About this file
This is a Performance Work Statement (PWS) for non-personnel services to perform inspections on Department of Defense fuel tanks at Davenport ARNG, Iowa. The contractor must provide strapping charts and aboveground storage tank (AST) inspections on tanks listed in Attachment B, including all personnel, equipment, supplies, facilities, transportation, tools, materials, and supervision.
Key requirements include: performing STI External inspections in accordance with STI SP001 standards; fuel removal/transfer and disposal of up to 3,250 gallons of residual/sludge fuel; tank cleaning; tank strapping with charts in both English and Metric measurements; and submission of draft/final inspection reports. Work hours are 0730-1630 Monday-Friday excluding federal holidays. Deliverables include Project Management Plan due 15 days after award, draft inspection reports due 28 days after field inspection, and strapping charts due 28 days after strapping completion. Key personnel must include a Certified STI SP001 Inspector and Project Manager. This is a Firm Fixed Price contract administered by the US Army Corps of Engineers, Omaha District.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP-POL-CMP-INSPECT-PWS-PO08
Davenport ARNG, Iowa
Part 1 General Information
1. GENERAL:
1.1. Scope: This is a non-personnel services contract to perform inspections on
Department of Defense fuel tanks. This service entails providing strapping charts and providing an aboveground storage tank (AST) Inspection on tank(s) listed in Attachment B.
1.2. Background: See Attachment J for previous inspection report(s).
1.3. Objectives: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items. The contractor shall also provide non-personnel services necessary to execute fuel removal and transfer and disposal of residual/sludge fuel, clean the tank, perform tank strapping and perform an STI External inspection on the tank(s), as applicable, at the location and for the tanks specified in Attachment B, as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services.
1.4. General Information
1.4.1. Recognized Holidays:
New Year’s Day Martin Luther King Birthday President’s Day Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Christmas
1.4.2. Hours of Operation: The contractor is responsible for conducting business, between the hours of 0730-1630 Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Other than normal duty hours, work must be coordinated with the Contracting Officer (KO) or his/her designated representative. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall maintain stability and continuity of the workforce.
1.4.3. Place of Performance: The work to be performed under this contract will be performed at the installation and facilities identified in Attachment B.
1.4.4. Type of Contract: The government will award a Firm Fixed Price Contract
1.4.5. Security Requirements: Reference Attachment A – General Installation Security Requirements
1.4.6. Site Access: Contractor shall coordinate with Installation personnel for access to the site. Points of contact for the installation will be provided upon award.
1.4.7. Meetings/Kick-Off Meetings: The Contractor shall coordinate with the USACE Project Manager (PM) and conduct a kickoff meeting prior to field activities.
This can be accomplished either prior to mobilization and inspection activities or onsite prior to commencement of inspection activities. The Work Plan shall be discussed, and further coordination and scheduling shall be accomplished at this meeting. These meetings shall be at no additional cost to the government.
1.4.8. Key Personnel: Certified STI SP001 Inspector and Project Manager.
1.4.9. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI.
The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as they deem necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.10. Suitability For Service: Evaluate inspection data to determine suitability for continued use. Identify conditions which pose a risk to integrity. Determine a metal loss threshold for mandatory repairs. In the determination of mandatory repairs:
• Use a "first, do no harm" approach to classifying tank repairs.
• Use Desired Service Interval as the time to next inspection unless notified otherwise by the Contracting Officer.
• Use minimum remaining thickness (MRT) no less than 100 mils at the next inspection.
• Do not classify as mandatory repair of conditions which are noncompliant with current standards but are un-related to structural or hydraulic integrity (e.g., gouge, improper weld spacing, weld profile).
• Apply repair determination to individual indications. Do not average across an entire plate or course.
PART 2
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND
SERVICES
2. GOVERNMENT FURNISHED ITEMS AND SERVICES:
2.1. Services: No Government furnished items or services are required.
PART 3
CONTRACTOR FURNISHED ITEMS AND SERVICES
3. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
3.1. General: The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 2 of this PWS.
3.2. Equipment: The Contractor shall provide all tools and inspection equipment needed to perform the inspection and other services to be performed under the PWS.
3.2.1. Precision Equipment: Contractor is responsible to ensure all equipment to be used is certified and calibrated to the parameters and tolerances of the required equipment.
3.3. Project Inspection Management Plan (PMP): As part of the initial PMP, the Contractor shall prepare and include a brief (< 10 pages) Work Plan, as an attachment, which will include proposed schedule, inspection activities, personnel performing inspection, required training certificates, and additional data or support requests.
3.4. Health and Safety Plan (HSP) and Accident Prevention Plan (APP): The
Contractor will prepare a Health and Safety Plan (HSP) to comply with 29 Code of Federal Regulations (CFR) 1910 and 1926 as well as applicable Military Service (Army, Air Force, or Navy), OSHA, state, host nation, and local and installation health and safety regulations regarding the proposed work effort. Qualifications for individuals who will be on-site for safety shall be submitted in the HSP.
3.4.1. The Accident Prevention Plan (APP) is required by FAR clause 52.236-13.
The APP describes the methods by which the contractor or USACE personnel will meet the safety and health requirements listed in EM 385-1-1. Entry into Confined Spaces shall comply with the requirements of 29 CFR 1910.146.
Provide additional monitoring for toxic (petroleum) vapors in addition to normal air monitoring requirements.
3.4.2. Abbreviated Accident Prevention Plans may be developed and submitted per
Form A-01 Abbreviated Accident Prevention Plan Checklist Page A-13 of the EM 385-1-1. This may be submitted to develop a plan more specific to the work performed under this PWS but shall still comply as indicated above.
PART 4
SPECIFIC TASKS
4. Specific Tasks: Per each tank as identified in attachment B
4.1. Basic Services.
STI Inspection:
4.1.1. Perform a Tel-con kick-off meeting either prior to mobilization or the morning of the commencement of work on-site.
4.1.2. Perform STI Inspection. The tank Inspection shall be in conformance with applicable industry standards STI SP001, NFPA 30, NFPA 326, UFGS 33 56 10, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local and service. At a minimum, table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.
4.1.3. Strapping charts are required per Attachment B, clean the tank and perform the visual inspection of the containment area. Tanks must be phased.
Coordination with the fuels operations personnel is required prior to mobilization to determine if the product can be disposed of. Perform strapping of tank and provide strapping charts reviewed and signed by an Independent Agent. The strapping charts are to be in gallons, barrels, and 1/16” measurements. Two charts to be provided one each in English and Metric measurements.
4.1.3.1. Remove and transfer quantity of fuel as identified in Attachment B.
Dispose of fuel/sludge or residual product not to exceed 3,250 gallons.
The contractor will be responsible to coordinate with environmental and safety authorities having jurisdiction to obtain and execute required permits, manifests, etc. Tank cleaning shall be done in accordance with
UFGS 33 01 50.55.
4.1.4. Provide Tel-con out briefing prior to completing the work. Out brief to be held within 24-72 hours after inspection. Coordination prior to inspection being completed. Draft findings submitted to USACE PM and Stakeholders 24 hours prior to the out brief. Inspector does not need to be on site but needs to be available and knowledgeable for inquiries from USACE and Stakeholders regarding the findings on the out brief call.
4.1.5. Provide DRAFT and FINAL inspection reports per the attached template.
Provide separate report for each tank inspected. Specify the due date for the next inspection. Include the STI SP001 inspector of record certificate number and signature.
PART 5
APPLICABLE PUBLICATIONS
5. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
5.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
Steel Tank Institute (STI) SP001 Standard for the Inspection of Aboveground Storage Tanks
American Petroleum Institute (API) RP 575 Inspection Practices for Atmospheric and Low-pressure Storage
Tanks Std 2015 Requirements for Safe Entry and Cleaning of Petroleum Storage
Tanks
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 30 Flammable and Combustible Liquids Code NFPA 70 National Electrical Code (NEC) NFPA 326 Standard for Safeguarding of Tanks and Containers for Entry, Cleaning, or Repairs NFPA 704 Standard System for the Identification of the Hazards of Materials for Emergency Response
UNIFIED FACILITIES CRITERIA (UFC)
UFC 3-460-01 Design: Petroleum Fuel Facilities UFC 3-460-03 Petroleum Fuel Systems Maintenance
UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS)
UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum
Fuel Tanks UFGS 09 97 13.27 High Performance Coating for Steel Structures UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 112 EPA: Oil Pollution Prevention
PART 6
ATTACHMENT
7. Attachment/Technical Exhibit List:
7.1. Attachment A – General Installation Security Requirements
7.2. Attachment B – Fuel Storage Tank List
7.3. Attachment C – Fuel Storage Tank Data Sheet
7.4. Attachment D – Monthly Contractors Progress, Management and Status Report
7.5. Attachment E – Inspection Telecon Briefing Template
7.6. Attachment F – Not Applicable
7.7. Attachment G – Return to Service Letter
7.8. Attachment H – STI External Template
7.9. Attachment I – Not Applicable
7.10. Attachment J – Previous Inspection Reports
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
STI Inspection:
Performance Objective
Standard Performance Threshold
Method of Surveillance
PRS # 1.
Kick-Off Meeting with USACE and Stakeholders
Para 1.5.8.
State, local, and federal requirements regulating fuel storage tanks
100% The contractor will schedule this Meeting either on-site prior to commencement of work or via teleconference prior to being onsite. Submit agenda and meeting minutes to stakeholders.
PRS # 2.
On Site Inspection
Para. 4.1.2.
State, local, and federal requirements regulating fuel storage tanks.
100% Random Inspection.
PRS # 3.
Out-Brief Meeting with USACE and Stakeholders
Para 4.1.4.
State, local, and federal requirements regulating fuel storage tanks
100% Contractor will coordinate a Tel-con and distribute the report of findings 24 hrs prior to the scheduled conference
PRS #4.
Strap tank and provide Strapping Chart
Para. 4.1.3.
State, local, and federal requirements regulating fuel storage tanks.
100% Random Inspection.
The contractor is to provide strapping charts reviewed and signed by and Independent Agent
PRS # 5.
Provide an STI Inspection report
Para. 4.1.5.
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection.
The contractor is to provide a DRAFT and FINAL report for MCX review and comment.
PRS #6.
Fuel transfer and disposal Para. 4.1.3.1
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection
DELIVERABLES SCHEDULE
DELIVERABLE SCOPE OF
WORK
PARAGRAPH
DUE DATE
Project Inspection Management Plan/Work Plan, Accident Prevention Plan & Health and Safety Plan (Draft)
3.3 & 3.4 15 days after award
Project Inspection Management Plan/Work Plan, Accident Prevention Plan & Health and Safety Plan (Final)
3.3 & 3.4 5 days after receipt of comments
Inspection and Evaluation Report – (Draft) 4.1.5 28 days after Field Inspection
Inspection and Evaluation Report – to include populated Attachment C Excel Sheet for each base (Final)
4.1.5 7 days after receipt of comments
Strapping Chart 4.1.3 28 days after strapping is completed
| TECHNICAL EXHIBIT 1 |
| PRS # 3. |
File details come from the government source that posted it. Updated .