FP Surge Tank Roof Repair Abstract.pdf
PDF 136 KB Posted
- Attached to
- Fort Peck PH 1 Surge Tank Roof Replacement
- Solicitation number
- W9128F25BA002
About this file
This document is an Abstract of Offers for Construction for the Fort Peck Surge Tank Roof Replacement project (Solicitation Number W9128F25BA002) issued by the US Army Corps of Engineers Omaha District. The solicitation involves a two-step Invitation for Bid (IFB) for restoring the Surge Tank roof of the Ft. Peck Powerhouse, constructed in the 1940s, to comply with Montana State Historical Preservation Office regulations. Five contractors submitted bids: A-Vet Roofing, Blue Frog Roofing Limited, AOD RBT Roofing JV, Tradesmen Group, LLC, and Tri Coast Construction.
The project requires complete removal of existing roofing layers and replacement with new Ludowici tiles matching original materials, preserving historical accuracy. The roof is located 272.48 feet above grade, spans 40 feet in diameter, and covers 2,500 square feet. The bid abstract shows detailed pricing for base items including mobilization, demolition of existing roof, installation of new roof assembly, and as-built corrections, with total base prices ranging from $696,363 to $1,988,188. An optional alternative roof assembly fastening method was also included in the bid options. The estimated construction magnitude is between $1,000,000 and $5,000,000, with the project located at Fort Peck Dam in Valley County, Montana.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED
6-May-25 22-Jul-25
DATE SIGNED
X C. REASONABLE CONTRACT
7A. 7B. 7C. 7D. 7E. 7F. E. F. 7E. F. 7E. F. 7E. F. 7E. F.
ITEM # DESCRIPTION EST. QTY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT
BASE ITEMS
Item Description Quantity Unit of
Measure
0001 Mobilization and Demobilization 1 Job 136,067.00$ 256,439.00$
138,132.00$ 372,482.00$ 307,334.00$ 235,606.00$
0002 Demolition of Existing Powerhouse Roof Assembly 1 Job 422,776.00$ 695,112.00$
338,154.00$ 86,492.00$ 649,086.00$ 375,989.00$
0003 Furnish and Install New Powerhouse Roof Assembly 1 Job 766,382.00$ 683,840.00$
448,207.00$ 229,083.00$ 973,629.00$ 1,369,093.00$
0004 Prepare and Furnish As-built Corrections to Contract Drawings 1 Job 30,385.00$ 23,288.00$
833.00$ 8,306.00$ 9,860.00$ 7,500.00$
Total for Base (Items 0001 through 0004) 1,355,610.00$ 1,658,679.00$ 925,326.00$ 696,363.00$ 1,939,909.00$ 1,988,188.00$
0005 Alternative Roof Assembly Fastening Method (if required) 1 Job 30,385.00$ 453,681.00$
190,920.00$ 18,059.00$ 325,960.00$ 104,581.00$
Total for Option (Item 0005) 30,385.00$ 453,681.00$ 190,920.00$ 18,059.00$ 325,960.00$ 104,581.00$
1,385,995.00$ 2,112,360.00$ 1,116,246.00$ 714,422.00$ 2,265,869.00$ 2,092,769.00$
20%
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
3 3
UEI: PU22G63NDZG8 UEI: WLK5TSBNBJF3
Cage Code: 440F1 Cage Code: 50A25
B. BID SECURITY (Type & Amount) B. BID SECURITY (Type & Amount)
8465 Rausch Drive 1507 Tara Street
Plain City, OH 43064 Kelso, WA 98626
NO. 4 NO. 5
A. OFFEROR A. OFFEROR
Tradesmen Group, LLC Tri Coast Construction
C. AMENDMENTS ACKNOWLEDGED
UEI: SEGBEAE2A2F5
Cage Code: 9X2X8
B. BID SECURITY (Type & Amount)
20%
NO. 3
A. OFFEROR
AOD RBT Roofing JV
8619 W. 7th Street
Texarkana, TX 75501Warner Robins, GA 31093
Denny Porta -
UEI: KFZNENWUHQW5
(Without Profit)
B. REASONABLE CONTRACT
UEI: SNSMZZH8J8D9
Cage Code: 8QY21CC: 527K2
20%
C. AMENDMENTS ACKNOWLEDGED
Fort Peck Montana
Fort Peck Surge Tank Roof Replacement
3 (Including Profit)
Berthoud, CO 80513
B. BID SECURITY (Type & Amount)B. BID SECURITY (Type & Amount)
20%
C. AMENDMENTS ACKNOWLEDGED
A. HIRED LABOR
GOVERNMENT ESTIMATE Blue Frog Roofing, LimitedA-Vet Roofing
56 Green Street
A. OFFEROR A. OFFEROR
405 Mountain View Road, Ste A.
9. OFFERS
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
l PAGES
TO THIS SOLICITATION
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
DANIEL D. MONAHAN, CONTRACTING OFFICER
I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE
ABSTRACT OF OFFERS - Construction
1. SOLICITATION NUMBER
W9128F25BA002
4. ISSUING OFFICE
NO. 1 NO. 2(Check A, B or C AND COMPLETE D, E AND F)
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE
Total of Base Price and Option CLIN (Item 0001 thru 0005)
6. NUMBER OF AMENDMENTS ISSUED
| 2025-07-22T15:21:16-0500 | |
| MONAHAN.DANIEL.D.1011397812 |