Contractors Progress Management and Status Report.xlsx | XLSX spreadsheet | |
| Attachment B_RIL.xlsx | XLSX spreadsheet | |
| Attachment E - Inspection Teleconference Briefing Template.docx | DOCX document | |
| Attachment 1 - CLIN Schedule.docx | DOCX document | |
| Combined Synopsis-Solicitation Fort Riley.pdf | ||
| Attachment J.1 - Tank 101 A(Facility 8314A)Ft Riley FINAL 2019.pdf | ||
| Attachment 2 - PWS.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers Omaha District
API 653 In‐Service (Visual) Inspection Report
FORT Riley, KS Tank 101B (Facility 8314B)
US Army Corps of Engineers Center of Expertise for Petroleum, Oils, and Lubricants
(USACE POL‐MCX)
12/4/2019
Table of Contents ACRONYMS AND ABBREVIATIONS .......................................................................................................... …...3
GENERAL SUMMARY
INSPECTION DATE
PREVIOUS INSPECTION DATES
RECOMMENDED FUTURE INSPECTION DATES (CALCULATIONS SHALL BE PROVIDED)
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection
2. Site Information
B. TANK INSPECTION COMMENTS
1. Secondary Containment
2. Tank Construction
3. Tank Foundation
4. Tank Bottom
5. Tank Shell
6. Tank Floating Roof
7. Tank Fixed Roof
8. Tank Appurtenances
9. Tank Piping System
10. Fire Protection System
C. FINDINGS AND RECOMMENDATIONS
1. MANDATORY REPAIRS per API 653, UFC 3‐460‐01, or AW 78‐24‐27 Standards
2. REQUIRED REPAIRS to Fully Comply with API 653, or, Federal, State, and Local Codes
3. RECOMMENDED REPAIRS TO FULLY COMPLY WITH UFC 3‐460‐01, AW 78‐24‐27 Standards or as Part of Regular Maintenance
APPENDIX A: ENGINEERING CALCULATIONS
APPENDIX B: ENGINEERING DRAWINGS
APPENDIX C: ENGINEERING DATA
APPENDIX D: API STANDARD 653 CHECKLISTS FOR TANK INSPECTIONS
APPENDIX E: PHOTOGRAPHS
ACRONYMS AND ABBREVIATIONS
API American Petroleum Institute
ASME American Society of Mechanical Engineers
ASNT American Society of Non‐Destructive Testing
ATG Automatic Tank Gauge
BBL Barrel
CFR Code of Federal Regulations
CP Cathodic Protection
DFT Dry Film Thickness
HLA High Level Alarm
HLCS High Level Control Shutoff
HHLA High‐High Level Alarm
LLA Low Level Alarm
LLLA Low‐Low Level Alarm
MFL Magnetic Flux Leakage
MT Magnetic Particle Testing
NACE National Association of Corrosion Engineers
NDT Non‐Destructive Testing
NFPA National Fire Protection Association
PSI Pounds per Square Inch
PT Penetrant Testing
P/V Pressure/Vacuum
RP Recommended Practice
PST Product Saver Tank
RT Radiography Testing
TML Thickness Measurement Location
TRV Thermal Relief Valve
UFC Unified Facilities Criteria
UFGS Unified Facilities Guide Specifications
ULS Ultra Low Sulfur
UT Ultrasonic Testing
VT Visual Testing
GENERAL SUMMARY
Summary of Inspection
An API Standard 653 In‐Service (Visual) inspection of Tank 101 B (Facility 8314 B) at Ft. Riley, KS was completed on December 4, 2019. Tank 101 B (Facility 8314 B) is a 2,500 barrel above ground storage tank containing F‐24 jet fuel. The tank was constructed in 1984 to API Standard 650 with a nominal diameter of 28 feet and a nominal shell height of 24 feet. The significant findings (overview) is summarized below.
MANDATORY REPAIRS per API 653, UFC 3‐460‐01, or AW 78‐24‐27 Standards:
1. None
REQUIRED REPAIRS to Fully Comply with API 653, Federal, State, or Local Codes:
1. The bottom‐to‐foundation seal is deteriorated around the entire circumference of the tank.
(Approximately 88‐linear feet)
2. The concrete ring‐wall has approximately 30 linear feet of hairline cracks.
3. The 3/4‐inch pipe penetrations in the ring‐wall are not sealed allowing a potential access point for water to enter under the tank bottom.
4. The support base for the ENRAF’s electronic readout is bolted to the top of the foundation.
The support partially extends under the bottom projection allowing a potential access point for water to enter the underside of the tank.
5. The fixed roof, shell, shell nozzles, and tank appurtenances have general coating deterioration throughout the entire tank. (Approximately 2,800ft²)
6. The (Varec) mechanical tape gauge is seized and not functioning. The ENRAF readout has the tank level at 18’ 11‐13/16” and the MTG is not legible.
7. The NFPA placard is worn and weather faded.
8. The tank is equipped with two (2) grounding lugs welded to the bottom projection. The grounding lugs are not configured to API‐650, and a minimum of four (4) grounding lugs shall be provided IAW API‐650. Note: The grounding lugs are bolted and not exothermically welded
IAW AW 78‐24‐27.
9. The lens cover for the light that is attached to the perimeter guardrail on the fixed roof is filled with water.
10. The product receipt line’s isolation valve and the high liquid level shut‐off valve (Cla‐Val) are bolted directly to each other not allowing a means of thermal relief. Even though there is no piping, pressure can build a possibly cause a leak.
11. The hardware on the fixed roof manhole is corroded.
RECOMMENDED REPAIRS TO FULLY COMPLY WITH UFC 3‐460‐01, AW 78‐24‐27 Standards or as Part of Regular Maintenance:
1. The facility number is not attached to the tank, and the tank stencils are faded and barely legible. Tanks should be marked with easily discernible painted numbers and letters IAW MIL‐ STD‐161 and UFC 3‐460‐01.
2. The piping stencils are faded and weathered. The piping should have easily discernable banding, product name, and flow direction IAW MIL‐STD‐161 and UFC 3‐460‐01.
3. The confined space placard is zip‐tied to the fixed roof manhole cover. Three of the zip‐ties have broken, and the placard is secured by one remaining zip‐tie.
4. The valves within the secondary containment are not marked with easily discernable painted numbers or numbered corrosion‐resistant metal or plastic tags as recommended IAW UFC 3‐ 460‐01.
5. The pipe penetrations through the secondary containment berm for the 6‐inch issue line and 4‐inch receipt line for Tanks 101A and 101B are wrapped for underground protection. The piping is not equipped with a sleeve, a sleeve seal, and a nitrile boot seal that is clamped to the piping as recommended IAW 78‐24‐27. (two 4‐inch and two 6‐inch pipe penetrations)
6. The five (5) sets of pipe supports within the containment are pipe hangers. The receipt line does not have any pipe supports on the shell. The 30‐foot section of receipt line and conduit are supported by the bolted flange at the top of Shell Course three and the pipe hanger. It is not recommended to use pipe hangers IAW UFC 3‐460‐01.
7. The 36‐inch x 36‐inch secondary containment drain basin is not equipped with a link seal around the piping as recommended IAW AW 78‐24‐27.
8. The product issue and receipt line are not equipped with a fuel sample connector as recommended IAW 78‐24‐27.
9. The 4‐inch product receipt line is not equipped with an isolation valve before the Cla‐Val IAW
AW 78‐24‐27.
10. The low suction line/stripper line is a 2‐inch valve that is welded to the 4‐inch shell overflow.
The shell overflow pipe has no supports or shell attachments and is only supported by the bolted 4‐inch flange connection at the top of shell course three and the bolted 2‐inch low suction flange connection. The low suction is near the water draw‐off system and does not tie into the issue line or have a CAM type connection.
11. The conventional TRVs for the 4‐inch receipt line and 6‐inch issue line are not equipped with a test tee as recommended in UFC 3‐460‐01.
12. The water draw‐off nozzle is a ¾‐inch coupling welded to ¾‐inch stainless steel piping. A 2‐ inch nozzle with a DBB valve with an eccentric flat on bottom (FOB) reducer is recommended.
The water draw‐off system is not equipped with a product return nozzle. The piping is configured to tie into the existing water draw‐off nozzle. An additional return nozzle with an eccentric flat on bottom (FOB) reducer attached to a 2‐inch nozzle with a DBB valve is recommended to meet the specifications described in AW 78‐24‐27.
13. The PST ground cable is bolted to the PST leg and not exothermically welded IAW AW 78‐24‐27.
14. The tank is equipped with one (1) 24‐inch shell manhole. The manhole is not hinged or equipped with a davit arm as recommended IAW AW78‐24‐27. Two 36‐inch manholes are recommended IAW UFC 3‐460‐01.
15. The tank is not equipped with a shell mounted low level alarm and low‐low level alarm as described in AW 78‐24‐27. The alarms are provided through a (Magnatrol) electronic level sensor located on the fixed roof.
16. The tank is not equipped with a shell mounted high level alarm and high‐high level alarm as described in AW 78‐24‐27. The alarms are provided through a (Magnatrol) electronic level sensor located on the fixed roof.
17. The high level shut off is not equipped with an intermediate platform. The high level shut off’s piping is constructed of threaded carbon steel instead of a flanged connection to storage tank, is not equipped with flanged ball valves, and does not have any means to test the system as described in AW 78-24-27.
18. The tank is equipped with a 3‐inch (Varec) center vent and flame arrestor. Flame arrestor are not recommended unless required by host‐nation and/or NATO regulations IAW UFC 3‐460‐01. The product issue is a 6‐inch line, and the product receipt is a 4‐inch line. Alternatively, the normal vent shall be at least as large as the largest fill or withdrawal connection, unless sized IAW API‐2000. A 24‐inch center vent is recommended IAW AW 78‐24‐27.
19. The tank is not equipped with sample gauge well as recommended IAW UFC 3‐460‐01 and AW 78‐24‐27. The only means to manually gauge the tank is through the ENRAF hatch.
20. The tank is not equipped with two (2) cable scaffold supports IAW UFC 3‐460‐01.
21. The conduit supports on the fixed roof are not properly secured. The supports freely rest on the tank top and pose the potential risk as a trip hazard and can rub and wear the coating.
INSPECTION DATE
API In‐Service (Visual) Inspection Date: December 4, 2019 Inspector(s): Stephen M. Hollenzer
API 653 Inspector No. 80182
PREVIOUS INSPECTION DATES
API Out‐of‐Service (Internal) Inspection Date: March 20, 2015 API In‐Service (Visual) Inspection Date: March 20, 2015 API In‐Service (Ultrasonic) Inspection Date: March 20, 2015
RECOMMENDED FUTURE INSPECTION DATES (CALCULATIONS SHALL BE PROVIDED)
API Out‐of‐Service (Internal) Inspection Date: March 20, 2025 (Based on the last API Out‐of‐Service Summary of findings)
API In‐Service (Visual) Inspection Date: December 4, 2024 API In‐Service (Ultrasonic) Inspection Date: March 20, 2030(Based on the last
API Out‐of‐Service Summary of findings)
Stephen M. Hollenzer, API‐653 #80182
GENERAL TANK INFORMATION
ITEM DESCRIPTION
Owner US Army
Location Ft. Riley
Facility Number 8314 B
Tank Number 101 B
State / Country Kansas, United States
City Fort Riley
Inspection Date December 4, 2019
Tank Manufacturer Webco Tank, Inc.
Design Standard API Standard 650
Date of Construction 1984
Tank Contents F‐24 Jet Fuel
Tank Serial Number Unknown
Tank Diameter 28’
Shell Height 24’
Product Height 18’ 11‐13/16”
Tank Capacity 2,500 barrels (105,000 gallons)
Foundation Concrete Pad
Construction
Bottom Lap‐Welded (Flat)
Shell Butt‐Welded (Cylindrical)
Floating Roof None
Fixed Roof Lap‐Welded
Material
Bottom Carbon Steel, A‐36
Shell Carbon Steel, A‐36
Floating Roof NA
Fixed Roof Carbon Steel, A‐36
Cathodic Protection Impressed Current
Interior Coating System Thin Film Epoxy/Polyurethane (Assumed)
Exterior Coating System Thin Film Epoxy/Polyurethane (Assumed)
Level Gauging ENRAF ATG
Overfill Protection Cla‐Val Hydraulic Control Valve
Piping
Receipt 4" Carbon Steel
Issue 6" Carbon Steel
Low Suction 2" Carbon Steel
Water Draw‐Off 3/4" Stainless Steel
Level Alarms & Controls
Description ENRAF ATG Independent (Electronic Sensor)
High‐High Level Alarm: 22’ 9‐5/8” 95%
High‐Level Alarm: 20’ 4‐7/8” 85%
Low‐Level Alarm: 3’ 7‐1/8” 15%
Low‐Low Level Alarm: 1’ 2‐3/8” 5%
High‐Level Control Shut‐Off: 95,500 gallons
Type of Internal Floating Roof
None
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection
This project will perform API 653 inspections of various tanks at facilities throughout the United States. Additional consideration is given to federal, state, and local regulations, as well as applicable military criteria and general industry standards.
An API Standard 653 In‐Service (Visual) inspection was performed for Tank 101 B
(Facility 8314 B).
2. Site Information
On December 4, 2019, Argus Consulting and our sub‐consultant (InterSpec, LLC) performed an API 653 In‐Service (Visual) inspection of Tank 101 B (Facility 8314 B), located at Ft. Riley, KS.
B. TANK INSPECTION COMMENTS
1. Secondary Containment
40 CFR 112.7(c) states that the entire secondary containment system, “including walls and floor, must be capable of containing oil and must be constructed so that any discharge from a primary containment system ... will not escape containment before cleanup occurs.” 40 CFR 112.8(c)(2) and 40 CFR 112.12(c)(2) state that diked areas must be “sufficiently impervious to contain oil.” The purpose of the secondary containment requirement is to prevent discharges, as described in 40 CFR 112.1(b);
therefore, effective secondary containment methods must be able to contain oil until the oil is cleaned up. The secondary containment area consists of a geomembrane floor and sloped berm walls. An informal containment evaluation was conducted. Based on visual observation, the containment does appear to be of sufficient size to contain a total tank loss per UFC 3‐460‐01 Section 8‐14.2.1, “The containment area needs to have sufficient capacity to contain the tank contents plus one foot of freeboard. If the containment has the capacity to contain the tank contents plus one foot of freeboard, the containment area is sufficient.” Based on visual observation, the secondary containment area appears to be properly graded to drain water away from the tank in accordance with NFPA 30.
2. Tank Construction
Tank 101 B (Facility 8314 B) is a nominal 2,500 barrel, 28’ diameter by 24’ tall, F‐24
Jet Fuel, aboveground vertical storage tank. The original construction nameplate is affixed to the tank but is not legible.
3. Tank Foundation
The tank rests on top of a concrete ringwall. The foundation was visually evaluated during the inspection for broken concrete, spalling, cracks, and vegetation against the bottom of the tank. The concrete pad has minor exposed hairline cracks. The tank bottom‐to‐pad sealant was inspected; it is not in satisfactory condition. A shell settlement survey was performed during the inspection in accordance with
Appendix B of API Standard 653. Settlement results are listed in Appendix A.
4. Tank Bottom
Not evaluated during this inspection.
5. Tank Shell
The shell is constructed of A‐36 carbon steel material. The shell is a cylindrical design, butt‐welded together, consisting of three (3) courses. The shell exterior has a thin film epoxy coating system (assumed). The coating was inspected for disbonding, adhesion, deterioration, and discoloration; it is in unsatisfactory condition. Based on visual observation, roundness, plumbness, peaking, and banding of the shell appear to be within the allowable tolerances of API Standard 653. Based on visual observation, the tank is stable and does not appear to be in danger of overturning or buckling due to high winds or seismic conditions.
6. Tank Floating Roof
The tank is not equipped with an internal floating roof.
7. Tank Fixed Roof
The fixed roof is a supported cone roof constructed of carbon steel material. The fixed roof has an epoxy coating system (assumed) on the exterior. The coating was inspected for disbonding, adhesion, deterioration, and discoloration; it is in unsatisfactory condition.
8. Tank Appurtenances
a. Water Draw‐Off System
1) Water Draw‐Off Line: The tank is equipped with a 3/4‐inch water draw‐off line. The water draw‐off line does not comply with UFC 3‐460‐01 and
AW 78‐24‐27 standards.
2) Product Saver Tank: The product saver tank (PST) complies with
UFC 3‐460‐01 and AW 78‐24‐27 standards, except for the lack of having the ground strap exothermically welded.
b. Low Suction Line
The tank is equipped with a 2‐inch low suction line.
c. Issue Line
The 6‐inch issue line is carbon steel. The line is protected from overpressure with a thermal relief system. The thermal relief system does not comply with
UFC 3‐460‐01 and AW 78‐24‐27 standards.
d. Receipt Line
The 4‐inch receipt line is carbon steel. The line is protected from overpressure with a thermal relief system; however, the high liquid control shut‐off valve is bolted directly to the isolation valve. The thermal relief system does not comply with UFC 3‐460‐01 and AW 78‐24‐27 standards.
e. Automatic Tank Gauging (Fuel Level)
The tank is equipped with an ENRAF system for electronic fuel level gauging and complies with UFC 3‐460‐01 and AW 78‐24‐27 standards.
f. Automatic Tank Gauging (Water Level)
The tank is equipped with an ENRAF VITO system for electronic water level gauging and complies with UFC 3‐460‐01 and AW 78‐24‐27 standards.
g. Mechanical Tank Gauging
The tank is equipped with a SHAND&JURS mechanical tape level gauge (MTG) for mechanical fuel level gauging. The MTG level is not legible and the ENRAF
ATG level is 18’ 11‐13/16”.
h. Tank Sampling\Manual Gauging
The tank is not equipped with a separate stilling well for sampling and manual gauging and does not comply with UFC 3‐460‐01 and AW 78‐24‐27 standards.
i. Level Alarms\High Level Shut‐Off
The ENRAF system provides low‐low, low, high, and high‐high level alarms. The tank is equipped with an electronic independent low, low‐low, high, and high‐ high level alarms and does not comply with UFC 3‐460‐01 and AW 78‐24‐27 standards. The high level shut‐off assembly is not accessible from the external ladder and does not have an intermediate platform.
j. Ladder and Platforms
The tank’s fixed roof is accessible by an external caged ladder mounted on the shell of the tank.
k. Grounding
The tank has two (2) grounding straps around the circumference of the tank.
The tank grounding lugs are welded directly to the bottom projection and are not exothermically welded to a ground lug with a pad on the shell.
l. Anchoring
The tank does not have anchors around the circumference of the tank.
9. Tank Piping System
Fuel is received by trucks and is issued to trucks.
10. Fire Protection System
The fire department provides fire protection. Fire hydrants were located near the tank.
C. FINDINGS AND RECOMMENDATIONS
The following information identifies the significant findings found during the tank inspection:
1. MANDATORY REPAIRS per API 653, UFC 3‐460‐01, or AW 78‐24‐27 Standards
Mandatory repairs represent items that require immediate attention, in order to prevent imminent risk to system operators, equipment integrity, or the adjacent environment. The tank should remain out of service until these repairs are completed.
a. None
2. REQUIRED REPAIRS to Fully Comply with API 653, or, Federal, State, and Local
Codes
Recommended repairs represent items that should be addressed in a timely manner, in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment. These items may be required by federal, state and local codes, or by military criteria.
a. Secondary Containment Floor Cracks
OBSERVATION: The bottom‐to‐foundation seal is deteriorated around the entire circumference of the tank. (Approximately 88 linear feet)
CODE REFERENCE: 40 CFR 112.7(c); 40 CFR 112.8(c)(2), 40 CFR 112.12(c)(2), 40 CFR
112.1(b) and ASTM C 920
RECOMMENDATION: Replace the sealant on the exterior of the tank between the foundation and ring‐wall by removing and resealing. Consider resealing the bottom to foundation in accordance with AW 78‐24‐27 Drawing D.04 Detail 3.
(Quantity: 88 LF)
b. Ring‐Wall Cracks
OBSERVATION: The ring‐wall has approximately 30 linear feet of minor hairline cracks.
CODE REFERENCE: 40 CFR 112.7(c); 40 CFR 112.8(c)(2), 40 CFR 112.12(c)(2), 40 CFR
112.1(b)
RECOMMENDATION: Repair all hairline cracks and chips in the foundation and reseal with flexible urethane (e.g. Sikaflex 1c) or a similar approved sealant.
(Quantity: 30 LF)
c. Foundation Pipe Penetration
OBSERVATION: The 3/4‐inch pipe penetrations in the ring‐wall are not sealed allowing a potential access point for water to enter under the tank bottom.
CODE REFERENCE: 40 CFR 112.7(c); 40 CFR 112.8(c)(2), 40 CFR 112.12(c)(2), 40 CFR
112.1(b)
RECOMMENDATION: Seal the pipe penetrations in the foundation with flexible urethane (e.g. Sikaflex 1c) or a similar approved sealant. (six (6) penetrations)
d. ENRAF Support
OBSERVATION: The support base for the ENRAF’s electronic readout is bolted to the top of the foundation. The support partially extends under the bottom projection allowing a potential access point for water to enter the underside of the tank.
CODE REFERENCE: 40 CFR 112.7(c); 40 CFR 112.8(c)(2), 40 CFR 112.12(c)(2), 40 CFR
112.1(b)
RECOMMENDATION: Relocate the support base for the electronic readout.
Replace the sealant between the foundation and ring‐wall where the support base was located.
e. NFPA Placard
OBSERVATION: The NFPA placard is worn and weather faded.
CODE REFERENCE: NFPA 30 paragraph 21.7.2.1. and UFC 3‐460‐01 Section 2‐17(c)
RECOMMENDATION: Replace the deteriorated NFPA placard on the tank shell.
f. Coating Deterioration
OBSERVATION: The fixed roof, shell, shell nozzles, and tank appurtenances have general coating deterioration throughout the entire tank. (Approximately 2,800ft²)
CODE REFERENCE: UFC 3‐460‐01 Section 8‐3.10(a) and UFGS 09 97.13.27 (Exterior
Coating of Steel Structures).
RECOMMENDATION: Mechanically clean and recoat any coating failure on the shell, shell nozzles, fixed roof, and tank appurtenances. (Approximately 2,800ft²)
g. Mechanical Tape Level Gauge
OBSERVATION: The (Varec) mechanical tape gauge not functioning, and the knob is missing. The ENRAF readout has the tank level at 18’ 11‐13/16” and the MTG is not legible.
CODE REFERENCE: API‐653 Section C.1.3.3, UFC 3‐460‐01 Table 8‐1(q), and AW
78‐24‐27 Drawing D.07 Detail 1
RECOMMENDATION: Provide a working mechanical tape gauge in accordance with UFC 3‐460‐01 Table 8‐1(q).
NOTE: If the tape gauge is no longer in use, consider removing the MTG assembly from the tank.
h. Grounding Lugs
OBSERVATION: The tank is equipped with two (2) grounding lugs welded to the bottom projection. The grounding lug is butted up against the shell‐to‐bottom weld.
A minimum of four (4) grounding lugs shall be provided IAW API‐650. Note: The grounding lugs are bolted and not exothermically welded IAW AW 78‐24‐27.
CODE REFERENCE: API‐650 5.8.11.3
RECOMMENDATION: Provide four grounding lugs in accordance with API‐650.
Exothermically‐weld the grounding cables to the grounding lug and install reinforcement at the shell in accordance with AW 78‐24‐27 Drawing ED.02 Detail 2.
i. Light on Fixed Roof
OBSERVATION: The lens cover for the light that is attached to the perimeter guardrail on the fixed roof is filled with water. The conduit supports for the light are loose and not properly secured.
CODE REFERENCE: General Maintenance
RECOMMENDATION: Remove the water from the lens cover. If the light is no longer in use consider removing the lighting assembly from the tank.
j. Thermal Relief on the Receipt Line
OBSERVATION: The product receipt line’s isolation valve and the high liquid level shut‐ off valve (Cla‐Val) are bolted directly to each other not allowing a means of thermal relief. Even though there is no piping, pressure can build and potentially cause a leak.
CODE REFERENCE: API‐576 Section 6.1.1 & UFC 3‐460‐01 Section 3‐3.1.2(j)
RECOMMENDATION: Provide a means for thermal relief between the isolation valve and the high liquid level shut‐off valve.
k. Corroded Hardware on Fixed Roof Manhole
OBSERVATION: The hardware on the fixed roof manhole cover is corroded.
CODE REFERENCE: General Maintenance
RECOMMENDATION: Replace the fasteners with stainless‐steel hardware on the fixed roof manhole.
3. RECOMMENDED REPAIRS TO FULLY COMPLY WITH UFC 3‐460‐01, AW 78‐24‐27
Standards or as Part of Regular Maintenance
Recommended repairs represent items that should be addressed in a timely manner, in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment.
a. Tank Labels and Markings
OBSERVATION: The facility number is not attached to the tank, and the tank stencils are faded and barely legible. Tanks should be marked with easily discernible painted numbers and letters IAW MIL‐STD‐161 and UFC 3‐460‐01.
CODE REFERENCE: UFC 3‐460‐01 Section 2‐17 and MIL‐STD‐161
RECOMMENDATION: Mark tanks with easily discernible painted numbers and letters in accordance with UFC 3‐460‐01 and MIL‐STD‐161.
b. Piping Identification
OBSERVATION: The piping stencils are faded and weathered. The piping should have easily discernable banding, product name, and flow direction IAW MIL‐STD‐161 and UFC 3‐460‐01.
CODE REFERENCE: UFC 3‐460‐01 Section 2‐17 & MIL‐STD‐161
RECOMMENDATION: Mark the piping with easily discernible painted numbers and letters in accordance with UFC 3‐460‐01 and MIL‐STD‐161.
c. Confined Space Placard
OBSERVATION: The confined space placard is zip‐tied to the fixed roof manhole cover.
Three of the zip‐ties have broken, and the placard is secured by one remaining zip‐ tie.
CODE REFERENCE: UFC 3‐460‐01 Section 2‐17(b)
RECOMMENDATION: Secure the confined space placard to the fixed roof manhole.
d. Valve Markings
OBSERVATION: The valves within the secondary containment are not marked with easily discernable painted numbers or numbered corrosion‐resistant metal or plastic tags as recommended IAW UFC 3‐460‐01.
CODE REFERENCE: UFC 3‐460‐01 Section 2‐17(a)
RECOMMENDATION: Mark the valves within the secondary containment in accordance with UFC 3‐460‐01.
e. Secondary Containment Pipe Penetrations
OBSERVATION: The pipe penetrations through the secondary containment berm for the 6‐inch issue line and 4‐inch receipt line for Tanks 101A and 101B are wrapped for underground protection. The piping is not equipped with a sleeve, a sleeve seal, and a nitrile boot seal that is clamped to the piping as recommended IAW
AW 78‐24‐27. (two 4‐inch and two 6‐inch pipe penetrations)
CODE REFERENCE: AW 78‐24‐27 Drawing CD.10
RECOMMENDATION: Provide a sleeve for the pipes penetrating the secondary containment berm wall in accordance with AW 78‐24‐27.
f. Pipe Supports
OBSERVATION: The five (5) sets of pipe supports within the containment are pipe hangers. The receipt line does not have any pipe supports on the shell. The 30‐foot section of receipt line and conduit are supported by the bolted flange at the top of
Shell Course three and the pipe hangers. The dead‐end on the 6‐inch issue line appears to be an attachment welded on to the elbow of the issue line to extend to the pipe hanger. It is not recommended to use pipe hangers IAW UFC 3‐460‐01.
CODE REFERENCE: UFC 3‐460‐01 Section 9‐3.2
RECOMMENDATION: Provide pipe supports in accordance with UFC 3‐460‐01. Ensure the piping is adequately supported and not putting any unnecessary stress on the shell nozzle.
g. Secondary Containment Drain Basin
OBSERVATION: The 36‐inch x 36‐inch secondary containment drain basin is not equipped with a link seal around the piping as recommended IAW AW 78‐24‐27.
CODE REFERENCE: AW 78‐24‐27 Drawing CD.09 Detail 3
RECOMMENDATION: Reconfigure the secondary containment drain basin in accordance with AW 78‐24‐27.
h. Fuel Sample Connector
OBSERVATION: The product issue and receipt line are not equipped with a fuel sample connector as recommended IAW AW 78‐24‐27.
CODE REFERENCE: AW 78‐24‐27 Drawing D. 13 Detail 4
RECOMMENDATION: Provide a fuel sample connector as recommended in
i. Isolation Valve on the Product Receipt Line
OBSERVATION: The 4‐inch product receipt line is not equipped with an isolation valve before the high liquid control shut‐off valve (Cla‐Val) IAW AW 78‐24‐27.
CODE REFERENCE: AW 78‐24‐27 Drawing D.12 Detail 3
RECOMMENDATION: Provide an isolation valve before the high liquid control shut‐ off valve (Cla‐Val) in accordance with AW Standard 78‐24‐27.
j. Conventional TRVs within the Secondary Containment
OBSERVATION: The conventional TRVs for the 4‐inch receipt line and 6‐inch issue line are not equipped with a test tee as recommended in UFC 3‐460‐01.
CODE REFERENCE: UFC 3‐460‐01 Section 9‐3.5.1.
RECOMMENDATION: Provide a test tee for the conventional TRVs within the secondary containment IAW UFC 3‐460‐01. Consider reconfiguring the TRV lines in accordance with AW 78‐24‐27 Drawing D.10 Detail 4.
k. Low Suction Line
OBSERVATION: The low suction line/stripper line is a 2‐inch valve that is welded to the 4‐inch shell overflow. The shell overflow pipe has no supports or shell attachments and is only supported by the bolted 4‐inch flange connection at the top of shell course three and the bolted 2‐inch low suction flange connection. The shell overflow pipe ends just above a 3‐inch pipe which runs into the secondary containment sump. The low suction is near the water draw‐off system and does not tie into the issue line or have a CAM type connection.
CODE REFERENCE: UFC 3‐460‐01 Table 8‐1(z) and AW 78‐24‐27 Drawing G.05.
RECOMMENDATION: Provide a low suction line that meets the criteria described in
UFC 3‐460‐01 and AW 78‐24‐27.
l. Water Draw‐off Piping
OBSERVATION: The water draw‐off nozzle is a ¾‐inch coupling welded to ¾‐inch stainless steel piping. A 2‐inch nozzle with a DBB valve with an eccentric flat on bottom (FOB) reducer is recommended. The water draw‐off system is not equipped with a product return nozzle. The piping is configured to tie into the existing water draw‐off nozzle. An additional return nozzle with an eccentric flat on bottom (FOB) reducer attached to a 2‐inch nozzle with a DBB valve is recommended to meet the specifications described in AW 78‐24‐27.
CODE REFERENCE: AW 78‐24‐27 Drawing D.13 Detail 5
RECOMMENDATION: Reconfigure the water draw‐off piping in accordance with
AW 78‐24‐27.
m. Product Saver Tank
OBSERVATION: The PST ground cable is bolted to the PST leg and not exothermically welded IAW AW 78‐24‐27.
CODE REFERENCE: AW 78‐24‐27 Drawing D.13 Detail 5
RECOMMENDATION: Exothermically weld the grounding cable for the product saver tank in accordance with AW 78‐24‐27.
n. Shell Manholes
OBSERVATION: The tank is equipped with one (1) 24‐inch shell manhole. The manhole is not hinged or equipped with a davit arm as recommended IAW
AW 78‐24‐27. Two 36‐inch manholes are recommended IAW UFC 3‐460‐01.
CODE REFERENCE: UFC 3‐460‐01 Table 8‐1(f) and AW 78‐24‐27 Drawing D.10
Detail 3
RECOMMENDATION: Provide two 36‐inch manholes with davit arms in accordance with UFC 3‐460‐01 and AW 78‐24‐27.
o. Low and Low‐Low Level Alarm
OBSERVATION: The tank is not equipped with a shell mounted low level alarm and low‐low level alarm as described in AW 78‐24‐27. The alarms are provided through a (Magnatrol) electronic level sensor located on the fixed roof.
CODE REFERENCE: AW 78‐24‐27 Drawing D.12 Detail 1 and UFC 3‐460‐01 Table
8‐1(l)
RECOMMENDATION: Provide a low and low‐low independent level alarm in
p. High and High‐High Level Alarm
OBSERVATION: The tank is not equipped with a shell mounted high level alarm and high‐high level alarm as described in AW 78‐24‐27. The alarms are provided through a (Magnatrol) electronic level sensor located on the fixed roof.
CODE REFERENCE: AW 78‐24‐27 Drawing D.12 Detail 2 and UFC 3‐460‐01 Table
8‐1(l)
RECOMMENDATION: Reconfigure the high and high‐high level alarm in accordance with AW 78‐24‐27.
q. High‐Level Shut Off Valve
OBSERVATION: The high level shut off valve is not equipped with an intermediate platform. The high level shut off’s piping is constructed of threaded carbon steel instead of a flanged connection to storage tank, is not equipped with flanged ball valves, and does not have any means to test the system as described in AW
78‐24‐27.
CODE REFERENCE: UFC 3‐460‐01 Table 8‐1(k) & AW 78‐24‐27 Drawing D.12 Detail 2
RECOMMENDATION: Provide an intermediate platform for the high level shut off valve in accordance with UFC 3‐460‐01 and reconfigure the piping for the high‐ level shut off valve in accordance with AW 78‐24‐27.
r. Center Vent
OBSERVATION: The tank is equipped with a 3‐inch (Varec) center vent and flame arrestor. Flame arrestors do not allow the tank to breathe properly and are not recommended unless required by host‐nation and/or NATO regulations IAW UFC
3‐460‐01. The screen around the vent is disengaged and not seated properly. The product issue is a 6‐inch line, and the product receipt is a 4‐inch line. Alternatively, the normal vent shall be at least as large as the largest fill or withdrawal connection, unless sized IAW API‐2000. A 24‐inch center vent is recommended
IAW AW 78‐24‐27.
CODE REFERENCE: AW 78‐24‐27 Drawing D.09 Detail 2 and UFC 3‐460‐01 Table
8‐1(o).
RECOMMENDATION: Remove the flame arrestor in accordance with UFC 3‐460‐01, and provide a center vent in accordance with AW 78‐24‐27.
s. Sample Gauge
OBSERVATION: The tank is not outfitted with a thief and reel sample gauge to manually gauge the tank. The tank is being manually gauged through the ENRAF hatch.
CODE REFERENCE: UFC 460 3‐460‐01 Table 8‐1(x), AW 78‐24‐27 Drawing D.07 Detail
RECOMMENDATION: Provide a 10‐inch roof nozzle and an aluminum, slotted stilling well for gauging and sampling with a datum plate to establish a gauging zero point.
Design in accordance with AW 78‐24‐27 Drawing D.07 Detail 2.
t. No Scaffold Cable Supports
OBSERVATION: The tank is not equipped with two (2) cable scaffold supports IAW UFC
3‐460‐01.
CODE REFERENCE: 3‐460‐01 Table 8‐1(jj).
RECOMMENDATION: Provide two (2) scaffold cable supports IAW API‐650 Figure 5.22 and UFC 3‐460‐01.
u. Conduit Supports
OBSERVATION: The conduit supports on the fixed roof are not properly secured. The supports freely rest on the tank top and pose the potential risk as a trip hazard and can damage the coating and appurtenances.
CODE REFERENCE: General Maintenance and AW 78‐24‐27 Drawing D.10 Detail 5
RECOMMENDATION: Secure the conduit supports on the fixed roof to prevent a potential trip hazard and damage to the coating and appurtenances.
Appendix A
Engineering Calculations
1. Shell Settlement Evaluation
Shell Settlement Evaluation
Where:
S max = maximum permissible out-of-plane deflection, in feet.
L = ΠD /N = arc length between measurement points, in feet.
D = tank diameter, in feet N = number of survey points.
Y = yield strength, in pounds per square inch (psi).
E = young's modulus, in pounds per square inch (psi) H = tank height, in feet
D = 28 feet N = 8 L = 3.14(28)/8 = 10.9956 feet Y = 36,000 psi E = 29,000,000 psi H = 24 feet
L 2 = 120.9027 square feet
11(120.9027)(36,000) 2(29,000,000)(24)
1) Maximum Permissible Out-of-Plane Deflection Calculation
S max = = 0.0344 feet
𝑆𝑚𝑎𝑥 11𝐿 𝑌
2𝐸𝐻
|S i | = U i - (1/2U i-1 + 1/2U i+1 ) Where:
|S i | = magnitude of the calculated out-of-plane deflection, in feet.
U i = Out-of-Plane settlement of point "i ", in feet
(+) when above cosine curve (-) when below cosine curve
Point Actual Curve
Fit U i U i+1 U i-1 S i |S i |
1 0.01042 0.00000 0.01042 0.01626 0.00584 0.00584 0.00063
2 0.01042 0.00458 0.00584 0.01042 0.00521 0.00521 0.00197
3 0.02083 0.01563 0.00521 0.00584 0.00458 0.00458 0.00000
4 0.03125 0.02667 0.00458 0.00521 -0.03125 -0.03125 0.01760
5 0.00000 0.03125 -0.03125 0.00458 -0.01626 -0.01626 0.02541
6 0.01042 0.02667 -0.01626 -0.03125 0.01563 0.01563 0.00844
7 0.03125 0.01563 0.01563 -0.01626 0.01626 0.01626 0.01563
8 0.02083 0.00458 0.01626 0.01563 0.01042 0.01042 0.00324
R 2 = 0.01 Note: Settlement evaluation must be done using the arc length method.
1) Out-of-Plane Deflection Calculation
Shell Settlement Graph
1 2
0.005
0.01
0.015
0.02
0.025
0.03
0.035
4 5 6 7 8 1 2 3 4
E le va ti on s
(f ee t)
Data PointsShell Settlement
Optimum Cosine Curve
Min. Settlement at (Pt 1)
Max. Settlement at (Pt 4)
Where:
S arc = settlement arc length between start and end point, in feet.
S i = maximum out-of-plane settlement within the settlement arc length, in inches.
K = factor based on tank roof type (per B.3.2.2).
Roof TypeFixed Roof K = 10.5
Sarc # Start Pt End Pt End Pt Sarc (ft) Si (in) Smax (in)
1 4 7 5 32.9867 0.3750 0.5016 Pass
2 7 4 1 54.9779 0.2500 0.8360 Pass
Evaluation of the settlement by the arc length method is within acceptable limits.
API 653 B.2.2.5 Evaluation by Settlement Arc Length Method (For R 2 less than 0.9)
Si < Smax →
Si < Smax →
Arc Length Evaluation
𝑆 𝑚𝑖𝑛 𝑘 𝑆 𝐷 𝐻
𝑌 𝐸
, 4.0
1 2
0.375 0.375
0.25
0.5
4 5 6 7 8 1 2 3 4
E le va ti on s
(i nc he s)
Data Points
Appendix B
Engineering Drawings
1. Shell Layout Drawing
2. Roof Layout Drawing
3. Containment Layout Drawing
Remarks/Legend:
Owner/Operator:
Inspection Firm:
Date: Revision Number: Revision Date:
Drawing Title: Tank Description: Drawing Number:
InterSpec, LLC.
12/3/2019 N/A N/A
Tank 101B (Facility 3414B) S-1Shell Layout [1 of 2]
A - 24" Manhole B - 4" Receipt C - 1" High Level Shut-Off D - 1" High Level Shut-Off E - 6" Product Issue F - 3/4" Water Draw Off G - 2" Low Suction H - 4" Shell Overflow
Seam #1 is the first shell seam left of the manway on the first shell course viewing from the outside.
The number in the upper left corner of each plate identifies the plate by the course and position of the plate in that course.
US Air Force - Fort Riley; Fort Riley, KS
A
B C
D
E
1-1 1-2 1-3
2-1 2-2
3-1 3-2 3-3
Grounding Lug
Manual Tank Gauge
ENRAF
Inspection Firm:
Date: Revision Number: Revision Date:
Drawing Title: Tank Description: Drawing Number:
InterSpec, LLC.
12/3/2019 N/A N/A
Tank 101B (Facility 3414B) S-2Shell Layout [2 of 2]
A - 24" Manhole B - 4" Receipt C - 1" High Level Shut-Off D - 1" High Level Shut-Off E - 6" Product Issue F - 3/4" Water Draw Off G - 2" Low Suction H - 4" Shell Overflow
Seam #1 is the first shell seam left of the manway on the first shell course viewing from the outside.
The number in the upper left corner of each plate identifies the plate by the course and position of the plate in that course.
US Air Force - Fort Riley; Fort Riley, KS
F G
H
1-4
3-4 3-5
1-5
2-3 2-4 2-5
Inspection Firm:
Date: Revision Number: Revision Date:
Drawing Title: Tank Description: Drawing Number:
US Air Force - Fort Riley; Fort Riley, KS
InterSpec, LLC.
12/3/2019 N/A N/A
Tank 101B (Facility 3414B) R-1Roof Layout [1 of 1]
The measured tank diameter is 28 feet.
The roof consists of 14 plates.
A - 3" Center Vent B - 8" Vito Probe C - 20" Manhole D - 4" Electronic Level Gauge E - 1" Manual Tank Gauge Wire F - 1 1/2" Manual Tank Gauge Float G - 1" Manual Tank Gauge Wire
H - 8" ENRAF
2 3 4
5 6 7
8 9 10
11 12 13
A
B
C D
E F HG
Inspection Firm:
Date: Revision Number: Revision Date:
Drawing Title: Tank Description: Drawing Number:
US Air Force - Fort Riley; Fort Riley, KS
InterSpec, LLC.
12/3/2019 N/A N/A
Tank 101B (Facility 3414B) C-1Containment Layout [1 of 1]
The secondary containment consists of a gravel floor and gravel walls.
- 6" Issue Piping (101 A)
- 4" Receipt Piping (101 A)
- 4" Receipt Piping (101 B)
- 6" Issue Piping (101 B)
- Pipe Support
36" x 36" Sump
Stairway
101 B 101 A
Concrete Sidewalk
Appendix C
Engineering Data
1. Shell Settlement Measurements
Shell Settlement Measurements
1 62 1/4
2 62 1/4
3 62 1/8
4 62
5 62 3/8
6 62 1/4
7 62
8 62 1/8
NOTE: The Rod Heights are based on the actual height of the transit at the time of the data collection. This data should only be used for this report. Point #1 is located at Vertical Shell Seam #1.
Point No. Rod Height (inches)
Appendix D
API Standard 653 Checklists for Tank Inspections
1. Tank In-Service Inspection Checklist
D‐1
Tank In-Service Inspection Checklist
API 653
Reference Item
Completed (X)
C.1.1 FOUNDATION
a) Measure foundation levelness and bottom elevations. ☒
C.1.1.1 CONCRETE RING
a) Inspect for broken concrete, spalling, and cracks, particularly under backup bars used in welding butt-welded annular rings under the shell.
b) Inspect drain openings in ring, back of water draw basins, and top surface of ring for indications of bottom leakage.
c) Inspect for cavities under foundation and vegetation against bottom of tank. ☐
d) Check that runoff rainwater from the shell drains away from tank. ☒
e) Check for settlement around perimeter of tank. ☒
C.1.1.2 ASPHALT
a) Check for settling of tank into asphalt base which would direct runoff rain water under the tank instead of away from it.
b) Look for areas where leaching of oil has left rock filler exposed, which indicates hydrocarbon leakage.
C.1.1.3 OILED DIRT OR SAND
a) Check for settlement into the base which would direct runoff rain water under the tank rather than away from it.
C.1.1.4 ROCK
a) Presence of crushed rock under the steel bottom usually results in severe underside corrosion. Make a note to do additional bottom plate examination (ultrasonic, hammer testing, or turning of coupons) when the tank is out of service.
C.1.1.5 SITE DRAINAGE
a) Check site for drainage away from the tank and associated piping and manifolds. ☒
b) Check operating condition of the dike drains. ☒
C.1.1.6 HOUSEKEEPING
a) Inspect the area for buildup of trash, vegetation, and other inflammables buildup. ☒
C.1.1.7 CATHODIC PROTECTION
a) Review cathodic protection potential readings. ☒
C.1.2 SHELLS
C.1.2.1 EXTERNAL VISUAL INSPECTION
a) Visually inspect for paint failures, pitting, and corrosion. ☒
b) Clean off the bottom angle area and inspect for corrosion and thinning on plate and weld.
c) Inspect the bottom-to-foundation seal, if any. Visually inspect for grooving, corrosion, pitting, and coating failures.
C.1.2.2 INTERNAL (FLOATING ROOF TANK)
a) Visually inspect for paint failures, pitting, and corrosion. ☐
C.1.2.3 RIVETED SHELL INSPECTION
a) Inspect external surface for rivet and seam leaks. ☐
b) Locate leaks by sketch or photo (location will be lost when shell is abrasive cleaned for painting).
c) Inspect rivets for corrosion loss and wear. ☐
d) Inspect vertical seams to see if they have been full fillet lap-welded to increase joint efficiency.
Reference Item
Completed (X)
e) If no record exists of vertical riveted seams, dimension and sketch (or photograph) the rivet pattern: number of rows, rivet size, pitch length, and note whether the joint is butt-riveted or lap-riveted.
C.1.2.4 WIND GIRDER (FLOATING ROOF TANKS)
a) Inspect wind girder and handrail for corrosion damage (paint failure, pitting, corrosion product buildup), especially where it occurs at tack-welded junction, and for broken welds.
b) Check support welds to shell for pitting, especially on shell plates. ☐
c) Note whether supports have reinforcing pads welded to shell. ☐
C.1.3 SHELL APPURTENANCES
C.1.3.1 MANWAYS AND NOZZLES
a) Inspect for cracks or signs of leakage on weld joints at nozzles, man ways, and reinforcing plates.
b) Inspect for shell plate dimpling around nozzles, caused by excessive pipe deflection. ☒
c) Inspect for flange leaks and leaks around bolting. ☒
d) Inspect sealing of insulation around manways and nozzles. ☒
e) Check for inadequate manway flange and cover thickness on mixer manways. ☐
C.1.3.2 TANK PIPING MANIFOLDS
a) Inspect manifold piping, flanges, and valves for leaks. ☒
b) Inspect fire-fighting system components. ☒
c) Check for anchored piping which would be hazardous to the tank shell or bottom connections during earth movement.
d) Check for adequate thermal pressure relief of piping to the tank. ☒
e) Check operation of regulators for tanks with purge gas systems. ☐
f) Check sample connections for leaks and for proper valve operation. ☐
g) Check for damage and test the accuracy of temperature indicators. ☐
h) Check welds on shell-mounted davit clips above valves 6 inches and larger. ☐
C.1.3.3 AUTOGAUGE SYSTEM
a) Inspect autogauge tape guide and lower sheave housing (floating swings) for leaks. ☒
b) Inspect autogauge head for damage. ☒
c) Bump the checker on autogauge head for proper movement of tape. ☒
d) Identify size and construction material of autogauge tape guide (floating roof tanks). ☒
e) Ask operator if tape tends to hang up during tank roof movement (floating roof tanks). ☒
f) Compare actual product level to the reading on the autogauge (maximum variation is 2 in.).
g) On floating roof tanks, when the roof is in the lowest position, check that no more than two feet of tape are exposed at the end of the tape guide.
h) Inspect condition of board and legibility of board-type autogauges. ☐
i) Test freedom of movement of marker and float. ☐
C.1.3.4 SHELL MOUNTER SAMPLE STATION
a) Inspect sample lines for function of valves and plugging of lines, including drain or return-to-tank line.
b) Check circulation pump for leaks and operating problems. ☐
c) Test bracing and supports for sample lines and equipment. ☐
C.1.3.5 HEATER SHELL MANWAY MOUNTED
a) Inspect condensate drain for presence of oil indicating leakage. ☐
Reference Item
Completed (X)
C.1.3.6 MIXER
a) Inspect for proper mounting flange and support. ☐
b) Inspect for leakage. ☐
c) Inspect condition of power lines and connections to mixer. ☐
C.1.3.7 SWING LINES: WRINCH OPERATION
a) Non-floating. Raise, then lower the swing line with the winch, and check for cable tightness to confirm that swing line lowered properly.
b) Floating. With tank half full or more, lower the swing line, then let out cable and check if swing has pulled cable tight, indicating that the winch is operating properly.
c) Indicator. Check that the indicator moves in the proper direction: Floating swing line indicators show a lower level as cable is wound up on the winch. Non-floating swing line indicators show the opposite.
C.1.3.8 SWING LINES: EXTERNAL GUIGE SYSTEM
a) Check for leaks at threaded and flanged joints. ☐
C.1.3.9 SWING LINES: IDENTIFY BALLAST VARYING NEED
a) Check for significant difference in stock specific gravity. ☐
C.1.3.10 SWING LINES: CABLE MATERIAL AND CONDITION
a) For non-stainless steel cable, check for corrosion over entire length. ☐
b) All cable: check for wear or fraying. ☐
C.1.3.11 SWING LINES: PRODUCT SAMPLE COPARISON
a) Check for water or gravity differences that would indicate a leaking swing joint. ☐
C.1.3.12 SWING LINES: TARGET
a) Target should indicate direction of swing opening (up or down) and height above bottom where suction will be lost with swing on bottom support.
C.1.4 ROOFS
C.1.4.1 DECK PLATE INTERNAL CORROSION
a) For safety, before accessing the roof, check with ultrasonic instrument or lightly use a ball peen hammer to test the deck plate near the edge of the roof for thinning.
(Corrosion normally attacks the deck plate at the edge of a fixed roof and at the rafters in the center of the roof first.)
C.1.4.2 DECK PLATE EXTERNAL CORROSION
a) Visually inspect for paint failure, holes, pitting, and corrosion product on the roof deck. ☒
C.1.4.3 ROOF DECK DRAINAGES
a) Look for indication of standing water. (Significant sagging of fixed roof deck indicates potential rafter failure. Large standing water areas on a floating roof indicate inadequate drainage design or, if to one side, a nonlevel roof with possible leaking pontoons.)
C.1.4.4 LEVEL OF FLOATING ROOFS
a) At several locations, measure distance from roof rim to a horizontal weld seam above the roof. A variance in the readings indicates a nonlevel roof with possible shell out-of-round, out-of- plumb, leaking pontoons, or hang-up. On small diameter tanks, an unlevel condition can indicate unequal loading at that level.
C.1.4.5 GAS TEST INTERNAL FLOATING ROOF
a) Test for explosive gas on top of the internal floating roof. Readings could indicate a leaking roof, leaking seal system, or inadequate ventilation of the area above the internal floating roof.
Reference Item
Completed (X)
C.1.4.6 ROOF INSULATION
a) Visually inspect for cracks or leaks in the insulation weather coat where runoff rain water could penetrate the insulation.
b) Inspect for wet insulation under the weather coat. ☐
c) Remove small test sections of insulation and check roof plate for corrosion and holes near the edge of the insulated area.
C.1.4.7 FLOATING ROOF SEAL SYSTEMS
a) Inspect the condition of the seal, measure and record maximum rim spaces and seal-to-shell gaps around the full roof circumference at the level of inspection. NOTE:
Inspection of the seal and measurement of the rim spaces and seal-to-shell gaps at more than one level may be necessary to more fully determine if any problems exist at other levels of tank operation).
b) Measure and record annular space at 30-ft spacing (minimum of four quadrants) around roof and record. Measurements should be taken in directly opposite pairs.
c) Check if seal fabric on primary shoe seals is pulling shoes away from shell (fabric not wide enough).
d) Inspect fabric for deterioration, holes, tears, and cracks. ☐
e) Inspect visible metallic parts for corrosion and wear. ☐
f) Inspect for openings in seals that would permit vapor emissions. ☐
g) Inspect for protruding bolt or rivet heads against the shell. ☐
h) Pull both primary and secondary seal systems back all around the shell to check their operation.
i) Inspect secondary seals for signs of buckling or indications that their angle with the shell is too shallow.
j) Inspect wedge-type wiper seals for flexibility, resilience, cracks, and tears. ☐
C.1.5 ROOF APPURTENANCES
C.1.5.1 SAMPLE HATCH
a) Inspect condition and functioning of sample hatch cover. ☐
b) On tanks governed by Air Quality Monitoring District rules, check for the condition of seal inside hatch cover.
c) Check for corrosion and plugging on thief and gauge hatch cover. ☐
d) Where sample hatch is used to reel gauge stock level, check for marker and tab stating hold-off distance.
e) Check for reinforcing pad where sample hatch pipe penetrates the roof deck. ☐
f) On floating roof sample hatch and recoil systems, inspect operation of recoil reel and condition of rope.
g) Test operation of system. ☐
h) On ultra clean stocks such as JP4, check for presence and condition of protective coating or liner inside sample hatch (preventing rust from pipe getting into sample).
C.1.5.2 GAUGE WELL
a) Inspect visible portion of the gauge well for thinning, size of slots, and cover condition. ☒
b) Check for a hold-off distance marker and tab with hold-off distance (legible). ☐
c) On floating roofs, inspect condition of roof guide for gauge well, particularly the condition of the rollers for grooving.
d) If accessible, check the distance from the gauge well pipe to the tank shell at different levels.
e) If tank has a gauge well washer, check valve for leakage and for presence of a bull plug or blind flange.
Reference Item
Completed (X)
C.1.5.3 FIXED ROOF SCAFFOLD SUPPORT
a) Inspect scaffold support for corrosion, wear, and structural soundness. ☐
C.1.5.4 AUTOGAUGE: INSPECT HATCH AND GUIDES
a) Check the hatch for corrosion and missing bolts. ☐
b) Check tape cable for wear or fraying caused by rubbing on the cover. ☐
C.1.5.5 AUTOGAUGE: FLOAT WELL COVER
a) Inspect for corrosion. ☐
b) Check tape cable for wear or fraying caused by rubbing on the cover. ☐
C.1.5.6 SAMPLE HATCH (INTERNAL FLOATING ROOF)
a) Check overall…