The file contains detailed engineering design drawings for the Powerhouse Heat Pump Replacement project at Oahe Dam in South Dakota, prepared by the U.S. Army Corps of Engineers Omaha District. The project involves comprehensive mechanical and electrical system upgrades, specifically:
Mechanical Scope: Removing and replacing two existing 180-ton water-to-water heat pumps, replacing hydronic water coils in multiple air handling units (AHUs), updating piping systems, valves, and associated components across seven equipment areas at elevation 1414.0. Electrical Scope: Replacing damper actuators, valve actuators, control wiring, electrical feeders, and related electrical infrastructure. The project includes precise modifications to piping configurations, electrical systems, and control mechanisms, with careful sequencing requiring one heat pump to be replaced, tested, and accepted before proceeding to the next. The design drawings provide extensive technical details including floor plans, piping sections, equipment layouts, and electrical schematics across multiple elevation levels of the powerhouse.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A N
S I
D
P O
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
M
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
IC
T
F
IL
E
N U
M B
E R
F
IL
E N
A M
E
S L
IN
D
G R
E
C
V E
R
I N
D E
X
G-001
Z
M
IC
H K
A
S L
IN
D
G R
G
-0 .d g n
Z
M
IC
H K
S
P
D
:3
:3
A
M
/1 /2
O A
G
-0 .d
POWERHOUSE HEAT PUMP REPLACEMENT
OAHE DAM, SOUTH DAKOTA
W9128F25B0007
05/01/2025
OMAHA DISTRICT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
O A
G
-0 .d g n
:3
:3
A
M
/1 /2
P D
D
S
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
of Engineers
US Army Corps
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
S L
IN
D
G R
B
B R
E V
IA
T
IO
N
S
G-002
Z
M
IC
H K
A
S L
IN
D
G R
G
-0 .d
Z
M
IC
H
O A
G
-0 .d g n
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
O A
G
-0 .d g n
:3
:2
P
M
/2 /2
P
D
D S
CONTRACTORCONTR
CONTINUE CONT
CONSTRUCTIONCONSTR
CONNECTCONN
CONCRETECONC
COMPARTMENTCOMPT
COMBUSTIONCOMB
COMMONCOM
COLUMNCOL
CARBON DIOXIDECO2
CLEANOUTCO
COUNTERCNTR
CORNERCNR
CONDUCTIVE NEOPRENE LATEXCNL
CONDUITCND
CONCRETE MASONRY UNITCMU
COMPOSITECMPST
CORRUGATED METAL PIPECMP
CENTIMETER(S)cm
CLEAR WIRED GLASSCLWG
CLEAR(ANCE)CLR
CLOSURECLOS
CLOSETCLO
CONTRACT LIMIT LINECLL
CLEAR GLASSCLGL
CEILING HEIGHTCLG HT
CEILINGCLG
CENTER LINECL
CIRCUIT BREAKERCKT BRKR
CIRCUITCKT
CONSTRUCTION JOINTCJ
CONTROL JOINTCJ
CIRCULARCIRC
CAST-IN-PLACECIP
CURB INLETCI
CAST IRONCI
CHROME PLATEDCHR PL
CHECKCHK
CHIMNEYCHIM
CHAMFERCHFR
CHALKBOARDCH BD
CORNER GUARDCG
CUBIC FEET PER MINUTECFM
COUNTERFLASHINGCFLG
CONDUCTIVE FLOORINGCFI
CERAMICCER
CEMENT PLASTERCEM PLAS
CEMENTCEM
COVER ELEVATIONCE
CLOSED CIRCUIT TELEVISIONCCTV
CUBICLE CURTAIN TRACKCCT
CATCH BASINCB
CAPACITYCAP
CABINETCAB
BOTH WAYSBW
BUILT-UP ROOFINGBUR
BETWEENBTWN
BTU PER HOURBtuH
BRITISH THERMAL UNITBtu
BASEMENTBSMT
BOTH SIDESBS
BRONZEBRZ
BRACKETBRKT
BRICKBRK
BEARING PLATEBRG PL
BEARINGBRG
BRIDGINGBRDG
BRACINGBRCG
BACK PLASTER(ED)BP
BOTTOMBOT
BOTTOM OFBO
BENCHMARKBM
BELOWBLW
BUILDINGBLDG
BUILDING LINEBL
BED JOINTBJT
BITUMINOUSBITUM
BEVELBEV
BRICK EXPANSION JOINTBEJ
BOUNDARYBDRY
BOARDBD
BOOKCASEBC
BULLETIN BOARDBB
ACOUSTICAL WALL TREATMENTAWT
AMERICAN WIRE GAUGEAWG
AVERAGEAVG
AUTOMATICAUTO
ACOUSTICAL TILE CEILINGATC
ASPHALTASPH
ABOVE SUSPENDED CEILINGASC
ASBESTOSASB
AMERICAN REFRIGERATION INSTITUTEARI
ARCHITECTARCH
APPROXIMATEAPPROX
APPROVEDAPPD
AMERICAN NATIONAL STANDARDS INSTITUTEANSI
ANODIZEANOD
AMPEREAMP
AMBIENTAMB
ALUMINUMALUM
ALTERNATEALT
ACTIVE LEAFA.L.
AMERICAN INSTITUTE OF STEEL CONSTRUCTIONAISC
AMPERE INTERRUPTING CAPACITYAIC
AREA INLETAI
AIR HANDLING UNITAHU
ANCHOR AHR
AGGREGATEAGGR
ABOVE FINISHED FLOORAFF
AUTOMATIC DOOR OPERATORADO
ADJACENT, ADJOINING, ADJUSTABLEADJ
ADHESIVEADH
ADDENDUMADDM
ACOUSTICAL CEILING TILEACT
ACOUSTICACST
ALUMINUM CABLE STEEL REINFORCEDACSR
ACCESS PANELACS PNL
ACCESS DOORACS DR
ACRYLIC PLASTICACR
AMERICAN CONCRETE INSTITUTEACI
ACCESSIBLEACC
ALTERNATING CURRENTAC
ABOVEABV
ANCHOR BOLTAB
AIR CONDITIONING UNITA/C UNIT
AIR CONDITIONINGA/C
ANGLEL
FLOORFLR
FLASHINGFLASH
FLUSH JOINTFJT
FIXTUREFIXT
FINISH FLOORFIN FLR
FINISHFIN
FIGUREFIG
FLAT HEAD WOOD SCREWFHWS
FIRE HOSE STATIONFHS
FIRE HOSE RACKFHR
FLAT HEAD MACHINE SCREWFHMS
FIRE HOSE CABINETFHC
FLAT HEADFH
FIRE HYDRANTFH
FIBERGLASSFGL
FACTORY FINISHFF
FIRE EXTINGUISHER CABINETFEC
FIRE EXTINGUISHER BRACKETFEB
FIRE EXTINGUISHERFE
FOUNDATIONFDTN
FIRE DAMPERFDMPR
FLOOR DRAINFD
FAN COIL UNITFCU
FLOOR CLEANOUTFCO
FLOOR CONSTRUCTION JOINTFCJ
FACINGFCG
FACE BRICKFC BRK
FOOT CANDLEFC
FIRE BRICKF BRK
FRESH AIR INTAKEFAI
FIRE APPARATUS CLOSETFAC
FRESH AIRFA
FIRE ALARMFA
FAHRENHEITF
EXTERIOREXT
EXPANSION BOLTEXP BT
EXPOSEDEXP
EXPANSIONEXP
EXISTINGEXST
EXHAUST AIREXH A
EXHAUSTEXH
EXCAVATEEXC
ENTERING WATER TEMPERATUREEWT
ELECTRIC WATER COOLEREWC
ESTIMATE(D)EST
ESCALATORESCAL
EQUIPMENTEQUIP
EQUALEQ
EPOXY COATINGEPY
EXPLOSION PROOFEPRF
ELECTRICAL PANELBOARDEP
ENTRANCE, ENTERINGENTR
ENCLOSE(URE)ENCL
EMERGENCYEMER
ESTIMATED MAXIMUM DEMANDEMD
EXPANDED METAL EM
ELECTRICELEC
ELEVATION - GRADE OR BUILDINGEL
EXPANSION JOINTEJ
EACH FACEEF
ENTERING AIR TEMPERATUREEAT
EACHEA
EASTE
DIRECT EXPANSIONDX
DUMBWAITERDWTR
DRAWERDWR
DOWELSDWLS
DRAWINGDWG
DOVETAIL DVTL
DRAIN TILEDT
DOWNSPOUTDS
DOUBLE STRENGTH (GLASS)DS
DOOR CLOSERDR CL
DRAINBOARDDRB
DRAINDR
DOORDR
DOWNDN
DEMOUNTABLEDMT
DAMPERDMPR
DAMPPROOFINGDMPF
DEAD LOADDL
DIVISIONDIV
DISTRIBUTION PANELDISTR PNL
DISPENSERDISP
DISCONNECTDISC
DIMENSIONDIM
DIAGONALDIAG
DIAMETERDIA
DUCT HEATERDH
DOUBLE HUNGDH
DRINKING FOUNTAINDF
DETAILDET
DEPARTMENTDEPT
DEPRESSIONDEPR
DEMOLITIONDEMO
DEGREEDEG
DUMMY CONTROL JOINTDCJT
DOWELED CONTROL JOINTDCJ
DOUBLE ACTING DOORDBL ACT DR
DOUBLEDBL
DRY BULBDB
DATUMDAT
PENNY (AS IN NAIL - 10D)d
CYLINDERCYL
COLD WATERCW
CONDUCTIVE VINYL HOMOGENEOUS (SHEET TYPE)CVH
CEILING VENTCV
CUBIC YARDSCU YD
CABINET UNIT HEATERCUH
CUBIC FEETCU FT
COPPERCu
CONDENSING UNITCU
CENTERCTR
CENTER TO CENTERC TO C
CURRENT TRANSFORMERCT
CERAMIC TILECT
CASEMENTCSMT
COUNTERSUNKCSK
CAST STONECS
COURSE(S)CRS
CROSS GRAINCRG
CORROSIVE RESISTANT STEELCRES
CIRCUMFERENCECRCMF
CARPETCPT
COMPRESSIBLECPRS
COVERCOV
CORRIDORCORR
LAG BOLTLB
LAVATORYLAV
LAUNDRYLAU
LEAVING AIR TEMPERATURELAT
LAMINATELAM
LADDERLAD
LABORATORYLAB
KEYWAYKWY
KILOWATTkW
KILOVOLT AMPERES REACTIVEkVAR
KILOVOLT AMPERESkVA
KILOVOLTSkV
KILOMETERkm
KICKPLATEKPL
KNOCKOUT PANELKOP
KITCHENKIT
KILOPOUND (1000 POUNDS)KIP
JOINTJT
JOISTJST
JUNCTIONJCT
JUNCTION BOXJ-BOX
JANITOR’S CLOSETJAN CLO
INSIDE PIPE SIZEI.P.S.
IRON PIPE SIZEIPS
IRON PIPEIP
INVERTINV
INTERMEDIATEINTM
INTERIORINT
INSULATIONINSUL
INSULATING FILLINSF
INCLUDEDINCL
INCINERATORINCIN
INCHIN
INTERLOCKILK
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICAIESNA
INSIDE DIAMETERID
INTERCOMIC
HERTZHz
HYDRAULICHYDR
HEATING, VENTILATING AND AIR CONDITIONINGHVAC
HEATERHTR
HEATINGHTG
HEIGHTHT
HOUSEKEEPINGHSKPG
HIGH-STRENGTH GYPSUM PLASTERHSGYP
HIGH STRENGTHHS
HOURHR
HIGH POINTHPT
HORSEPOWERHP
HIGH PRESSUREHP
HORIZONTALHORIZ
HANDRAILHNDRL
HOLLOW METALHM
HOOK(S)HK
HANDHOLEHH
HEXAGONHEX
HIGH EARLY-STRENGTH CEMENTHES
HARDWOODHDWD
HARDWAREHDW
HEADERHDR
HEAD JOINTHD JT
HARDBOARDHDBD
HEAVY DUTYHD
HEADHD
HANDICAPPEDHCP
HALON CONTAINMENT DAMPERHCD
HOLLOW COREHC
HOSE BIBBHB
GYPSUM PLASTERGYP PLAS
GYPSUM BOARDGYP BD
GYPSUMGYP
GLAZED WALL TILEGWT
GROUTGT
GLAZED STRUCTURAL UNITSGSU
GLAZED STRUCTURAL TILEGST
GRATINGGRTG
GRADE LINEGR LN
GRANITEGRAN
GYPSUM TILEGPT
GALLONS PER MINUTEGPM
GOVERNMENTGOVT
GROUNDG
GLAZED CONCRETE MASONRY UNITSGLZ CMU
GLAZINGGLZ
GLASS FIBERGLF
GLASS BLOCKGL BLK
GLASSGL
GASKET(ED)GKT
GALVANIZED IRON PIPEGIP
GALVANIZED IRONGI
GOVERNMENT-FURNISHED EQUIPMENT CONTRACTOR INSTALLEDGFE/CI
GOVERNMENT-FURNISHED EQUIPMENTGFE
GROUND FAULT CIRCUIT INTERRUPTERGFCI
GROUND FACEGF
GENERALGEN
GENERAL CONTRACTORGC
GRAB BARGB
GALVANIZED STEELGALV STL
GALVANIZEDGALV
GALLON(S)GAL
GAGEGA
NATURAL GASG
FABRIC WALL COVERINGFWC
FIRE WATERFW
FUTUREFUT
FURRINGFURG
FOOTINGFTG
FEETFT
FASTEN(ER)FSTNR
FULL SIZEFS
FIRE-RETARDANTFRT
FRAMINGFRMG
FORGEDFRG
FRAMEFR
FIRE RESISTANT FR
FEET PER MINUTEFPM
FIREPROOFFP
FIRE PARTITIONFP
FACE OF STUDFOS
FACE OF MASONRYFOM
FACE OF FINISHFOF
FACE OF CONCRETEFOC
FENCEFN
FLUORESCENTFLUOR
FLOOR PLATEFLR PL
FLOORINGFLG
FLEXIBLEFLEX
PERFORATE(D)PERF
PEDESTALPED
PAVEMENT DRAINPD
CEMENT PLASTER (PORTLAND)PCP
POUNDS PER CUBIC FOOTPCF
PRECAST CONCRETEPCC
PIECEPC
PUSH BUTTON STATIONPBS
PARTICLE BOARDPBD
PANIC BARPB
PARALLELPAR
PUBLIC ADDRESSPA
POLEP
OBSCURE WIRED GLASSOWGL
OUTSIDE SCREW AND YOKEOS & Y
OPERATIONSOPS
OPAQUEOPQ
OPPOSITEOPP
OPENINGOPNG
OPPOSITE HANDOPH
OVALHEAD WOOD SCREWOHWS
OVALHEAD MACHINE SCREWOHMS
OVERHEADOH
OBSCURE GLASSOGL
OFFICEOFC
OUTSIDE DIAMETEROD
ON CENTER EACH WAYOCEW
ON CENTEROC
OBSERVATION WINDOWOBW
OBSCUREOBSC
OUTSIDE AIROA
NOT TO SCALENTS
NOT REQUIREDN’’REQD
NOISE REDUCTION COEFFICIENTNRC
NOISE REDUCTIONNR
NOMINALNOM
NUMBERNO
NORMALLY OPENNO
NONMETALLICNM
NEOPRENE LATEXN.L.
NAILABLENL
NOT IN CONTRACTNIC
NICKELNi
NATIONAL FIRE PROTECTION ASSOCIATIONNFPA
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNEMA
NATIONAL ELECTRICAL CODENEC
NORMALLY CLOSEDNC
NATURALNAT
NORTHN
MULLIONMULL
MOVABLEMVBL
METALMTL
METAL FURRINGMTFR
MOUNTEDMTD
MOUNTMT
METAL THRESHOLDMT
MACHINE SCREWSMS
METAL ROOF DECKINGMRD
MARBLE BASEMRB
MOP RECEPTORMR
MOVABLE PARTITIONMP
MOTORMOT
MODIFIEDMOD.
MODULARMOD
MASONRY OPENINGMO
MATERIAL NOT IN CONTRACT (INSTALLATION BY CONTRACTOR)MNIC
MILLIMETER(S)mm
MILLWORKMLWK
MOULDINGMLDG
MONOLITHICML
METAL LATHML
MISCELLANEOUSMISC
MIRRORMIRR
MINIMUMMIN
MALLEABLE IRONMI
MANHOLEMH
MATTE-GLAZED TILEMGT
MOTOR GENERATORMG
MANUFACTURERMFR
MANUFACTURINGMFG
METAL FLOOR DECKINGMFD
METAL EDGE STRIPMES
MEMBRANEMEMB
MEDIUMMED
MECHANICAL ROOMMECH RM
MECHANICALMECH
METAL DIVIDER STRIPMDS
METAL-CASED OPENINGMCO
MASONRY CONTROL JOINTMCJ
MEDICINE CABINETMC
MEMBERMBR
MACHINE BOLTSMB
MAXIMUMMAX
MATERIAL(S)MATL
MASONRYMAS
MACHINEMACH
MATCHED AND BEADEDM&B
METER(S)m
LEAVING WATER TEMPERATURELWT
LIGHTWEIGHT CONCRETELWC
LOUVERLVR
LIGHTNINGLTNG
LIGHTINGLTG
LIGHTWEIGHTLT WT
LIGHTLT
LAWN SPRINKLERLS
LIVING ROOMLR
LOW POINTLPT
LIGHTPROOF LOUVERLPL
LIGHTPROOF DOORLPD
LIGHTPROOFLP
LONGITUDINALLONG
LINTELLNTL
LIMESTONELMST
LUMENLM
LEAD-LINED DOORLLD
LIVE LOADLL
LOCKERLKR
LINEARLIN
LEFT HAND(ED)LH
LENGTHLG
LOADINGLDG
LOADLD
LIGHT CONTROLLC
LUMBERLBR
LABELLBL
POUNDLB
SOUNDPROOF DOORSPD
SPECIALSPCL
SPACERSPC
SHUT OFF VALVESOV
SHEET METAL SCREWSSMS
SHEET METALSM
SLEEVESLV
SEALANTSLNT
SKYLIGHTSKLT
STEEL JOIST INSTITUTESJI
SIMILARSIM
SHELVINGSHV
SHEATHINGSHTHG
SHEETSHT
SHOULDERSHLDR
SHEET GLASSSG
STRUCTURAL FACING UNITSFU
STRUCTURAL FACING TILE UNITSFTU
SAFETY GLASSSFGL
SEQUENCESEQ
SECTIONSECT
STEEL DOOR INSTITUTESDI
STORM DRAINSD
STRUCTURAL CLAY TILESCT
SCREENSCRN
SCHEDULESCHED
SOLID CORESC
SECURITY BARSS.B.
SPLASH BLOCKSB
SUPPLY AIRSA
SOUTHS
RAINWATER CONDUCTORRWC
RIVETRVT
REVERSERVS
RUBBER TILE FLOORRTF
RAISED PATTERN RUBBER TILERPRT
REVOLUTIONS PER MINUTERPM
RETRACTABLE PARTITIONRP
RIGHT OF WAYROW
ROUGH OPENINGRO
ROUNDRND
ROOMRM
RAILINGRLG
RACKRK
ROOF HATCHRH
RIGHT HANDRH
RELATIVE HUMIDITYRH
ROOFINGRFG
REVISIONREV
RETURNRET
RESILIENTRESIL
REQUIREDREQD
REMOVE(ABLE)REM
REINFORCEREINF
REGLETREG
REGISTERREG
REFRIGERATIONREFR
REFLECTREFL
REFERENCEREF
RECTIFIERRECT
RECREATION ROOMREC ROOM
RECEPTACLERECPT
RIGID INSULATIONRDG INS
ROOF DRAINRD
RECEIVERRCVR
REINFORCED CONCRETE PIPERCP
REMOTE CONTROLRC
RUBBERRBR
RUBBLE STONERBL
RUBBER BASE, RESILIENT BASERB
RETURN AIR REGISTERRAR
RETURN AIR GRILLERA GR
RABBETEDRAB
RETURN AIRRA
RISERR
RANGER
RADIUSR
QUANTITYQTY
QUARTER ROUND1/4 RND
QUARTERQTR
QUARTQT.
QUARRY TILEQT
PASS WINDOWPW
PAVINGPVG
POLYVINYL CHLORIDEPVC
PAVEDPV
PAPER TOWEL RECEPTACLEPTR
PARTITIONPTN
PAPER TOWEL DISPENSERPTD
POST-TENSIONED CONCRETEPT CONC
POINTPT.
PNEUMATIC TUBEPT
POUNDS PER SQUARE INCHPSI
POUNDS PER SQUARE FOOTPSF
PRESTRESSED CONCRETEPS CONC
PRESSED STEELP.S.
PIPE SPACEPS
PRESSURE-REGULATING VALVEPRV
PROJECTPROJ
PARKINGPRKG
PREFORMEDPREFMD
PREFINISHEDPREFIN
PREFABRICATE(D)PREFAB
PAIRPR
PARTS PER MILLIONPPM
POLISHED PLATE GLASSPPGL
PORTABLEPORT
PORCELAINPORC
POLISHEDPOL
PAINT(ED)PT
PANELPNL
PLYWOODPLYWD
PLATE GLASSPL GL
PILINGPLG
POUNDS PER LINEAR FOOTPLF
PLUMBINGPLBG
PLATFORMPLAT
PLASTERPLAS
PLASTIC LAMINATEPLAM
PROPERTY LINEPL
PLATEPL
POST INDICATING VALVEPIV
PREFAB ISOLATION POWER UNITPIPU
POINT OF INTERSECTIONPI
PHARMACYPHAR
PHASEPH
PERIMETERPERIM
YARD DRAINYD
YARDYD
TRANSFORMERXFMR
WELDED WIRE REINFORCEMENTWWR
WELDED WIRE MESHWWM
WELDED WIRE FABRICWWF
WALL TO WALLW/W
WIDTHWTH
WEIGHTWT
WAINSCOTWSCT
WASTE STACKW.S.
WATERSTOPWS
WARDROBEWRB
WASTE RECEPTACLEWR
WORKING POINTWP
WEATHERPROOFWP
WATERPROOF(ING)WP
WITHOUTW/O
WIRE MESHWM
WORK SHOPWKSH
WROUGHT IRONWI
WATT-HOUR METERWHM
WHEEL BUMPERWHB
WATER HEATERWH
WALL HUNGWH
WIRED GLASSWGL
WIDE FLANGEWF
WINDOWWDW
WASTE DISPOSERWDSP
WOOD DOORWD
WOODWD
WOOD-CASED OPENINGWCO
WHEELCHAIRW/C
WATER CLOSETWC
WOOD BLOCKINGWBL
WET BULBWB
WITHW/
WESTW
VINYL WALL COVERINGVWC
VENT THRU ROOFVTR
VOLTAGE TRANSFORMERV.T.
VENT STACKVS
VERMICULITEVRM
VAPOR RETARDERVR
VOLUMEVOL
VENEERVNR
V-JOINT(ED)VJ
VINYL HOMOGENEOUSVH
VERTICAL GRAINVG
VINYL FABRICVF
VESTIBULEVEST
VERTICALVERT
VENTILATOR(TION)VENT
VAULT DOORVD
VITRIFIED CLAY TILEVCT
VINYL COMPOSITION TILEVCT
VINYL BASEVB
VARNISHVAR
VOLTV
UNIT VENTILATORUV
UTILITYUTIL
URINALUR
UNINTERRUPTABLE POWER SUPPLYUPS
UNFINISHEDUNFIN
UNEXCAVATEDUNEX
UNDERWRITERS LABORATORIESUL
UNIT HEATERUH
UNDERGROUNDUGND
UNIT COOLERUC
TYPICALTYP
TELEVISIONTV
THERMOSTATTSTAT
TRANSVERSETRANS
TRANSOMTRANS
TOILET PARTITIONTPTN
TOILET PAPER DISPENSERTPD
TOP OF WALLTOW
TOP OF STEELTOS
TOP OF SLABTOS
TOPOGRAPHYTOPO
TOLERANCETOL
TOP OFTO
TACKSTRIPTKS
TACKBOARDTK BD
THRESHOLDTHRES
THICK(NESS)THK
TRUSS HEADTH
TOGGLETGL
TONGUE AND GROOVET&G
TERMINALTERM
TERRAZZOTER
TEMPORARYTEMP
TEMPERATURETEMP
TELEPHONETEL
TERRA COTTATC
TOWEL BARTB
TANGENTTAN
TREADT
SYSTEMSYS
SYNTHETICSYNTH
SYMMETRICALSYMM
SWITCHBOARDSWBD
SWITCHSW
SHEET VINYL SV
SUSPENDEDSUSP
SUBFLOORSUB FL
STAIRWAYSTWY
STRUCTURALSTRUCT
STRINGERSTR
STATIC PRESSUREST PR
STORAGESTOR
STEELSTL
SEATINGSTG
STANDARDSTD
STATIONSTA
STAINLESS STEELSST
STANDING SEAM (ROOF)SS
SERVICE SINKSS
SHELF AND RODS&R
SQUARE HEADSQHD
SQUARESQ
SPEAKERSPKR
SPACE HEATERSPH
SPECIAL FINISHSP FIN
SOUNDPROOFSPF
SPECIFICATIONSPEC
ABBREVIATIONS
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
A N
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M
R
O
JE
C T
L O
C A
T
IO
N M
A P
K
T R
S T
A G
IN
G
A R
E A
GA100
K
P A
R K
C F
O S
M
G
A .d
P A
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
OF POWERHOUSE)
AREA (PLAN WEST SIDE
POTENTIAL STAGING
CONTRACTOR (KTR)'S
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M
W E
R H
O U
S E
T R
A N
S E
V E
R S
E S
E C
T
IO
N
GA101
K
P A
R K
C F
O S
M
G
A .d
P A
P
D
:5
:5
P
M
/2 /2
O A
G
A
.d g n
PRIMARY WORK AREA (EL.1414.0)
S4 AHU SYSTEM THERMOSTAT AREA (EL.1438.0)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
O A
G
A
.d g n
:5
:5
P
M
/2 /2
P
D
D S
A1
POWERHOUSE TRANSVERSE SECTION
SCALE: N.T.S.
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
A N
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M
G
N E
R A
T O
R B
A Y
F L
O O
R P
L A
N E
L .1
.0
GA102
K
P A
R K
C F
O S
M
G
A .d
P A
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
LOWER LEVELS
(APPROX. 10' X 10') TO
MATERIAL HATCH ACCESS
A1
GENERATOR BAY FLOOR PLAN_EL.1456.0
SCALE: N.T.S.
AUX. HOIST)
TONS-MAIN HOIST / 25 TONS-
OVERHEAD CRANE (250
BAY
GENERATOR
ACCESS TO
CONTROLLED
NOTE:
CRANE SUPPORT REQUEST, ETC. DURING PRE-CONSTRUCTION MEETING.
REPRESENTATIVE AND COR FOR DETAILS OF POWERHOUSE ACCESS, KEY CONTROL,
CONTRACTOR MUST COORDINATE WITH POWERHOUSE GOVERNMENT
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
A N
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M
U
R B
IN
E
F L
O O
R P
L A
N
E L
.1
.0
GA103
K
P A
R K
C F
O S
M
G
A .d
P A
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
UPPER / LOWER LEVELS
(APPROX. 10' X 10') TO
MATERIAL HATCH ACCESS
A1
TURBINE FLOOR PLAN_EL.1438.0
SCALE: N.T.S.
VERIFY. (TYP. 6)
THERMOSTATS. FIELD
DAMPER CONTROL
OF S4 SYSTEM AHU ZONE
APPROXIMATE LOCATIONS
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
A N
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M
C H
E Q
U
IP
M E
N T
G A
L L
E R
Y F
L O
O R
P L
A N
E
L .1
.0
GA104
K
P A
R K
C F
O S
M
G
A .d
P A
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
A1
PLAN_EL.1414.0
MECH EQUIPMENT GALLERY FLOOR
SCALE: N.T.S.
HEAT PUMP ROOM
S1, S2, S3 SYSTEM AHUS
S4 SYSTEM AHUS (TYP. 6)
DOUBLE SWING DOOR
6' x 7' STANDARD
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M
G
N E
R A
L N
O T
E S
M
E C
H S
O W
M-001
K
P A
R K
C F
O S
M
M
-0
.d
P A
P
D
:4
:1
A
M
/1 /2
O A
M
-0
.d
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
O A
M
-0
.d g n
:4
:1
A
M
/1 /2
P D
D
S
MECHANICAL SCOPE OF WORK MECHANICAL GENERAL NOTES
ADVISE COR PRIOR TO INSTALLATION FOR CLARIFICATION.
MANUFACTURER’S RECOMMENDATIONS. IF IN CONFLICT WITH THE DESIGN INDICATED HEREIN,
RECOMMENDATIONS AND DIRECTION. PROVIDE STRAIGHT INLET AND OUTLET PIPES BASED ON
INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORDANCE WITH THE MANUFACTURER’S
CHARACTERISTICS, OF THE SYSTEM THEY SERVE.
SHALL BE SUITABLE FOR THE CONTINUOUS OPERATIONAL TEMPERATURES, PRESSURES AND
ALL SEALS, BEARINGS, PACKINGS, AND ACCESSORIES FOR ALL EQUIPMENT AND PIPING SPECIALTIES
STANDOFF BASED ON CODE REQUIREMENTS AND MANUFACTURER RECOMMENDATIONS.
LOCATIONS. WHERE REQUIRED, PROVIDE ACCESS DOORS THAT ADHERE TO MINIMUM MAINTENANCE
ALL ITEMS THAT REQUIRE MAINTENANCE OR ADJUSTMENT MUST BE INSTALLED IN ACCESSIBLE
SYSTEMS AS REQUIRED IN THE WORK AREA WITHIN THE SCOPE OF WORK.
CONTRACTOR IS RESPONSIBLE FOR DRAINING, FLUSHING, PURGING, AND FILLING ALL PIPING
THE PERFORMANCE OF WORK FOR THIS PROJECT.
EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED AND/OR NEW ITEMS PROVIDED IN
INSULATE DUCTWORK, EQUIPMENT, AND PIPING PER SPECIFICATION SECTION 23 07 00 WHERE
TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
CONTRACT DOCUMENTS FOR MECHANICAL WORK ARE SCHEMATIC IN NATURE AND ARE INTENDED
THESE DIFFER, THE MOST STRINGENT SHALL APPLY.
ANTICIPATED REVISIONS BASED ON EMERGING TRENDS IN BUILDING REGULATIONS. WHERE ANY OF STATE, AND LOCAL), AS ADOPTED BY THE AGENCIES HAVING JURISDICTION, INCLUDING REASONABLY INSTALL ALL WORK TO COMPLY WITH ALL LAWS, REGULATIONS, CODES, AND STANDARDS (FEDERAL, EXTENT OF WORK INVOLVED IN THIS PROJECT.
NECESSARILY SHOWN ON THIS DRAWING BUT WHAT WAS DEEMED NECESSARY TO SHOW THE
ACCURATE AS INDICATED. NOT ALL EXISTING PIPING, DUCTWORK, AND EQUIPMENT ARE
DATA AND INFORMATION SHOWN AS TO THEIR COMPLETENESS NOR THE ACTUAL LOCATIONS ARE
INCLUDING RECORD DRAWINGS AND SITE VERIFICATION; THERE IS NO IMPLIED GUARANTEE THE EXISTING MECHANICAL AS-BUILT DATA HAVE BEEN COLLECTED FROM THE BEST AVAILABLE SOURCES
NECESSARY ISOLATION VALVES, AND DRAIN THE AFFECTED HEAT PUMP AND ASSOCIATED PIPING.
THE CONTRACTING OFFICER'S REPRESENTATIVE TO DISCONNECT ELECTRICAL SERVICE, CLOSE
PRIOR TO REMOVAL OF THE EXISTING HEAT PUMPS, THE CONTRACTOR SHALL COORDINATE WITH
1438.0 AND 1414.0. CRANE SERVICE IS AVAILABLE MON-THUR, 0730-1630.
NOTICE BY THE CONTRACTOR, TO MOVE MATERIAL AND EQUIPMENT BETWEEN LEVELS AT EL. 1456.0, THE GOVERNMENT WILL PROVIDE CRANE SERVICE (CRANE ONLY - NOT RIGGING) WITH A 48 HOUR
CONGESTED AREA IN WHICH THE HEAT PUMPS ARE TO BE INSTALLED.
AND POWERED CARTS SHALL BE ELECTRIC AND THEIR USE SHALL BE MINIMIZED DUE TO THE
UNLOAD AND INSTALL THE NEW HEAT PUMPS AND REMOVE THE EXISTING HEAT PUMPS. FORKLIFTS
THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS, AND MANPOWER NECESSARY TO
AND MATERIALS PRIOR TO INSTALLATION.
THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) ON DELIVERY AND STORAGE OF EQUIPMENT VARIATIONS, DUST, DIRT, AND OTHER CONTAMINANTS. THE CONTRACTOR SHALL COORDINATE WITH
SHALL BE PROVIDED WITH PROTECTION FROM THE WEATHER, TEMPERATURE AND HUMIDITY
ALL MATERIALS AND EQUIPMENT DELIVERED TO THE SITE AND STORED PRIOR TO INSTALLATION
STARTED ON THE NEXT HEAT PUMP.
PUMP SHALL BE COMPLETED AND THE UNIT SHALL BE TESTED AND ACCEPTED BEFORE ANY WORK IS HEAT PUMP #1 FIRST, HEAT PUMP #2 SUBSEQUENTLY. ALL WORK ASSOCIATED WITH FIRST HEAT THE HEAT PUMPS SHALL BE REMOVED AND REPLACED ONE AT A TIME IN THE FOLLOWING ORDER;
NEW BY THE CONTRACTOR AS PART OF THE PIPING REVISION WORK.
SYSTEM AT ANY OF THE TWO (2) EXISTING HEAT PUMPS, THESE DEVICES SHALL BE REPLACED WITH
(SUCH AS FLEXIBLE CONNECTORS, THERMOMETERS, PRESSURE GAGES, ETC.) IN THE PIPING
SHOULD IT BE NECESSARY FOR THE CONTRACTOR TO REMOVE THE EXISTING ANCILLARY DEVICES
ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL REQUIREMENTS.
07 00. EXISTING PIPING THAT IS REMOVED SHALL BE DISPOSED OF OFFSITE BY THE CONTRACTOR IN PROVIDED IN ACCORDANCE WITH THE REQUIREMENTS OF SPECIFICATION SECTION 23 64 26 AND 23 SUPPORT THE INSTALLATION OF THE NEW HEAT PUMPS. NEW PIPING AND INSULATION SHALL BE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PIPING SYSTEM REVISIONS NECESSARY TO
REFER TO SPECIFICATION SECTION 23 64 10 FOR NEW HEAT PUMPS.
HEAT PUMPS OFFSITE IN ACCORDANCE WITH ALL APPLICABLE STATE AND FEDERAL REQUIREMENTS.
TWO (2) NEW WATER-TO-WATER HEAT PUMPS. THE CONTRACTOR SHALL DISPOSE OF THE REMOVED WORK INCLUDES A REMOVAL OF TWO (2) EXISTING WATER-TO-WATER HEAT PUMPS AND PROVIDING
WRITING OF ANY DISCREPANCIES BEFORE PERFORMING ANY WORK.
DIMENSIONS IN THE FIELD AND ADVISE THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) IN
THE CONTRACTOR SHALL BECOME FAMILIAR WITH ALL DETAILS OF THE WORK, VERIFY ALL
DURING WORK, IMMEDIATELY STOP WORK AND NOTIFY COR AND POWERHOUSE PERSONNEL.
SCOPE OF THIS PROJECT. HOWEVER, IF CONTRACTOR ENCOUNTERED SUSPECTED ACM MATERIAL
NO ASBESTOS CONTAINING MATERIAL (ACM) IS KNOWN TO PRESENT IN THE SYSTEMS WITHIN THE
PERSONNEL AND COR14 CALENDAR DAYS PRIOR TO EXPECTED HVAC SYSTEM OUTAGE.
HVAC SYSTEM OUTAGE DURING ON-SITE WORK BUT WHEN NECESSARY, NOTIFY POWERHOUSE
POWERHOUSE PERSONNEL AND / OR COR. CONTRACTOR SHALL ATTEMPT TO MINIMIZE DURATION OF
HEAT PUMPS, ETC. THESE ACTIONS MUST BE CLOSELY COORDINATED AND COMMUNICATED WITH
SYSTEM FLUID, TEMPORARY OUTAGE PLAN THAT MAY BE NECESSARY FOR AFFECTED AHUS AND/OR INCLUDING BUT ARE NOT LIMITED TO IDENTIFYING SYSTEM PIPING ISOLATION POINTS, DRAINING
CONTRACTOR SHALL BE FULLY RESPONSIBLE TO DEVELOP ANTICIPATED ON-SITE WORK PLANS
TO START OF WORK.
IN BLUE. CONTRACTOR MUST FIELD VERIFY EXACT LOCATIONS AND DEMARCATIONS OF ITEMS PRIOR EQUIPMENT, COMPONENTS, ITEMS AND PIPING THAT ARE TO BE PROVIDED HAVE BEEN HIGHLIGHTED
ARE SUBJECT TO DEMOLISH UNDER THIS CONTRACT HAVE BEEN HIGHLIGHTED IN GREEN. NEW
CONTRACT HAVE BEEN HIGHLIGHTED IN RED. EQUIPMENT, COMPONENTS, ITEMS, AND PIPING THAT EQUIPMENT, COMPONENTS, ITEMS, AND PIPING THAT ARE SUBJECT TO REPLACEMENT UNDER THIS
PROVIDE SHOP DRAWING OF NEW TUBING AND NOZZLE ASSEMBLY PRIOR TO FABRICATION.
ASSEMBLY. CONTRACTOR SHALL VERIFY EXISTING COPPER TUBING AND NOZZLE ASSEMBLY AND
OF EXISTING SOLDERED TUBING TO ALLOW FUTURE REPLACEMENT OF TUBING AND NOZZLE
NOZZLES IN S1, S2, S3 SYSTEM AHUS. CONTRACTOR SHALL PROVIDE THREADED TYPE JOINTS IN LIEU REMOVE / REPLACE ELECTRONIC FILTER CLEANER RAW WATER SUPPLY COPPER TUBING AND SPRAY
VALVES WITH THREADED PLUGS AT PIPING TERMINATION NEAR THE HEADER.
S1 AND S2 AHUS. PIPING SHALL BE DEMOLISHED UP TO THE MAIN HEADER. PROVIDE ISOLATION REMOVE / SCRAP RAW WATER HUMIDIFIER ASSEMBLIES AND ASSOCIATED RAW WATER PIPING FROM
REMOVE / REPLACE CONDENSATE DRAIN PANS IN ALL S4 SYSTEM AHUS.
FLOOR ABOVE (EL. 1438.0). CONTRACTOR SHALL FIELD VERIFY EXACT LOCATIONS OF THERMOSTATS.
SYSTEM AHU). WORK SHALL INCLUDE REPLACING ASSOCIATED THERMOSTATS AND WIRING ON
REMOVE / REPLACE S4 SYSTEM AHU DAMPER ACTUATORS (TOTAL 12, TWO (2) ACTUATORS PER S4
REMOVE / REPLACE 150KW ELECTRIC RESISTANT PRE-HEATING COIL IN S3 SYSTEM AHU.
INCLUDING POWER / CONTROL WIRING.
REMOVE / REPLACE OUTSIDE AIR INTAKE DAMPER ACTUATOR ON TOP OF THE POWERHOUSE
UNITS.
TO BE REPLACED WITH ELECTRIC MOTORIZED ACTUATORS) IN S1, S2, AND S3 SYSTEM AIR HANDLING
REMOVE / REPLACE CONDENSATE DRAIN PANS AND DAMPER ACTUATORS (PNEUMATIC ACTUATORS
ADJUST NEW VALVE SETTINGS.
AND TUBING. CONTRACTOR IS RESPONSIBLE TO RECORD EXISTING BALANCING VALVE SETTINGS TO
SUCH AS MANUAL BALANCING VALVES, ISOLATION VALVES, THERMOMETERS, PRESSURE GAUGES
DOWNSTREAM FROM MAIN HEADER TO EACH AIR HANDLING UNIT INCLUDING PIPING SPECIALTIES REPLACED WITH NEW. THIS WORK SHALL INCLUDE REPLACING HEAT PUMP SUPPLY / RETURN PIPING HYDRONIC WATER COILS IN ALL AIR HANDLING UNITS (S1, S2, S3, AND S4 SYSTEMS) SHALL BE
RETURN PIPING AS INDICATED THROUGHOUT CONTRACT DRAWINGS.
REMOVE / REPLACE VALVES AND MOTORIZED VALVE ACTUATORS IN HEAT PUMP LOOP SUPPLY /
THE STRAINER AND PIPING.
FINALIZE THE PIPE ROUTING AND STRAINER LOCATION. PROVIDE NEW FLOOR PIPE SUPPORTS FOR CONTRACTOR SHALL FIELD VERIFY THE HEAT PUMP ROOM LAYOUT AND CONTROL AIR TANK AREA TO TO COMPLETE DAMPER ACTUATOR WORK PRIOR TO STRAINER REPLACEMENT / RELOCATION). THE REPLACEMENT WORK HAS BEEN COMPLETED ON S1, S2, AND S3 AHUS (CONTRACTOR MAY CHOOSE
CONTROL AIR TANK ASSEMBLY IS TO REMAIN AT CURRENT LOCATION UNTIL DAMPER ACTUATOR
PROPOSED ROUTE OF 8" HEADER AND STRAINER LOCATION. IT SHALL BE NOTED THAT THE EXISTING
NEW STRAINER DISCHARGE PIPING IN HEAT PUMP ROOM. SEE SHEETS M-101 AND M-305 FOR
SHALL ANTICIPATE PARTIAL ALTERATION OF 8" HEAT PUMP SUPPLY WATER PIPING AND PROVIDING APPROXIMATELY 1 FT A.F.F. TO ALLOW EASIER AND SAFER STRAINER MAINTENANCE. CONTRACTOR REMOVE / REPLACE EXISTING 8" MANUAL BASKET STRAINER. NEW STRAINER SHALL BE INSTALLED AT
ACCOMMODATE NEW HEAT PUMPS BASED ON EQUIPMENT SELECTION.
ANTICIPATE MINOR ALTERATION OF EXISTING HEAT PUMP VICINITY PIPING AS NECESSARY TO
DEMOLISHING REMAINING HEAT PUMP.
SEQUENCED TO DEMOLISH ONE HEAT PUMP, INSTALL, AND TEST NEW HEAT PUMP PRIOR TO
WATER HEAT PUMPS WITH CAPACITY AND PERFORMANCE SHOWN ON SHEET M-603. WORK SHALL BE DEMOLISH EXISTING TWO(2) WATER TO WATER HEAT PUMPS AND PROVIDE TWO (2) NEW WATER TO 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
12.
BASE BID
13.
14.
15.
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
F L
O W
AHU SYSTEM NO. 1AHU SYSTEM NO. 2
AHU SYSTEM NO. 3
6" ACS
6"ACR
8" HPS
ACR
ACS
6" RTRP 8" RTRP
8" RTRP
8X6 RTRP
HEAT PUMP NO. 1 HEAT PUMP NO. 2
P U
M P
N O
P U
M P
N O
RWRW
R W
RW LINE
1¼" M.I.
EXISTING
H P -1
WATER TREATMENT ROOM
WATER SUPPLY TO HEAT PUMPS - CONTROL PANEL (VALVES)
SYSTEM NO.4 CONDITIONING WATER - CONTROL PANEL (VALVES)
HEAT PUMP NO.1 (HP1) - CONTROL PANEL
HEAT PUMP NO.2 (HP2) - CONTROL PANEL
M
MM
M
HP-3
HP-2
HP-1
HP-4 TOPTOP
BOT BOT
M M
F L
O W
> UNIT 1
MECHANICAL EQUIPMENT GALLERY
76'-0"
1'-6" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
12" DROP
8" HPS
> EL.1433.50
EXISTING LADDER
PLATFORM
M
M
HP-8
H P -5
F L
O W
> UNIT 2
PS
12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
S4 AIR HANDLING UNIT
76'- 0"
12" DROP
DRAIN
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
1'-6"
MECHANICAL EQUIPMENT GALLERY
HEAT PUMP ROOM
10" RW
8" HPRW
6"ACR
10"DTDA
8" HPS
> UNIT 3
MECHANICAL EQUIPMENT GALLERY
12'-5" 13'-0" 10'-4" 13'-11"1'-6" 12'-5" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSED
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'- 0"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
> UNIT 4
12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
1'-6" 12'-5"
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
VALVE
DRAIN
12" DROP
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSD
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
> UNIT 6
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
8" HPS
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
> UNIT 7
10" RW
3" ACS
3"ACR
10"DTDA
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 26'-4"
MECHANICAL EQUIPMENT GALLERY
EXISTING LADDER
PLATFORM
76'-0"
AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7
M M
CAT
DA DA DA DADA DA DA DA DA DA DA DA DA DA
S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT
> UNIT 5
DA
8" HPRW
AIR INTAKE SHAFT
ELEVATOR SHAFT
8" BASKET STRAINER
ET
AS
F L
O W
F L
O W
F L
O W
F L
O W
F L
O W
F L
O W
A N
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M
C H
A N
IC
A
L C
O M
P O
S
IT
E A
R E
A P
L A
N -E
L .1
.0
M-100
K
P A
R K
C F
O S
M
M
-1
.d
P A
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
K3
MECHANICAL COMPOSITE AREA PLAN-EL.1414.0
1"=30'SCALE:
30' 60'0
NORTH
PLAN
OTHER VALVES
INTAKE SHAFT, AND ALL
S3 SYSTEM AHUS, OA
HEAT PUMP ROOM / S1, S2, S4 SYSTEM AHUSHP-5 & HP-8 VALVES
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
F L
O W
AHU SYSTEM NO. 1AHU SYSTEM NO. 2
AHU SYSTEM NO. 3
6" ACS
6"ACR
8" HPS
ACR
ACS
6" RTRP 8" RTRP
8" RTRP
8X6 RTRP
HEAT PUMP NO. 1 HEAT PUMP NO. 2
P U
M P
N O
P U
M P
N O
RWRW
R W
RW LINE
1¼" M.I.
EXISTING
H P -1
WATER TREATMENT ROOM
WATER SUPPLY TO HEAT PUMPS - CONTROL PANEL (VALVES)
SYSTEM NO.4 CONDITIONING WATER - CONTROL PANEL (VALVES)
HEAT PUMP NO.1 (HP1) - CONTROL PANEL
HEAT PUMP NO.2 (HP2) - CONTROL PANEL
M
MM
M
HP-3
HP-2
HP-1
HP-4 TOPTOP
BOT BOT
M M
HEAT PUMP ROOM
M M
CAT
DA
AIR INTAKE SHAFT
ELEVATOR SHAFT
8" BASKET STRAINER
ET
AS
F L
O W
AHU SYSTEM NO. 1AHU SYSTEM NO. 2
AHU SYSTEM NO. 3
6" ACS
6"ACR
8" HPS
ACR
ACS
6" RTRP 8" RTRP
8" RTRP
8X6 RTRP
HEAT PUMP NO. 1 HEAT PUMP NO. 2
P U
M P
N O
P U
M P
N O
RWRW
R W
RW LINE
1¼" M.I.
EXISTING
H P -1
WATER TREATMENT ROOM
WATER SUPPLY TO HEAT PUMPS - CONTROL PANEL (VALVES)
SYSTEM NO.4 CONDITIONING WATER - CONTROL PANEL (VALVES)
HEAT PUMP NO.1 (HP1) - CONTROL PANEL
HEAT PUMP NO.2 (HP2) - CONTROL PANEL
M
MM
M
HP-3
HP-2
HP-1
HP-4 TOPTOP
BOT BOT
M M
F L
O W
> UNIT 1
MECHANICAL EQUIPMENT GALLERY
76'-0"
1'-6" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
12" DROP
8" HPS
> EL.1433.50
EXISTING LADDER
PLATFORM
M
M
HP-8
H P -5
F L
O W
> UNIT 2
PS
12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
S4 AIR HANDLING UNIT
76'- 0"
12" DROP
DRAIN
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
1'-6"
MECHANICAL EQUIPMENT GALLERY
HEAT PUMP ROOM
10" RW
8" HPRW
6"ACR
10"DTDA
8" HPS
> UNIT 3
MECHANICAL EQUIPMENT GALLERY
12'-5" 13'-0" 10'-4" 13'-11"1'-6" 12'-5" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSED
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'- 0"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
> UNIT 4
12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
1'-6" 12'-5"
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
VALVE
DRAIN
12" DROP
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSD
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
> UNIT 6
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
8" HPS
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
> UNIT 7
10" RW
3" ACS
3"ACR
10"DTDA
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 26'-4"
MECHANICAL EQUIPMENT GALLERY
EXISTING LADDER
PLATFORM
76'-0"
AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7
M M
CAT
DA DA DA DADA DA DA DA DA DA DA DA DA DA
S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT
> UNIT 5
DA
8" HPRW
AIR INTAKE SHAFT
ELEVATOR SHAFT
8" BASKET STRAINER
ET
AS
F L
O W
F L
O W
F L
O W
F L
O W
F L
O W
F L
O W
8" RTRP
CAT
8" RTRP
A N
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M
C H
A N
IC
A
L P
L A
N -A
R E
A
E
L .1
.0
M-101
K
P A
R K
C F
O S
M
M
-1
.d
P A
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
C1
MECHANICAL PLAN-AREA 1 (EL.1414.0)
1/4"=1'-0"SCALE:
NORTH
PLAN
0 4' 8'2'
N16
KEYPLAN
1"=100'SCALE:
NORTH
PLAN
100' 200'0
MECHANICAL KEYNOTES
FINALIZE THE PIPE ROUTING AND STRAINER LOCATION.
THE HEAT PUMP ROOM LAYOUT AND CONTROL AIR TANK AREA TO
SECTIONS ON SHEET M-305. THE CONTRACTOR SHALL FIELD VERIFY
AND PIPE SUPPORTS. SEE PARTIAL PLAN C12 ON THIS SHEET AND
STEEL PIPING, RTRP (REINFORCED THERMOSETTING RESIN PIPE) ,
APPROXIMATELY 1 FT A.F.F WITH NEW ASTM A53 / A53M, SCH 40
VICINITY PIPING. NEW STRAINER SHALL BE INSTALLED AT
REMOVE / REPLACE EXISTING 8" MANUAL BASKET STRAINER AND
RESISTANT PRE-HEAT COIL IN S3 AHU.
REMOVE / REPLACE 150 KW FINNED-TUBULAR TYPE ELECTRIC
CONTROL WIRING SHALL BE REPLACED.
DAMPER ACTUATOR ON TOP OF POWERHOUSE ROOF. POWER/
REMOVE / REPLACE OUTSIDE AIR INTAKE DAMPER AND MOTORIZED
ASSOCIATED WITH HP-1 AND HP-2.
ON SHEET M-301 FOR CONFIGURATIONS OF ADDITIONAL VALVES
REPLACEMENT SHOWN ON THIS PLAN VIEW. REFER TO SECTIONS
NOTE-NOT ALL VALVES AND VALVE ACTUATORS SUBJECT TO
INFORMATION.
SYSTEM. SEE VALVE SCHEDULE ON SHEET M-601 FOR PERTINENT
VALVES ASSOCIATED WITH HEAT PUMPS AND HEAT PUMP HYDRONIC
ACTUATORS, AND 6" GLOBE STYLE DIAPHRAGM FLOW CONTROL
REMOVE / REPLACE 6" ISOLATION VALVES, MOTORIZED VALVE
WITH ISOLATION VALVES AND THREADED PLUGS.
CUT NEAREST TO THE RAW WATER HEADER AND BE TERMINATED
PIPING IN S1 AND S3 SYSTEM AHUS. RAW WATER PIPING SHALL BE
DEMOLISH EXISTING RAW WATER HUMIDIFIER ASSEMBLIES AND
FABRICATION.
MEASUREMENTS AND SHOP DRAWING SUBMITTAL PRIOR TO
NOZZLE ASSEMBLIES. CONTRACTOR IS RESPONSIBLE FOR FIELD
AHUS. CONTRACTOR SHALL PROVIDE NEW THREADED TUBING AND
TUBING (1/2") AND NOZZLE ASSEMBLIES IN S1, S2, AND S3 SYSTEM
REMOVE / REPLACE ELECTRONIC FILTER CLEANING SPRAY COPPER
ACTUATOR REPLACEMENT)
CONTROL AIR TANK AND TUBING AFTER COMPLETION OF DAMPER
WITH ELECTRIC MOTORIZED ACTUATORS. DEMOLISH EXISTING
-- DAMPER ACTUATORS (PNEUMATIC ACTUATORS TO BE REPLACED
-- PRESSURE GAUGES AND TUBING
-- THERMOMETERS
-- ISOLATION VALVES
-- MANUAL BALANCING VALVES
-- VICINITY WATER PIPING (SUPPLY/ RETURN / RAW WATER)
-- CONDENSATE DRAIN PANS
-- HYDRONIC WATER COILS
REMOVE / REPLACE FOLLOWING ITEMS IN S1,S2, AND S3 AHUS;
2. SEE SHEET M-603 FOR EQUIPMENT SCHEDULE.
FIRST THEN, WORK SHALL PROCEED TO REMOVE AND REPLACE HP-
SELECTION. HP-1 SHALL BE REPLACED, TESTED, AND ACCEPTED
EVAPORATOR WATER PIPING CONNECTIONS BASED ON EQUIPMENT
MAKE NECESSARY PIPING ADJUSTMENTS FOR CONDENSER /
TON EACH) WITH NEW. CONTRACTOR SHALL BE RESPONSIBLE TO
REMOVE / REPLACE EXISTING WATER TO WATER HEAT PUMPS (180 1.
1 1
2.
3.
4.
6.
5.
C12
PARTIAL PLAN
1/4"=1'-0"SCALE:
CONNECTION
EXISTING DRAIN
PURGE PIPING TO
ROUTE STRAINER
M-501(TYP.2)
DETAIL L2 ON SHEET
SUPPORTS PER
PROVIDE PIPE
APPROX. 1 FT. A.F.F.
B.O. STRAINER
MODIFY 8" PIPING AS SHOWN
ON SHEET M-501. (TYP. 3)
DETAILS L8, L13, AND E3
ATTACHMENTS. SEE
HANGERS AND CEILING
PROVIDE NEW PIPE
0 4' 8'2'
NORTH
PLAN
7.
COLOR LEGEND
ITEMS TO BE DEMOLISHED
ITEMS TO BE REMOVED AND REPLACED
NEW ITEMS TO BE PROVIDED
8.
TANK (EX.)
CONTROL AIR
EXISTING ITEMS TO REMAIN
M-301
C2
M-302
C2
M-302
C8
M-302
C14
M-303
E1
M-301
C2
EL.1427.50
10" RTRP ELBOW
10"x8" RTRP
10" RTRP
8" RTRP
VALVE
8" BUTTERFLY
FLANGES
8" RTRP
ELBOW
8" RTRP
8" RTRP
FLANGE
10" RTRP
A P
P R
O X
H P -8
PIPING
EXISTING
PLATFORM
TO FLOOR
APPROX. 9'6"
M
M
H P -5
VALVE BEHIND TEE
8" BUTTERFLY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
WATER TREATMENT ROOM
F L
O W
> UNIT 1
MECHANICAL EQUIPMENT GALLERY
76'-0"
1'-6" 12'-5" 13'-0" 10'-4"12'-5"
8" HPS
> EL.1433.50
EXISTING LADDER
PLATFORM
M
M
HP-8
H P -5
F L
O W
F L
O W
AHU SYSTEM NO. 1AHU SYSTEM NO. 2
AHU SYSTEM NO. 3
6" ACS
6"ACR
8" HPS
ACR
ACS
6" RTRP 8" RTRP
8" RTRP
8X6 RTRP
HEAT PUMP NO. 1 HEAT PUMP NO. 2
P U
M P
N O
P U
M P
N O
RWRW
R W
RW LINE
1¼" M.I.
EXISTING
H P -1
WATER TREATMENT ROOM
WATER SUPPLY TO HEAT PUMPS - CONTROL PANEL (VALVES)
SYSTEM NO.4 CONDITIONING WATER - CONTROL PANEL (VALVES)
HEAT PUMP NO.1 (HP1) - CONTROL PANEL
HEAT PUMP NO.2 (HP2) - CONTROL PANEL
M
MM
M
HP-3
HP-2
HP-1
HP-4 TOPTOP
BOT BOT
M M
F L
O W
> UNIT 1
MECHANICAL EQUIPMENT GALLERY
76'-0"
1'-6" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
12" DROP
8" HPS
> EL.1433.50
EXISTING LADDER
PLATFORM
M
M
HP-8
H P -5
F L
O W
> UNIT 2
PS
12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
S4 AIR HANDLING UNIT
76'- 0"
12" DROP
DRAIN
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
1'-6"
MECHANICAL EQUIPMENT GALLERY
HEAT PUMP ROOM
10" RW
8" HPRW
6"ACR
10"DTDA
8" HPS
> UNIT 3
MECHANICAL EQUIPMENT GALLERY
12'-5" 13'-0" 10'-4" 13'-11"1'-6" 12'-5" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSED
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'- 0"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
> UNIT 4
12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
1'-6" 12'-5"
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
VALVE
DRAIN
12" DROP
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSD
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
> UNIT 6
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
8" HPS
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
> UNIT 7
10" RW
3" ACS
3"ACR
10"DTDA
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 26'-4"
MECHANICAL EQUIPMENT GALLERY
EXISTING LADDER
PLATFORM
76'-0"
AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7
M M
CAT
DA DA DA DADA DA DA DA DA DA DA DA DA DA
S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT
> UNIT 5
DA
8" HPRW
AIR INTAKE SHAFT
ELEVATOR SHAFT
8" BASKET STRAINER
ET
AS
F L
O W
F L
O W
F L
O W
F L
O W
F L
O W
F L
O W
A N
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M
C H
A N
IC
A
L P
L A
N -A
R E
A
E
L .1
.0
M-102
K
P A
R K
C F
O S
M
M
-1
.d
P A
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
C1
MECHANICAL PLAN-AREA 2 (EL.1414.0)
1/4"=1'-0"SCALE:
NORTH
PLAN
0 4' 8'2'
N16
KEYPLAN
1"=100'SCALE:
NORTH
PLAN
100' 200'0
MECHANICAL KEYNOTES
PRIOR TO VALVE REPLACEMENT WORK.
ISOLATE THE RAW WATER AND HEAT PUMP WATER SYSTEM PIPING
POWERHOUSE MAINTENANCE PERSONNEL IN ORDER TO PROPERLY
OF CONTROL. CONTRACTOR SHALL CLOSELY COORDINATE WITH
PANEL(S). SEE SHEET M-601 FOR VALVE SCHEDULE AND SEQUENCE
REPLACE CONTROL / POWER WIRING FROM / TO VALVE CONTROL
MOTORIZED VALVE ACTUATORS (HP-5 AND HP-8). REMOVE AND
REMOVE / REPLACE 8" BUTTERFLY TYPE ISOLATION VALVES AND 1.
B16
SECTION
SCALE: N.T.S.
COLOR LEGEND
ITEMS TO BE REMOVED AND REPLACED
EXISTING ITEMS TO REMAIN
M-102
B16
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
13'-11" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
12" DROP
> UNIT 2
PS
12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
S4 AIR HANDLING UNIT
76'- 0"
12" DROP
DRAIN
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
1'-6"
MECHANICAL EQUIPMENT GALLERY
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
DA DA
F L
O W
F L
O W
AHU SYSTEM NO. 1AHU SYSTEM NO. 2
AHU SYSTEM NO. 3
6" ACS
6"ACR
8" HPS
ACR
ACS
6" RTRP 8" RTRP
8" RTRP
8X6 RTRP
HEAT PUMP NO. 1 HEAT PUMP NO. 2
P U
M P
N O
P U
M P
N O
RWRW
R W
RW LINE
1¼" M.I.
EXISTING
H P -1
WATER TREATMENT ROOM
WATER SUPPLY TO HEAT PUMPS - CONTROL PANEL (VALVES)
SYSTEM NO.4 CONDITIONING WATER - CONTROL PANEL (VALVES)
HEAT PUMP NO.1 (HP1) - CONTROL PANEL
HEAT PUMP NO.2 (HP2) - CONTROL PANEL
M
MM
M
HP-3
HP-2
HP-1
HP-4 TOPTOP
BOT BOT
M M
F L
O W
> UNIT 1
MECHANICAL EQUIPMENT GALLERY
76'-0"
1'-6" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
12" DROP
8" HPS
> EL.1433.50
EXISTING LADDER
PLATFORM
M
M
HP-8
H P -5
F L
O W
> UNIT 2
PS
12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
S4 AIR HANDLING UNIT
76'- 0"
12" DROP
DRAIN
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
1'-6"
MECHANICAL EQUIPMENT GALLERY
HEAT PUMP ROOM
10" RW
8" HPRW
6"ACR
10"DTDA
8" HPS
> UNIT 3
MECHANICAL EQUIPMENT GALLERY
12'-5" 13'-0" 10'-4" 13'-11"1'-6" 12'-5" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSED
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'- 0"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
> UNIT 4
12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
1'-6" 12'-5"
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
VALVE
DRAIN
12" DROP
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSD
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
> UNIT 6
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
8" HPS
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
> UNIT 7
10" RW
3" ACS
3"ACR
10"DTDA
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 26'-4"
MECHANICAL EQUIPMENT GALLERY
EXISTING LADDER
PLATFORM
76'-0"
AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7
M M
CAT
DA DA DA DADA DA DA DA DA DA DA DA DA DA
S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT
> UNIT 5
M-101 THRU M-107
DA
8" HPRW
AIR INTAKE SHAFT
ELEVATOR SHAFT
8" BASKET STRAINER
ET
AS
F L
O W
F L
O W
F L
O W
F L
O W
F L
O W
F L
O W
A N
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M
C H
A N
IC
A
L P
L A
N -A
R E
A
E
L .1
.0
M-103
K
P A
R K
C F
O S
M
M
-1
.d
P A
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
D1
MECHANICAL PLAN-AREA 3 (EL.1414.0)
1/4"=1'-0"SCALE:
NORTH
PLAN
0 4' 8'2'
N16
KEYPLAN
1"=100'SCALE:
NORTH
PLAN
100' 200'0
MECHANICAL KEYNOTES
REQUIREMENTS.
ELEC. SHEETS AND SPECIFICATIONS FOR DETAILED AND ADDITIONAL
BETWEEN THERMOSTATS AND DAMPER ACTUATORS. REFER TO
EL.1438.0. REUSE EXISTING RIGID AND FLEXIBLE CONDUITS
POWER WIRING, AND ASSOCIATED THERMOSTATS ON FLOOR ABOVE
REMOVE / REPLACE EXISTING DAMPER ACTUATORS, CONTROL /
DRAIN PAN.
REMOVE / REPLACE EXISTING AHU WATER COIL AND CONDENSATE
SYSTEM AHU SECTION.
SPECIFICATION SECTION 23 07 00. SEE SHEET M-305 FOR TYPICAL S4
HANGERS AND SADDLES. NEW PIPING SHALL BE INSULATED PER
AND PRESSURE GAUGES IN THE PIPING. REUSE EXISTING PIPE
ISOLATION VALVES, BRONZE BALANCING VALVES, THERMOMETERS,
INCLUDE REPLACEMENT OF PIPING SPECIALTIES SUCH AS
WATER PIPING BETWEEN MAIN HEADER AND AHU. WORK SHALL
REMOVE / REPLACE EXISTING 3" HEAT PUMP SUPPLY / RETURN 1.
2.
3.
(TYP)
PIPE HANGERS
EXISTING
COLOR LEGEND
ITEMS TO BE REMOVED AND REPLACED
EXISTING ITEMS TO REMAIN
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
10" RW
8" HPRW
6"ACR
10"DTDA
8" HPS
> UNIT 3
MECHANICAL EQUIPMENT GALLERY
12'-5" 13'-0" 10'-4" 13'-11"1'-6" 12'-5" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSED
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'- 0"
1'-6" 12'-5"
EXISTING LADDER
PLATFORM
DA DADA DA DA DA
S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT
F L
O W
F L
O W
AHU SYSTEM NO. 1AHU SYSTEM NO. 2
AHU SYSTEM NO. 3
6" ACS
6"ACR
8" HPS
ACR
ACS
6" RTRP 8" RTRP
8" RTRP
8X6 RTRP
HEAT PUMP NO. 1 HEAT PUMP NO. 2
P U
M P
N O
P U
M P
N O
RWRW
R W
RW LINE
1¼" M.I.
EXISTING
H P -1
WATER TREATMENT ROOM
WATER SUPPLY TO HEAT PUMPS - CONTROL PANEL (VALVES)
SYSTEM NO.4 CONDITIONING WATER - CONTROL PANEL (VALVES)
HEAT PUMP NO.1 (HP1) - CONTROL PANEL
HEAT PUMP NO.2 (HP2) - CONTROL PANEL
M
MM
M
HP-3
HP-2
HP-1
HP-4 TOPTOP
BOT BOT
M M
F L
O W
> UNIT 1
MECHANICAL EQUIPMENT GALLERY
76'-0"
1'-6" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
12" DROP
8" HPS
> EL.1433.50
EXISTING LADDER
PLATFORM
M
M
HP-8
H P -5
F L
O W
> UNIT 2
PS
12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
S4 AIR HANDLING UNIT
76'- 0"
12" DROP
DRAIN
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
1'-6"
MECHANICAL EQUIPMENT GALLERY
HEAT PUMP ROOM
10" RW
8" HPRW
6"ACR
10"DTDA
8" HPS
> UNIT 3
MECHANICAL EQUIPMENT GALLERY
12'-5" 13'-0" 10'-4" 13'-11"1'-6" 12'-5" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSED
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'- 0"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
> UNIT 4
12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
1'-6" 12'-5"
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
VALVE
DRAIN
12" DROP
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSD
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
> UNIT 6
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
8" HPS
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
> UNIT 7
10" RW
3" ACS
3"ACR
10"DTDA
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 26'-4"
MECHANICAL EQUIPMENT GALLERY
EXISTING LADDER
PLATFORM
76'-0"
AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7
M M
CAT
DA DA DA DADA DA DA DA DA DA DA DA DA DA
S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT S4 AIR HANDLING UNIT
> UNIT 5
M-101 THRU M-107
DA
8" HPRW
AIR INTAKE SHAFT
ELEVATOR SHAFT
8" BASKET STRAINER
ET
AS
F L
O W
F L
O W
F L
O W
F L
O W
F L
O W
F L
O W
A N
S
W E
R H
O U
S E
H E
A T
P U
M P
R E
P L
A C
E M
E N
T
O A
H E
D A
M S
O U
T H
D A
K O
T A
W
F
B
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
C F
O S
M
C H
A N
IC
A
L P
L A
N -A
R E
A
E
L .1
.0
M-104
K
P A
R K
C F
O S
M
M
-1
.d
P A
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
D1
MECHANICAL PLAN-AREA 3(EL.1414.0)
1/4"=1'-0"SCALE:
NORTH
PLAN
0 4' 8'2'
N16
KEYPLAN
1"=100'SCALE:
NORTH
PLAN
100' 200'0
MECHANICAL KEYNOTES
(TYP)
PIPE HANGERS
EXISTING
(TYP)
PIPE HANGERS
EXISTING
COLOR LEGEND
ITEMS TO BE REMOVED AND REPLACED
EXISTING ITEMS TO REMAIN
REQUIREMENTS.
ELEC. SHEETS AND SPECIFICATIONS FOR DETAILED AND ADDITIONAL
BETWEEN THERMOSTATS AND DAMPER ACTUATORS. REFER TO
EL.1438.0. REUSE EXISTING RIGID AND FLEXIBLE CONDUITS
POWER WIRING, AND ASSOCIATED THERMOSTATS ON FLOOR ABOVE
REMOVE / REPLACE EXISTING DAMPER ACTUATORS, CONTROL /
DRAIN PAN.
REMOVE / REPLACE EXISTING AHU WATER COIL AND CONDENSATE
SYSTEM AHU SECTION.
SPECIFICATION SECTION 23 07 00. SEE SHEET M-305 FOR TYPICAL S4
HANGERS AND SADDLES. NEW PIPING SHALL BE INSULATED PER
AND PRESSURE GAUGES IN THE PIPING. REUSE EXISTING PIPE
ISOLATION VALVES, BRONZE BALANCING VALVES, THERMOMETERS,
INCLUDE REPLACEMENT OF PIPING SPECIALTIES SUCH AS
WATER PIPING BETWEEN MAIN HEADER AND AHU. WORK SHALL
REMOVE / REPLACE EXISTING 3" HEAT PUMP SUPPLY / RETURN 1.
2.
3.
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A D
V E
R T
IS
E
M E
N T
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
P
R O
D U
C T
IO
N
D A
T A
> UNIT 4
12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
VALVE
DRAIN
12" DROP
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
> EL.1433.50
76'-0"
1'-6" 12'-5" 12'-5" 13'-0"
MECHANICAL EQUIPMENT GALLERY
PIPE HANGER
REVERSD
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
DA DA
S4 AIR HANDLING UNIT
F L
O W
F L
O W
AHU SYSTEM NO. 1AHU SYSTEM NO. 2
AHU SYSTEM NO. 3
6" ACS
6"ACR
8" HPS
ACR
ACS
6" RTRP 8" RTRP
8" RTRP
8X6 RTRP
HEAT PUMP NO. 1 HEAT PUMP NO. 2
P U
M P
N O
P U
M P
N O
RWRW
R W
RW LINE
1¼" M.I.
EXISTING
H P -1
WATER TREATMENT ROOM
WATER SUPPLY TO HEAT PUMPS - CONTROL PANEL (VALVES)
SYSTEM NO.4 CONDITIONING WATER - CONTROL PANEL (VALVES)
HEAT PUMP NO.1 (HP1) - CONTROL PANEL
HEAT PUMP NO.2 (HP2) - CONTROL PANEL
M
MM
M
HP-3
HP-2
HP-1
HP-4 TOPTOP
BOT BOT
M M
F L
O W
> UNIT 1
MECHANICAL EQUIPMENT GALLERY
76'-0"
1'-6" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
12" DROP
8" HPS
> EL.1433.50
EXISTING LADDER
PLATFORM
M
M
HP-8
H P -5
F L
O W
> UNIT 2
PS
12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
S4 AIR HANDLING UNIT
76'- 0"
12" DROP
DRAIN
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
1'-6"
MECHANICAL EQUIPMENT GALLERY
HEAT PUMP ROOM
10" RW
8" HPRW
6"ACR
10"DTDA
8" HPS
> UNIT 3
MECHANICAL EQUIPMENT GALLERY
12'-5" 13'-0" 10'-4" 13'-11"1'-6" 12'-5" 12'-5"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSED
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'- 0"
10" RW
8" HPRW
6" ACS
6"ACR
10"DTDA
8" HPS
> UNIT 4
12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
1'-6" 12'-5"
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
VALVE
DRAIN
12" DROP
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
10" RW
8" HPRW
4" ACS
4"ACR
10"DTDA
8" HPS
PIPE HANGER
REVERSD
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
> EL.1433.50
76'-0"
> UNIT 6
1'-6" 12'-5" 12'-5" 13'-0" 10'-4" 13'-11" 12'-5"
MECHANICAL EQUIPMENT GALLERY
8" HPS
GENERATOR
LINE FROM
STEEL HPS
EXISTING 8"
EXISTING LADDER
PLATFORM
>…