This document is a Draft Bid Schedule for the Fort Peck PH1 Surge Tank Roof Replacement project, detailing five Contract Line Item Numbers (CLINs) for a roof restoration effort. The base items include mobilization and demobilization (CLIN 0001), demolition of the existing powerhouse roof assembly (CLIN 0002), furnishing and installing a new powerhouse roof assembly (CLIN 0003), and preparing as-built corrections to contract drawings (CLIN 0004). An optional item (CLIN 0005) allows for an alternative roof assembly fastening method if required. The bid schedule specifies that prices must be entered for all base items, with total amounts submitted without individual item prices being subject to rejection. The document includes notes about pricing modifications and emphasizes that the option CLIN will not affect base bid evaluation unless exercised by the government.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FP00103
CLIN Description Quantity Unit
Measure Amount
0001 Mobilization and Demobilization 1 Job $______________
0002 Demolition of Existing Powerhouse Roof Assembly 1 Job $______________
0003 Furnish and Install New Powerhouse Roof Assembly 1 Job $______________
0004 Prepare and Furnish As-built Corrections to Contract Drawings 1 Job $______________
OPTION
ITEM
0005 Alternative Roof Assembly Fastening Method (if required) 1 Job $______________
NOTES:
FP PH1 Surge Tank Roof Replacement
SECTION 00 10 00 BID SCHEDULE
Prices must be entered for all base items (CLINs 0001 through 0004) of the schedule. Total amounts submitted without prices being entered on individual base items will be rejected. Prices for the Option CLIN (0005) should be provided but will not affect the base bid evaluation unless exercised by the Government.
A modification to a proposal that provides for a single adjustment to the total amount submitted should state the application of the adjustment to each respective lump sum price affected. If the modification is not apportioned accordingly, the single adjustment will be applied proportionally to Item Nos. 0001 through 0005 (base and option items).
BASE ITEMS
TOTAL BASE (Items 0001 thru 0004)DRAFT