OA00107GA103.pdf
PDF 827 KB Posted
- Attached to
- Oahe Powerhouse Heat Pump Replacement
- Solicitation number
- W9128F25BA003
About this file
This document is a detailed turbine floor plan technical drawing for the Oahe Dam Powerhouse Heat Pump Replacement project located in South Dakota, prepared by the U.S. Army Corps of Engineers Omaha District. The architectural drawing (GA103) shows a comprehensive floor plan at elevation 1438.0, featuring seven generator bays with large circular generator units, surrounding service areas, and storage spaces.
The drawing highlights specific technical installation details, including 12 total locations for material hatch access (approximately 10' x 10' in size) and precise mapping of S4 system air handling unit (AHU) zone damper control thermostats, with two sets specified for each AHU. The document is dated 05/01/2025, with a solicitation number W9128F25B0007, and includes a general revision noted on 05/30/2025. The plan provides a comprehensive spatial layout and technical configuration for the planned HVAC equipment replacement at the Oahe Dam powerhouse facility.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
A N
S I
D
P O
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
M
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
IC
T
F
IL
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M E
R
T U
R B
IN
E
F L
O O
R P
L A
N
E L
.1
.0
GA103
K
P A
R K
C F
O S
M E
A
G
A .d g n
K
P A
K
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
UPPER / LOWER LEVELS
(APPROX. 10' X 10') TO
MATERIAL HATCH ACCESS
A1
TURBINE FLOOR PLAN_EL.1438.0
SCALE: N.T.S.
(TOTAL 12 LOCATIONS)
EACH AHU). FIELD VERIFY.
THERMOSTATS (2 SETS PER
DAMPER CONTROL
OF S4 SYSTEM AHU ZONE
APPROXIMATE LOCATIONS
A
M
-G
E N
E R
A L
R E
V
IS
IO
N
/3
/2
File details come from the government source that posted it. Updated .